ESTIMATE
AMOUNT Rs 2037000.00
Materials,
Providing
Earth
bore,
Erection
of
Switchgear,Strung
Counter Signed
Counter Signed
EXECUTIVE ENGINEER
SUBSTATION ERECTION
TRICHY
ASSISTANT ENGINEER
SUBSTATION ERECTION-II
PERAMBALUR
To
ASSISTANT ENGINEER
SUBSTATION ERECTION-II
PERAMBALUR
/2012Dt 23.6.2012
SUB:-ElectricityRe-Revised Labour estimate as per cost data20112012 for the proposed Krishnapuram 110/22KV Substation into Grid ssSubmission-Regarding
Herewith I enclosed the following Estimate for the proposed Krishnapuram 110/22kv ss
into Grid Substation under the newly revised cost data for the year 2011-2012..This scheme
has been administratively approved vide B.PNO:395 dated 03.09.2010.
Sl
NAME OF WORK
No
01 Supply of MS Steel, Fabrication of
AMOUNT
Steel Structures
,Painting and Erection of Steel Structures ,Supply of Steel
and Erection of Station Earth mat ,Earth Electrodes, Earth
Risers for Pole and Supply of Steel ,Fabrication, Painting
of First Primer, and First Finish coat Erection of Minor
Steel Structures, Supply & Earthing of Steel Materials,
Providing Earth bore ,Erection of Switchgear, Strung
Bus,Isolators,Busbars,Cabling and Termination, Supply
and Erection of Station Auxiliaries etc at Krishnapuram
110/22kv ss for the Conversion of Grid ss Under DCW
Basis
Rs2037000.0
0
Copies
enclosed
Two
I request that the estimate may be forwarded for early sanction please.
K SRIDHAR
ASSISTANT ENGINEER
SUBSTATION ERECTION-II
PERAMBALUR
Endt No:-AEE/SSE/PBLR/C
/F.KRISHNAPURAM 110/22KV SS /2012Dt
Sir,
Submitted to EE/SSE/TRICHY for favour of furthur action please.
.6.2012