NNPC INTERNAL MEMORANDUM REFINERIES DAILY SITUATION REPORT Date: 18% November, 2014 % Throughput (Crude stock MP/Suff. (days) @ 60% throughput UB + ESCRAVOS 180,787m?/15.1 days @ 60% throughput) KRPC (mix of water + crude} — 10,305m3(1.8 days @ 60% throughput) SEPLAT = Om? ISSUES: KRPC: FCCU: Shutdown. CDU: Shutdown due to low stock of crude oil. NHU: Shutdown, VDU: Shutdown. CRU: Shutdown. VDU2: Shutdown. GCU: Shutdown. PPU: Boiler 01 02, 03 & TGO4 in service. LAB PLANT: Preservation activities ongoing. MOLEX - Shutdown. Line 2C: Escravos crude oil supply suspended @ 17:40hrs of 13/11/2014 due to low stock @ WRPC. WRPC: FCCU: Shutdown. VRU: Shutdown. CO Boiler: Dry-out is in progress. CDU/VDU/GP: Maintenance work on the Vacuum Heater, 15-H-01 and the Vacuum Column 15C01 in progress. NHU/CRU: Catalyst regeneration completed. Unit preparation i/p. PPU: PC No Plant: In service. PIPELINES/NPDC UB Crude receipt - Shutdown. Eseravos Light Crude receipt - Shutdown. System 2A - Shutdown. System 2C (KRPC) ~ Shutdown. JETTY: MT CRETE is at Jetty for discharge of E/light Crude oil; Crude oil discharge awaits Charterer’s instruction. PHRC: FCCU: Shutdown, CDU: Shutdown, VDU: Shutdown. CRU/CCR/NHU: Shutdown, PPU: GEL utility services supplying power to PHRC. GTO1 in service @ 4.00MW. Crude Receipt: Nil, Jetty: A/O - Empty. A/INNER: Empty. Jetty B/O: MT. BREEZE * discharging 29,00MT of imported PMS into ref tankage. Pipelines: 2E - Shutdown 2EX - Shutdown, 2 dl ue) os ll T fengt. George C. Kalu ce: GED (R&P), MDs (PHRC, KRPC & WRPC), STA-GMD, MD (PPMC), GGM ETD, GGM COMD, MGR TAM & Projects, Mgr. Rehab, TAs-GED(R&P).

Das könnte Ihnen auch gefallen