Sie sind auf Seite 1von 476

Author - Pankaj Sharma

Connoisseur Solutions

Process Framework

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Definition of Project
Definition as per PMBOK Guide
A project is a temporary endeavor undertaken to
create a unique product or service.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Definition

A temporary endeavor means that every project has a definite


beginning and end.

Unique means that the product or service or result is different from


other product or service or result.

Progressively elaborated - proceeding in steps

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Examples of Project

Building a Software
A Major Enhancement to the software
Filming a Motion Picture
Building a new office
Designing a new product or service
Creating an advertisement campaign
Creating a new process with a business unit
Moving from one building to another
Designing a space vehicle

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project vs Operation

PROJECTS

OPERATIONS

Temporary

Ongoing

Unique

Repetitive

Closes after attaining the objectives

Objective is to sustain business

Prototyping the new car model

Assembly line production

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Constraints

Risk

Scope

Budget

Scope

Cost
Quality

Resources

Quality

Schedule

PM Triangle

Schedule

Source: A Guide to the Project Management Body of Knowledge, Fourth Edition (PMBOK Guide) 2008 Project
Management Institute, Inc. All Rights Reserved.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Why Projects Fail ?

Lack of clearly defined purpose


Inexperienced project Managers
Poor estimation of duration and cost
Cultural and ethical misalignment
Poor requirements and scope management
Lack of coordination of resources and activities
Poor communication
Inadequate planning of scope, schedule, resources, cost, risk and
quality
Lack of progress and quality control

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

What Is Project Management ?


Project management is the application of knowledge, skills, tools
and techniques to project activities to meet the project requirements
- PMBOK Guide 4th edition (Glossary)

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Project Management Benefits

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Management Process Groups

Process Groups
Project management processes have been bundled into 5 groups and these
groups are called project management process groups
Initiating
Planning
Executing
Monitoring and controlling
Closing
These process groups are common to most of the projects across various
domains construction, technology, IT, life sciences etc.
Process groups are different than the Phases
Process groups may overlap / repeat based on the activities in the project

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Initiating Process Group

Processes within this group launches the project or a project phase


Key activities associated with Initiation includes:
Identifying business needs
Creating a feasibility study
Creating a Product description
Creating Detailed Business Case
Creating a Project Charter
Selecting a Project Manager

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Planning Process Group

It involves creation of Project Management Plan that acts as a


roadmap for project execution
Key activities would include:

Collect Requirements
Define Scope
Create Work Breakdown Structure
Define and Sequence Activities
Estimate Activity Resource Requirement and Duration
Creating Schedule
Estimate Cost and Determine Budget
Planning Human Resource, Quality, Communications
Identify, Analyze and Prepare Risk Response Plan
Planning Procurement
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Executing Process Group

Executing process group consists of processes to complete the work in


each of the phases
Helps the PM coordinate and direct project resources to meet the
objectives of the project plan
Key activities would include:
Direct and manage project execution
Acquire project team
Perform quality assurance
Manage Stakeholders Expectation
Distributing project information
Develop and Manage project team
Conduct Procurement

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Monitoring and Controlling Process Group

Controlling processes are the activities that


ensure that the project goes according to plan
the actions to implement when project is not going as per the plan
Variances from the project baselines are identified and necessary
corrective measures are undertaken
Key activities would include:
Ensuring Quality Control
Providing scope verification
Implementing change control
Configuration management
Controlling key parameters like cost, schedule and scope
Monitor and Control Risks

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Closing Process Group

This process group includes all processes to close all activities in a


project or project phase
Closing activities to be performed even for the aborted / terminated
projects
Key activities would include:
Auditing procurement documents
Scope verification
Closing vendor contracts
Closing administrative duties
Submitting final reports
Archiving project records
Celebrating!!!
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Process Group Interaction


Executing
Processes

Level

Planning
Processes

Of

Activity

Phase
Start

Initiating
Processes

Controlling Processes

Time

Pankaj Sharma, 9810996356

Closing
Processes

Phase
Finish

Author - Pankaj Sharma

Connoisseur Solutions

Project Life Cycle

Projects are divided into phases

The project will have at least a beginning, intermediate and ending phase

Number of phases depends on complexity and size of the project

Reviews are conducted at the end of each phase to measure performance

Phase end reviews allows to decide if the project should continue

The collection of phases is called project life cycle

The project life cycle defines the beginning and end of a project

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Characteristics of Project Phase


The completion of one or more deliverables marks the project phase
Deliverables are reviewed and formally accepted by customer at
phase end
Phase end reviews are also called phase exits, stage gates or kill
points
Rolling wave planning summarizes the future phases at high level

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Characteristic of Project Life Cycle

Source : PMI PMBOK Fifth Edition

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Management Knowledge Areas

There are 10 Knowledge Areas covered in PMBOK Guide 5th edition


These 10 Knowledge Areas are:
Project Integration management
Project Scope Management
Project Time Management
Project Cost Management
Project Quality Management
Project Human Resource Management
Project Communications Management
Project Risk Management
Project Procurement Management
Project Stakeholder Management
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Stakeholders

Individuals and organizations involved in the project


Those who will be directly or indirectly impacted
Stakeholders should be identified throughout the project
They may have a positive or negative influence on the outcome
Stakeholder influence goes down as the project progresses

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Project Stakeholders

Key stakeholders include: Project Manager


Customer / User
Performing organization
Project team members
Project management team
Sponsor
Influencers
PMO

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Project Manager Skill Set

Communication Skills
Organizational and Planning skills
Budgeting Skills
Conflict Management Skills
Negotiation and Influencing Skills
Leadership Skills
Team Building and Motivating skills

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project, Program & Portfolio Management

Programs

Collection of related projects


Controls are implemented and managed in a coordinated way
Collective benefits are realized
Each project has a project manager

Portfolios

Collection of programs and projects


Projects meet a specific business goal or objective
Includes weighing the value of each project against the portfolios
strategic objective

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Management Office (PMO)

Project Management Office [PMO]

Centralized units to oversee project and programs within the organization


Establishes and maintains the standards of project management
methodologies
Support managers in planning, estimating, risk management and provide
trainings

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type - PM Influence

Pankaj
Sharma,Fifth
9810996356
Source: A Guide to the Project Management Body
of Knowledge,
Edition.

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Functional Organization

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Weak Matrix

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Balanced Matrix

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Strong Matrix

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Projectized

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Type Composite

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Organization Types Advantages & Disadvantages

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Process Framework

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

PM Knowledge Area Process Mapping

Source: A Guide to the Project Management Body of Knowledge, Fifth Edition

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Integration Management

Author - Pankaj Sharma

Connoisseur Solutions

Project Integration Management


Processes and activities needed to identify, define, combine, unify,
and coordinate the various processes and project management
activities within the Project Management Process Groups

Author - Pankaj Sharma

Connoisseur Solutions

Project Integration Management

Develop Project Charterthe process of developing a document that formally


authorizes a project or a phase and documenting initial requirements that satisfy the
stakeholders needs and expectations.

Develop Project Management Planthe process of documenting the actions


necessary to define, prepare, integrate, and coordinate all subsidiary plans.

Direct and Manage Project Workthe process of performing the work defined in the
project management plan to achieve the projects objectives.

Monitor and Control Project Workthe process of tracking, reviewing, and


regulating the progress to meet the performance objectives defined in the project
management plan.

Perform Integrated Change Controlthe process of reviewing all change requests,


approving changes, and managing changes to the deliverables, organizational process
assets, project documents, and the project management plan.

Close Project or Phasethe process of finalizing all activities across all of the Project
Management Process Groups to formally complete the project or phase.

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Charter

Inputs

Tools and Techniques

Outputs

Project statement of work

Expert Judgment

Project Charter

Business case

Facilitation Techniques

Agreements
Enterprise environmental
factors
Organizational Process
Assets

Author - Pankaj Sharma

Connoisseur Solutions

Project Charter

Project Title and Description


Measurable project objectives and related success criteria,
High-level requirements
Assumptions and Constraints
High level project descriptions and boundaries
High Level Risks
Summary milestone schedule
Summary budget
Stakeholder list
Project Approval Requirements( i.e. What constitutes the project
success, who decide that the project is successful, and who signs off
the project)
Project Manager Assigned and Authority Level (Who is given authority
to lead the project, and can he / she determine, manage and approve
changes to budget, schedule, staffing, etc.?)
Name and Authority of the sponsor or other persons authorizing the
project charter.

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods


Numeric Methods

Benefit Measurement Model (also called Comparative


approach )

Payback Period

Cost Benefit Analysis

Scoring Models

Net Present Value (NPV)

Internal Rate of Return (IRR)

Mathematical Models (also called Constrained Optimization)

Use linear, dynamic, non-linear, multi-objective programming


to solve problem

Author - Pankaj Sharma

Project Selection Methods


Non Numeric Method
Sacred cow
Operating necessity
Murder Board

Competitive necessity

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods

Payback period the amount of time to recover your cost. It


compares the initial investment to the cash inflows expected over
the life of the product.

For example, Initial investment on a project is Rs. 4,00,000,


Expected cash inflows: Rs. 50,000 per quarter for first two
years, Rs. 100,000 per quarter thereafter.
What is the payback period?
Cash inflows = Rs. 50,000 x 4 (quarters in a year) = Rs. 2,
00,000 per year for first two years. Hence, year 1 inflow = Rs. 2,
00,000, year 2 inflow = Rs. 2, 00,000. Total Rs. 4, 00,000 in 2
years
So payback is reached in 2 years.

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods

Benefit Cost Ratio (BCR) or profitability Index . This is the ratio of project benefit
and the project cost.
BCR = Revenue / Cost
Select the project with a higher BCR

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods

Present Value (PV) is the expected future cash flows expressed in


todays monetary value
PV = FV / (1+r)

For example, Calculate the Present Value of $ 100,000


received three years from now. The interest rate is 10
percent.
PV = 100000 / (1+10/100)3 = $ 75,131

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods

Net Present value (NPV) is the sum total of the Present Value of
Cash Inflows Cash Outflows
TIME PERIOD

INCOME/REVENUE

PRESENT VALUE AT
10% INT RATE

COSTS

PRESENT VALUE AT
10% INT RATE

200

200

50

45

100

91

100

83

300

225

TOTAL

NPV of the Project is 353-291 = 62


Select the project with higher NPV

353

291

Author - Pankaj Sharma

Connoisseur Solutions

Project Selection Methods

Internal Rate of Return (IRR): The rate of interest at which the revenues and
costs are equal.
Select the project with a higher IRR.

Return On Investment (ROI) A return ratio that compares the net benefits of
a project/ product, verses its total cost.
ROI = Operating Income / Investments

Author - Pankaj Sharma

Connoisseur Solutions

Item
Criteria

Weight

Scoring Model Weighted Criteria (example, using


scale of 1-5)

Project A

4
Good ROI

12

20

Our Winner!!
(hmmmm)

25

16

4
Match New
Initiatives of
Competition

9
5

15

5
Provide
Better
Service

10

Project C

15

2
CEO Likes It

Project B

12

12

15

Total:

54

Total:

58

Total:

57

Total:

Total:

Author - Pankaj Sharma

Connoisseur Solutions

Sacred Cows and Pressing Needs

Sacred Cow selectionSenior Management wants it!


(it may often turn out well; many visionary projects
start here)
Business opportunity (make more $$$)
Savings potential (save $$$)
Keeping up with competition (example, many ecommerce projects were in response to competitors
initiatives)
Risk management (examples: disaster recovery
initiatives, Y2K)
Government or regulatory requirements

URGENT!

Author - Pankaj Sharma

Connoisseur Solutions

Murder Board
Murder Board" is a term often used for the team created to see if
they can push hard on a project plan to see where it will break.
This process is called by other names as well, depending on the
subject of the scrutiny and type of firm in which it is employed. For
a hard review of a proposal, it is usually called a "red team." Some
consulting firms call final briefing reviews "gauntlet drills."

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 1: Which Project Will You Select


Method

Project A

Project B

Which One?

Scoring Model

17

20

Payback Period

24 Months

25 months

Benefit Cost Ratio

3.5

4.5

Net Present Value


(NPV)

95,000

80,000

9.5%

11.5%

IRR

Author - Pankaj Sharma

Connoisseur Solutions

Project Management Plan


The project management plan defines how the
project is executed, monitored and controlled, and
closed. The project management plan content will
vary depending upon the application area and
complexity of the project.

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Management Plan

Inputs

Tools and Techniques

Outputs

Project Charter

Expert Judgment

Project
Management Plan

Outputs from other


Process

Facilitation techniques

Enterprise
environmental factor
Organizational
Process Assets

Author - Pankaj Sharma

Connoisseur Solutions

Components of Project Management Plan

Requirements Management Plan


Scope management plan
Schedule management plan
Cost management plan
Quality management plan
Process improvement plan
Human Resource management plan
Communication management plan
Risk management plan
Procurement management plan
Stakeholder management plan
Project baselines (include but not limited to scope, schedule and
cost baselines)

Author - Pankaj Sharma

Connoisseur Solutions

Components of Project Management Plan


The project management plan may also include the following.
Life cycle selected for the project and the processes that will be
applied to each phase
Details of the tailoring decisions specified by the project
management team as follows

Project management processes selected by the project management team


Level of implementation for each selected process
Description of the tools and techniques to be used for accomplishing those
processes and
Description of how the selected processes will be used to manage the specific
project, including the dependencies and interactions among those processes and
the essential inputs and outputs.

Description of how work will be executed to accomplish the


project objectives
Change management plan that documents how the changes will
be monitored and controlled
Configuration management plan that documents how the
configuration management will be performed

Author - Pankaj Sharma

Connoisseur Solutions

Components of Project Management Plan

Description of how the integrity of the project baselines will be


maintained

Requirements and techniques for communicating among


stakeholders

Key management reviews for the content, the extent of, and
timing to address, open issues and pending decisions

Author - Pankaj Sharma

Connoisseur Solutions

Direct and Manage Project Work


Direct and Manage Project Work is the process of performing
the work defined in the project management plan and
implementing approved changes to achieve the projects
objectives.

Author - Pankaj Sharma

Connoisseur Solutions

Activities in Direct and Manage Project Work


The activities include, but are not limited to:

Perform activities to accomplish project requirements;


Create project deliverables
Staff, train, and manage the team members assigned to the project

Obtain, manage, and use resources including materials, tools,


equipment, and facilities

Author - Pankaj Sharma

Connoisseur Solutions

Activities in Direct and Manage Project Work


The activities include, but are not limited to:
Establish and manage project communication channels, both external
and internal to the project team
Generate project data, such as cost, schedule, technical and quality
progress, and status to facilitate forecasting
Issue change requests and adapt approved changes into the projects
scope, plans, and environment
Manage risks and implement risk response activities
Collect and document lessons learned, and implement approved process
improvement activities

Author - Pankaj Sharma

Connoisseur Solutions

Direct and Manage Project WorkInputs

Tools and Techniques

Outputs

Project Management
Plan

Expert Judgment

Deliverables

Project Management
Information System

Work Performance
Data

Meetings

Change Requests

Approved Change
Requests
Enterprise
environmental factor
Organizational Process
Assets

Project
Management Plan
updates
Project Document
Updates

Author - Pankaj Sharma

Connoisseur Solutions

Monitor and Control Project Work


Monitor and Control Project Work is the process of tracking,
reviewing, and regulating the progress to meet the
performance objectives defined in the project management
plan.
Continuous monitoring gives the project management team
insight into the health of the project, and identifies any
areas that may require special attention. Control includes
determining corrective or preventive actions or re-planning
and following up on action plans to determine if the actions
taken resolved the performance issue.

Author - Pankaj Sharma

Connoisseur Solutions

Monitoring and Control Project Work


Inputs

Tools and Techniques

Project Management Plan

Expert Judgment

Change requests

Schedule Forecasts

Analytical techniques

Work Performance
Reports

Cost Forecasts

Project Management
Information Systems

Validated Changes
Work Performance
Information
Enterprise environmental
factors
Organizational Process
Assets

Meetings

Outputs

Project management
plan updates
Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Perform Integrated Change Control


Perform Integrated Change Control is the process of review
in all change requests, approving changes and managing
changes to the deliverables, organizational process assets,
project documents and the project management plan.
The Perform Integrated Change Control process is conducted
from project inception through completion. The project
management plan, the project scope statement, and other
deliverables are maintained by carefully and continuously
managing changes, either by rejecting changes or by
approving changes thereby assuring that only approved
changes are incorporated into a revised baseline.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Integrated Change Control


Inputs

Tools and Techniques

Project management Plan

Expert judgment

Work performance
reports

Meetings

Change requests

Enterprise environmental
factors
Organizational process
assets

Change control tools

Outputs
Approved change
requests
Change log
Project management
plan updates
Project documents
updates

Author - Pankaj Sharma

Connoisseur Solutions

Close Project or Phase


Close Project or Phase is the process of finalizing all
activities across all of the Project Management Process
Groups to formally complete the project or phase.
When closing the project, the project manager will review
all prior information from the previous phase closures to
ensure that all project work is complete and that the
project has met its objectives.

Author - Pankaj Sharma

Connoisseur Solutions

Close Project or Phase


Inputs
Project Management Plan

Tools and Techniques


Expert Judgment

Accepted Deliverables

Analytical techniques

Organizational Process
Assets

Meetings

Outputs
Final product, service,
or result transition
Organizational process
assets updates

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Integration Management


Revising Key Terms
1. The project management plan is the collection of
______ Plans
2. Work Culture and company policies are called
Enterprise__________ Factors
3. ___________ is a document that gives the
project manager authority over the team

Author - Pankaj Sharma

Connoisseur Solutions

Answer to Exercise 2: Integration Management


Revising Key Terms
1. The project management plan is the collection of
Subsidiary Plans
2. Work Culture and company policies are called Enterprise
Environmental Factors
3. Project Charter is a document that gives the project
manager authority over the team

Author - Pankaj Sharma

QUIZ !

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Scope Management

Author - Pankaj Sharma

Connoisseur Solutions

Project Scope Management


Project Scope Management includes the processes
required to ensure that the project includes all the
work required, and only the work required, to
complete the project successfully. Managing the
project scope is primarily concerned with defining
and controlling what is and is not included in the
project.

Author - Pankaj Sharma

Connoisseur Solutions

Why Manage Project Scope?

Some of the issues faced in projects


Project teams believe the additional work is a change request, but
the client insists it is part of the original scope
The project suddenly finds itself crunched for time. A number of
additional requirements are coming up along with the continuing
development work
The client talks about a high level vision which the project is
expected to achieve, but the stakeholders are either unable to
articulate this vision in concrete objectives and deliverables or
provide conflicting views
Contradicting requirements. Different interpretation of the same
statement by different people
Commitment made to the customer without understanding the
application portfolio

Author - Pankaj Sharma

Connoisseur Solutions

Project Scope Management


Project Scope Management includes the processes
required to ensure that the project includes all the
work required, and only the work required, to
complete the project successfully. Managing the
project scope is primarily concerned with defining
and controlling what is and is not included in the
project.

Author - Pankaj Sharma

Connoisseur Solutions

Project Scope Management

Plan Scope Management The process of creating a scope


management plan that documents how the project scope will be
defined , validated and controlled
Collect RequirementsThe process of defining and documenting
stakeholders needs to meet the project objectives
Define ScopeThe process of developing a detailed description of the
project and product
Create WBSThe process of subdividing project deliverables and
project work into smaller, more manageable components
Validate ScopeThe process of formalizing acceptance of the
completed project deliverables
Control ScopeThe process of monitoring the status of the project
and product scope and managing changes to the scope baseline

Author - Pankaj Sharma

Connoisseur Solutions

Plan Scope Management


Plan Scope Management is the process of creating a scope
management plan that documents how the project scope will
be defined , validated and controlled.
The key benefit of this process is that it provides guidance
and direction on how scope will be managed throughout the
project.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Scope Management

Inputs

Tools and Techniques

Outputs

Project Management Plan

Expert Judgment

Scope
Management Plan

Project Charter

Meetings

Enterprise environmental
factors
Organization process
assets

Requirements
Management Plan

Author - Pankaj Sharma

Connoisseur Solutions

Scope Management Plan


The scope management plan is a component of the project or
program management plan that describes how the scope will be
defined, developed, monitored, controlled, and verified. The scope
management plan is a major input into the Develop Project
Management Plan process, and the other scope management
processes.

Author - Pankaj Sharma

Connoisseur Solutions

Scope Management Plan


The components of a scope management plan include:
Process for preparing a detailed project scope statement
Process that enables the creation of the WBS from the detailed
project scope statement

Process that establishes how the WBS will be maintained and


approved
Process that specifies how formal acceptance of the completed
project deliverables will be obtained and

Process to control how requests for changes to the detailed project


scope statement will be processed.

Author - Pankaj Sharma

Connoisseur Solutions

Requirements Management Plan


The requirements management plan is a component of the project
management plan that describes how requirements will be analyzed,
documented, and managed.

Author - Pankaj Sharma

Connoisseur Solutions

Requirements Management Plan


Components of the requirements management plan can include, but
are not limited to:
How requirements activities will be planned, tracked, and reported;
Configuration management activities such as: how changes to the
product will be initiated, how impacts will be analyzed, how they will
be traced, tracked, and reported, as well as the authorization levels
required to approve these changes;
Requirements prioritization process;
Product metrics that will be used and the rationale for using them;
and
Traceability structure to reflect which requirement attributes will be
captured on the traceability matrix.

Author - Pankaj Sharma

Connoisseur Solutions

Collect Requirements
(Planning Process Group)

Collect Requirements is the process of defining and


documenting stakeholders need to meet the project
objectives
Many organizations categorize requirements into project
requirements and product requirements. Project
requirements can include business requirements, project
management requirements, delivery requirements, etc.
Product requirements can include information on technical
requirements, security requirements, performance
requirements etc.

Author - Pankaj Sharma

Connoisseur Solutions

Product Scope and Project Scope

Product Scope:

The features and functions in a product,


service, or result.

Project Scope:

The work that needs to be done in order


to deliver a product, service or result
with the specified features and
functions.

Author - Pankaj Sharma

Connoisseur Solutions

Collect Requirements

Inputs

Tools and Techniques

Outputs

Scope management plan

Interviews
Focus Groups
Facilitated Workshop
Group Creativity Techniques
Group Decision Making
Techniques
Questionnaires and surveys
Observations
Prototypes
Benchmarking
Context Diagrams
Document analysis

Requirements
Documentation

Requirements
management plan
Stakeholder management
plan
Project Charter
Stakeholder Register

Requirements
Traceability Matrix

Author - Pankaj Sharma

Connoisseur Solutions

Collect Requirements Requirement Traceability Matrix

Author - Pankaj Sharma

Connoisseur Solutions

Define Scope

Define Scope is the process of developing a detailed


description of the project and product. The preparation
of a detailed project scope statement is critical to project
success and builds upon the major deliverables,
assumptions, and constraints that are documented during
project initiation.

Author - Pankaj Sharma

Connoisseur Solutions

Define Scope -

Inputs

Tools and Techniques

Outputs

Scope management
plan

Expert Judgment

Project Scope
Statement

Project Charter
Requirements
Documentation
Organizational Process
Assets

Product Analysis
Alternatives Identification
Facilitated Workshops

Project Document
Updates

Author - Pankaj Sharma

Connoisseur Solutions

Project Scope Statement


Project scope statement describes, in detail, the projects
deliverables and the work required to create those deliverables
Project Objectives

Project constraints/assumptions

Product scope description

Initial identified risk

Project requirement

Schedule milestones

Project boundaries

Initial project organization

Project deliverables

Fund limitation

Product acceptance criteria

Configuration management
requirement
Approval requirement

Author - Pankaj Sharma

Connoisseur Solutions

Create WBS

(Planning Process Group)

Create WBS is the process of subdividing project


deliverables and project work into smaller, more
manageable components.
The planned work is contained within the lowest level WBS
components, which are called work packages. A work
package can be scheduled, cost estimated, monitored, and
controlled.

Author - Pankaj Sharma

Connoisseur Solutions

Create WBS

(Planning Process Group)

Inputs

Tools and Techniques

Outputs

Scope management
plan

Decomposition

Scope Baseline

Expert judgment

Project Document
Updates

Project Scope
Statement
Requirements
Documentation
Enterprise
environmental factors
Organizational Process
Assets

Author - Pankaj Sharma

Connoisseur Solutions

Create WBS
The Work Breakdown Structure breaks down deliverables
Work Packages are deliverables / work packages, NOT activities

A sample WBS for a car manufacturing project

Author - Pankaj Sharma

Connoisseur Solutions

Phase-Based WBS
Partial WBS for Software Project Based on Phase
Customer Relationship Management System

Project Management

Requirements

Planning

Client Interviews

Reporting

Review of Current Workflows

Administration
Meetings
Documentation Planning

Design

Logical Design

Build

Logical Design

Process Models

Process Models

Use Cases

Use Cases

Logical Data Models

Physical Data Models

Business Objectives
Preliminary Test Planning
Documentation Planning
Training Requirements

etc.

Author - Pankaj Sharma

Connoisseur Solutions

Component-Based WBS
Partial WBS for Luxury Townhouse Complex by Component
IYHTAYCAI* Village Project
(*If you have to ask, you can't affort it)

Project Management

Buildings

Land Planning

Sales and Marketing

Planning

Townhouse Units

Water and Sewers

Advertising

Reporting

Clubhouse

Roads and Access Lanes

Association Declarations

Administration

Gatehouses

Retention Ponds

General Legal

Meetings

Pro Shop

18-Hole Golf Course

Documentation Planning

Documentation Planning

Permits and Inspections

Maintenance Staffing Requirements

Permits and Inspections

Author - Pankaj Sharma

WBS Dictionary Template

Connoisseur Solutions

WBS Dictionary
Project Name:
WBS Owner:

WBS Name:

WBS Id:

Parent Id:

Start Date:

End Date:

WBS Detail:
WBS Element Description:
Acceptance Criteria:
Assumptions:
Resources Assigned:
WBS dependencies:
Cost:
Approved by:

Date:

Author - Pankaj Sharma

Connoisseur Solutions

Scope Baseline

Definition: An approved specific version of the detailed scope statement,


work breakdown structure (WBS), and its associated WBS dictionary

When finalizing scope baseline, the items that are eliminated from the project
must be formally documented as exclusions to the project.

If their exclusion is not properly documented, they may return again and
again as new requirements to be considered.

Author - Pankaj Sharma

Connoisseur Solutions

Validate Scope

Validate Scope is the process of formalizing acceptance of


the completed project deliverables. This process includes
reviewing deliverables with the customer or sponsor to
ensure that they are completed satisfactorily and obtaining
formal acceptance of deliverables by the customer or
sponsor.

Author - Pankaj Sharma

Connoisseur Solutions

Validate Scope

Once the scope of the project has been defined


and delivered, the scope of the project delivered must be verified.

This means getting approval of the delivered scope of the project from all of the
stakeholders.

It is a good practice to get the stakeholders to agree to the acceptance criteria at


the beginning of the project rather than at the end of it.

A set of acceptance criteria is drawn up and the acceptance criteria are agreed to
when the project scope is accepted by the stakeholders.

Author - Pankaj Sharma

Connoisseur Solutions

Validate Scope
Inputs

Tools and Techniques

Project Management Plan

Inspection

Accepted deliverables

Requirements
Documentation

Group decision making


techniques

Change requests

Requirements Traceability
Matrix
Verified Deliverables
Work performance data

Outputs

Work performance
information

Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Control Scope

(Monitoring and Controlling Process Group)

Monitoring the status of the project and product scope and


managing changes to the scope baseline.

Author - Pankaj Sharma

Connoisseur Solutions

Control Scope

(Monitoring and Controlling Process Group )


Inputs

Tools and Techniques

Project Management Plan

Variance Analysis

Requirements
Documentation
Work Performance Data

Requirements Traceability
Matrix
Organizational Process
Assets

Outputs
Work Performance
Information
Change Requests
Project Management
Plan Updates
Project Document
Updates
Organization Process
Assets Updates

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 1: Correct Order


Arrange the following activities in correct order

Define
scope

Create
WBS

Collect
Requirements

Validate Scope

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Scope Management Crossword

Revising Key Terms : Complete the following


1.

____________ Scope means the features or functions of the thing or


service that you are building

2.

The process where you write the project scope statement is called
_________ Scope

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Scope Management Crossword


Revising Key Terms : Complete the following
1. Product Scope means the features or functions of the thing or service that
you are building
2. The process where you write the project scope statement is called Define
Scope

Author - Pankaj Sharma

QUIZ !

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Time Management

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Time Management


Project Time Management includes the processes required to manage timely completion of
the project.

Plan schedule management The process of establishing the policies, procedures and
documentation for planning, developing, managing, executing and controlling the project schedule
Define ActivitiesThe process of identifying the specific actions to be performed to produce the
project deliverables.
Sequence ActivitiesThe process of identifying and documenting relationships among the project
activities.
Estimate Activity ResourcesThe process of estimating the type and quantities of material, people,
equipment, or supplies required to perform each activity.
Estimate Activity DurationsThe process of approximating the number of work periods needed to
complete individual activities with estimated resources.
Develop ScheduleThe process of analyzing activity sequences, durations, resource requirements,
and schedule constraints to create the project schedule.
Control ScheduleThe process of monitoring the status of the project to update project progress
and managing changes to the schedule baseline.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Schedule Management


Plan schedule Management is the process of establishing the policies,
Procedures, and documentation for planning, developing, managing
and controlling the project schedule
The key benefit of this process is that it provides direction on how the
project schedule will be managed throughout the project.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Schedule Management

Inputs

Tools and Techniques

Outputs

Project management
plan

Expert Judgment

Schedule
management plan

Project charter
Enterprise Environment
Factors

Analytical techniques
Meetings

Organization Process
Assets

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Schedule Management

The schedule management plan can establish the following:


Project schedule model development. The scheduling methodology and the
scheduling tool to be used
Level of accuracy. The acceptable range used in determining realistic activity
duration estimates is
.
Units of measure. Each unit used in measurements (such as staff hours, staff
days, or weeks for time
Organizational procedures links. The WBS provides the framework for the
schedule
.
Project schedule model maintenance. The process used to update the status
and record progress of

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Schedule Management

Control thresholds. Variance thresholds for monitoring schedule performance


may be specified to indicate
An agreed-upon amount of variation to be allowed before some action needs to be taken.
Thresholds are typically expressed as percentage deviations from the parameters
established in the baseline plan.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Define Activities
Define Activities is the process of identifying and documenting the
specific actions to be performed to produce the project deliverables.
The key benefit of this process is to break down work packages into
Activities that provide a basis for estimating, scheduling, executing,
Monitoring , and controlling the project work.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Define Activities

Inputs

Tools and Techniques

Outputs

Schedule management
plan

Decomposition

Activity List

Rolling Wave Planning

Activity Attributes

Expert Judgment

Milestone List

Scope Baseline
Enterprise Environment
Factors
Organization Process
Assets

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Define Activities : Inputs


Schedule Management Plan - provides direction on how the project schedule will
be managed throughout the project.
Scope Baseline provides the project deliverables, assumptions and constraints
Enterprise Environmental Factors that can influence the Define Activities process
include, but are not limited to, the project management information system (PMIS).

Organizational Process Assets that can influence the Define Activities process
include, but are not limited to:
Existing formal and informal activity planning-related policies, procedures, and
guidelines, such as the scheduling methodology, that are considered in developing the
activity definitions, and
Lessons-learned knowledge base containing historical information regarding
activities lists used by previous similar projects.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Define Activities : Tools and Techniques


Decomposition involves subdividing the project work packages into smaller, more
manageable components called activities.
Rolling Wave Planning is a form of progressive elaboration planning where the work
to be accomplished in the near term is planned in detail and future work is planned at
a higher level of the WBS.
Templates is a standard activity list or a portion of an activity list from a previous
project is often usable as a template for a new project. The related activity attributes
information in the templates can also contain other descriptive information useful in
defining activities.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Define Activities : Outputs


Activity List is a comprehensive list including all schedule activities required on the
project.
Activity attributes depicts the multiple components associated with each activity
Activity ID, WBS ID, Activity Name, activity description, predecessor activities,
successor activities, logical relationships, leads and lags, resource requirements,
imposed dates, constraints, and assumptions.
Activity attributes can be used to identify the person responsible for executing the
work, geographic area, or place where the work has to be performed, and activity type
such as level of effort (LOE), discrete effort, and apportioned effort (AE).
Milestone List identifies all milestones and indicates whether the milestone is
mandatory, such as those required by contract, or optional, such as those based upon
historical information.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities

Sequence Activities is the process of Identifying and documenting


relationships among the project activities.
The key benefit of this Process is that it defines the logical sequence of
Work to obtain the greatest efficiency given all project constraint.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities

Inputs

Tools and Techniques

Outputs

Schedule management
plan
Activity List
Activity Attributes
Milestone List
Project Scope Statement
Enterprise environmental
Factors
Organization Process
Assets

Precedence Diagramming
Method (PDM)
Dependency determination
Leads and Lags

Project Schedule
Network Diagrams

Pankaj Sharma, 9810996356

Project Document
Updates

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities - Inputs


Schedule Management Plan - provides direction on how the project schedule will be
managed throughout the project.
Activity List Output of Define Activities process
Activity Attributes Output of Define Activities process
Milestone List - Output of Define Activities process
Project Scope Statement Output of Define Scope Process
Organizational Process Assets - The organizational process assets that can
influence the Sequence Activities process include, but
are not limited to, project files from the corporate knowledge base used for scheduling
methodology.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities Tools and Techniques


Precedence Diagramming Method (PDM)- Also known as activity on node (AON)
as the activities are represented on nodes and the logical relationship between
activities is represented through arrows
The relationship in the figure below represents that the Activity B is dependent on
Activity A. i.e. Activity B can only start after the completion of activity A

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities Tools and Techniques


Types of dependencies in PDM

Finish to Start (FS) This relationship means Task A must complete before Task
B can begin. This is the most common relationship.
Finish to Finish (FF) - Finish of successor activity depends on finish of the
predecessor
Start-to-Start (SS) Start of a successor activity depends on start of a predecessor
activity.
Start- to Finish (SF) Finish of Successor depends on the start of preceding
activity.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sequence Activities Tools and Techniques


Dependency Determination

There are three kinds of dependencies, Mandatory dependency, Discretionary


dependency and external dependency
Mandatory dependencies referred as hard logic are natural order of activities or
which are contractually required.
Discretionary dependencies referred as preferred logic, soft logic or preferential
logic are defined as best practices and are considered the preferred choice among the
other alternatives.
External dependencies are external to the project and are not in projects control.
E.g. Deliverable from other project or expected new law etc

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources


Estimate Activity Resources is the process of estimating the
type and quantities of material, human resources,
Equipment, or supplies required to perform each activity.
The key benefit of this process is that it identifies the type,
Quantity, and characteristics of resources required to
Complete the activity which allows more accurate cost and
duration estimate

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources


Inputs

Tools and Techniques

Schedule Management
Plan
Activity List
Activity Attributes
Resource Calendars
Risk Register
Enterprise Environmental
Factors
Organization Process
Assets

Expert judgment
Alternatives analysis
Published estimating data
Bottom-up estimating
Project management software

Pankaj Sharma, 9810996356

Outputs
Activity resource
requirements
Resource
breakdown structure
Project
management
updates

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources - Inputs


Schedule Management Plan Identifies the level of accuracy and the units of
measure for the resource to be estimated
Activity List Identifies the activities which will need resources
Activity Attributes Provide the primary data input for use in estimating those
resources required for each activity in the activity list.
Resource Calendar Resource calendars specify when and how long identified
project resources will be available during the project
Enterprise Environmental Factors- The enterprise environmental factors that can
influence the Estimate Activity Resources process include but are not limited to
resource availability and skills
Organizational Process Assets that influence this process include but are not
limited to; Policies and Procedures related to staffing, policies and procedures related
to rental purchase of supplies and equipments, Historical information regarding types
of resources used for similar work on previous projects
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources Tools and Techniques


Expert Judgment is often required to assess the resource-related inputs to this
process. Any group or person with specialized knowledge in resource planning and
estimating can provide such expertise.
Alternatives Analysis
Many schedule activities have alternative methods of accomplishment. They include
using various levels of resource capability or skills, different size or type of machines,
different tools (hand versus automated), and make-or-buy decisions regarding the
resource.
Published Estimating Data
Several companies routinely publish updated production rates and unit costs of
resources for an extensive array of labor trades, material, and equipment for different
countries and geographical locations within countries.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources Tools and Techniques


Bottom-Up Estimating When an activity cannot be estimated with a reasonable
degree of confidence, the work within the activity is decomposed into more detail. The
resource needs are estimated. These estimates are then aggregated into a total
quantity for each of the activitys resources. Activities may or may not have
dependencies between them that can affect the application and use of resources. If
there are dependencies, this pattern of resource usage is reflected and documented in
the estimated requirements of the activity.
Project Management Software Project management software has the capability to
help plan, organize, and manage resource pools and develop resource estimates.
Depending on the sophistication of the software, resource breakdown structures,
resource availability, resource rates and various resource calendars can be defined to
assist in optimizing resource utilization.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Resources Outputs


Activity Resource Requirements identifies the types and quantities of resources
required for each activity in a work package. These requirements can then be
aggregated to determine the estimated resources for each work package. The amount
of detail and the level of specificity of the resource requirement descriptions can vary
by application area. The resource requirements documentation for each activity can
include the basis of estimate for each resource, as well as the assumptions that were
made in determining which types of resources are applied, their availability, and what
quantities are used.
Resource Breakdown Structure is a hierarchical structure of the identified
resources by resource category and resource type. Examples of resource categories
include labor, material, equipment, and supplies. Resource types can include the skill
level, grade level or other information as appropriate to the project. The resource
breakdown structure is useful for organizing and reporting project schedule data with
resource utilization information.
Project Documents may be updated include, but are not limited to:
Activity list,
Activity attributes, and
Resource calendars.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration


Estimate Activate Durations is the process of estimating the
Number of work periods needed to complete individual
Activities with estimated resources.
The key benefit of this process is that it provides the
amount of time each activity will take to complete, which is
a major input to Develop schedule process.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration


Inputs

Tools and Techniques

Outputs

Schedule management
plan
Activity List
Activity Attributes
Activity Resource
Requirements
Resource Calendars
Project Scope Statement
Risk Register
Resource Breakdown
Structure
Enterprise Environmental
Factors
Organization Process
Assets

Expert judgment
Analogous Estimating
Parametric Estimating
Three point estimates
Group decision making
techniques
Reserve Analysis

Activity duration
updates
Project document
updates

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration - Inputs


Schedule Management Plan defines the method used and the level of accuracy
along with other criteria required to estimate activity durations including the project
update cycle.
Activity List Defines activity list that will need duration estimates.
Activity Attributes- Output of Define Activities process
Activity Resource Requirements The number of resources allocated will impact
the duration of most of the activities.
Resource Calendars - can include the type, availability, and capabilities of human
resources. The type, quantity, availability, and capability, when applicable, of both
equipment and material resources, which could significantly influence the duration of
schedule activities, are also considered. Examples such as Existing conditions,
Availability information and length of the reporting periods. Examples of constraints
include , Available skilled resources and contract terms and requirement.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration - Inputs


Project Scope Statement- The assumptions and constraints from the project scope
statement are considered when estimating the activity durations. This includes
Existing conditions
Availability of information
Length of the reporting periods
Examples of constraints include, but are not limited to
Available skilled resources
Contract terms and requirements
Enterprise Environmental Factors that can influence the Estimate Activity
Durations process include, but are not limited to: Duration estimating databases and
other reference data, Productivity metrics, and Published commercial information.
Organization Process Assets that can influence the Estimate Activity Durations
process include but are not limited to: Historical duration information, Project
calendars, Scheduling methodology and Lessons learned.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration Tools and Techniques


Expert Judgment guided by historical information, can provide duration estimate
information or recommended maximum activity durations from prior similar projects.
Expert judgment can also be used to determine whether to combine methods of
estimating and how to reconcile differences between them.
Analogous estimating uses parameters such as duration, budget, size, weight, and
complexity, from a previous, similar project, as the basis for estimating the same
parameter or measure for a future project.
Parametric Estimating Parametric estimating uses a statistical relationship between
historical data and other variables (e.g., square footage in construction) to calculate
an estimate for activity parameters, such as cost, budget, and duration.
Reserve Analysis include contingency reserves, (sometimes referred to as time
reserves or buffers) into the overall project schedule to account for schedule
uncertainty. The contingency reserve may be a percentage of the estimated activity
duration, a fixed number of work periods, or may be developed by using quantitative
analysis methods.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Activity Duration Tools and Techniques


Three-Point Estimates (PERT) is based on statistical methods in particular normal
distribution. The estimation of activity duration is done based on the following three
points
Most likely (M). The duration of the activity, given the resources likely to be
assigned, their productivity, realistic expectations of availability for the activity,
dependencies on other participants, and interruptions.
Optimistic (O). The activity duration is based on analysis of the best-case scenario
for the activity.
Pessimistic (P). The activity duration is based on analysis of the worst-case scenario
for the activity.
PERT analysis calculates an Expected (E) activity duration using a weighted average
of these three estimates:
Double Triangular or Beta Distribution - E = O + 4M + P/6 , Standard Deviation SD= P-0/6
Triangular Distribution E= 0+M+P/3 ,
Standard Deviation = 02+M2+P2-OM-MP-PO/18

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule
Develop schedule is the process of analyzing activity
sequences, durations, resource requirements, and
schedule constraints to create the project schedule model.
The key benefits of this process is that by entering schedule
activities , durations, resources, resource availabilities and
Logical relationships into the scheduling tool , it generates a
schedule model with planned dates for completing project
activities

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule

Inputs

Schedule management
Activity List
Activity attributes
Project schedule
network diagrams
Activity resource
requirements
Resource calendars
Activity duration
estimates
Project scope
statement
Project staff
assignments
Resource Breakdown
Structure
Risk Register
Enterprise
Environmental Factors
Organizational
Process Assets

Tools and Techniques

Schedule network analysis


Critical path method
Critical chain method
Resource optimization techniques
Modeling techniques
Leads and lags
Schedule compression
Scheduling tool

Pankaj Sharma, 9810996356

Outputs
Project schedule
Schedule baseline
Schedule data
Project Calendars
Project Management
Plan updates
Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule - Inputs


Schedule Management Plan Identifies the scheduling method and tool used to
create the schedule and how schedule is to be calculated.
Activity List Identifies the activities that will be included in the schedule model
Activity attributes Provide the details used to build the schedule model.
Project schedule network diagram contains logical relationship between
predecessor and successor that will be used to build the schedule.
Activity resource requirements Identify the types and quantities of resources
required for each activity used to create the schedule model.
Resource calendars- specify when and how long identified project resources will be
available during the project
Activity duration estimates contain the quantitative assessment of the likely
number of work periods that will be required to complete an activity that will be used
to calculate the schedule.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule - Inputs


Project scope statement- contains assumptions and the constraints that can impact
the development of the schedule.
Enterprise Environmental Factors that can influence the Develop Schedule process
include, but are not limited to, a scheduling tool that can be used in developing the
schedule.
Organizational Process Assets The organizational process assets that can influence
the Develop Schedule process include, but are not limited to:
Scheduling methodology and Project calendar.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Tools and Techniques


The critical path method calculates the theoretical early start and finish
dates, and late start and finish dates, for all activities without regard for
any resource limitations, by performing a forward and backward pass
analysis through the schedule network.
Critical Chain Method is a schedule network analysis technique that
modifies the project schedule to account for limited resources. The
resource-constrained critical path is known as the critical chain. The critical
chain method adds duration buffers that are non-work schedule activities to
manage uncertainty.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Tools and Techniques


Resource Optimization Techniques that can be used to Adjust the
schedule model due to demand and supply of resources include.
Resource Levelling - Is necessary when resources have been overallocated, such as when a resource has been assigned to two or more
activities during the same time period, when shared or critical required
resources are only available at certain times or are only available in limited
quantities. Resource leveling can often cause the original critical path to
change.
Resource Smoothing A technique that adjusts the activities of a
schedule model such that the requirements for resources on the project do
not exceed certain predefined resource limits. There is no change in the
project completion date the activities may only be delayed within their free
and total float.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Tools and Techniques


Modeling Techniques include

What-If Scenario Analysis- A schedule network analysis is performed


using the schedule to compute the different scenarios, such as delaying a
major component delivery, or introducing external factors, such as a strike
The outcome of the what if scenario analysis can be used to assess the
Feasibility of the project schedule under adverse conditions
Simulation involves calculating multiple project durations with different
sets of activity assumptions. The most common technique is Monte Carlo
Analysis in which a distribution of possible activity durations is defined for
each activity and used to calculate a distribution of possible outcomes for
the total project.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Tools and Techniques


Applying Leads and Lags - Leads and lags are refinements applied during network
analysis to develop a viable schedule.
Schedule Compression
Crashing. A schedule compression technique in which cost and schedule tradeoffs are
analyzed to determine how to obtain the greatest amount of compression for the least
incremental cost. Examples of crashing could include approving overtime, bringing in
additional resources, or paying to expedite delivery to activities on the critical path.
Crashing only works for activities where additional resources will shorten the duration.
Crashing does not always produce a viable alternative and may result in increased risk
and/or cost.
Fast tracking. A schedule compression technique in which phases or activities
normally performed in sequence are performed in parallel. An example is constructing
the foundation for a building before completing all of the architectural drawings. Fast
tracking may result in rework and increased risk. Fast tracking only works if activities
can be overlapped to shorten the duration.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Tools and Techniques


Scheduling Tool - Automated scheduling tools expedite the scheduling
process by generating start and finish dates based on the inputs of
activities, network diagrams, resources and activity durations. A scheduling
tool can be used in conjunction with other project management software
applications as well as manual methods.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Outputs


Schedule Baseline - is a real or theoretical construct that captures the approved
schedule. It is used to provide a comparison or contrast with the actual progress of
work against the schedule and to determine if performance to date is within
acceptable parameters.
Project schedule displays the start and end dates of all the activities in the project
and the same for overall project. It can be represented in the form of Gantt Chart,
Milestone Chart or a project network diagram.
Schedule data is the data on the basis of which schedule was developed. It includes
resource requirements by time period, alternative schedules such as best-case or
worst case, not resource leveled or resource leveled with, or without imposed dates
and scheduling of contingency reserves

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Schedule Outputs


Project Calendars A project calendar identifies working days and shifts that are
available for scheduled activities. It distinguishes time period in days or part of days
that are available to complete scheduled activities from time period that are not
available.
Project Management Plan Updates Elements of the project management plan
that may be updated include
Schedule baselines
Schedule management plan
Project document updates includes updates to resource requirement, activity
attributes, risk registers and calendars

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Critical Path

For the network diagram below find Critical Path, float for activity A and E

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Critical Path

For the network diagram below find Critical Path, float for activity A and E

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Forward and Backward Pass

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Exercise : Critical Path

Complete the following Project Network Diagram

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Critical Path

Based on the portion of network diagram shown below find ES and LF for
activity F

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule
(Monitoring and Controlling Process Group)

Control Schedule is the process of monitoring the status of the


project to update project progress and manage changes to the
schedule baseline.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule
Control Schedule is the process of monitoring the status of
project activities to update project progress and manage
changes to the schedule baseline to achieve the plan.
The key benefit of this process is that it provides the means
to recognize deviation from the plan and take corrective
action and preventive actions and thus minimizes risk.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule
Inputs

Tools and Techniques

Project management
plan
Project schedule
Work performance data
Organizational process
assets

Performance reviews
Project management
Software
Resource optimization
techniques
Modeling techniques
Leads and lags
Schedule compression
Scheduling tool

Pankaj Sharma, 9810996356

Outputs
Work performance
information
Schedule forecasts
Change Requests
Project Management
Plan updates
Project document
updates
Organization Process
asset updates

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Inputs


Project Management Plan is a formal, approved document that defines how the
project is executed, monitored and controlled.
Project Schedule is the primary input to this process, since it is the source against
which the results are controlled.
Work Performance Data details the work that is being executed, recently
completed, and next steps. This information is gathered from the Direct and Manage
Project execution process.
Project Calendars - A schedule model may require more than one project calendar
to allow for different work periods for some activities to calculate the schedule
forecasts.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Inputs


Schedule Data will be reviewed and updated in the Control Schedule process.

Organizational Process Assets can be a system for formally evaluating schedule


change, or a software system to help detect changes or measuring variance

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Tools and Techniques


Performance Reviews keeps project manager updated on how project is progressing
against the base lined schedule. Some of the techniques that can be used for
performance reviews are :
Trend analysis examines project performance over time to determine whether
performance is improving or deteriorating.
Critical path method Comparing the progress along the critical path can help
determine schedule status. The variance on the critical path will have a direct impact
on the project end data. Evaluating the progress of activities on near critical paths can
identify schedule risk.
Critical Chain method- Comparing the amount of buffer remaining to the amount
of buffer needed to protect the delivery date can help determine schedule status. The
difference between the buffer needed and the buffer remaining can determine whether
corrective action is appropriate.
Earned Value Management - Measurements such as SV and SPI helps you to
know whether you are ahead or behind in terms of the schedule.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Tools and Techniques


Project Management Software automates the other tools and techniques in control
schedule
Resource optimization techniques involves the scheduling of activities and
resources required by those activities while taking into consideration both the resource
availability and the project time.
Modeling techniques are used to review various scenarios guided by risk monitoring
to bring the schedule model into alignment with the project management plan and
approved baseline.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Tools and Techniques


Leads and lags have impact on the schedule and as the project progresses lead and
lags need to be adjusted to reflect reality so as to provide the most realistic view of
the schedule possible

Schedule compression includes shortening the duration of the plan through


Crashing and Fast tracking
Scheduling tool provides various features (Views, reports etc) that helps in
managing the schedule

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Schedule- Outputs


Work Performance Information The updated schedule performance index (SPI)
, Schedule variance (SV) and other earned value measurements relevant to the
schedule need to be calculated and communicated out.
Change Requests Any change in the schedule due to change in scope or due to
any other valid reason requires Change Request.
Project Management Plan Updates - As the schedule changes, the project
management plan is updated.
Project Document Updates This includes any project document (Other than
project management plan) that has changed as a result of Control Schedule. For
example Scheduled data such as revised planned start and finish dates, Project
schedule and the Risk register

Organization Process Updates Any times a lesson is learned in Control Schedule,


it becomes a reusable asset for the performing organization.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 3: Time Management


Complete the following
1. Adding more resources to a project so you can get it done
faster is called____________ .
2. _________ is the process where you put the activities in
order.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise 3: Time Management

1. Adding more resources to a project so you can get it done


faster is called Crashing .
2. Sequence Activities is the process where you put the
activities in order.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

QUIZ !

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Cost Management

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Cost Management


Project Cost Management includes the processes involved in estimating,
budgeting, and controlling costs so that the project can be completed
within the approved budget.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Cost Management Processes

Process

Process Group

Plan Cost Management

Planning

Estimate Costs

Planning

Determine Budget

Planning

Control Costs

Monitoring and Controlling

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs
Estimate Costs is the process of developing an approximation of the
monetary resources needed to complete project activities. The table below
shows five different types of estimates that can be used based on the need.
Estimate Type

Range

Order of Magnitude Estimates

-50% to +50%

Conceptual Estimate

-30% to +50%

Preliminary Estimate

-20% to +30%

Definitive Estimate

-15% to +20%

Control Estimate

-10% to +15%

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Types of Cost

Direct Cost- Any cost that is identified specifically with a particular final
cost objective.

Indirect Cost- Any cost not directly identified with a single, final cost
objective (more than one project)

Fixed Cost - Periodic charge that does not vary with business volume

Variable Cost - Cost that fluctuates based on the business volume

Opportunity Cost: When there is a decision to be made between two


opportunities, the opportunity cost is the value / money forgone for the not
doing the project.
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Types of Cost

Lifecycle Costing: Takes into account cost of development of a project


and also the cost of supporting during the lifecycle.

Sunk Cost - Cost already incurred which cannot be recovered regardless


of future events

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management


The process that establishes the policies, procedures , and
documentation for planning , managing , expending , and
controlling project costs.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management


Inputs

Tools and Techniques

Outputs

Project Management
Plan
Project Charter
Enterprise
Environmental Factors
Organizational Process
Assets

Expert Judgment
Analytical Techniques
Meetings

Cost Management
Plan

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management- Inputs

Project Management Plan component that is important for this process are
primarily the scope and cost baselines.
Project Charter provides the summary budget from which the detailed project costs
are developed . It also defines the project approval requirements that will influence
the management of the project costs.
Enterprise Environmental Factors include factors such as Organization
structure/culture, Market conditions, currency exchange rates (for project sourced
from more than one country) that influence the project cost.
Organizational Process Assets include financial control procedures , historical
information . Existing formal and informal cost estimating and budgeting related
policies, procedures and guidelines.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management- Tools and Techniques

Expert Judgment Guided by historical information, provides valuable insight about


the environment and information from prior similar projects. Judgment based upon
expertise in an application area, knowledge area , discipline, industry can be useful in
this process.
Analytical Techniques Some of the techniques payback period, return on
investment, internal rate of return, discounted cash flow and net present value can be
useful in this process
Meetings - Project teams may hold meetings planning meetings to develop the cost
management plan. These meetings may include, project sponsor, project manager,
selected team members , selected stakeholders, anyone with responsibility for project
costs.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management- Outputs


Cost Management Plan is a component of the project management plan and
describes how the project costs will be planned, structured , and controlled. The cost
management plan can establish the following.
Units of measure - Each unit of measure for each resource.
Level of precision The degree to which activity cost estimates will be rounded up
or down.
Level of accuracy - The acceptable range (e.g. +_ 100%) used in determining
realistic activity cost estimates is specified , may include an amount for contingencies.
Control threshold Variance threshold for monitoring cost performance may be
specified to indicate an agreed upon amount of variation to be allowed before some
action need to be taken.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Cost Management- Outputs

The cost management plan also contains.


Rules of performance measurement Earned value management (EVM) rules of
performance measurement are set. For example
Define the points in the WBS at which measurement of control accounts will be
performed
Establish the earned value measurement techniques (e.g. weighted
milestones, fixed formula, percent complete, etc) to be used and
Specify tracking methodologies and the earned value management
computation equations for calculating projected estimate at completion (EAC)
forecasts to provide a validity check on the bottom-up EAC

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Cost
Estimate cost is the process of developing an approximation of the
monetary resources needed to complete project activities. The key
benefit of this process is that it determines the amount of cost
required to complete project work.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs
Inputs

Tools and Techniques

Outputs

Cost Management Plan


Human Resource
Management Plan
Scope baseline
Project Schedule
Risk Register
Enterprise
Environmental Factors
Organizational Process
Assets

Expert Judgment
Analogous Estimating
Parametric estimating
Bottom-up estimating
Three-point estimates
Reserve Analysis
Cost of Quality
Project management
estimating software
Vendor bid analysis
Group decision making
techniques

Activity Cost
estimates
Basis of estimates
Project document
updates

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs - Inputs

Cost management plan The cost management plan defines how project costs will
be managed and controlled . It includes the method used and the level of accuracy
required to estimate activity cost.
Human Resource Plan provides detail on Project staffing attributes, personnel rates,
and related rewards/recognition, these are necessary components for developing the
project cost estimates.

Scope baseline include inputs from scope statement, Work Breakdown Structure and
WBS dictionary.
Project Schedule provides detail on the type and quantity of resources and the
amount of time which those resources are applied to complete the work of the project,
all these factors directly impact the cost
Risk Register provides input related to costs associated with risk response

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs - Inputs

Enterprise Environmental Factors include availability of resources, published


commercial information
Organizational Process Assets include cost estimating policies, historical
information, cost estimating templates and lesson learned

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs -Tools and Techniques


Expert Judgment guided by historical information, provides valuable
insight about the environment and information from prior similar projects. Expert
judgment can also be used to determine whether to combine methods of estimating and
how to reconcile differences between them.
Analogous Estimating relies on historical information (Previous projects executed by
the organization) to predict the cost of current project. This is a top-down approach is
good for fast estimates to get a general idea of what the project may cost. The accuracy
depends upon how similar the two projects actually are.
Parametric estimating uses a mathematical model based on known parameters to
predict the cost of a Project. A parameter can be cost per unit, cost per cubic yard etc.
Two Parametric estimating techniques are Regression Analysis and Leaning curve.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs -Tools and Techniques


Bottom-up estimating produces a separate estimate for each scheduled activity. The
detailed cost is then summarized or rolled up to higher levels for subsequent reporting
and tracking purposes. The cost and accuracy of bottom-up cost estimating is typically
influenced by the size and complexity of the individual activity or work package.
Three-point estimates concept originated with the program evaluation and review
technique (PERT). PERT uses three estimates to define an approximate range for an
activitys cost:

Triangular Distribution
Estimated Cost = Optimistic + Most Likely + Pessimistic)/ 3
Beta Distribution
ESTIMATED COST = (Optimistic + 4*(Most Likely) + Pessimistic) / 6

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs -Tools and Techniques


Reserve Analysis adds reserve amount (Contingency) to the cost. This is done to take
care of uncertainties in the project.
Cost of Quality includes assumptions related to Cost of Quality
Project management software is helpful in performing calculations, Organizing and
storing large amount of information needed for preparing cost estimates and for
reporting purpose
Vendor bid analysis may include analysis of what the project should cost, based on the
responsive bids from qualified vendors.
Group Decision Making Techniques Team based approaches , such as
brainstorming, the Delphi or nominal group techniques, are used for engaging team
members to improve estimate accuracy and commitment to the emerging estimates.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Estimate Costs - Outputs

Activity Cost estimates details how much it would cost to complete each schedule
activity on the project
Basis of estimates include supporting documentation of the cost estimates and it
may include documentation of the basis of estimates , documentation of all
assumptions made , documentation of any known constraint , indication of the range
of possible estimates and indication of the confidence level of the final estimates
Project document updates include project risk register and cost management plan

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Estimate Cost


Revise Tools to Estimate Cost
1. You figure out a best case scenario and , a likely scenario and a worst
case scenario. Then you use a formula to come up with an expected cost
for the project. The tool used by you is ________
2. John creates a document with all the historical information from similar
project he had done in past and also takes input from a contractor who
provides his input. The tool used by John is_________

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise : Estimate Cost


Revise Tools to Estimate Cost
1. You figure figures out a best case scenario and , a likely scenario and a
worst case scenario. Then you use a formula to come up with an
expected cost for the project. The tool used by you is Three-point
estimate
2. John creates a document with all the historical information from similar
project he had done in past and also takes input from a contractor who
provides his input. The tool used by John is Expert Judgment

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget
Determine Budget is the process of aggregating the estimated costs of individual
activities or work packages to establish an authorized cost baseline. This baseline
includes all authorized budgets, but excludes management reserves.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget
Inputs

Tools and Techniques

Cost management
plan
Activity cost estimates
Basis of estimate
Scope baseline
Project Schedule
Resource Calendars
Risk register
Agreements
Organizational Process
Assets

Cost Aggregation
Reserve Analysis
Expert Judgment
Historical relationship
Funding limit reconciliation

pankaj sharma, 9810996356

Outputs
Cost baseline
Project funding
requirements
Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget - Inputs


Cost Management Plan - describes how the project costs will be managed and
controlled
Scope baseline refers to collection of approved project scope statement and its
associated WBS and WBS dictionary.
Activity cost estimates of a work package is a summation of the activity cost
estimates of activities under the work package
Basis of estimate includes supporting detail for cost estimates contained in the basis
for estimates should specify any basic assumptions
Project Schedule helps in mapping the cost back to time for planning purpose

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget - Inputs


Resource Calendars along with Project schedule will help plan for when the costs will
be incurred
Agreements Applicable agreement information and costs relating to products,
services or results that have been or will be purchased are included when determining
the budget.
Organizational Process Assets include cost budgeting policies procedures ,
guidelines and reporting method

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget Tools and Techniques


Cost Aggregation involves aggregating the costs of individual activities to work
packages that are further aggregated to higher levels of WBS and finally into the
project cost
Reserve Analysis include contingency reserve and management reserves for the
project. Contingency reserves are allowances for response plan strategized for the
identified risks. These are also known as known unknowns . Management reserves
are allowance for unplanned changes to thee project scope and cost. The are also
known as unknown unknowns. Reserves are not the part of the project cost baseline.
Expert Judgment can be taken from experienced consultant in the project application
area. This can be from an internal organizational resource or external sources

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget Tools and Techniques


Historical relationship result in parametric estimates or analogous estimates that
involve parameter to develop mathematical models to predict total project costs.
Funding limit reconciliation refers to reconciliation of planned spending with the
funding limit

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget Outputs


Cost performance baseline is an authorized time-phased budget at completion
(BAC) used to measure, monitor, and control overall cost performance on the project.
It is developed as a summation of the approved budgets by time period and is
typically displayed in the form of an S-curve, as is illustrated in Figure below
(Reference PMBOK 4th edition). In the earned value management technique the cost
performance baseline is referred to as the performance measurement baseline (PMB).

Reference PMBOK 5th Edition

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Determine Budget Outputs


Project funding requirements are derived from cost baselines. Total funding
requirement is sum of cost baseline and management reserve.
Project document updates include updates to risk register, cost estimates and
project schedule

pankaj sharma, 9810996356

Author - Pankaj Sharma

Project Budget Components

pankaj sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Determine Budget


Revise Tools to Determine Budget
Monika reads a newspaper article that says there has been sharp increase in steel
cost recently. She knows this was not in her contractors original plan and decides to
put a few hundred dollars aside to deal with the price hike if it should happen. The
tool used by Monika is

Parametric estimating

Reserve analysis

Cost aggregation

Fund Limit Reconciliation

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise 2: Determine Budget


Revise Tools to Determine Budget
Monika reads a newspaper article that says there has been sharp increase in steel
cost recently. She knows this was not in her contractors original plan and decides to
put a few hundred dollars aside to deal with the price hike if it should happen. The
tool used by Monika is

Parametric estimating

Reserve analysis

Cost aggregation

Fund Limit Reconciliation

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs

Control Costs is the process of monitoring the status of the project


to update the project budget and managing changes to the cost
baseline.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs
Inputs

Tools and Techniques

Outputs

Project management
plan
Project Funding
Requirements
Work Performance
data
Organizational Process
Assets

Work performance
Information
Cost forecasts
Change Requests
Project
management plan
updates
Project document
updates
Organizational
Process assets
updates

Earned value management


Forecasting
To-complete performance
index TCPI
Performance reviews
Project management software
Reserve analysis

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs - Inputs


Project Management Plan contains Cost management plan and Cost performance
Baseline, these are helpful in controlling the cost.
Project Funding Requirements As explained earlier include projected expenditures
plus anticipated liabilities
Work Performance Data provides information on the status and cost of project
activities and ensures that the project goals and objectives are met as per the project
management plan
Organizational Process Assets that can influence this process include cost
budgeting policies, procedures, guidelines , cost budgeting tools and reporting
methods

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Tools and Techniques


Earned value management is used to measure the performance of the project, It
integrates project scope, cost, and schedule measures to help the project management
team assess and measure project performance and progress. The EVM technique
involves evaluating the planned value , Earned Value and the Actual cost for each
schedule activity , work package or control account.
1. Planned Value (PV) is the authorized budget assigned to the scheduled work to be
accomplished for a schedule activity or work breakdown structure component. It is
also known as Budgeted Cost of Work Scheduled (BCWS)
2. Earned Value (EV) is the value of work performed expressed in terms of the
approved budget assigned to that work for a schedule activity or a WBS
component. It is also known as Budgeted cost of Work Performed (BCWP)
3. Actual Cost (AC) is the total cost actually incurred and recorded in accomplishing
work performed for an activity or work breakdown structure component.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Tools and Techniques


Variance Analysis helps in analyzing the performance of the project vis--vis cost
and schedule baselines
Schedule Variance (SV) is a measure of schedule performance on a project.
It is equal to the earned value (EV) minus the planned value (PV). SV= EV-PV.
Cost variance (CV) is a measure of cost performance on a project. It is equal
to the earned value (EV) minus the actual costs (AC). CV = EV-AC
Schedule performance Index (SPI) in addition to project status is used to predict
the completion date. SPI = EV/PV
Cost Performance Index (CPI) measures the cost efficiency for the work completed,
it is the ration of EV to AC. CPI = EV/AC.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Tools and Techniques


Forecasting Techniques are used to calculate Estimate at completion (EAC) and
Estimate to complete (ETC).
EAC = AC + ETC
EAC forecast for ETC work performed at the budgeted rate
EAC = AC + BAC EV
EAC forecast for ETC work performed at the present CPI
EAC = BAC / cumulative CPI
EAC forecast for ETC work considering both SPI and CPI factors.
AC + [(BAC EV) / (cumulative CPI x cumulative SPI)].

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Tools and Techniques


To-complete performance index (TCPI) is the calculated projection of cost
performance that must be achieved on the remaining work to meet a specified
management goal, such as the BAC or the EAC.
TCPI based on the BAC: Work Remaining (BAC EV) / Fund Remaining (BAC AC).
TCPI based on EAC : (BAC-EV)/(EAC-AC)
Performance reviews involves following three types of analysis
1. Variance Analysis compares actual project performance to planned or expected
performance. Cost and schedule variances are the most frequently analyzed.
2. Trend Analysis examines project performance over time to determine if
performance is improving or deteriorating.
3. Earned value management compares the baseline plan to actual schedule and
cost performance.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Tools and Techniques


Project management software is often used to monitor the three EVM dimensions
(PV, EV, and AC), to display graphical trends, and to forecast a range of possible final
project results.
Reserve Analysis During cost control, reserve analysis is used to monitor the status
of contingency and management reserves for the project to determine if these reserves
are still needed or if additional reserves need to be requested.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Outputs


Work Performance Information includes the calculated CV, SV, CPI, and SPI
values for WBS components, in particular the work packages.
Cost Forecasts includes a calculated EAC value or a bottom-up EAC value.
Organizational Process Assets Updates include Causes of variances, Corrective
action chosen and the reasons, and Other types of lessons learned from project cost
control.
Change Requests include change request to the cost performance baseline
or other components of the project management plan. Change requests can include
preventive or corrective actions and are processed for review and disposition through
the Perform Integrated Change Control process

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Costs Outputs


Project Management Plan Updates Elements of the project management plan that
may be updated include Cost performance baseline, Cost management plan.
Project Documents Updates include updates to cost estimates, basis of
Estimates
Organizational Process Assets Updates

Organizational Process Assets that may be updated include, but are not limited to :

Cause of variances
Corrective action choosen and the reasons
Financial databases
Other types of lesson learned from project cost control

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 1 : EVM
Practice Earned Value Formulae
Your current project is an $800,000 software development effort, with
two teams of programmers that will work for six months, at a total of
10,000 hours. According to the project schedule your team should be
done with 38% of the work. You find that the project is currently 40%
complete. You have spent 50% of the budget so far. Calculate the
following
1.
2.
3.
4.

BAC
EV, PV
SV, CV
SPI, CPI

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answer to Exercise - 1 : EVM


Practice Earned Value Formulae
1. BAC = $ 800,000, AC = $ 400,000
2. PV = $ 80,000 * 38 / 100 = $ 304,000
EV = $ 80,000 * 40 / 100 = $ 320,000

3. SV = EV PV = $ 16,000
CV = EV AC = - $ 80,000
4. SPI = EV / PV = 1.05
CPI = EV / AC = 0.8

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2 : EVM
Practice Earned Value Formulae
Youre managing a highway construction project. Your total budget is
$650,000, and there are a total of 7,500 hours of work scheduled on
the project. You check with your accounting department, and they tell
you that youve spent a total of $400,000. According to the schedule,
your crew should have worked 4,500 hours, but your foreman says
that the crew was allowed to work some overtime, and theyve
actually put in 5,100 hours of work. Based on this Calculate the
following Earned Value numbers:
PV =
EV =
CV =
BAC =
AC =
SV =
SPI = , CPI =
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answer to Exercise - 2 : EVM


Practice Earned Value Formulae
BAC = $ 650,000
AC = $ 400,000
PV = 650,000 x 60% = $390,000
EV = 650,000 x 68% = $ 442,000
CV =442,000 400,000 = $42,000
SV = $ 52,000
SPI = 1.13 , CPI = 1.11

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise - 3 : EVM
Practice Earned Value Formulae
Its nine months into your project. The total budget for your project is
$4,200,000. Youve spent $1,650,000 so far, and youve got a CPI of
.875. Use the Earned Value Management formulas from forecasting to
figure out where things stand.
Find the following
EAC =
ETC =
VAC =

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answer to Exercise - 3 : EVM


Practice Earned Value Formulae
EAC = $ 4,200,000 / 0.875 = $ 4,800,000
ETC = $ 4,800,000 $ 1,650,000 = $ 3, 150,000
VAC = $ 4,200,000 $ 4,800,000 = $ 600,000

pankaj sharma, 9810996356

Author - Pankaj Sharma

QUIZ !

pankaj sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Risk Management

Author - Pankaj Sharma

Connoisseur Solutions

What is Risk?

Project risk is an uncertain event that can have a positive or a negative impact
on the result

If a project risk materializes and has a negative impact on the project, it is


called Threat to the project e.g.
Unproven technology impacting project schedule
Loosing critical resource from project

If an uncertain event has a positive impact on the project, it is called


opportunities. E.g.
Emergence of new tool to increase productivity
New resource replacing the lost resource is a better one!
Not all risks are bad, however most of them are perceived as Threat to
success

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Risk Vs Issue
Risk
Risk is an uncertain event or event
that might happen in future

Issue
Issue is an event that has already
occurred

Once risk is identified, its impact


should be analyzed and the
response plan should be prepared
Examples:
Lack of Business/Application
knowledge which may impact
the quality of work products

Once the impact of Issue is


analyzed, the same should be
resolved or escalated
Examples:
Client contact is not providing
review comments on
deliverables in spite of
repeated reminders

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Risks Key characteristics

Some of the risks are known risks e.g.


Working in a project with competitor (multi-vendor scenario)
Doing a project in a new geography (cultural differences)
Project attracting environmentalists attention
Accident during Travel

To manage known risks, risk response plan is prepared

Known risks are predicted / identified based on the past experience of


similar projects

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Risks Key characteristics

All the risks can not be predicted and such risks are known as unknown risks.
e.g.
Natural disaster

Unknown risks cannot be managed proactively

Most of the organizations address such risks through Business continuity and
Disaster Recovery plan

What is the difference between Risk and Issue?

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Risk Management


Project Risk Management includes the processes of conducting risk
management planning, identification, analysis, response planning
and monitoring and control on a project. The objectives of Project
Risk Management are to increase the probability and impact of
positive events, and decrease the probability and impact of
negative events in the project.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Risk Management Processes

Process

Process Group

Plan Risks Management,


Identify Risks, Perform
Qualitative Risk Analysis,
Perform Quantitative Risk
Analysis , Plan Risk Responses

Planning

Control Risks

Monitoring and Controlling

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management


Plan Risk Management is the process of defining how to conduct
risk management activities for a project. The Plan Risk
Management process should begin as a project is conceived and
should be completed early during project planning.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management


Inputs

Tools and Techniques

Outputs

Project management
plan
Project charter
Stakeholder register
Enterprise
Environmental Factors
Organizational
Process Assets

Analytical techniques
Expert Judgment
Meetings

Risk management
plan

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Inputs

Project Management Plan . All approved subsidiary plans and baselines should be
taken into consideration in order to make the risk management plan consistent with
them. The project management plan provides baseline or current state of riskaffected areas including scope, schedule and cost.
Project Charter can provide various inputs such as high level risks, high level
project descriptions and high level requirements.

Stakeholder Register , which contains all details related to the projects stakeholder
, provide an overview of their role.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Inputs


Enterprise Environmental Factors include the company culture and existing systems
that are dealt with and used by the project manager to run the project. The other
factors that can influence this process are risk attitudes and tolerances that describe
the degree of risk that an organization will withstand
Organizational Process Assets that can influence this process include risk
categories, common definitions of concepts and terms, risk statement formats,
standard templates, roles and responsibilities, authority levels for decision making,
lessons learned and stakeholder register

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management -Tools and Techniques


Analytical Techniques

Analytical techniques are used to understand and define the overall risk management
context of the project. Risk management context is a combination of stakeholder risk
attitudes and the strategic risk exposure of a given project based on the overall project
Context. Some of the examples of these techniques are , use of strategic risk scoring
Sheets, a stakeholder risk profile analysis may be performed to grade and qualify the
project stakeholder appetite and tolerance.
Expert Judgment
To ensure that a comprehensive risk management plan is developed expert advice
should be taken from groups or individuals with specialized knowledge on the subject
area.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management -Tools and Techniques


Meetings helps in development of the risk management plan. The
meeting will consist of the project manager, project team members, selected relevant
Stakeholders, and anyone other than these who will be performing the risk management
Activities
The following decisions can be taken at the meeting
1. Basic plans for conducting the risk management
2. Risk, cost elements and schedule activities are developed for inclusion in the project
budget and schedule respectively
3. Risk contingency reserve application approaches may be established or reviewed
4. Risk management responsibilities should be assigned
5. General organizational templates for risk management will be tailored as per the
project

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Outputs

Risk management plan describes the various risk management processes that will
be implemented, monitored and controlled throughout the project lifecycle. It can
include the following
1. Methodology Defines the approaches, tools and the data sources that may be
used to perform risk management on the project
2. Roles and Responsibilities Defines the lead, support and risk management
team membership for each type of activity in the risk management plan, assigns
people to these roles and clarifies their responsibilities
3. Budgeting - Assigns resources and estimates costs needed for risk management
for inclusion in the project cost baseline
4. Timing Defines when and how often the risk management process will be
performed throughout the project life cycle and establishes risk management
activities to be included in the project schedule.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Outputs

5. Risk Categories provides a structure that ensures a comprehensive process of


systematically identifying risks to a consistent level of detail and contributes to the
effectiveness and quality of Identify risks process.
An organization can use a previously prepared categorization of typical risk. A risk
breakdown structure (RBS) is one approach to providing such a structure, but it
can also be addressed by simply listing the various aspects of the project.
The risk categories may be revisited during the Identify risks process. A good practice
is to review the risk categories during the Risk Management Planning process prior to
their use in Identify risks process. Risk categories based on prior projects may need to
be tailored, adjusted or extended to new situations before those categories can be
used on the current project.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Outputs


Risk Breakdown Structure (RBS)

Source : PMI PMBOK Fourth


Edition

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Outputs


6. Definition of Risk Probability and
Impact

Source : PMI PMBOK Fourth


Edition

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Management - Outputs


7. Definition of Risk Probability and Impact matrix, A grid mapping of
probability of happening of risk and the impact if happens, Based on the probability
and impact values the risks are rated as High, Moderate and Low.
8. Revised stakeholders tolerance, based on the project may be revised in the risk
management process.
9. Reporting formats, define how the outcomes of the risk management process will
be documented , analyzed and communicated. It describes the content and format of
the risk register as well as any other risk report required.
10. Tracking. Tracking documents how risk activities will be recorded for the benefit
of the current project and how risk management processes will be audited.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Sources of Project Risks

C
om

e
op
Sc

m
un
ic
at
io
n

Project Initiation

Lifecycle and
Environment Variables

Availability
Productivity

Expectation
Feasibility

Project
Risk

Performance
Services
Materials

Requirement
Standards

Time Objectives
Restraints

t
en
m
re
cu

ua
lit
y

o
Pr

Restraints
Cost Objectives

Time

Pankaj Sharma, 9810996356

Cost

Human
Resource

Ideas
Directives
Data Accuracy

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks Process


Risk Identification process determines which risks may affect the project and
documenting their characteristics. It is an iterative process as risk can be identified at
any levels in the project. Irrespective of risks having positive or negative
consequences, all risks events and their consequences should be identified.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks
Inputs

Tools and Techniques

Risk management plan


Cost management plan
Schedule management
plan
Quality management plan
Human resource
management plan
Scope baseline
Activity cost estimates
Activity duration estimates
Stakeholder register
Project documents
Procurement documents
Enterprise environmental
factors
Organizational Process
Assets

Documentation reviews
Information gathering techniques
Checklist analysis
Assumptions analysis
Diagramming techniques
SWOT analysis
Expert Judgment

Pankaj Sharma, 9810996356

Outputs
Risk Register

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks - Inputs


Risk Management Plan provides inputs regarding the assignment of roles and
responsibilities, provision for risk management activities in the budget and schedule,
and categories of risk, which are sometimes expressed in a Risk Breakdown Structure.
Cost Management Plan provides processes and controls that can be used to help
identify risks across the project
Schedule Management Plan provides insight to project time / schedule objectives
and expectations which may be impacted by risks (Known and Unknown)
Quality management plan contains information related to the quality management
plan which is an important input to Identify risk process as the project specific
approach may generate or alleviate risk by its nature or structure

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks - Inputs


Human Resource Management Plan . The human resource management plan
provides guidance on how project human resource should be defined , staffed , and
eventually released. It can also contain roles and responsibilities, project organization
charts, and the staffing management plan, which forms a key input to identify risk
process.
Scope baseline is a component of scope statement which should be evaluated as
potential causes of project risk
Activity Cost Estimates provide a quantitative assessment of likely cost to complete
schedule activities and ideally are expressed as a range, with the width indicating the
degree of risk
Activity duration estimates are useful in identifying risks related to the time
allowances for activities or project as a whole, with the width of the ranges of these
estimates indicating the relative degree of risk.
Stakeholder register contains information on stakeholders, which will be useful in
interviewing the key stakeholders for their inputs to this process
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks - Inputs


Project Documents that may be useful while identifying risks are assumptions log,
work performance reports, network diagrams, baselines and other project information
that may be useful in identifying risks.
Procurement Documents , If the project requires external procurement of
resources , procurement documents become a key input to the identify Risks process.
The complexity and the level of detail of the procurement documents should be
consistent with the value of, and risks associated with, planned procurement.
Enterprise Environmental Factors that can influence this process are published
information which consists of commercial database, academic studies, published
checklists, benchmarking, industry studies and risk attitudes.
Organizational Process Assets that can influence this process are project files,
organizational and project process controls, risk statement templates and lessons
learned

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks Tools and Techniques


Documentation reviews includes structured review of the project documentation,
which may include project files, project plans, assumptions, historical information, and
other information from the project level as well as individual activity level. It is also
essential to identify the quantity of plans and the consistency between the plans
Information gathering techniques There are five key techniques for information
gathering

Brainstorming session is conducted by a facilitator and a group of Subject Matter


Expert (SMEs), who perform brainstorming and arrive at a comprehensive list of
project risks. Identified risks are categorized by the type of risks. A risk breakdown
structure (RBS) can be used as a framework for risk identification.

Delphi Technique is conducted by a facilitator and a group of experts, who are

given a questionnaire to fill. The results are collected and summarized and the results
are again circulated to get feedback from the experts.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks Tools and Techniques

Interviewing is one of the main sources of risk gathering techniques where


experienced project managers, stakeholders and subject matter experts are
interviewed for risk identification.

Root Cause identification involves identifying the causes of risks and improves
the understanding of the risk. It sharpens the definition of the risk and allows
grouping risks by causes. Effective risk response can be developed if the root
cause of the risk is addressed

Checklist Analysis can be based on historical information gathered from previous


similar projects. The lowest level of Risk Breakdown Structure (RBS) can also be used
as a checklist. Checklists can be updated at the end of the project completion to add
new risks, if any. Checklists are not a very much efficient method of identifying risks.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks Tools and Techniques


Assumption Analysis reviews the validity of assumptions defined in the
project to ensure that risks are not missed due to inaccuracy or
incompleteness of the assumption. Assumptions are tested against their strength. The
consequences that might occur if the assumptions were false are also analyzed. In
such cases the assumptions are considered as risks.
Diagramming Techniques may include Cause and effect diagrams also known
as Ishikawa or fishbone diagrams, System or process flowcharts, and
influence diagrams, which are graphical representation of situations showing
causal influences
SWOT Analysis examines the project from its Strengths, Weaknesses,
Opportunities and Threats to identify the probable risk events.

Expert Judgment involves participation of SMEs based on their previous


experience and area of expertise
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Identify Risks Outputs


Risks Register The identified risks are mentioned in the document called a Risk
Register, which becomes a component of the project management plan. Following
items can be included in the Risk Register

List of identified risks The list can state the EVENT that may occur , the
IMPACT and if CAUSE, EVENT may occur , then listing of EFFECT. Root causes of
the risk events can also be listed

List of potential responses If identified during the process of risk


identification, responses should be documented and it may be a useful input to the
plan Risk Responses process

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis


Prioritizing risks for further analysis or action by assessing and combining
their probability of occurrence and impact.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis


Inputs

Tools and Techniques

Outputs

Risk Management Plan


Scope baselines
Risk Register
Enterprise
environmental factors
Organizational Process
assets

Risk probability and impact


assessment
Probability and impact matrix
Risk data quality assessment
Risk categorization
Risk urgency assessment
Expert judgment

Project document
updates

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis - Inputs


Risk Management Plan documents the roles and responsibilities for :
Budgets and schedule activities for risk management
Risk Categories
Definition of probability and impact
The probability and impact matrix
Revised stakeholders risk tolerances
These inputs are documented during Perform Qualitative Risk analysis if not defined
during the risk management process.
Scope Baseline mentions the project deliverables, assumptions and constraints.
Depending on the project type, i.e. whether it is a state-of-the-art project or a
common recurring project type, the risks and level of uncertainty can be evaluated. A
project which is more complex than the ones the team has handled earlier and where
the uncertainty level is high requires more diligence during the process.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis - Inputs


Risk Register contains all the identified risks, its a component of the project
management plan
Enterprise Environmental Factors, may provide insight and context to the risk
assessment such as :
Industry studies of similar projects by risk specialists and
Risk databases that may be available from industry or proprietary sources

Organizational Process assets that can influence this process are information of
similar previous projects, studies of similar projects by risk specialists and risk
databases that may be available from industry or proprietary sources.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis Tools and


Techniques
Risk probability and impact assessment examines the likelihood that each specific risk will
occur and evaluates the potential effect of any of the project objectives such as time, cost, scope
or quality. It also evaluates the positive opportunities and negative threats. To assess the
probability and impact of each risk, a meeting or interview with subject matter experts either
internal or external to the organization is conducted where levels are assigned to each risk and
also the potential effects of these risks is evaluated in case the risk occurs
Probability and impact matrix assigns ratings to each risk and classifies them for either
perform quantitative risk analysis or plan risk responses. Ratings are assigned to risks based on
the combination of probability and impact. The risk may guide in providing risk responses as
indicated below

Risks that have a negative impact on the project objectives if they occur (threats) and that are

in the high risk (black zone of the matrix), may require priority action and aggressive response
strategies.
Threats in low risk (medium gray zone) may not require proactive management action
beyond being placed on a watch list or adding a contingency reserve.
For opportunities, those in the high-risk (black zone) that can be obtained most easily and offer
the greatest benefit should, therefore be targeted first
Opportunities in the low-risk (Medium gray zone) should be monitored

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis Tools and


Techniques
Probability Impact Matrix

Source : PMI PMBOK Fourth Edition

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis Tools and


Techniques
Risk data quality assessment involves determining the quality or usefulness of the data collected
to evaluate the risk as per the risk management plan. It involves examining degree to which the risk
is understood, and the accuracy, quality, reliability and integrity of the data about risk. If data quality
is unacceptable, it may be
necessary to gather higher-quality data.
Risk categorization Project risks can be categorized by the source of risk (e.g., using the RBS),
areas of the project affected (e.g. ,using the WBS) or other useful category (e.g. , project phase,
etc.) to determine areas of the project most exposed to the effects of uncertainty. Grouping risks by
common root causes can lead to developing effective risk responses.
Risk urgency assessment determines how soon the potential risks may occur, and it also identifies
near- term responses for those risks.
Expert judgment is required to assess the probability and impact of each risk to determine its
location in the probability impact matrix

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis Outputs


Risk Register Updates Risk register is initiated during identify risk process ,and is updated with
information from Perform Qualitative Risk Analysis.
Following are the updates from Perform Quantitative Risk Analysis:
Relative ranking or priority list of the project risks. The probability and impact matrix can be
used to classify risks according to their individual significance. The project manager can then use the
prioritized list to focus attention on those items of high significance to the project, where responses
can lead to better project outcomes. Risk may be listed by priority separately for cost, time, scope
and quality as organizations may value one objective over another. A description of the basis for the
assessed probability and impact should also be included for the assessed risks.
Risk grouped by categories can reveal common root cause of the risk or project areas requiring
particular attention.
Cause of risk or project areas requiring particular attention. Discovering concentrations of
risk may improve the effectiveness of risk.
List of risks requiring response in the near-term. Those risks that require an urgent response
and those that can be handled at a later date may be put into different groups.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Qualitative Risk Analysis Outputs


List of risks for additional analysis and response. Some risks might warrant
more analysis , including perform qualitative risk analysis as well as response action
Watch-lists of low priority risks. Risks that are not assessed as important in the
Qualitative Risk Analysis process can be placed on a watch-list for continued
monitoring
Trends in qualitative risk analysis results. As the analysis is repeated , a trend
for particular risks may become apparent and can make risk response or further
analysis more or less urgent/important

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis Process


Numerically analyzing the effect of identified risks on overall
project objectives.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis Process


Inputs

Tools and Techniques

Outputs

Risk management plan


Cost management plan
Schedule management
plan
Risk register
Enterprise
environmental Factors
Organizational process
assets

Data gathering and


representation techniques
Quantitative risk analysis and
modeling techniques
Expert Judgment

Project document
updates

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis -Inputs


Risk management plan provides guidelines , methods and tools to be used in
quantitative risk analysis.
Cost management plan contains baseline data related to cost, this may help to
determine the approach for Quantitative analysis for the project.
Schedule management plan contains baseline data related to schedule, this may
help to determine the approach for Quantitative analysis for the project.
Risk register is used as a reference point for performing quantitative risk analysis
Organizational process assets that can influence this process are information of
previous projects, studies of similar projects by risk specialists and risk databases that
may be available from industry or proprietary sources.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis -Inputs


Enterprise Environmental Factors may provide insight and context to the risk
analysis, such as :
Industry studies of similar projects by risk specialists, and
Risk databases that may be available from industry or proprietary sources.

Organizational process assets that can influence this process are information of
previous projects, studies of similar projects by risk specialists and risk databases that
may be available from industry or proprietary sources.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis - Tools and


Techniques
Data gathering and representation techniques

Interviewing : Experienced project managers , stakeholders and subject matter


experts are interviewed to quantify the probability and impact of risks on project
objective. During interviewing different kind of probability distribution are used. In
case a triangular one is used then the three values for 3 point estimates are taken as
input from the SMEs which is used to quantify risk for each element.
Probability distributions : are basically of two types Asymmetrical distribution
or Uniform distributions
Asymmetrical distribution depicts shape which are compatible with the data
typically developed during project risk analysis. Asymmetrical distributions are of two
types- Continuous probability distributions represent the uncertainty in values, such as
durations of schedule activities and costs of project components, whereas Discrete
probability distributions can be used to represent uncertain events, such as the
outcome of a test or a possible scenario in the decision tree.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis -Outputs


Uniform distributions can be used if there is no obvious value that is more likely
than any other between specified high and low bounds
Quantitative risk analysis and modeling techniques
Commonly used techniques in Quantitative Risk Analysis and Modeling techniques
include:
Sensitivity analysis. This aid in determining which risks have the most potential
impact on the project. It examines the extent to which the uncertainty of each project
element affects the objective being examined when all other uncertain elements are
held at their baseline values. Sensitivity analysis can be done by using the Tornado
diagram.
Expected monetary value (EMV) analysis is a statistical concept that calculates
the average outcome when the future includes scenarios that may or may not happen
(i.e. analysis under uncertainty). The EMV of opportunities will generally be expressed
as positive values while those of risks will be negative. EMV is calculated by
multiplying the value of each possible outcome by its probability of occurrence and
adding them together.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis - Tools and


Techniques

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis - Tools and


Techniques

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis

Source: A Guide to the Project Management Body ofPankaj


Knowledge,
Fourth Edition
Sharma,
9810996356
(PMBOK Guide) 2008 Project Management Institute, Inc., All Rights Reserved.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis Tools and


Techniques
Modeling and simulation. A project simulation uses a model that translates the
uncertainties or potential risks specified at a detailed level of the project into their
potential impact on project objectives.
Simulation techniques compute the project model using the inputs such as cost or
schedule to determine the probability distribution. Simulation techniques should be the
preferred one for predicting schedule or cost risks as compared to other techniques
Simulations are typically performed using the Monte Carlo technique. In a simulation,
the project model is computed many times (iterated) with the input values randomized
from a probability distribution function (e.g. cost of project elements or duration of
schedule activities) chosen for each iteration from the probability distribution of each
variable. A probability distribution is then calculated.
Expert Judgment Subject matter experts internal or external to the organization
such as Engineering or statistical experts are required to identify potential cost and
schedule impacts , to evaluate probability and to define inputs to tools

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quantitative Risk Analysis Outputs


Risk Register Updates The register initiated in the Identify Risks process and is updated in
Perform Qualitative Risk Analysis process. The risk register is a component of the
project management plan. Updates include the following components :

Probabilistic analysis of the project. Estimates are made of potential project schedule and
cost outcomes, listing the possible completion dates and costs with their associated confidence
levels. This output typically expressed as a cumulative distribution is used with stakeholder
risk tolerances to permit qualification of the cost and time contingency reserves

Probability of achieving cost and time objectives. With the project facing the risks, the
probability of achieving project objectives under the current plan can be estimated using
quantitative risk analysis results

Prioritized list of quantified risks. This list of risks includes those that pose the greatest
threat or present the greatest opportunity to the project. These include the risks that require
the greatest cost contingency and those that are most likely to influence the critical path.

Trends in quantitative risk analysis results. As the analysis is repeated a trend may
become apparent that leads to conclusions affecting risk responses

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses


Developing options and actions to enhance opportunities and

reduce threats to project objectives

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses


Inputs

Tools and Techniques

Outputs

Risk management
plan
Risk register

Strategies for negative risks or


threats
Strategies for positive risks or
opportunities
Contingent response strategy
Expert Judgment

Project
management plan
updates
Project document
updates

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses - Inputs


Risk management plan include roles and responsibilities, risk analysis definitions,
risk thresholds for low, moderate and high risks and the time and budget required to
conduct the project Risk Management Processes. Some components of the Risk
Management Plan that are important inputs to Plan Risk Responses may include risk
thresholds for low, moderate and high risks to help understand those risks for which
responses are needed, assignment of personnel and scheduling and budgeting for risk
response planning.
Risk register provides important inputs related to this process and this include the
relative rating or priority list of project risks, a list of risk for additional analysis and
response, trends in qualitative risk analysis results, root causes, risk grouped by
categories and a watch list of low priority risks.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Tools and Techniques


Strategies for negative risks or threats

Avoid. Risk avoidance involves changing the project management plan to eliminate the threat
posed by an adverse risk, to isolate the project objectives from the risks impact or to relax the
objective that is in jeopardy, such as extending the schedule or reducing scope. Some risks that
arise early in the project can be avoided by clarifying requirements, obtaining information, improving
communication or acquiring expertise.
Transfer. Risk transference requires shifting the negative impact of a threat, along with
ownership of the response to a third party. Transferring the risk simply gives another party
responsibility for its management, it doesnt eliminate it. Risk transference nearly always involves
payment of a risk premium to the party taking on the risk. Transference tools can be quite diverse
and can include but are not limited to the use of insurance, performance, bonds, warranties,
guarantees etc.
Mitigate. Risk Mitigation implies a reduction in the probability and impact of an adverse risk event
to an acceptable threshold. E.g. Conducting more tests, a more stable supplier etc

Accept. This includes passive or active acceptance. Passive acceptance requires no action , the
most common active acceptance strategy is to establish a contingency reserves, including amounts
of money or resources to handle known or unknown threats/ opportunities
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Tools and Techniques


Strategies for positive risks or opportunities

Exploit .This strategy may be selected for risks with positive impacts where the organization
wishes to ensure that the opportunity is realized. This strategy seeks to eliminate the uncertainty
associated with a particular upside risk by making the opportunity definitely happen. Directly
exploiting responses include assigning more talented resources to the project to reduce time to
completion or to provide better quality than originally planned.
Share. Sharing a positive risk involves allocating ownership to a third party who is best able to
capture the opportunity for the benefit of the project. E.g. forming risk-sharing partnerships, teams,
special-purpose companies or joint ventures, which can be established with the express purpose of
managing opportunities.
Enhance . This strategy modifies the size of an opportunity by increasing probability and /or
positive impacts and by identifying and maximizing key drivers of these positive-impact risks.
Seeking to facilitate or strengthen the cause of the opportunity and proactively targeting and
reinforcing its trigger conditions, might increase the probability

Accept. Accepting an opportunity is being willing to take advantage of it if it comes along, but not
actively pursuing it.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Tools and Techniques


Contingent response strategy. Some responses are designed for use only if certain
events occur. For some risks, it is appropriate for the project team to make a response
plan that will only be executed under certain predefined conditions, if it is believed
that there will be sufficient warning to implement the plan. Events that trigger the
contingency response such as missing intermediate milestones or gaining higher
priority with a supplier, should be defined and tracked
Expert Judgment. Expertise may be provided by any group or person with
specialized education, knowledge, skill, experience or training in establishing risk
responses.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Outputs


Project Management Plan Updates- Elements of the project management plan that
may be updated include

Schedule management plan


Cost management plan
Quality management plan
Procurement management plan
Human resource management plan
Scope baseline
Schedule baseline
Cost baseline.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Outputs


Project Document Updates. This include components of the Risk register such as

Identified risks their descriptions, areas of the project (e.g. WBS element) affected,
their causes (e.g. RBS element) and how they may affect project objectives
Risk owners and their assigned responsibilities
Output from the Perform Qualitative and Perform Quantitative Risk Analysis
processes, including prioritized lists of project risks and probabilistic analysis of the
project
Agreed upon response strategies
Specific actions to implement the chosen response strategy
Symptoms and warning signs of risks occurrence

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Risk Responses Outputs


Budget and schedule activities required to implement the chosen responses

Contingency reserves of time and cost designed to provide for stakeholders risk
tolerance.
Contingency plans and trigger that call for their execution
Fallback plans for use as a reaction to a risk that has occurred and the primary
response proves to be inadequate
Residual Risks that are expected to remain after planned response have been taken
as well as those that have been deliberately accepted
Secondary risks that arise as a direct outcome of implementing a risk response
Contingency reserves that are calculated based on the quantitative analysis of the
project and the organizations risk thresholds.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Risks
Implementing risk response plans, tracking identified risks, monitoring
residual risks, identifying new risks, and evaluating risk process
effectiveness throughout the project.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Risks
Inputs

Project management plan


Risk register
Work performance data
Work performance reports

Tools and Techniques

Risk reassessment
Risks audits
Variance and trend analysis
Technical performance measurement
Reserve analysis
Status meetings

Pankaj Sharma, 9810996356

Outputs
Work Performance
Information
Change requests
Project management
plan updates
Project document
updates
Organizational process
assets updates

Author - Pankaj Sharma

Connoisseur Solutions

Control Risks- Inputs


Project management plan consists of the risk management plan which includes the
assignment of people, time, and resources to the project risk management process.
Risk register which is a subset of the project management plan, includes a list of
identified risks agreed upon risk responses, specific implementation actions, symptoms
and warning signs of risk, residual and secondary risks, watch-list of low priority risks
and cost contingency reserves.
Work Performance Data includes information such as project deliverables status ,
schedule progress and incurred costs.
Work Performance reports gather and summarize the information required by the
stakeholders. This information is an analysis of the work performed during the
execution process vis--vis project baseline and is relevant to the risk management
process.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Risks- Tools and Techniques


Risk reassessment indicates reassessing the identified risks and identification of new risks as
defined in the risk management plan. Project risk reassessment should be performed regularly and it
can be included as an agenda item at the project status meetings.
Risks audits are scheduled audits that document the effectiveness of risk responses with respect to
their dealing with identified risks and their associated root causes. This aids in determining the
effectiveness of the risk management process.
Variance and trend analysis Performance data provides the data for variance and trend analysis.
Using this data and applying the earned value analysis and similar methods of project variance and
trend analysis; it is possible to monitor the overall project performance.
Technical performance measurement. This involves identifying the variance in the technical
performance from the planned technical schedule. Any variance from the defined milestone(s) can
aid the project team to forecast the degree of success in achieving the projects scope.
Reserve analysis. During the planning phase, contingency reserves are defines as a part of risk
response plan. During execution some of the reserves get exhausted. This tool determines if the
remaining reserves are sufficient to tackle the remaining risks.
Meetings. Status review meetings help in monitoring the risks
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Risks- Outputs


Work Performance Information , as a Control Risks output , provides a mechanism
to communicate and support decision making.
Change requests - During this process, there may be requested change due to
implementation of the contingency plans or workarounds. These changes are reviewed
and approved through the integrated change control process.
Project management plan updates may arise as a result of the approved change
requests
Project document updates- Project documents that may be updated as a result of
this process are assumptions log updates and technical documentation updates.
Organizational process assets updates- The risk management processes produce
information that should be documented for future reference. The organizational
process assets may be updated to include templates for the risk management plan,
including the probability and impact matrix and risk register, risk breakdown structure
and lessons learned from the project risk management activities.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

QUIZ !

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Quality Management

Author - Pankaj Sharma

Connoisseur Solutions

What is Quality?
Standard Definition:
Quality is the degree to which a set of inherent
characteristics fulfil requirements PMBOK
Guide (Glossary)

Conformance of requirements of the customer


Philip Crosby
Fitness for use Joseph Juran

Author - Pankaj Sharma

Connoisseur Solutions

What is Grade?
Grade is a category or rank given to entities having the same
functional use but different technical characteristics. (as per
PMBOK Guide ).

Author - Pankaj Sharma

Connoisseur Solutions

Importance of Quality?
Why is quality important?

Quality = Customer Satisfaction = Business growth


Quality = Pride in delivery = Higher Team Morale
Lack of quality = Cost
Lack of quality = Loss of customer confidence
Lack of quality = Loss of Reputation = Difficulty in gaining new
business
Lack of quality could lead to loss of life

Author - Pankaj Sharma

Connoisseur Solutions

Quality Principles

Quality is concerned with Prevention over Inspection.

Inspection is typically used to prove that the system works (because


youve put good quality practices in place), rather than a way to
reject the failures.

A good quote to remember is, Quality should be planned in not


inspected in because the cost of rework can be very high.

Author - Pankaj Sharma

Connoisseur Solutions

Project Quality Management


Processes and activities of the performing organization that determine
quality policies, objectives, and responsibilities so that the project will
satisfy the needs for which it was undertaken

Author - Pankaj Sharma

Connoisseur Solutions

Quality Management Processes

Process

Process Group

Plan Quality Management

Planning

Perform Quality Assurance

Executing

Control Quality

Monitoring and Controlling

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Management


Identifying quality requirements and/or standards for the project and product, and
documenting how the project will demonstrate compliance.
This process is important to ensure that the resulting product is of acceptable quality.
This is performed in parallel with the development of the project management plan
and other planning process

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Management


Inputs

Tools and Techniques

Outputs

Project Management
Plan
Stakeholder register
Risk register
Requirement
documentation
Enterprise
Environmental Factors
Organizational Process
Assets

Cost-benefit analysis
Cost of quality (COQ)
Seven basic quality tools
Benchmarking
Design of experiments
Statistical sampling
Additional quality planning
tools
Meetings

Management Plan
Process
improvement plan
Quality Metrics
Quality Checklists
Project document
updates

Quality

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Management - Inputs


Project Management Plan The following contents of the project management plan
are useful in creating Quality management plan

Scope baseline include Project scope statement, Work breakdown structure and WBS
dictionary.

Schedule baseline contains the accepted schedule performance measures , including start and
finish dates

Cost Base line documents the accepted time interval being used to measure cost performance

Other management plans . These plans contribute to the overall project quality and may
highlight actionable areas of concern with regard to the project quality

Stakeholder register aids in identifying those stakeholders possessing a particular


interest in, or having an impact on quality
Risk register will list all the risks that may have impact on the quality

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Management - Inputs


Requirement Documentation .Requirement documentation captures the
requirements that the project shall meet pertaining to stakeholder expectations. The
component of the requirements document include but is not limited to project and
quality requirement
Enterprise Environmental Factors that influence the plan quality management
process include , Government agency regulation, standard & guidelines and rules
specific to the application area, operating conditions that may impact the quality and
cultural perception that may influence expectations about quality
Organizational Process Assets that influence the Plan Quality Management
process include Organizational quality policies, procedures and guidelines. The
performing organizations quality policy, as endorsed by senior management , sets the
organizations intended direction on implementing its quality management approach;
Historical databases and lesson learned from previous phases or projects

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality -Tools and Techniques

Cost-benefit analysis considers the cost benefit trade offs, the benefit of quality
activities must outweigh the costs e.g. higher productivity, less rework and lower cost.
Cost of quality (COQ) considers the expense of all the activities within a project to
ensure quality and is the sum of the following
Appraisal Cost includes cost related to Audit, Inspection and Testing
Prevention Cost includes cost related Training, documentation , quality planning and
process reviews
Internal Failure Cost includes cost related to rework , scrap etc
External Failure Cost is related to the defects found by the customer. It includes
liabilities, Warranty work and lost business

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality -Tools and Techniques

Seven Basic Quality Tools The seven basic QC tools include

Control chart determines whether or not the process is stable or has


predictable performance. It illustrates the performance of project over time
and is typically used in projects , or operations , where there are repetitive
activities (Help desk, manufacturing , a series of testing). Upper (UCL) and
lower(LCL) control limits together form the acceptable range of variation in
the process. The UCL is typically set at +3 or +6 sigma while the LCL is set
at -3 0r -6 sigma. The table below shows the four sigma values
representing normal distribution.
Tolerances means the result is acceptable if it falls within the
range specified and, Control Limits means that the process is in
control if the result falls within the control limits.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality -Tools and Techniques


Single Point outside
the UCL is an
indication of process
breakdown

7 points on one side of CL could


indicate a change in the actual mean
of the process i.e the prediction
interval would have changed.

7 points moving in one direction


also indicates possible appearance
of a special cause that needs
investigation

UCL

90
80

CL

70
60
50

LCL

40
30
20
10
0
1

11

Source : http://en.wikipedia.org/wiki/Control_chart

13

15

17

19

21

23

25

27

29

31

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Tools and Techniques


Cause and effect diagram (Ishikawa diagram or Fishbone diagram) is a
graphical representation that depicts how different factors relate together and how
these relations may contribute to inadequate quality.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Tools and Techniques


Flowcharting depicts the sequence of operation, inspection ,decisions etc in a
system. This help in analyzing where quality problem may happen

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Tools and Techniques


Histogram is a statistical tool used in the analysis and determination of possible
solutions to quality control problem. It depicts how often the problem happens or its
frequency

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Tools and Techniques


Pareto Chart A Pareto chart is a specific c type of histogram, ordered by frequency of
occurrence. It shows how many defects were generated by type or category of
identified cause . Rank ordering is used to focus corrective action. The project team
should address the causes creating the greatest number of defects first.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality Tools and Techniques


Check sheets, which are also known as tally sheets and may be used as a checklist
when gathering data. Check sheets are used to organize facts in a manner that will
facilitate the effective collection of useful data about a potential quality problem.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality - Tools and Techniques

Benchmarking is a technique where projects quality standards are compared to best


practices of other projects . Based on the difference corrective actions are made to
the current project
Design of experiments approach relies on statistical what-if scenarios to determine
what variables within project will result in the best outcome
Statistical sampling is used to test a random sample instead of testing the entire
population. Attribute Sampling is the results conforms, or it does not where as,
Variable Sampling is when the result is rated on a continuous scale that measures
the degree of conformity.
Flowcharting depicts the relationship between the process steps graphically. It can
be used to predict where quality problems may happen
Proprietary quality management methodologies includes methodologies such
as Six Sigma, QFD, CMMI etc
Additional planning tool includes brainstorming, affinity diagrams and nominal
group techniques

Author - Pankaj Sharma

Connoisseur Solutions

Plan Quality - Outputs

Quality Management Plan defines how the project team will implement the
organizations quality policy
Process improvement plan explains how quality activities will be streamlined and
improved. The areas to consider include process boundaries, process configuration,
process metrics and targets for improved performance
Quality Metrics define how the quality will be measured. Quality metrics is also called
as operational definitions
Quality Checklists ensures that a set of required steps have been performed and
they were performed in the proper sequence
Project document updates that may be updated as plan quality is performed are
Stakeholder register and responsibility assignment matrix.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance


Auditing quality requirements and the results from quality control measurements to
ensure appropriate quality standards and operational definitions are used. This is
performed as an ongoing activity in the project life cycle

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance


Inputs

Tools and Techniques

Outputs

Quality management
Plan
Process improvement
plan
Quality Metrics
Quality control
measurements
Project documents

Quality management and


control tools
Quality Audits
Process Analysis

Change Requests
Project
Management Plan
Updates
Project Document
Updates
Organizational
Process Asset
Updates

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance - Inputs


Quality Management Plan describes the quality assurance and continuous process
improvement approaches for the project.
Process Improvement Plan The projects quality assurance activities should be
supportive of and consistent with the performing organizations process improvement
plan.
Quality Metrics provide an objective means of measurement
Quality control measurements are used to analyze and evaluate the quality
standards and processes of the performing organization
Project documents may influence quality assurance work and should be
monitored within the context of a system for configuration management.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance Tools and Techniques


Quality Management and Control Tools
The perform Quality Assurance uses the tools and techniques of the Plan Quality
Management and Control quality process. In addition, other tools that are available
include
Affinity Diagram. Similar to mind-mapping techniques in that they are used to
generate ideas that can be linked to form organized patterns of thought about a
problem. The creation of WBS may be enhanced by using the affinity diagram to give
structure to the decomposition of scope.
Process decision program charts (PDPC). Used to understand a goal in
relation to the steps for getting to the goal. The PDPC is a useful method for
contingency planning because it aids teams in anticipating intermediate steps that
could derail achievement of the goal.
Interrelationship digraphs. Provide a process for creative problem solving in
moderately complex scenarios that posses intertwined logical relationships for up to 50
relevant items.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance Tools and Techniques


Quality Management Other tools
Tree Diagrams. Also known as systematic diagrams and may be used to represent
decomposition hierarchies such as the WBS, RBS (Risk breakdown structure), and OBS
(Organizational breakdown structure ). As the tree diagrams permit the creation of
nested branches that terminates into a single decision point , they are useful as
decision trees for establishing an expected value for a limited number of dependent
relationships that have been diagrammed systematically.
Prioritization matrices. Identify the key issues and the suitable alternatives to be
prioritized as a set of decisions for implementation. Criteria are prioritized and
weighted before being applied to all available alternatives to obtain a mathematical
score that ranks the options.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance Tools and Techniques


Quality Management Other tools
Activity networks diagrams . Previously known as arrow diagrams. They include
both the AOA (Activity on Arrow) and , most commonly used , AON (Activity on Node)
formats of a network diagram.
Matrix diagrams. A quality management and control tool used to perform data
analysis within the organizational structure created in matrix. The matrix diagram
seeks to show the strength of the relationships between factors , causes , and
objectives that exist between the rows and columns that form the matrix.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance Tools and Techniques


Quality Audits - A quality audit is a structured , independent process to determine if
project activities comply with organizational and project policies , processes , and
procedures.
Process Analysis - follows the steps outlined in the process improvement plan to
identify needed improvements . This analysis also examines problems experienced ,
constraints experienced , and non value added activities identified during process
operations. Process analysis includes root cause analysis a specific technique used
to identify a problem , discover the underlying causes that lead to it, and develop
preventive actions.

Author - Pankaj Sharma

Connoisseur Solutions

Perform Quality Assurance Outputs


Change Requests are the outcome of updating quality standards and processes to
improve organizations effectiveness and efficiency
Project Management Plan Updates includes updates in Quality management plan,
Schedule management plan, Cost management plan as a result of Quality assurance
activities
Project Document Updates include updates to training plans , process
documentation and quality audit report
Organizational Process Asset Updates includes updating quality standards and
processes to improve organization's effectiveness and efficiency

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality
Monitoring and recording results of executing the quality activities to assess
performance and recommend necessary changes. This process takes place throughout
the project lifecycle , involves inspection , measurement and testing of deliverables
and their comparison with the baseline

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality
Inputs

Project management plan


Quality Metrics
Quality Checklists
Work Performance data
Approved change requests
Deliverables
Project documents
Organizational Process Assets

Tools and Techniques

Outputs

Quality Control
measurements
Validated
changes
Validated
deliverables
Work
performance
information
Change requests
Project
management plan
updates
Project document
updates
Organization
process assets
updates

Seven basic quality toold


Statistical sampling
Inspection
Approved change requests
review

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality- Inputs


Project management plan contains the quality management plan, which describes
how quality control will be performed within the project
Quality Metrics will be used to measure whether the work result meet quality
specification
Quality Checklists will assist in assessing conformance of the deliverables to quality
Work Performance Data evaluate actual progress against the planned progress.
Approved change requests include modification such as defect repairs, revised work
methods and revised schedule
Deliverables of the project are primary input to this process

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality - Inputs


Project Documents such as Agreements , Quality audit reports and change logs
supported with corrective actions plans, Training plans and assessments of
effectiveness.
Organizational Process Assets that influence the control quality process include,
but are not limited to:
The organizations quality standard and policies
Standard work guidelines
Issue and defect reporting procedures and communication policies

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality Tools and Techniques


Seven Basic Quality Tools

Statistical sampling is based on selecting and testing a random sample


instead of the entire population.
Inspection is the examination (reviews, peer reviews, audits, or walkthroughs) of a
work product to determine whether it conforms to documented standards.

Approve Change Request Review All approved change requests should be


reviewed to verify that they were implemented as approved

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality Outputs


Quality control measurements are the documented results of quality control
activities in the format specified during quality planning.
Validated changes involve inspection of any changed or repaired items and they will
be either accepted or rejected before notification of the decision is provided. Rejected
items may require rework.
Verified deliverables - A goal of quality control is to determine the correctness of
deliverables. The results of the execution quality control processes are validated
deliverables.
Work Performance Information is the performance data collected from various
controlling processes, analyzed in context and integrated based on relationship across
areas

Author - Pankaj Sharma

Connoisseur Solutions

Control Quality Outputs


Change requests as a result of corrective or preventive action. These changes should
be initiated in accordance with the Integrated change control Process
Project management plan updates includes update to quality management plan
and the process improvement plan
Project documents that may be updated include, but are not limited to, quality
standards, Agreements , Quality audit report and change log supported with corrective
action plans.
Organization process assets updates includes updates to Completed checklists,
lesson learned documentation etc.

Author - Pankaj Sharma

Exercise 4: Quality Management

Connoisseur Solutions

Revising Key Terms : Complete the following


1. ___________ is more important than inspection in Quality Management
2. When a process has data points above the upper limit or blow the lower
limit , those data points are out of _________
3. ______________ is the process of monitoring and recording results of
executing the quality activities to assess performance and recommend
necessary changes.

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise 4: Quality Management


Revising Key Terms : Complete the following
1. Prevention is more important than inspection in Quality Management
2. When a process has data points above the upper limit or below the lower
limit , those data points are out of Control
3. Perform Quality Control is the process of monitoring and recording
results of executing the quality activities to assess performance and
recommend necessary changes.

Author - Pankaj Sharma

QUIZ !

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Communications Management

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Communications Management


Processes required to ensure timely and appropriate generation, collection,
distribution, storage, retrieval and ultimate disposition of project
information. This knowledge area is made up of five processes to
determine what to communicate, to whom, how often, and when to
reevaluate the plan
An effective project manager spends about 90% of his time communicating
and 50% of that time is spent communicating with the project team

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Communication Model Various Elements


Sender

The person who needs to initiate the communication

Receiver

The person who gets the message

Medium

The thing used to transmit the message

Feedback

A response to a message

Noise

Something that interferes with the message

Encode

Modify a message so that it can be sent

Decode

Modify a message that has been sent so that it can


be understood

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 1: Communication Model


Revising Key Terms : Communication Model

1. _____________ is used to transmit the message


2. The person who gets the message is _____________
3. Something that interferes with the message is
_______________

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise : Communication Model


Revising Key Terms : Communication Model

1. Medium is used to transmit the message.


2. The person who gets the message is Receiver.
3. Something that interferes with the message is Noise.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Kinds of Communication

Formal vs Informal
Verbal vs Non-verbal
Official vs Non-official
Written vs Oral
Vertical vs Horizontal

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Kinds of Communication
Communication
Type

Example

Formal Written

RFP, Project Charter

Informal Written

E-mail, Memos

Formal Verbal

Speech

Informal Verbal

Conversations

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Additional Information

Nonverbal Communication
Means gestures, facial expressions, and physical appearance while you
are communicating your message

Para lingual Communication


Is the tone and pitch of your voice when you are telling people whats going
on with your project

Feedback
Is when you respond to communication.

Active listening
When you give feedback to someone who is speaking
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Kinds of Communication


Revising Key Terms : Kinds of Communication
1.

The Project manager writes a requirement specification for your project. This is an
example of ___________ kind of communication.
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written

2.

You sent an email to some of your team members to get more information about an
issue that has been identified on your project. This is an example of ___________ kind
of communication
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise 2: Kinds of Communication


Revising Key Terms : Kinds of Communication
1.

The Project manager writes a requirement specification for your project. This is an
example of ___________ kind of communication.
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written

2.

You sent an email to some of your team members to get more information about an
issue that has been identified on your project. This is an example of ___________ kind
of communication
A. Informal verbal
B. Informal written
C. Formal verbal
D. Formal written
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Communication Management Processes

Process

Process Group

Plan Communications
management

Planning

Manage Communications

Executing

Control Communications

Monitoring and Controlling

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communication Management


Determining the project stakeholder information needs and defining a
communication approach. It entails:

How often communication will be distributed and updated


Mode of communication (email, teleconference etc)
Information that will be included in the project communications
Stakeholders that will receive this information

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management


Inputs

Tools and Techniques

Outputs

Project
management plan
Stakeholder
Register
Enterprise
Environmental
Factors
Organizational
Process Assets

Communications
requirements analysis
Communications
technology
Communication models
Communication method
Meetings

Communications
Management Plan
Project
document updates

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Inputs


Project Management Plan provides information on how the project will
be executed , monitored , controlled , and closed.
Stakeholder Register provides the information needed to plan the
communication with project stakeholders.
Enterprise Environmental Factors , plan communication management
process is tightly linked with enterprise environmental factors, since the
structure of an organization will have a major effect on the projects
communication requirements.
Organization Process Assets, Lesson learned and historical information
are of particular importance because they can provide insights on both the
decision taken regarding communication issues and the result of the
decision in previous similar project
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Tools and


Techniques
Communication Requirements Analysis , The analysis of the
communication requirements determine the information needs of
the project stakeholders. The project manager should also consider the
number of potential communication channel or paths as an indicator of the
complexity of a projects communications. For Example if there are n
people involve in a project communication. The total number of channels
would be n(n-1)/2

4 people 6 channels

6 people 15 channels

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Tools and


Techniques
Communication Technology, The method used to transfer information
among project stakeholder may vary significantly. For example, a project
team may use technique from brief conversation to extended meetings, or
from simple written documents to extensive materials which are accessible
online as a method of communication .
Factors that can affect the choice of communication technology include :

Urgency of the need for information


Availability of technology
Ease of use
Project environment
Sensitivity and confidentiality of the information

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Tools and


Techniques
Communication Models, Basic model of communication includes
following parameters
Encode : Thoughts and ideas translated to a language which can be
understood by other
Message & Feedback Message : Output of encoding
Medium : The method used to convey the message
Decode : Converting feedback back to understandable form

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Tools and


Techniques
Communication Methods are broadly classified into
Interactive communication
Push Communication
Pull Communication
Meetings , The plan communication process requires discussion and
dialogue with the project team to determine the most appropriate way to
Update and communicate project information and to respond to request
from various stakeholders for that information. These discussions and
dialogue are commonly facilitated through meetings, which may be
conducted face to face or online and in different locations, such as the
project site or customers site.

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Outputs


Communication Management Plan contains the following
information

Stakeholder communication requirements


Information to be communicated including language , format , content
and level of detail;
Reason for distribution of that information
Time frame and frequency for the distribution of required information
and receipt of acknowledgement or response , if applicable
Person responsible for communicating the information
Person responsible for authorizing release of confidential information
Person or groups who will receive the information
Person or groups who will receive the information
Methods or technologies used to convey the information, such as
memos, e-mail, and /or press releases;
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Communications Management - Outputs


Communication Management Plan contains the following
information

Methods or technologies used to convey the information, such as


memos, e-mail, and /or press releases;
Glossary of common terminology
Flow charts of the information flow in the project, workflows with
possible sequence of authorization , list of report, and meeting plans
etc and
Communication constraints usually derived from a specific legislation
or regulation , technology , and organization policies etc

The communications management plan can also include guidelines and


templates for project status meetings , project team meetings , emeetings and e-mail messages.
Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Communication Plan
Communication
Team Briefing

Format
Restricted Intranet

Weekly Web Bulletin

Internal Intranet

Technical Incident
Report
Budget and Schedule
Detail
Accomplishments and
Setbacks
Schedule Milestones
Cost-to-Date Milestones
Current Top 5 Risks

Email

Frequency
Daily at 9:00

Distribution
Team and stakeholders
with access to secure
project info area
Weekly
Team, sponsor, senior
management
Immediately after Incident Webmaster, IT Department

Spreadsheets and Detailed


Gantt Chart
Email and Intranet

Bi-Weekly
Weekly

Sponsor, Senior
Management
All internal stakeholders

Email and Intranet


Email and Intranet

Weekly
Weekly

All internal stakeholders


All internal stakeholders

Email and Intranet

Weekly

All internal stakeholders

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Communications
This process updates stakeholders on the progress of the project as per the
communications management plan. The information that gets distributed
includes status reports, review meetings etc

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Communications
Inputs

Tools and Techniques

Outputs

Communication
management plan
Work performance
reports
Enterprise
environmental factors
Organizational
process assets

Project
communications
Project
management plan
updates
Project
document updates
Organizational
Process assets
updates

Communication
technology
Communication models
Communications method
Information management
system
Performance reporting

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Communications Process

This process tracks how the project is progressing against the plan
and provide report to stakeholders on status, progress metrics
(Schedule and Cost variance) and forecasts

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Communications Process


Inputs

Tools and Techniques

Outputs

Project
management plan
Project
communications
Issue log
Work performance
data
Organizational
Process assets

Work
performance
information
Change
requests
Project
management plan
updates
Project
document updates
Organizational
Process assets
updates

Information
management system
Expert Judgment
Meetings

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Communication Management


Communication Channels
Channels = n(n-1)/2
Where n is the number of people on the project
If there are five people on the project, then we have 10
communication channels.
This is calculated as follows: 5*(5-1) /2 = 10

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Communication Filtering
When a portion of the message is lost in communication.

Common reasons of filtering:


Ambiguous language
Predefined mindset
Hidden agenda in message content

Senders reputation
Senders status in the organization
Dysfunctional emotional behavior
Environmental Background

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Communication Management

Revising Key Terms : Complete the following


1.
2.
3.

A contract is always __________ communication


A stakeholder with high interest and low power must be kept
_______ of your projects progress
Information should be distributed to all _______

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise : Communication Management

Revising Key Terms : Complete the following


1.
2.
3.

A contract is always formal communication


A stakeholder with high interest and low power must be kept
Informed of your projects progress
Information should be distributed to all stakeholders

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 4: Number of Lines of Communication

Practicing the concept


You are managing a project with five team members and one
sponsor. Draw all the channels of communication on this picture.
Solution: Lines of Communication = 6 * (6 1)/2 = 15

Pankaj Sharma, 9810996356

Author - Pankaj Sharma

QUIZ !

Pankaj Sharma, 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Project Human Resource Management

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Human Resource Management


Processes that organize, manage and lead the project team. Project team is comprised of the

people with assigned roles and responsibilities for completing the project.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Human Resource Management Processes

Process

Process Group

Plan Human Resource


Management

Planning

Acquire Project Team

Executing

Develop Project Team

Executing

Manage Project Team

Executing

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management

Identifying and documenting project roles, responsibilities and required skills,


reporting relationships and creating a staffing management plan.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management


Inputs

Project Management

Plan
Activity Resource
Requirement
Enterprise
Environmental Factors
Organizational Process
Assets

Tools and Techniques


Organization charts and
position descriptions
Networking
Organizational theory
Expert Judgment
Meetings

pankaj sharma, 9810996356

Outputs

Human Resource
Plan

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management- Inputs


Project Management Plan provides useful information such as , how work will
be executed to accomplish the project objectives, A change management plan that
documents how changes will be monitored and controlled, how integrity of the
project baselines will be maintained . Need and method of communication among
stakeholders.
Activity Resource Requirements provides information on the preliminary resource
requirement of the project. These requirements are progressively elaborated during
the Human resource planning phase.
Enterprise Environmental Factors that can influence this process include
Organization culture and structure , Existing human resources, Personnel
administration policies and marketplace condition.
Organizational Process Assets that can influence this process include
Organizational standard processes and policies and standardized role descriptions,
Templates for organizational charts and position descriptions, and Historical
information on organizational structures that have worked in previous projects.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management -Tools and


Techniques

The objective of Organization charts and position descriptions is to ensure that


each work package has an unambiguous owner and all the team members have clear
understanding of their roles and responsibilities. Three formats that are most common
for creating this document are hierarchical, matrix, and text-oriented

Fig Reference PMBOK 4th Edition

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management -Tools and


Techniques

Sample RACI Chart

Fig Sample RACI Chart-Reference PMBOK 4th Edition

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management-Tools and


Techniques

Networking is the process of communicating with others (within Organization,


industry or professional environment). It includes luncheon meetings, informal
conversations including meetings and events, trade conferences, and symposia.
Networking within the organization helps project manager in understanding the
political and organizational force that will influence the project.
Organizational theory -Different organizational structures have different individual
response, individual performance, and personal relationship characteristics.
Organizational theory provides information regarding the way in which people, teams,
and organizational units behave. This information helps in effective planning and in
reducing the amount of time, cost and effort needed to create the plan

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Human Resource Management - Outputs

Human Resource Plan has three components roles and responsibility, organization
charts and the staffing management plan.

Roles and responsibility details role, authority, responsibility and competency


for the resource requirement of the project.
Project Organization Chart is a graphic display of project team members and
their reporting relationships. It can be formal or informal, highly detailed or
broadly framed, based on the needs of the project.
Staffing Management Plan details how and when the project will be staffed,
released, training needs of resources, recognition & rewards, compliance and
resource calendar. It also includes policies and procedures that protect team
members from safety hazards.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team


Confirming human resource availability and obtaining the team necessary to complete
project assignments

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team


Inputs

Tools and Techniques

Human resource
management plan
Enterprise
environmental factors
Organizational process
assets

Pre-assignment
Negotiation
Acquisition
Virtual Teams
Multi- criteria decision analysis

pankaj sharma, 9810996356

Outputs
Project Staff
Assignments
Resource Calendars
Project
Management Plan
Updates

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team - Inputs


Human Resource Management Plan provides information on how project human
resource should be identified, staffed, managed, controlled and eventually released.
It also contains details on skills required , roles and responsibilities for a particular
position and the competency level that a project demands.
Enterprise Environmental Factors that can influence this process are existing
information for human resources including who are available, competency levels,
prior experience personnel administration policies, processes and procedures
Organizational Process Assets that can influence the Acquire Project Team process
include, but are not limited to, organization standard policies, processes, and
procedures.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team Tools and Techniques


Pre-assignment refers to assigning the project team members in advance, this is
needed when specific skilled resources are required or the resources are defined in the
project charter
Negotiation with functional managers and other project managers is required if
project manager needs specific skills for the project
Acquisition is needed when specific skills are not available in the organization. This
can involve hiring individual consultants or subcontracting work to another
organization
Virtual teams can be defined as groups of people with a common goal who fulfill their
roles with little or no time spent meeting face to face. Communication is important in
such teams, the availability of electronic communication such as e-mail, audio
conferencing, web-based meetings and video conferencing has made such teams
feasible.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team Tools and Techniques


Multi Criteria Decision Analysis, Selection criteria are often used as a part of
acquiring the project team . By use of a multi- criteria decision analysis tool, criteria
are developed and used to rate or score potential team members. The criteria are
weighted according to the relative importance of the needs within the team. Some
examples of selection criteria that can be used to score team members are:
Availability . Identify whether the team member is available to work on the
project within time period needed. If there are any concerns for availability during
project timeline.
Cost. Verify if the cost of adding the team member is within the prescribed budget.
Experience, Verify that the team member has the relevant experience that will
contribute to the project success.
Ability, Verify that the team member has the competencies needed by the project.
Knowledge and Skills. The team member has relevant knowledge of the
customer, similar implemented projects, nuances of the project environment and
relevant skills to use a project tool.
Attitude that includes his ability to gel with other members of the team.
International factors such as location of the team member, time zone and
communication capabilities
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Acquire Project Team Outputs

Project Staff Assignments includes assignment of resource to each role defined


initially. The documentation of these assignments can include a project team directory,
memos to team members, and names inserted into other parts of the project
management plan, such as project organization charts and schedules.
Resource Calendars documents the time periods that each project team member
can work on the project. This should be created keeping in mind each persons
schedule conflicts, involvement in other projects and his/her holiday
Project Management Plan Updates Elements of the project management plan that
may be updated include, but are not limited to the human resources plan.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team


Process of improving competencies, team interaction, and the overall team
environment to enhance project performance.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team


Inputs

Tools and Techniques

Outputs

Human resource
management plan
Project staff
assignments
Resource Calendars

Team Performance
assessments
Enterprise
Environmental Factors
updates

Interpersonal Skills
Trainings
Team building activities
Ground rules
Co-location
Recognition and rewards
Personnel assessment tools

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team - Inputs


Human Resource Management Plan provides guidance on how project human
resource should be defined , staffed , managed , controlled , and eventually released.
It identifies training strategies and plans for developing the project team. Items such
as rewards, feedback, additional training and disciplinary actions can be added to the
plan as a result of ongoing team performance assessments and other form of project
team management.

Project staff Assignments details the assignments or activities to be performed by


the Project team
Resource Calendars identify the times when the project team members can
participate in team development activities.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team Tools and Techniques


Interpersonal Skills also referred to as soft skills are very critical for team
development. It include skills such as empathy, influence, creativity, and group
facilitation, these are valuable assets when managing the project team.
Trainings help in enhancing the competencies of the project team members.
Training can be formal or informal. Training can be formal or informal ; classroom
based ,on line, instructor-led or on the job training.

Team building activities are critical to improve interpersonal relationships,


resolving team issues and to keep the team motivated so that team members work
together effectively . They are critical for the team members who operate virtually
from remote locations . Project managers should obtain top management support,
obtain commitment of team members, introduce appropriate rewards and
recognition, create a team identity, manage conflicts effectively, promote trust and
open communication among team members, and, above all, provide good team
leadership to build effective teams.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team Tools and Techniques


Traditionally, a team goes through five stages of development.

Forming: a group of people come together to accomplish a shared purpose.


Storming: Disagreement about mission, vision, and approaches combined with the
fact that team members are getting to know each other can cause strained
relationships and conflict.

Norming: The team has consciously or unconsciously formed working relationships


that are enabling progress on the teams objectives.
Performing: Relationships, team processes, and the teams effectiveness in working
on its objectives are synching to bring about a successfully functioning team.

Adjourning : In the adjourning phase, the team completes the work and moves on
from the project.
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team Tools and Techniques


Histogram is a statistical tool used in the analysis and determination of possible
solutions to quality control problem. It depicts how often the problem happens or its
frequency
Ground Rules define the acceptable behavior by the project team members. This
allows team members to discover values that are important to one another
Co-Location involves placing many or all of the most active project team members in
the same physical location to enhance their ability to perform as a team. E.g. create a
war room where all the team members work, or co-locate the project team at the
customers site.
Recognition and Rewards helps in keeping the team motivated and to boost their
spirits. People are motivated if they feel they are valued in the organization and this
value is demonstrated by the rewards given to them.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of


Motivation
Abraham Maslows Hierarchy of Needs (1954)
(In order of priority)

Self
Actualization

Self fulfillment, growth, learning

Esteem

Accomplishment, Respect, Attention,


Appreciation

Social

Love, affection, approval, friends,


association
Security, stability, freedom from threat
and physical harm

Safety
Physiological

Air, water, food, house, clothing

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


McGregors Theory X

The average worker is inherently lazy and needs supervisions

The average worker dislikes work and avoids work whenever possible

To induce adequate effort, the supervisor must threaten punishment and exercise careful supervision

The average worker avoids increased responsibility and seeks to be directed

Theory X relies on Strict Rules, Performance incentives, Rewards, Threats to job


security

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


McGregors Theory Y

Workers are willing to do the job without continuous supervision

The average worker wants to be active and finds the physical and mental effort on the job satisfying

Greatest results come from willing participation which will tend to produce self-direction towards goals without coercion and
control

The average worker seeks opportunity for personal improvement and self respect

Theory Y relies on worker participation in decisions, cordial manager-worker relationships, worker


designed job methodology, worker individualism

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


William Ouchis

Theory Z

According to Theory Z, people who dont fit either Theory X or Theory Y are really a combination of the two.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


Herzbergs Motivation Hygiene Theory
As per this theory presence of hygiene factors doesnt motivate someone , however their
absence de-motivates. Motivation factors will motivate but they will not work without the
hygiene factors in place.
I.

Motivating factors
I.

Achievements

II.

Recognitions

III. Work Itself


IV.

Responsibility

V.

Advancement

VI.

Possibility for growth

Hygiene Factors are Company Policy, Paycheck, status, Relationship with co-workers

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation

Expectancy Theorem of Motivation by Victor Vroom


1. You need to give people an expectation of a reward in order to motivate them
2. The rewards or awards should be achievable, if they are impossible to achieve,
they will de-motivate them

3. People are motivated by achievements


4. People expect to be rewarded for achievements

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation

McLellands Achievement Theory


1.
2.
3.
4.

People need achievement, power and affiliation to be motivated.


Achievement is when someone performs well and is recognized for it
Power means he or she has a lot of control or influence in the company
Affiliation , a strong sense from being a part of a working team and having good
relationships with coworkers

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


Ouchis Theory

1. Formulated from Quality movement and Quality circles


2. Both Management and Workers need to be involved, and they should trust each
other

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Recognition and Rewards Theories of Motivation


The Oldham-Hackman job characteristics model

I.

Skill Variety the number of job skills that the job holder has the opportunity
to exercise

II.

Task Identity the degree to which your work and its result are identifiable as
belonging to you

III. Task Significance the degree to which your job has an influence on others
IV. Autonomy the discretion you have about the way that you do the job
V.

Feedback the information that you get back about the result of your work

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Forms of Power
Below are the five Kinds of Power that can help the project managers maximize his ability
to influence and manage the team

Formal positional, granted by organizational/upper mgmt

Expert power earned through a recognized level of knowledge or skill in a


specific area

Reward the power to give a positive consequences, like promotions, salary rise
etc.

Penalty the power to provide negative consequences, like suspension,


termination, reprimands

Referent power gained when team members admire, and willingly follow an
individual as a role model

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Forms of Power at Work


Revising Key Terms : Forms of Power at Work
1. A functional manager assigns a tester to work on the project managers
team. This is an example of _________ power
2. The programmers always listen to the team lead because hes really a
good software architect. This is an example of _________ power

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answers to Exercise : Forms of Power at Work


Revising Key Terms : Forms of Power at Work
1. A functional manager assigns a tester to work on the project managers
team. This is an example of Legitimate power
2. The programmers always listen to the team lead because hes really a
good software architect. This is an example of Expert power

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Leadership Style
Following are the leadership style that managers can use to interact with organizational
members

Autocratic traditional figure of a boss who makes binding decisions


regardless of what subordinates think or desire

Laissez-Fare Other extreme of autocratic, the staff can pursue anything


they wish, enhances free thinking

Democratic participative, decisions made jointly by management and staff

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Develop Project Team Outputs


Team Performance assessments gives insight to project manager on areas that
need improvement.

Enterprise Environmental Factors Updates The Enterprise environmental factors


that may be updated as a result of the Develop Project Team process include, but are
not limited to, personnel administration, including updates for employee training
records and skill assessments.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team


Tracking team member performance, providing feedback, resolving issues and
managing changes to optimize project performance.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team


Inputs

Tools and Techniques

Outputs

Human resource
management plan
Project staff
assignments
Team Performance
Assessments
Issue log
Work performance
reports
Organizational process
assets

Change Requests
Project
management plan
updates
Project document
updates
Enterprise
Environmental Factors
updates
Organizational
process assets
updates

Observation and
Conversation
Project performance
appraisals
Conflict management
Interpersonal skills

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team - Inputs


Human Resource Management Plan contains the human resource plan which
includes roles and responsibilities, project organization and staffing management plan
Project staff assignments provide a list of team members assigned to the project
that needs to be evaluated under the appraisal process
Team Performance Assessment is done on continuous basis formally or informally
by the project management team. This helps in issues and conflict resolution
Issue Log, Issues arise in the course of managing the project team. An issue log can
be used t document and monitor who is responsible for resolving specific issues by a
target date.
Work Performance Reports provide information on project performance vis--vis
project management plan. It aids in determining the future resource requirements,
recognition and rewards and updates to the staffing management plan.
Organizational process assets that can influence this process include certificates of
appreciation, newsletters, website, bonus structure, corporate apparel and
organizational perquisites

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team Tools and Techniques


Observation and Conversation are used to stay in touch with the team members
work and attitudes. The project management team monitors progress toward project
deliverables, accomplishments that are a source of pride for team members, and
interpersonal issues.
Project performance appraisals helps in clarification of roles and responsibilities,
constructive feedback to team members, discovery of unknown or unresolved issues,
development of individual training plans, and the establishment of specific goals for
future time periods.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team Tools and Techniques


Interpersonal skills use a combination of technical, human and conceptual
skills to analyze situations and interact appropriately with team members. E.g.
Leadership, Influence and effective decision making
Conflict Management results in greater productivity and positive
working relationships. When managed properly, differences of opinion can lead to
increased creativity and better decision making. Below are the source of conflicts on
the Project
More than 50% conflicts on the projects are due to disagreement over
schedules, priorities and resources)
1.
Schedules
2.
Project Priorities
3.
Human Resources
4.
Technical Opinions
5.
Procedures
6.
Cost
7.
Personality
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team Tools and Techniques


Conflict Resolution Methods

Confronting/Problem Solving. Treating conflict as a problem to be solved by


examining alternatives; requires a give-and-take attitude and open dialogue.
Withdrawing/Avoiding. Retreating from an actual or potential conflict
situation.
Smoothing/Accommodating. Emphasizing areas of agreement rather than
areas of difference.
Compromising. Searching for solutions that bring some degree of satisfaction to
all parties.
Forcing. Pushing ones viewpoint at the expense of others; offers only win-lose
solutions.
Collaborating. Incorporating multiple viewpoints and insights from differing
perspectives; leads to consensus and commitment.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team Outputs


Change Requests due to change in staffing. The change request should be processed
and approved through integrated change control process. Staffing changes may include
moving people to different assignments , outsourcing some of the work, and replacing
the team member who leave.
Project Management Plan Updates may include changes in the human resource
management plan
Project Documents Updates that may be updated include
Issue Log
Role description
Project staff assignment
Enterprise Environmental Factors updates include input to organizational
performance appraisals and personnel skill updates
Organizational process assets updates include Historical information and lessons
learned documentation Templates, and Organizational standard processes.
pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Manage Project Team Outputs


Enterprise Environmental Factors updates include input to organizational
performance appraisals and personnel skill updates
Organizational process assets updates include Historical information and lessons
learned documentation Templates, and Organizational standard processes.
Change Requests due to change in staffing. The change request should be processed
and approved through integrated change control process
Project management plan updates include updates to staffing management plan

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Resolving Conflict


Revising Key Terms : Conflict Management
Figure out the conflict resolution technique that is being used in the cases
below:
1. I dont really have time to deal with this right now. Just figure it out and
get back to me.
2. Hold on a second. Lets sit down and figure out what the real problem is.

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Resolving Conflict


Revising Key Terms : Conflict Management
Figure out the conflict resolution technique that is being used in the cases
below:
1. I dont really have time to deal with this right now. Just figure it out and
get back to me - Withdrawal
2. Hold on a second. Lets sit down and figure out what the real problem is
Problem Solving / Confronting

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Halo Effect
Extending the impression of a particular outstanding trait to influence the total
judgment of a person E.g. : Assuming that a person who is good in technology will be
a good project manager

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 3: HR Management
Revising Key Terms : Complete the following
1.
2.

The main output of the Acquire Project Team process is


___________ assignments
The _________ effect causes people with technical expertise
to be put in the position for which they are unqualified

pankaj sharma, 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 3: HR Management
Revising Key Terms : Complete the following
1.
2.

The main output of the Acquire Project Team process is


Project Resources assignments
The Halo effect causes people with technical expertise to be
put in the position for which they are unqualified

pankaj sharma, 9810996356

Author - Pankaj Sharma

QUIZ !

pankaj sharma, 9810996356

Connoisseur Solutions

Connoisseur Consulting Solutions

Author - Pankaj Sharma

Project Stakeholder Management

Author - Pankaj Sharma

Connoisseur Solutions

Key Learning Objectives


Who are Stakeholder and effective way to manage them
Project Stakeholder Management processes

Identify Stakeholder
Plan Stakeholder Management
Manage Stakeholder Engagement
Control Stakeholder Engagement

Quiz Quarter

Author - Pankaj Sharma

Connoisseur Solutions

What is Stakeholder Management?


Stakeholder Management includes the processes required to
identify people, groups or organizations that could impact or be
impacted by the project, to analyze stakeholder expectations and
their impact on the project and to develop appropriate
management strategies for effectively engaging stakeholder in
project decisions and execution.

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders
Identify Stakeholders is the process of identifying the people, groups or
organizations that could impact or be impacted by decision, activity or
outcome of the project analyzing and documenting relevant information
regarding their interest , involvement, interdependencies, influence and
potential impact on project success.
The key benefit of Identify stakeholder process is that it allows the project
manager to identify the appropriate focus for each stakeholder or group of
stakeholders

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders
Inputs

Project Charter

Procurement

Stakeholder

analysis

documents

Expert judgment

Enterprise

Meetings

Environmental
Factors

Tools & Techniques

Organizational
process assets

Outputs
1. Stakeholder

Register

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders - Inputs


Project Charter - can provide information about internal and
external parties related with the project and affected by the result or
the execution of the project, such as project sponsor(s), customers,
team members , groups and departments participating in the project,
and other people or organizations affected by the project.
Procurement Documents If the project is the result of a
procurement activity or is based on an established contract , the
parties in that contract are key project stakeholders. Other relevant
parties such as suppliers should also be considered as part of the
project stakeholder list.

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders - Inputs


Enterprise Environmental Factors relevant to Identify
stakeholders are:
Organizational culture and structures
Governmental or industry standards (e.g. Regulations, product
standards); and
Global , regional or local trends and practices or habits.
Organizational Process Assets relevant to Identify
stakeholder are :
Stakeholder register templates
Lessons learned from previous projects or phases and
Stakeholder register from previous projects.

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders -Tools and Techniques


1. Stakeholder Analysis - Identifies the interests, expectations and influence of the
stakeholders and relates them to the purpose of the project.
There are multiple classification models used for stakeholders analysis , such as :
Power /Interest grid, grouping the stakeholders based on their level of authority
(power) and their level or concern (interest) regarding the project outcomes
Power /Influence grid, grouping the stakeholders based on their level of authority
(power) and their active involvement (influence) in the project.
Influence/ Impact grid , grouping the stakeholders based on their active involvement (
Influence ) in the project and their ability to effect changes to the projects planning or
execution ( impact ).
Salience model, describing classes of stakeholders based on their power (ability to
impose their will), urgency (need for immediate attention), and legitimacy (their
involvement is appropriate).

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders -Tools and Techniques


2. Expert Judgement include suggestions and recommendations of Subject Matter
Experts such as :
Senior Management
Other units within the organization
Identified key stakeholders
Project managers who have worked on projects in the same area
Subject Matter Experts in the business project area
Industry groups and consultants
Professional and technical associations , regulatory bodies and non governmental
organizations (NGOs)
3. Meetings Project meetings designed to develop an understanding of major project
stakeholders and they an be used to exchange and analyze information about roles ,
interest , knowledge and the overall position of each stakeholder facing the project.

Author - Pankaj Sharma

Power Grid Matrix

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Identify Stakeholders - Output


The main output of Identify Stakeholder process is stakeholder
register. It contains following details.
Identification Information :
Name, Organizational Position, Location, Role in the project, Contact
info
Assessment Information:
Major Requirement, Main expectation, Potential Influence
Stakeholders Category:
External/Internal, Supporter, Neutral, Resister

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management


Plan Stakeholder Management is the process of developing
appropriate management strategies to effectively engage
stakeholders throughout the project life cycle, based on the
analysis of their needs, interests and potential impact on the
project success.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management


Inputs

Tools & Techniques

Outputs

Project Management

Expert judgment

Plan

Meetings

Management Plan

Stakeholder Register

Analytical Techniques

Procurement document

Enterprise

Environmental Factors

Organizational process
assets

Stakeholder

updates

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Inputs


Project Management Plan - The information that is taken from
Project Management Plan to create stakeholder plan includes
Life cycle selected for the project and the processes that will be
applied to each phase;
Description of how work will be executed to accomplish the project
objectives;
Description of how human resources requirements will be met and
how roles and responsibilities, reporting relationships, and staffing
management will be addressed and structured for the project;
Change management plan that documents how changes will be
monitored and controlled
Need and techniques for communicating among stakeholders
.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Inputs


Stakeholder Register Provides the information needed to plan
appropriate ways to engage project stakeholders.
Enterprise Environmental Factors - such as organizational
culture, structure, and the political climate. These factors help in
determining the best options to support a better adaptive process
for managing stakeholders
Organizational Process Assets such as lessons learned
database and historical information are of particular importance as
they provide insight into previous stakeholder management plans
and their effectiveness. These can be used to plan the stakeholder
management activities for the current project.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Tools and


Techniques
Expert Judgment Suggestions and guidance should be sought
from groups or individuals with specialized training or subject matter
expertise or insight into the relationships within the organization,
such as
Senior Management
Project Team Members
Other units or individuals within the organization
Identify key stakeholders
Project managers who have worked on the projects in the same
area
Industry groups and consultants
Professional and technical associations , regulatory bodies and non
governmental organizations.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Tools and


Techniques
Meetings Should be held with experts and the project team to define
the required engagement levels of all stakeholders. This information
can be used to prepare the stakeholder management plan

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Tools and


Techniques
Analytical Techniques includes comparison of the current
engagement level of stakeholder to the planned engagement levels
required for successful project completion. Stakeholder engagement
throughout the lifecycle of the project is critical to project success.
The engagement level of the stakeholders can be classified as follows:

Unaware Unaware of project and potential impacts


Resistant Aware of project and potential impacts and resistant to
change
Neutral Aware of project yet neither supportive nor resistant
Supportive Aware of project and potential impacts and supportive
to change
Leading Aware of project and potential impacts and actively
engaged in ensuring the project is a success.

Author - Pankaj Sharma

Connoisseur Solutions

Stakeholders Engagement Assessment


Matrix

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management Outputs


Stakeholder Management Plan

is a component of the project


management plan that explains the management strategies required to effectively
engage stakeholders. In addition to the data gathered in the stakeholder register it
provides.
Desired and current engagement levels of key stakeholders
Scope and impact of change to stakeholders
Identified interrelationships and potential overlap between stakeholders
Stakeholder communication requirements for the current project phase;
Information to be distributed to stakeholders, including language, format,
content , and level of detail;
Reason for the distribution of that information and the expected impact to
stakeholder engagement;
Time frame and frequency for the distribution of required information to
stakeholders.
Method for updating and refining the stakeholder management plan as the
project progresses and develops.

Author - Pankaj Sharma

Connoisseur Solutions

Plan Stakeholder Management - Outputs


Project Document Updates includes project schedules and
stakeholder register

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement


Manage Stakeholder Engagement is the process of communicating and
working with stakeholders to meet their need/expectations, address
issues as they occur, and foster appropriate stakeholder engagement in
project activities throughout the project life cycle.

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement


Inputs

Tools & Techniques

Outputs

Stakeholder Management

Communication Methods

Issue Log

Plan

Interpersonal skills

Change Requests

Communication

Management Skills

Project Management

Management Plan

Change Log

Organizational process
assets

Plan updates

Project documents
updates

Organizational process
assets updates

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement - Inputs


Stakeholder Management Plan This plan explains the management strategies
required to effectively engage stakeholders.
Communication Management Plan This plan explains what to be communicated o
whom and at what frequency. What to be communicated to external stakeholders or
not
Change log Document changes that occur during a project. It is important to
communicate . The impact of these changes on cost, time and quality should be
communicated to the relevant stakeholders.
Organizational Process Assets - The organizational process assets that can
influence the Manage Stakeholder Engagement process include Issue management
procedures, Change management procedure and Organizations communication
requirement.

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement Tools


and Techniques
Communication Methods The methods of communication identified for each
stakeholder in the communications management plan are utilized during stakeholder
engagement management. Based on the stakeholders communication requirements,
the project manager decides how, when, and which of these communication methods
are to be used in the project
Interpersonal skills - This include conflict management skills, communication
skills, ability to overcome resistance to the change.

Management Skills - The project manager applies management skills such as


negotiation, facilitation and ability to influence people to coordinate and harmonize
the group toward accomplishing
the project objectives

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement Outputs


Issue Log It is good to maintain an issue log for managing stakeholder issues. This
log is updated as new issues are identified and current issues are resolved.
Change Requests - Managing stakeholder engagement may result in a change
request to the product or the project. It may also include corrective or preventive
actions to the project itself or to the interaction with the impacted stakeholders, as
Appropriate
Project Management Plan updates - Stakeholder management plan or
communication management plan might be updated when new stakeholder
is identified Project documents updates Organizational process assets
updates

Author - Pankaj Sharma

Connoisseur Solutions

Manage Stakeholder Engagement Outputs


Project documents updates - Project documents that may be updated include, but
are not limited to, the stakeholder register. This is updated
as information on stakeholders change, when new stakeholders are identified, or if
registered stakeholders are no longer involved in or impacted by the project, or other
updates for specific stakeholders are required.
Organizational process assets updates - The organizational process assets that may
be updated include,
Project records. Project records include correspondence, memos, meeting minutes, and
other documents describing the project.
Lessons learned documentation. Documentation includes the root cause analysis of
issues faced, reasoning behind the corrective action chosen, and other types of lessons
learned about stakeholder management. Lessons learned are documented and
distributed, and become part of the historical database for both the project and the
performing organization.

Author - Pankaj Sharma

Connoisseur Solutions

Control Stakeholder Engagement


Control Stakeholder Engagement is the process of
monitoring overall project stakeholder relationship
and adjusting strategies and plans for engaging
stakeholders.

Author - Pankaj Sharma

Connoisseur Solutions

Control Stakeholder Engagement


Inputs
1. Project Management Plan
2. Issue Log

Tools & Techniques


1. Information Management

Outputs
1. Work Performance

Systems

Information

3. Work Performance Data

2. Expert Judgment

2. Change Requests

4. Project Documents

3. Meetings

3. Project Management
Plan updates
4.

Project documents
updates

5. Organizational process
assets updates

Author - Pankaj Sharma

Connoisseur Solutions

Inputs - Control Stakeholder Engagement


1. Project Management Plan - The information related to Project Management that will be utilized
include
The lifecycle selected for the project and the processes that will be applied to each phase.
How work will be executed to accomplish the project objectives
How human resources requirements will be met, how roles and responsibilities , reporting
relationships, and staffing management will be addressed and structured for the project;
A change management plan that documents how change will be monitored and controlled
Needs and techniques for communication among stakeholders
2. Issue Log The issue log is updated as new issues are identified and current issues are resolved
3. Work Performance Data include reported percentage of work completed , technical
performance measures, start and finish dates of schedule activities, number of change requests,
number of defects , actual costs, actual durations etc.
4. Project Documents Multiple project documents originating from initiation , planning, execution
, or control processes may be used as supporting inputs for controlling stakeholder engagement.
These include
Project schedule
Stakeholder register
Issue Log
Change Log
Project Communications

Author - Pankaj Sharma

Connoisseur Solutions

Tools and Techniques - Control Stakeholder


Engagement
1. Information Management Systems An information management system
provides a standard tool for the project manager to capture , store, and distribute
information to stakeholders about the project cost, schedule progress, and
performance.
2. Expert Judgement - Suggestions should be sought from subject matter expert
such as :
Senior Management
Other units or individuals within the organization
Identified key stakeholders
Project Managers who have worked on projects in the same area
Subject matter experts in the business or project area
Industry groups and consultants
Professional and technical associations, regulatory bodies and non
governmental organization

3. Meetings Status review meetings are used to exchange and analyze information
about stakeholder engagement

Author - Pankaj Sharma

Connoisseur Solutions

Outputs- Control Stakeholder Engagement


1. Work Performance Information is the performance data collected from various
controlling processes, analyzed in context , and integrated based on relationships
across areas. Thus work performance data have been transformed into work
performance information.
2. Change Requests - Analysis of project performance and interactions with
stakeholders often generates change requests. These change requests include
Recommended corrective actions include changes that bring the expected
future performance of the project in line with the project management plan
and ;
Recommended preventive actions can reduce the probability of incurring
future negative project performance.

Author - Pankaj Sharma

Connoisseur Solutions

Outputs- Control Stakeholder Engagement


1. Project Management Plan Updates Elements of the project management
plan that may be updated include :
Change Management Plan
Communication management plan
Cost Management Plan
Human resource management plan
Procure management plan
Quality management plan
Requirements management plan
Risk management plan
Schedule management plan
Scope management plan
Stakeholder management plan

Author - Pankaj Sharma

Connoisseur Solutions

Outputs- Control Stakeholder Engagement


1. Project Documents Updates Following documents may be updated.
Stakeholder register - This is updated as information on the stakeholders
change, when new stakeholders are identified, or if registered stakeholders
are no longer involved in or impacted by the project, or other updates for
specific stakeholders are required.
Issue log This is updated as new issues are identified and current issues
are resolved.

Author - Pankaj Sharma

Connoisseur Solutions

Outputs- Control Stakeholder Engagement


1. Organizational Process Assets Updates Following are the organization
process assets that may be updated.
Stakeholder notifications - Information may be provided to stakeholders
about resolved issues, approved changes and general project status.
Project reports - Formal and informal project reports describe project
status and include lessons learned, issue logs, project closure reports , and
outputs from other knowledge areas
Project presentations - Information formally or informally provided by the
project team to any or all project stakeholders

Project records Project records include correspondence, memos, meeting


minutes, and other documents describing the project.
Feedback from stakeholders Information received from stakeholders
concerning project operations can be distributed and used to modify or
improve future performance of the project.
Lesson learned documentation - Documentation includes the root cause
analysis of issues faced, reasoning behind the corrective actions chosen, and
other types of lessons learned about stakeholder management. Lesson
learned are documented and distributed so that they become part of the
historical database for both the project and performing organization.

Author - Pankaj Sharma

Connoisseur Solutions

Project Procurement Management

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Procurement Management


Processes necessary to purchase or acquire products, services or results needed from
outside the project team.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Procurement Management Processes

Process

Process Group

Plan Procurements

Planning

Conduct Procurements

Executing

Control Procurements

Monitoring and Controlling

Close Procurements

Closing

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements
Plan Procurements is the process of documenting project purchasing decisions,
specifying the approach, and identifying potential sellers

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements
Inputs

Tools and Techniques

Project management plan


Requirements
documentation
Teaming agreements
Risk Register
Project Schedule
Activity cost estimates
Stakeholder register
Enterprise Environmental
Factors
Organizational Process
Assets

Make or buy analysis


Expert Judgment
Market research
Meetings

pankaj sharma, Mobile 9810996356

Outputs
Procurement
management plan
Procurement
statements of work
Make or buy decisions
Procurement
documents
Source selection
criteria
Change requests
Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements - Inputs


Project Management Plan - describes the need, justification, requirements, and current
boundaries for the project. It consists of Scope statement, WBS and WBS dictionary.
Requirements documentation include Important information about project
requirements that is considered during planning for procurements.
Risk Register include risk-related information such as identified risk, risk owners and risk responses
Activity resource requirements state the type and quantities of resources needed for project
activities
Project Schedule provides information on project timelines and milestones
Activity cost estimates are used to evaluate the price quoted in the bids or proposals received
from potential sellers
Stakeholder Register describes the details on the participants and their interest in the project

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements - Inputs


Enterprise Environmental Factors includes condition of marketplace, what product and service
are available in the market, who is the seller and what are his terms and condition
Organizational Process Assets includes policies and procedures , standards ,guidelines,
performance measurement criteria, defect management procedures, change control procedures and
historical information. Some organizations may define certain constraint on procurement decisions.
This also include the various types of contractual agreements used by the organization, All legal
contractual relationships generally fall into one of two broad families: either fixed price or
cost reimbursable. Also, there is a third hybrid type commonly in use called the time and materials
contract.
The next slides describes the different contract types in details

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements -Tools and Techniques


Types of Contract
Time & Material T & M

The seller is paid for the amount of time it


takes to accomplish the work and he is
also reimbursed for the materials used for
the project

Firm Fixed Price - FFP

The seller is paid a fixed price for an


agreed upon unit of work done by him

Fixed Price Incentive Fee FPIF

The seller is paid a fixed price plus an


incentive amount for achieving pre-agreed
project metrics

Fixed Price with Economic Price


Adjustment Contracts FP-EPA

The seller is paid a fixed price. The


contract is reviewed at pre-defined
intervals in the project for adjustments to
the contract price based on certain
parameters

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements -Tools and Techniques


Types of Contract
Cost Plus Fixed Fee CPFF

The contractor is reimbursed its cost plus


an additional fixed fee. Not desirable from
the buyers point of view

Cost Plus Incentive Fee - CPIF

Seller is reimbursed for an agreed upon


performance cost along with a preestablished fee plus an incentive bonus. In
this case, the buyer and seller share the
uncertainty to a certain degree

Cost Plus Award Fee

Seller is reimbursed for an agreed upon


performance cost plus all legitimate cost

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements -Tools and Techniques


Make or buy analysis helps project management team to decide whether it is beneficial
(in terms of cost and quality) to procure a product or service or it can be produced within
the organization.

Market Research includes examination of industry and specific vendor capabilities.


Procurement teams may leverage information gained at conferences , online reviews and
a variety of sources to identify market capabilities.
Meetings , by collaborating with potential bidders , the organization purchasing the
material or service may benefit while supplier can influence a mutually beneficial
approach or product.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements - Outputs

Procurement management plan describes how the procurement process will be


managed from planning procurement to close procurement. It contains detail on
1. Types of Contracts to be used
2. Risk management issues
3. Whether independent estimates will be used and whether they are needed as
evaluation criteria
4. Standardized procurement documents, if needed
5. Process of managing multiple providers (sellers)
6. Coordination with other project aspects
7. Any constraints and assumptions that could affect planned procurements
8. Handling the long lead times to purchase certain items from sellers and
coordinating the extra time needed to procure these items with the development
of the project schedule
9. Handling make or buy decision and linking them to the Estimate Activity
Resources and Develop schedule process.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements - Outputs

Procurement statements of work defines the products, services , or result to be


procured in details so that the seller can be sure that he can provide appropriate
products , services, or results. It is developed from the project scope baseline and
defines only that portion of the project scope that needs to be procured and stated in
the contract.
Procurement documents define the buyers requirements and facilitate complete
and correct response from the prospective sellers in the form of a proposal, which
aids in the selection of the seller(s). The most commonly used procurement
documents are RFP (Request for Proposal), IFB (Invitation for Bid and RFI (Request for
Information

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Plan Procurements - Outputs

Source selection criteria are the set of guidelines on the basis of which a particular
seller is selected from among the proposals received. Some of the source selection
criteria are sellers understanding of need , overall- life-cycle cost, technical capability,
Risk, past performance of the seller, Financial capacity, Warranty etc
Make or - Buy Decisions, A make-or- buy analysis results in a decision of whether
particular work can best be accomplished by the project team or needs to be
purchased from outside sources.
Change requests may be there during this process due to updates in the project plan
or its subsidiary plan and other components. These changes are reviewed and
approved through the integrated change control process.
Project Documents Updates that may be updated include requirement
documentation, requirements traceability matrix and risk register.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 1: Make or Buy Analysis


Practicing Key Concepts
Youve been contracted by a construction company to manage their contracting.
They have a choice of either buying an excavator or renting it. To buy it, the
company would have to pay $105,000, but owning it will require approximately
$10,000 in maintenance costs per year. The price to rent the excavator is $5000 per
month, with a one-time service charge of $2000. Whats the minimum number of
months the company needs to use the excavator in order for it to make sense to
buy it rather than rent?
1.
2.
3.
4.

8 months
16 months
21 months
25 months

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Plan Procurements

Which document are we referring below?


1. A type of procurement document used to request proposals from
prospective sellers of products or services.
2. A type of procurement document used to request price
quotations from prospective sellers of common or standard
products or services.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 2: Plan Procurements

Which document are we referring below?


1. A type of procurement document used to request proposals from
prospective sellers of products or services.
RFP
2. A type of procurement document used to request price
quotations from prospective sellers of common or standard
products or services.
RFQ

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement
Conduct Procurements is the process of obtaining seller responses, selecting a seller,
and awarding a contract

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement
Inputs

Tools and Techniques

Project Management
Plan
Procurement
documents
Source selection
criteria
Seller proposals
Project documents
Make or buy decisions
Teaming agreements
Organizational Process
Assets

Bidder conferences
Proposal evaluation techniques
Independent estimates
Expert Judgment
Advertising
Analytical Techniques
Procurement negotiation

pankaj sharma, Mobile 9810996356

Outputs
Selected sellers
Agreements
Resource calendars
Change requests
Project
management plan
updates
Project document
updates

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement - Inputs


Project Management Plan contains procurement management plan and this
describes how the procurement process will be managed from preparing procurement
documentation through close procurements
Procurement Documents as explained earlier provide an audit trail for contracts and
other agreements
Source Selection criteria are set of guidelines, either subjective or objective, that
are used by the performing organization to select a particular contract/ vendor (seller)
from among the proposals received.
Seller proposals are responses to the procurement document package that will be
used for selection of the sellers by the organizations evaluation body

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement - Inputs


Project documents that are important inputs to this process include risk register and
risk related contract decisions.
Make- or -buy decisions as explained earlier is based on the outcome of Make orbuy- Analysis. The factors that influence the decision making include , core
competencies of the organization, value delivered, risk associated with meeting the
need in a cost=effective manner and internal capability as compared to the vendor
community.
Procurement Statement of Work provides suppliers with a clearly stated set of
goals , requirements, and outcomes from which they can provide a quantifiable
response. The statement of work include

Specifications
Quantity desired
Quality levels
Performance data, period of performance, work location and other requirements

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement - Inputs


Organizational Process Assets that can influence this process include listings of
prospective and previously qualified sellers and information on relevant past
experience with sellers, prior agreements

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement Tools and Techniques


Bidder conferences are meetings wherein the prospective supplier (sellers) are called
in to ensure that all the supplier have a clear understanding of the work defined in the
procurement documents.
Proposal evaluation techniques are used to evaluate the proposals by giving a
rating score to each proposal
Independent estimates are sometimes prepared by the procuring organization using
internal expert in estimation or an outside professional estimator
Expert Judgment includes a team of experienced and skilled experts for evaluation of
proposals under various areas of expertise as mentioned in the procurement
documents and contract

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurement Tools and Techniques


Advertising is used by the performing organization to invite the potential sellers to be
Contracted
Analytical Techniques, procurements involve defining a need in such as way
that vendors can bring value through offerings. To ensure that the need can be and is
met, analytical techniques can help organizations identify the readiness of a vendor to
provide the desired end state. By examining past performance information, teams may
identify areas that may have more risk and that need to be monitored closely to
ensure success of the project
Procurement negotiations between the buyers and the potential sellers are
performed with the goal of reaching mutual agreement on the contractual terms and
conditions. The goal is to reach a win-win scenario between the buyer and seller.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurements Outputs


Selected Sellers are those who have met the evaluation criteria and negotiated a
draft contract with the buyer, which will become the actual contract when the contract
is awarded
Agreement is a formal document governing the relationship between the buyer and
the seller. The contract describes the work to be performed and perhaps the way in
which the work will be performed. An important to include with the contract is how
disputes will be resolved. Depending upon the application area, an agreement can also
be called an understanding , a contract, a subcontract, or a purchase order.
Regardless of the document complexity , a contract is a mutually binding legal
agreement that obligates the seller to provide the specific products, services, or
results and obligates the buyer to compensate the seller. The major component of
agreement are:

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Conduct Procurements Outputs


Major components of an agreement

Statement of work or deliverables


Schedule baselines
Performance reporting
Period of performance
Roles and responsibilities
Sellers place of performance
Pricing
Payment Terms
Place of delivery
Inspection and acceptance criteria
Warranty
Product Support
Limitation of liability
Fees and retainer
pankaj sharma, Mobile 9810996356

Connoisseur Solutions

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurements Outputs


Major components of an agreement

Penalties
Incentives
Insurance and performance bonds
Subordinate subcontractor approvals
Change request handling and
Termination clause and alternative dispute resolution (ADR) mechanism. The ADR
method can be decided in advance as a part of the procurement award.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurements Outputs


Resource Calendar state the availability and the quantity of contracted resource and
the project period (dates) during which the resources are active or idle
Change Requests to the project management pan, its subsidiary plans and other
components are processed for review and disposition through the Perform Integrated
Change Control process.
Project Management Plan Updates, the elements of the project management plan
that may be updated include Cost baseline, Scope baseline, Schedule baseline,
Communication management plan, and Procurement management plan.
Project Document Updates, the project documents that may be updated include,
requirement documentation, requirement traceability documentation, risk register and
stakeholder register.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Conduct Procurements Outputs


Selected Sellers are those who have met the evaluation criteria and negotiated a
draft contract with the buyer, which will become the actual contract when the contract
is awarded
Procurement Contract Award is a formal document governing the relationship
between the buyer and the seller. The contract describes the work to be performed
and perhaps the way in which the work will be performed. An important to include
with the contract is how disputes will be resolved.
Resource Calendar state the availability and the quantity of contracted resource and
the project period (dates) during which the resources are active or idle
Change Requests As discussed earlie
Project Management Plan Updates As discussed earlier
Project Document Updates As discussed earlier
pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurements
Managing procurement relationships, monitoring contract performance and
making changes and corrections as needed.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement
Inputs

Tools and Techniques

Outputs

Project Management
Plan
Procurement
documents
Agreement
Approved change
requests
Work Performance
reports
Work performance
Data

Contract change control system


Procurement performance
reviews
Inspections and audits
Performance reporting
Payment system
Claims administration
Records management system

Work performance
information
Change requests
Project
management plan
updates
Project document
updates
Organizational
process assets update

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement - Inputs


Project Management Plan describes how the procurement process will be managed
from developing procurement documentation through contract closure.
Procurement documents contain complete supporting records for administration of
the procurement processes; this includes procurement contract awards and the
statement of work
Agreements As Explained earlier Agreements are understanding between parties,
including understanding of the duties of each parties.
Approved change requests include modifications to the terms and condition of the
contract including the procurement statement of work, pricing and the description of
the products , services or results.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement - Inputs


Work Performance Reports is a seller performance related documentation that
include
Technical documentation. Sellers- developed technical documentation and other
deliverable information are provided in accordance with the terms of the contract.
Work performance information. The sellers performance reports indicate which
deliverables have been completed and which have not.
Work Performance Data includes information on a regular basis of the performance
and status of the sellers project work activities. It includes information such as which
deliverables have been completed and which have not, whether the quality standards
defined for the project are being adhered to and the payment is being made for the
costs that have been stated in the contract.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement Tools and Techniques


Contract change control system is a component of integrated change control system
and it describes the process of updating the contract
Procurement performance reviews are periodic reviews initiated by the buyer to
measure the projects progress against the plan
Inspections and audits are done by the buyer and supported by the seller to identify
any non-compliance to the projects process or deliverables.
Performance reporting provides information to management about how effectively
the seller is achieving his contractual objective.
Payment system helps to ensure that invoices and payments match up and that the
right amount is being invoiced for the right deliverables at the right time.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement Tools and Techniques


Claims administration are basically disagreements (about scope or change request).
It is preferred that the claims should be resolved by the parties involved as per the
dispute resolution procedure . If not resolved by the parties involved, then the disputes
are resolved by the process of Arbitration whereby a third neutral party is given the
task of getting the dispute resolved.
Records management system is a part of the project management information
systems (PMIS). In addition to the documentation, it also consists of processes, control
functions, and automated tools. This system should index various documents for their
easy retrieval and archival.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement Outputs


Work Performance Information provides a basis for identification of current or
potential problems to support later claims or new procurements. By reporting on the
performance of a vendor, the organization increases the knowledge of the
performance of the procurement , which supports improved forecasting , risk
management and decision making. Performance reports also assist in the event there
is a dispute with the vendor.
Change requests, changes to the project management plan, its subsidiary plans, and
other components , such as the cost baseline, schedule baseline, and procurement
management plan may result from the control procurement process.
Project management plan updates includes update to the procurement
management plan ,schedule baseline and cost baseline

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Control Procurement Outputs


Project Documents Updates include updates to procurement documentation, it
include the procurement contract with all supporting schedules, requested unapproved
contract changes , and approved change requests. It also includes any seller
developed technical documentation and other work performance information such as
deliverable s, seller performance reports and warranties, financial documents including
invoices and payment records, and the result of contract related inspections.
Organizational process assets updates that will be updated as a result of this
process includes documentation related to sellers unsatisfactory performance, request
for contract changes or clarifications, payments made by the buyer to the seller and
also the documents related to sellers performance.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise : Control Procurements


Revising Tools and Techniques
1. ___________________ involves process to change the
procurement contract. It can involve the approvals, paperwork
and the dispute resolution mechanism required for the change
control.
2. ______________ system refers to how the payments are made to
the seller.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Answer to Exercise : Control Procurements


Revising Tools and Techniques
1. Contract Change Control System involves process to change the
procurement contract. It can involve the approvals, paperwork
and the dispute resolution mechanism required for the change
control.
2. Payment system refers to how the payments are made to the
seller.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Close procurements
Process of completing each project procurement. It involves administrative activities
such as updating the project records with results and archiving the information for
future use and finalizing open claims in accordance with the terms and conditions
stated in the contract document
Close Procurement process closes the procurement applicable to that phase of the
project

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Close procurements
Inputs

Tools and Techniques

Outputs

Project Management
Plan
Procurement
documentation

Procurement audits
Procurement Negotiations
Records management system

Closed
procurements
Organizational
process assets
updates

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Close procurements- Inputs


Project Management Plan Discussed Earlier

Procurement documentation includes information on contract schedule, scope,


quality and cost performance along with all contract change documentation, payment
records and inspection results. This information can be used for lessons learned
information and as a basis of evaluating contractors for future contracts.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Close procurements- Tools and Techniques


Procurement Audits is a structured review of the procurement processes from the
plan procurements process through administer contracts process. The purpose of
procurement audit is to identify the improvement areas and the flawed procurement
processes and/ or procedure. This will assist in reusing the successful/updated
procedures in other projects.
Procurement Negotiations refers to the settlement for any outstanding issues,
claims and disputes through negotiation. Whenever the settlement cannot be achieved
through direct negotiation, some form of alternative dispute resolution(ADR) including
mediation or arbitration can be explored
Records Management System is used by the project manager to manage contract
and procurement documentation and records. Contract documents and
correspondence are archived through the records management system as part of the
close procurement process

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Close procurements- Outputs


Closed Procurements is the process in which the buyers contract administrator
sends formal written notice to the seller that the contract is complete.
Organizational Process Assets Updates will be updated due to modification in the
procurement files and lessons learned documentation. Also, deliverable acceptance
and rejection will be stated in the final contract documentation with supporting
reasons.

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 5: Contract Type


Reviewing Associated Risks to Buyers & Sellers
Explain the risks from buyer and seller perspective in case of the following
types of contracts
1.
2.
3.
4.
5.
6.

Firm fixed price


Fixed price plus incentive fee (FPIF)
Cost plus fixed fee
Cost plus award fee
Cost plus incentive fee
Time and Material (T&M)

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Procurement Management

Negotiations Techniques

Deadline: imposing a deadline to reach an agreement


Stalling: one party may claim that an agreement cannot be finalized
because of his limited authority

Fair and Responsible: a negotiator may claim that the price for a
product is equitable because thats what another company is
paying.
Delay: are useful when tempers are beginning to flare, to divert from
a subject, etc (Ex: arrival of refreshments, request for recess etc)
Withdrawal: one party may attack an issue, then retreat
pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Project Procurement Management

Negotiations Techniques

Arbitration: a third party may be brought in when agreement cannot


be reached. (out of court settlement)

Fait Accompli: a party may claim that what is being asked for has
already been accomplished and cannot be changed

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

Connoisseur Solutions

Exercise 5: Procurement Management

Revising Key Terms : Complete the following


1. An Invitation for __________ is a document that ask sellers for
the price of work
2. The buyer selects the __________ selection criteria before
contacting potential sellers
3. The ___________contract has high risk to the seller because the
seller must cover costs that go beyond the price

pankaj sharma, Mobile 9810996356

Author - Pankaj Sharma

QUIZ !

pankaj sharma, Mobile 9810996356

Connoisseur Solutions

Das könnte Ihnen auch gefallen