CONCRETE ANCHOR BLOCK
INSTALLATION DETAILS
Issue Date
Rev. No.
Date
06/86
2
10/91
Standard
Engineering Standards
4802
Page
2 of 2
Issue Date
Rev. No.
Date
Line Size
2" - 3"
4"
6"
8"
10"
12"
14"
16"
18"
20"
24"
26"
30"
Blocks
Req'd
1
1
1
1
1
1
1
1
2
2
2
2
2
A
3' - 0"
3' - 6"
5' - 0"
6' - 6"
8' - 0"
9' - 6"
12' - 0"
15' - 0"
8' - 0"
9' - 0"
11' - 0"
12' - 0"
14' - 0"
BLOCK
DIMENSIONS
B
C
1' - 3"
1' - 4"
1' - 7"
1' - 9"
2' - 0"
2' - 2"
2' - 3"
2' - 4"
1' - 11"
2' - 0"
2' - 2"
2' - 3"
2' - 4"
"g"
E
1' - 6"
1' - 8"
2' - 6"
3 '- 0"
3' - 6"
3' - 9"
3' - 9"
3' - 9"
4' - 6"
4' - 9"
5' - 3"
5' - 6"
6' - 0"
Bar Size
1' 6"
1`' - 9"
2' - 6"
3' - 3"
4' - 0"
4' - 9"
6' - 0"
7' - 6"
4' - 0"
4' - 6"
5' - 6"
6' - 0"
7' - 0"
4
4
4
4
4
5
6
6
6
5
6
6
6
06/86
2
10/91
REINFORCEMENT
"f"
On
Bar Size
On
Center
Center
12"
4
12"
12"
4
12"
12"
4
10-1/2"
12"
4
9-1/2"
12"
5
12"
9'-1/2"
5
12"
6-1/2"
5
12"
6-1/2"
5
12"
12"
5
12"
10"
5
12"
9-1/2"
5
12"
8-1/2"
5
11"
6"
5
11"
NOTES
1.
For location of anchor block, reference Operating Procedure 80.205, Acetylene Welded or Dresser Coupled Lines.
2.
3.
4.
5.
6.
7.
Installation of anchoring sleeve to be completed and concrete to be thoroughly cured prior to placing any lateral load
on anchor block. Allow concrete to cure six (6) days if Type I cement is used or two (2) days if Type III.
8.
If two (2) blocks are required, the minimum separation between blocks shall be four (4) times the distance from
grade to bottom of the block.
9.
Recompact to its original compaction level any disturbed soil within the first 30 feet from each anchor block
towards the tie-in point prior to placing any lateral load on anchor block.
10.
*
11.
Blocks have been dimensioned and designed to withstand the pulling force of unrestrained, mechanically-coupled
lines at a maximum pressure of 600 psig.