MATERIAL REQUISITION FOR PIPELINE

VALVES
Document No: PD70XX-PL-MR-A4-02

Page 1 of 10
Rev.: 0

Project No.: PD70XX

PROJECT NAME

: PALANPUR TO PALI SECTION OF MBPL

COUNTRY

: INDIA

CUSTOMER

: GSPL INDIA GASNET LTD. (GIGL)

PURCHASER

: PUNJ LLOYD LIMITED

MR TITLE

: MR FOR PIPELINE VALVES

23.06.2016

ISSUED FOR REVIEW

JIS

SNM

Rev.
No.

Date

Description

Prepared
by

Checked
by

SNM

STI

LE
PEM
Approved by

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 2 of 10
Rev.: 0

Project No.: PD70XX

TABLE OF CONTENT
1.
Introduction
2.
General Notes
3.
Scope of Supply
4.
List of Applicable Documents
5.
Sample Formats (To be filled by the Supplier)
5.1.
Unfilled Technical Schedules / Datasheets
5.2
List of Special Tools and Tackles (To be filled by Vendor)
5.3
List of Initial Spares for Start up and commissioning (To be filled
by Vendor) 8
5.4
List of Operational Spare for two years (To be filled by Vendor)
5.5
List of Capital Spares (To be filled by Vendor)
5.6
List of Deviations, if any (To be Filled by Vendor)
5.7
List of Consumable for 1st fill Consumable / lubricants (To be
Filled by Vendor)
5.8
Utility Consumption (To be filled by Vendor)

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 3 of 10
Rev.: 0

Project No.: PD70XX

1. Introduction
M/s Punj Lloyd Ltd. Company is currently bidding for EPC of Project- PALANPUR
TO PALI SECTION OF MEHSANA-BHATINDA GAS PIPELINE (MBPL) PROJECT
(PHASE-1).
M/s GSPL India Gasnet Limited (GIGL) has planned to implement an approx. 1637
km long natural gas pipeline network project that includes 838 km long mainline for
transportation & distribution of natural gas from Palanpur (Gujarat) to Bhatinda (Punjab)
and spur lines of various sizes (approx. 799 km long) are envisaged to cater industrial
and localized demand.
The pipeline en route shall be connected with Spur lines for supply of natural gas at
various locations of Gujarat, Rajasthan, Haryana and Punjab state. This pipeline would
receive natural gas from GSPCs existing gas pipeline at Palanpur or through
interconnectivity from other sources.
The proposed pipeline under Mehsana Bhatinda Pipeline Project (Phase-1) from
Palanpur, Gujarat to Lunawa, Pali (Rajasthan), shall comprise of mainline section
of 30 OD of approx. 160 km.
Under Phase-1, the pipelines and associated facilities have been indicated above. The
project under Phase-1 broadly covers the following key installation:

The trunk pipeline (natural gas) from SV location at Palanpur (Gujarat) to


Lunawa, Pali (Rajasthan) comprising of 30 inch, 159.065Kms,
(Gujarat) Lunawa, to Pali (Rajasthan).

Palanpur

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 4 of 10
Rev.: 0

Project No.: PD70XX

2. General Notes
2.1. This Material Requisition is issued for obtaining suppliers budgetary quotation for the
following:
MANUFACTURING, INSPECTION, TESTING AND SUPPLY OF PIPELINE BALL
VALVES (GOV/HOV) FOR GAS PIPELINE AS MENTIONED IN SCOPE OF SUPPLY
SECTION 3

2.2. Design, materials, manufacturing, examination, testing, inspection and documentation


shall conform to the applicable project documents, codes and standards listed in
Section 4.0 (List of Applicable Documents).
2.3. Where no code or standard is specified in the project specifications and other reference
documents, the supplier shall propose applicable codes and / or standards on
which the supplier's design and manufacturing is based, for review and approval
by the purchaser
2.4.

In case of any conflict between these documents, the supplier shall notify the
purchaser and obtain a written clarification of the points in question. The
decision of the purchaser shall be final.

2.5. Supplier shall separate price list for any special tools and tackles, which are
recommended for regular operation and maintenance
2.6. Supplier shall separate price list for the commissioning spares, which are recommended
for the purpose of commissioning.
2.7. The scope of supply should be in full compliance with all the requirements stated in this
requisition. No deviation from and / or alternative to this requisition shall be
permitted, except for those deviations and / or alternatives listed in the suppliers
quotation and accepted in writing by the purchaser.
2.8. If the Supplier intends any deviation from and / or alternative to this requisition, the
Supplier shall submit a deviation and / or alternative list giving detailed
comparison between the project requirements and the suppliers
recommendations.
2.9. Supplier shall be responsible for any discrepancies, errors or omissions in the
drawings / documents prepared by supplier, even if these have been approved /
reviewed by the purchaser. Review of suppliers documents by Purchaser does
not relieve the supplier of his responsibility for correctness of design and supply.
If any such errors or omissions are discovered later, the same shall be made
good, by Supplier, at his sole expense.
2.10.

All documents, drawings, manuals, reports and written instructions shall be in


the English language. Metric System units shall be used, unless otherwise
specified.

2.11.

The Supplier shall carry out pre-shipment protection and preservation of


equipment and materials as per suppliers standard, unless otherwise specified.

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 5 of 10
Rev.: 0

Project No.: PD70XX

2.12.

Supplier shall clearly describe how the equipment and materials are to be
transported and shall submit a preliminary shipping / packing list indicating
number and estimated size of package.

2.13.

Documents to be submitted along with offer

Equipment GA along with weight and dimension


Technical Schedule/ Data Sheet Vendor to essentially submit with offer.
Utility consumption figure (air, water, nitrogen etc)
Package control system philosophy as applicable
Compliance to specification and in case of any deviation , it shall be listed
clearly
(PLEASE LIST THE DOCUMENTS AS PER ITEM TO BE PROCURED)

2.14.

Additional comments on specification If any

3. Scope of Supply

Sl.
No.

Quantity
(Nos.)

Tag no.

Description
Design, Manufacture, Inspection, testing
and Supply of Full Bore Ball Valves for
Gas pipeline in accordance with
documents listed at SNo. 4 of this material
requisition.

1.

SV 4001
SV 4002
SV 4003
SV 4004
SV 4005

2.

GOV 1113
GOV 1202

3.

HOV - 1112

30 Inch Ball Valve, Class 600# Full Bore,


Both Ends Welded, 250mm long Pups, Gas
Over Oil
Actuated Valve with stem
extension, Under ground Installation, PMS
Class : X70, Connecting Pipeline Material /
Thickness- API 5L Gr. X 70 PSL-2 / 15.5
mm.
30 Inch Ball Valve, Class 600# Full Bore,
Both Ends Welded, 250mm long Pups, Gas
Over Oil Actuated Valve, Above ground
Installation, PMS Class : D1A, Connecting
Pipeline Material / Thickness- API 5L Gr. X
52 PSL-2 / 23.8 mm.
30 Inch Ball Valve, Class 600# Full Bore,
Both Ends Welded, 250mm long Pups,
Manually Operated Hydraulically Actuated
Valve, Above ground Installation, PMS Class
: D1A, Connecting Pipeline Material /
Thickness- API 5L Gr. X 52 PSL-2 / 23.8
mm.

Price

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

HOV 1114
HOV 1201

4.

5.

6.

Rev.: 0

Project No.: PD70XX

30 Inch Ball Valve, Class 600# Full Bore,


Both Ends Welded, 250mm long Pups,
Manually Operated Hydraulically Actuated
Valve, Above ground Installation, PMS Class
: X70, Connecting Pipeline Material /
Thickness- API 5L Gr. X 70 PSL-2 / 15.5
mm.
30 Inch Ball Valve, Class 600# Full Bore,
Both Ends Welded, 250mm long Pups,
Manually Gear Operated with future provision
for Gas Over Oil Actuator, Above ground
Installation, PMS Class : D1A, Connecting
Pipeline Material / Thickness- API 5L Gr. X
52 PSL-2 / 23.8 mm.
18 Inch Ball Valve, Class 600# Full Bore,
Both Ends Welded, 250mm long Pups,
Manually Gear Operated with future provision
for Gas Over Oil Actuator, Above ground
Installation, PMS Class : D1A, Connecting
Pipeline Material / Thickness- API 5L Gr. X
52 PSL-2 / 15.9 mm.

MANDATORY SPARES

7.

Page 6 of 10

30 Inch Ball Valve, Class 600# Full Bore,


Both Ends Welded, 250mm long Pups, Gas
Over Oil
Actuated Valve with stem
extension, Under ground Installation, PMS
Class : X70, Connecting Pipeline Material /
Thickness- API 5L Gr. X 70 PSL-2 / 15.5
mm.

8.

1 LOT

Documentation

9.

1 LOT

Preservation, Packing and transportation

10.

1 LOT

11.

1LOT

Special tools and tackles for installation


and commissioning ( provide the separate
itemized price list), if any
Day rate for supervision during installation,
commissioning, testing, etc. (please also
indicate no of days required and the
facility such as equipment and man-power
to be provided by purchaser)

12.

1LOT

13.

1LOT

14.

1LOT

15.

1 LOT

Spares for startup and Commissioning


with separate itemized price list
Spare for 2 year of operation with separate
itemized price list
Capital Spare with itemized price list
Consumable / lubricants to be required
during installation and commissioning
with itemized price list

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02
16.

1 LOT

17.

1 LOT

Page 7 of 10
Rev.: 0

Project No.: PD70XX

Consumable / lubricants to be required for


1st fill.
Training requirement, please provide the
number of day and per day rate.

Note:
1. Please ensure that the commercial price shall be submitted as per break up
provided above, in case of any item not applicable shall be clearly marked as NA.
4. List of Applicable Documents
Sl.
No.

Description

Document
number

Rev.

IOCL-MECH-BVAPI6D-LPG/NG46A

2. Technical Specification Gas Over Oil Actuator

IOCL-INST-SPECGOOA

3. Technical Specification Hydraulic Oil Actuator

IOCL-INST-SPECHOA

4. Technical Specifications for Positive Material


Identification (PMI) at Suppliers Works

IOCL-MECH-PMI

5. Technical Specification API 5L Mainline Pipe


(HSAW)

IOCL-MECHPIPE-HSAW-ML021D

6. Technical Specification API 5L Mainline Pipe


(LSAW)

IOCL-MECHPIPE-LSAW-ML021C

IOCL-MECH-QAPAPI6 DBV

8. Quality Assurance Plan For Gas Over Oil


Acutator

IOCL-INST-QAPGOOA

9. Quality Assurance Plan for Hydraulic Actuator

IOCL-INST-QAPHOA

1. Technical Specification API 6D Ball Valves

7. Quality Assurance Plan for API 6D Ball Valve

10. Process Datasheet for (Sectionalising ValveMainline)

1
IOCL-MBPL-0103-4504

11. Process Datasheet for (Actuated Valve)

1
IOCL-MBPL-0103-4506

12. Data Sheet Isolation Valves

IOCL-MBPL-01-

Page 8 of 10

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Rev.: 0

Project No.: PD70XX


04-2305

13. Instrument Data Sheet (Gas Over Oil Actuator)

9200-11000-IDS1301A

14. Instrument Data Sheet (Hydraulic Oil Actuator)

9200-11000-IDS1302A

15. Instrument Data Sheet (Differential Pressure


Switch)

9200-11000-IDS1203A

16. Pipeline Engineering Design Basis

IOCL-MBPL-0102-2000

9200-111000-302452-00

17. Typical details of GOOA & HOA valve

5. Sample Formats (To be filled by the Supplier)


5.1. Unfilled Technical Schedules / Datasheets

Vendor to essentially submit duly filled schedules / datasheet of equipment along with
offer.
5.2
Sl.
No.

List of Special Tools and Tackles (To be filled by Vendor)


Description

Qty
(nos.)

Part number

Unit
Price

Total
Price

5.3 List of Initial Spares for Start up and commissioning (To be filled
by Vendor)
Qty (nos.)
Sl.
No.

Description

Part
number

Per
Eqpt. /
Item

Recomm
ended

Delivery
(in
Weeks)

Unit
Price

Total
Price

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 9 of 10
Rev.: 0

Project No.: PD70XX

5.4 List of Operational Spare for two years (To be filled by Vendor)
Qty (nos.)
Sl.
No.

Description

Part
number

Per
Eqpt. /
Item

Recomm
ended

Delivery
(in
Weeks)

Unit
Price

Total
Price

Delivery
(in
Weeks)

Unit
Price

Total
Price

5.5 List of Capital Spares (To be filled by Vendor)


Qty (nos.)
Sl.
No.

Description

Part
number

Per
Eqpt. /
Item

Recomm
ended

5.6 List of Deviations, if any (To be Filled by Vendor)


Sl.
No.

Spec. No.
and
Para No.

Project Specification
Requirement

Proposed Deviation

Reason

5.7 List of Consumable for 1st fill Consumable / lubricants (To be


Filled by Vendor)
Qty (nos.)
Sl.
No.

Description

Part
number

Per
Eqpt. /
Item

Recommended

Unit
Price

Total
Price

MATERIAL REQUISITION FOR PIPELINE


VALVES
Document No: PD70XX-PL-MR-A4-02

Page 10 of 10
Rev.: 0

Project No.: PD70XX

5.8 Utility Consumption (To be filled by Vendor)


Sl. No.

Utilities

1.

Instrument Air

2.

Plant Air

3.

Water

4.

Power

Qty

(Vendor is requested to add, if any other Utilities are envisaged)

Unit