VALVES
Document No: PD70XX-PL-MR-A4-02
Page 1 of 10
Rev.: 0
PROJECT NAME
COUNTRY
: INDIA
CUSTOMER
PURCHASER
MR TITLE
23.06.2016
JIS
SNM
Rev.
No.
Date
Description
Prepared
by
Checked
by
SNM
STI
LE
PEM
Approved by
Page 2 of 10
Rev.: 0
TABLE OF CONTENT
1.
Introduction
2.
General Notes
3.
Scope of Supply
4.
List of Applicable Documents
5.
Sample Formats (To be filled by the Supplier)
5.1.
Unfilled Technical Schedules / Datasheets
5.2
List of Special Tools and Tackles (To be filled by Vendor)
5.3
List of Initial Spares for Start up and commissioning (To be filled
by Vendor) 8
5.4
List of Operational Spare for two years (To be filled by Vendor)
5.5
List of Capital Spares (To be filled by Vendor)
5.6
List of Deviations, if any (To be Filled by Vendor)
5.7
List of Consumable for 1st fill Consumable / lubricants (To be
Filled by Vendor)
5.8
Utility Consumption (To be filled by Vendor)
Page 3 of 10
Rev.: 0
1. Introduction
M/s Punj Lloyd Ltd. Company is currently bidding for EPC of Project- PALANPUR
TO PALI SECTION OF MEHSANA-BHATINDA GAS PIPELINE (MBPL) PROJECT
(PHASE-1).
M/s GSPL India Gasnet Limited (GIGL) has planned to implement an approx. 1637
km long natural gas pipeline network project that includes 838 km long mainline for
transportation & distribution of natural gas from Palanpur (Gujarat) to Bhatinda (Punjab)
and spur lines of various sizes (approx. 799 km long) are envisaged to cater industrial
and localized demand.
The pipeline en route shall be connected with Spur lines for supply of natural gas at
various locations of Gujarat, Rajasthan, Haryana and Punjab state. This pipeline would
receive natural gas from GSPCs existing gas pipeline at Palanpur or through
interconnectivity from other sources.
The proposed pipeline under Mehsana Bhatinda Pipeline Project (Phase-1) from
Palanpur, Gujarat to Lunawa, Pali (Rajasthan), shall comprise of mainline section
of 30 OD of approx. 160 km.
Under Phase-1, the pipelines and associated facilities have been indicated above. The
project under Phase-1 broadly covers the following key installation:
Palanpur
Page 4 of 10
Rev.: 0
2. General Notes
2.1. This Material Requisition is issued for obtaining suppliers budgetary quotation for the
following:
MANUFACTURING, INSPECTION, TESTING AND SUPPLY OF PIPELINE BALL
VALVES (GOV/HOV) FOR GAS PIPELINE AS MENTIONED IN SCOPE OF SUPPLY
SECTION 3
In case of any conflict between these documents, the supplier shall notify the
purchaser and obtain a written clarification of the points in question. The
decision of the purchaser shall be final.
2.5. Supplier shall separate price list for any special tools and tackles, which are
recommended for regular operation and maintenance
2.6. Supplier shall separate price list for the commissioning spares, which are recommended
for the purpose of commissioning.
2.7. The scope of supply should be in full compliance with all the requirements stated in this
requisition. No deviation from and / or alternative to this requisition shall be
permitted, except for those deviations and / or alternatives listed in the suppliers
quotation and accepted in writing by the purchaser.
2.8. If the Supplier intends any deviation from and / or alternative to this requisition, the
Supplier shall submit a deviation and / or alternative list giving detailed
comparison between the project requirements and the suppliers
recommendations.
2.9. Supplier shall be responsible for any discrepancies, errors or omissions in the
drawings / documents prepared by supplier, even if these have been approved /
reviewed by the purchaser. Review of suppliers documents by Purchaser does
not relieve the supplier of his responsibility for correctness of design and supply.
If any such errors or omissions are discovered later, the same shall be made
good, by Supplier, at his sole expense.
2.10.
2.11.
Page 5 of 10
Rev.: 0
2.12.
Supplier shall clearly describe how the equipment and materials are to be
transported and shall submit a preliminary shipping / packing list indicating
number and estimated size of package.
2.13.
2.14.
3. Scope of Supply
Sl.
No.
Quantity
(Nos.)
Tag no.
Description
Design, Manufacture, Inspection, testing
and Supply of Full Bore Ball Valves for
Gas pipeline in accordance with
documents listed at SNo. 4 of this material
requisition.
1.
SV 4001
SV 4002
SV 4003
SV 4004
SV 4005
2.
GOV 1113
GOV 1202
3.
HOV - 1112
Price
HOV 1114
HOV 1201
4.
5.
6.
Rev.: 0
MANDATORY SPARES
7.
Page 6 of 10
8.
1 LOT
Documentation
9.
1 LOT
10.
1 LOT
11.
1LOT
12.
1LOT
13.
1LOT
14.
1LOT
15.
1 LOT
1 LOT
17.
1 LOT
Page 7 of 10
Rev.: 0
Note:
1. Please ensure that the commercial price shall be submitted as per break up
provided above, in case of any item not applicable shall be clearly marked as NA.
4. List of Applicable Documents
Sl.
No.
Description
Document
number
Rev.
IOCL-MECH-BVAPI6D-LPG/NG46A
IOCL-INST-SPECGOOA
IOCL-INST-SPECHOA
IOCL-MECH-PMI
IOCL-MECHPIPE-HSAW-ML021D
IOCL-MECHPIPE-LSAW-ML021C
IOCL-MECH-QAPAPI6 DBV
IOCL-INST-QAPGOOA
IOCL-INST-QAPHOA
1
IOCL-MBPL-0103-4504
1
IOCL-MBPL-0103-4506
IOCL-MBPL-01-
Page 8 of 10
Rev.: 0
9200-11000-IDS1301A
9200-11000-IDS1302A
9200-11000-IDS1203A
IOCL-MBPL-0102-2000
9200-111000-302452-00
Vendor to essentially submit duly filled schedules / datasheet of equipment along with
offer.
5.2
Sl.
No.
Qty
(nos.)
Part number
Unit
Price
Total
Price
5.3 List of Initial Spares for Start up and commissioning (To be filled
by Vendor)
Qty (nos.)
Sl.
No.
Description
Part
number
Per
Eqpt. /
Item
Recomm
ended
Delivery
(in
Weeks)
Unit
Price
Total
Price
Page 9 of 10
Rev.: 0
5.4 List of Operational Spare for two years (To be filled by Vendor)
Qty (nos.)
Sl.
No.
Description
Part
number
Per
Eqpt. /
Item
Recomm
ended
Delivery
(in
Weeks)
Unit
Price
Total
Price
Delivery
(in
Weeks)
Unit
Price
Total
Price
Description
Part
number
Per
Eqpt. /
Item
Recomm
ended
Spec. No.
and
Para No.
Project Specification
Requirement
Proposed Deviation
Reason
Description
Part
number
Per
Eqpt. /
Item
Recommended
Unit
Price
Total
Price
Page 10 of 10
Rev.: 0
Utilities
1.
Instrument Air
2.
Plant Air
3.
Water
4.
Power
Qty
Unit