This setup applies when the vessel is carrying out Logistics operations for BSP.
NOTE:ASOG DOES NOT COVER DIVING OPERATIONS (ValidityPeriod: 18 March 2015)

DDEFAULT POSITIONING IN CASE OF LOGISTICS FUNCTIONS IS IN DRIFT OFF CONDITION. ANY


OTHER CONSIDERATION REQUIRES CONCURRENCE FROM SHORE BASED ACCOUNTABLE
PERSONNEL AND STRICT ADHERENCE TO ASOG.

VESSEL TO OPERATE IN CRITICAL ACTIVITY MODE (CAM). INSPECTION


REPAIR MAINTENANCE (IRM) WHILE EXECUTING DP CAM OPERATIONS NOT
PERMITTED

A CHANGE IN STATUS TO YELLOW OR RED TRIGGERS NOTIFICATION TO SHELL TA


(SIGNATORY ON STATEMENT OF VERIFICATION). VESSEL NOT PERMITTED TO
RETURN TO WORK AFTER YELLOW OR RED, WITHOUT CONCURRENCE FROM SHELL
TA. REQUIREMENT TO SEEK CONCURRENCE WAIVED FOR "PROACTIVE" or
"PRECAUTIONARY" YELLOWS INITIATED BY VESSEL OPERATIONAL TEAMS.
MARINE RISK TEAM 24 HOUR CONTACT NUMBER FOR IN SERVICE ISSUES/ASOG
DRIVEN NOTIFICATIONS +x xxx xxx

PRE WATCH AND PRE TASK MEETINGS TO COVER IJS SETUP AND USE, PRECAUTIONS ABOUT
INADVERTENT CHANGE OF MODE, NEED TO SETUP AND MONITOR POSITION OFFSETS
INDEPENDENT OF DP CONTROL SYSTEM

DEFAULT DP MODE: AUTO POSITION. DEFAULT CENTER OF ROTATION


(COR): CENTER OF GRAVITY. DEFAULT DP GAIN SETTING: MEDIUM.
EXPECTED WEATHER EVENTS TO TRIGGER CONSIDERATION OF USING HIGH
GAIN. USE OF LOW GAIN TO TRIGGER BLUE STATUS

When working within 500m zone, default position references sensors for this activity
are:
at least three independent systems in use (two different principles, different I/O and
different UPS)

Close proximity to surface facility (< 200m)- required position references systems (Cyscan, Mini
Radascan) to be on different UPS's. DGNSS may be used after ascertaining effectiveness (effects of
shadowing, surface facility movement etc.) If only a single relative system is operational, only snatch
lifts permitted (no hydrocarbon transfers or heavy lifts)

Graphical User Interfaces (GUIs) of position monitoring systems to be


optimized to enhance position excursion monitoring and early warning
(Examples: ECDIS, position reference screens independent of control system
network (DP/IAS/PMS etc.)

Power Plant 2 Island configuration. Shaft Generators online and Auxiliary Diesel
Generators #1 and #2 on standby. BT3 not to be used.

Remote Access and Monitoring (DPCS/VMS/PMS)( if applicable) to be disabled and isolated during
Industrial Mission operations on DP. Enabling RAM requires written concurrence from Accountable
Senior Shell Representative. Effective control measures (including documented sign off by Vessels
Master ) to be in place to manage connecting external drives to DPCS/VMS/PMS

Reinstating equipment post failures requires vessel to safely suspend


operations, leave worksite / 500m zone prior to attempting reinstatement (e.g.
Low level auxiliaries, thruster, control voltages)

Vessel to be setup and stabilized upon arrival at worksite. DP checks to be done with
vessel at intended heading and thrust levels to be verified to be within ASOG limits.
Entry into 500m zone is in DP auto position mode

Default mode of exit from worksite until 200m off surface asset is on DP. This does not preclude
Master from departing in manual or joystick in response to loss of station keeping event or
necessitated by other emergencies

Independence and segregation of auxiliary systems supporting station keeping


equipment to be maintained and integrity of isolating valves to be validated and
verified. No cross connections in any auxiliary system

THRUSTER BIAS:- Default for CAM is bias released. Use of thruster bias to trigger a change of status to blue. Thrusters biasing if
needed and agreed upon is contingent upon bias being released at net thrust levels > 20% or on any thruster alarm condition

Starting of BT3 NOT allowed in the 500m zone.

Critical Activity Mode (CAM) of Configuration


Condition

GREEN

Notify Master, Chief Engineer, Client, Deck, Crane and Fixed Platform

NO

YES

Action

CONTINUE NORMAL OPERATIONS

INFORM / CONSULT / RISK ASSESS (CONSIDER


ONGOING AND UPCOMING OPERATIONS)

440V &240V bus ties TB-1,TB-4, TB-5 open


(TB-2, TB-3, closed)

Any other setup

Auxiliary generator #1 and #2 on standby

Auxiliary generator online

240V Switchboard

NCDB1 supplied only from 240V BB1, supply from


240V ESB1 isolated.

Any other setup

Main Shaft generators and Aux Diesel Generators

Tested to 100% upon field arrival or within the last


6 months

Not tested to 100% upon field arrival, or in the last 6


months, or problems found

Thrusters BT1, BT2 , T4 and T5 (BT3 not usedl)

Available, selected to DP, tested to 100% on field


arrival or within the last 6 months

Any not available, not selected to DP, or not tested to


100% on field arrival or within last 6 months, or problems
found

All Thrusters

Duty pump assigned 'same side' as thruster, and


changeover to backup pump tested at field arrival

Not tested on field arrival or problems found

Emergency Stops

Tested on field arrival or within last 4 weeks

Not tested on field arrival or within last 4 weeks or


problems found

Thruster Manual Levers

Tested and fully operational and set at zero


position verified at all locations

Any known deficiencies or zero position not verified at all


locations

Tested, in standby, fully operational and set at zero


position verified at all locations

Not in standby mode, any known deficiencies, or zero


position not verified at all locations

All DP operators practice taking control from DP to manual and controlling


the vessel on manual (individual levers) - intact and post worst case failure
condition

Control practiced

Any operator not practiced

All DP operators practice taking control from DP to IJS and operating the
vessel on joystick

Control practiced

Any operator not practiced

Within operating limits

Above operating limits

Thrusters and Main Propulsion

Generators & Power System

Main Switchboards Setup (BT3 not used)

Auxiliary Diesel Generators (BT3 not used)

Manual Controls and IJS

Independent Joystick

Speed and Increments of Moves

Thrust levels checked to within ASOG levels at operational heading before


commencing operation

ADVISORY

Speed of Moves within 500m Zone

500m to 200m <= 0.75m/s (1.5 kts)


200m to worksite <= 0.3m/s (0.6 kts)

Any other setting

Increments of moves within 500m

500m - 200m < 50m


200m to worksite < 10m

Any other setting

Thrust Values when exiting 500m zone on Joystick, Manual, or DP

Rate of Change of Heading

This document was generated according to:


DNV-RP-E307 Dynamic Positioning Systems - Operation Guidance January 2011
http://exchange.dnv.com/publishing/Codes/ToC_edition.asp#Recommended Practices

0-200m < 25% (minimum to safely pull away)


200m - 500m < 50 % (minimum to safely pull away
out of 500m zone)

Approaching 25% or 50% respectively

<= 10 degrees/min

> 10 degrees/min

09/13/2016

329490521.xls

GIS/Shell _ASOG_Std_Doc_Rev: A

DP Control System

DP Control System - Consequence Analysis

Any other setup, in alarm or problems found

DP Reference System - Median Check

Median check setup and enabled, with agreed


references

Not setup or enabled or one of the agreed references


unavailable

Thruster Bias Checked at Field Arrival

Bias released

Thruster bias not being released upon alarms. Bias not


released at net thruster loads > 20%

DPO is alerted to mode change by audio and


visual alarm

DPO is not alerted to mode change by audio and visual


alarm

Protected from inadvertent operation

Any risk of inadvertent operation

Mimics correct

Any discrepancies evident between DP displays and other


display / indicators

COR set at vessel center of gravity

Any other setup

Position Reference Systems - Availability

Two (2) relative positioning sensors (Cyscan and


Mini Radascan) and two (2) DGNSS's on different
UPS's.

Lack of redundancy in absolute or relative position


reference systems or all on same UPS. Any known
deficiencies

Position Reference Systems - Weighting

Auto (Normal) weighting enabled.

Any other setup

Set at OEM default value and on different


differential correction systems.

Not set at OEM default value, not on different corrections,


or alarms present

DP Mode Change

DP Mode Selection

DP Displays

Position Reference Systems

Center of Rotation (COR)

DGNSS - On Different Mask Elevations & Different


Corrections/Configuration

DGNSS - Antenna Obstructions

No possibility of masking by cranes / structures

Possibility of masking by cranes / structures

Control unit configured with transponder ID(s) and


operational

Any other setup or problems found

Cyscan (Laser Reference)

Using prism as target with the rejection window


threshold set to reject false signals

Any other setup or problems found

DP Environmental sensors
(Gyro, MRU, wind sensors)

All enabled in DP and fully operational

Any other setup or known deficiencies

Manual input of speed and latitude

Any other setup

All systems, including standby's, operational and


completely segregated. Standby's tested on field
arrival

Any other configuration or known deficiencies reducing


redundancy

Fuel Systems

Redundancy concept maintained by complete


segregation.

Segregation compromised or any redundant equipment


not operational or FO supplied from settling tank

Fuel Management Procedures

Effective procedures in place and adhered to

Effective procedures not implemented or not adhered to

Power limitation function checked at field arrival or


within the last six(6) months.

Power limit function not checked at field arrival or within


the last six(6) months, or any problems found

Load dependent auto stop disabled

Load dependent auto stop active

PMS in auto/DP mode

Any other setup

UPS's and 24Vdc Supplies

Power Management System Fuel Oil Systems

Cooling
System

Sensors

Mini Radascan (Radar Reference)

Gyros - Latitude and Speed Setting

Sea water / Fresh Water Cooling System

Power Management System - Power Limiting

Power Management System - Load Dependent Stop


Power Management System - Auto Mode

24Vdc System

Tested for 30 minutes on batteries with full load 24 Not tested for 30 minutes on batteries with full load at field
hours before field arrival or within last month.
arrival or within the last month, or problems found.
Batteries fully charged. No cross connections
Batteries partly discharged. Any cross connections

24Vdc supply to Main Engines and MSB

Main engines and MSB backup 24vdc supply to be


isolated

Not isolated or problems found

DP 24Vdc systems DCSB-1 and DCSB-2 changeover switches

DCDB-1 fed from DCSB-1 BC1


DCDB-2 fed from DCSB-1 BC2
DCDB-3 fed from DCSB-2 BC5
DCDB-4 fed from DCSB-2 BC4

Any other setup

DP 24Vdc systems DCSB-1 and DCSB-2


cross connects

No cross connections TB-6; TB-7 and TB-8 all OPEN

Any system cross connected


Any of TB-6; TB-7 and TB-8 CLOSED

Not in bypass mode.Tested for 30 minutes on


batteries with full load 24 hours before field arrival
or within last month. Batteries fully charged.

Any other configuration. Not tested for 30 minutes on


batteries with full load at field arrival or within the last
month or problems found. Batteries partly discharged

Isolation valve closed. Redundancy concept


maintained by complete segregation.
Both compressors and receivers available.

Segregation compromised.
A compressor or receiver not available.

DP & IAS UPS's

Compressed
Air

Page 2 of 22

Consequence analysis enabled and not in alarm

Compressed / Start / Control Air System

This document was generated according to:


DNV-RP-E307 Dynamic Positioning Systems - Operation Guidance January 2011
http://exchange.dnv.com/publishing/Codes/ToC_edition.asp#Recommended Practices

09/13/2016

329490521.xls

Miscellaneous

HVAC and
Ventilation

GIS/Shell _ASOG_Std_Doc_Rev: A

Page 3 of 22

Machinery Space Ventilation Fans

All fans running and dampers open

Any fan stopped or damper closed

Air Conditioning

Operational in all DP critical areas.

Any known deficiencies

Engine Room Manning


Watertight Integrity
Escape Route Established

ER manned

ER not manned

All watertight door and openings secured

Any not secured or controlled by PTW

Direction to go ( ______ deg T)

Escape route compromised

Activity Specific Operating Guidelines (ASOG) - xxx xxx


RED

YES

YES

Action

CONTINUE NORMAL OPERATIONS

INFORM / CONSULT / RISK ASSESS (CONSIDER


ONGOING AND UPCOMING OPERATIONS)

Within operating limits

Approaching operating limits

Weather / Environmental Forecast

Main Azimuths and Bow thrusters

Shaft Generators

24Vdc Supplies

Sensors

Position Reference
Systems

Networks

PMS DP Control System

Weather / Environmental Conditions and Vessel


Performance

YELLOW

YES

Thrusters and Main


Propulsion

ADVISORY

NO

Shaft
Generators

GREEN

24Vdc &
UPS's

Condition
Notify Master, Chief Engineer, Client, Deck, Crane and Fixed Platform

DRIFT OFF / DRIVE OFF

Vessel Footprint/Weather/Environment Related Excursion (From Setpoint)

Heading Excursion

Maximum Position change (step)

Maximum Heading Change

Bow Thruster Load


Azimuth Thrust Loading / Thrust

Shaft Generators Loading

No position alarms or warnings

Position excursions, frequent alarms or position limits (>


3m)

Position Excursion
(> 5m)

No heading alarms or warnings

Heading instability with frequent alarms or heading


deviation
(> 3 degrees)

Heading Deviation
(> 5 Degrees)

500m - 200m <= 50m


200m to worksite <= 10m

Step change > 10 degrees

Main propulsion and tunnel thrusters operating


Any main propulsor/thruster in alarm or any main
without any alarms and main propulsion operating propulsor/thruster operating on backup/standby pump(s) on main pump(s) - if applicable)
if applicable)
BT1, BT2 < 45%

BT1, BT2 - approaching 45%

Loss of any thruster

BT1,BT2 > 50%

Both < 45%

Any approaching 45%

Any > 50%

Shaft generators operating without any alarms

Any alarm, poor performance, unexpected or unexplained


event

Loss of online Shaft generator

Any approaching 45%

Any > 50%

Any charger alarm or problems found

Any system on batteries

DP / IAS UPS's

Batteries fully charged, no alarms and not in


bypass mode

Any UPS alarm or in bypass mode or any problems found

Any system on batteries

DP Controllers and Power Supplies

Both controllers and power supplies available

Any alarm, poor performance, unexpected or unexplained


event

Only one controller or one power supply


operating

DP Control System (Mimics)


DP Operator Workstations
PMS Control System (Mimics)

DP Networks

DP Position Reference Systems


(See Title Block)

All displays checked and up to date

Any incorrect information


Any alarm, poor performance, unexpected or unexplained
Only one operator workstation remaining
event

All operating normally, no alarms


All displays checked and up to date

Any incorrect information

Dual network available

Any alarms or poor performance

1 network lost

Two relative positioning systems (Cyscan & Mini


Radascan) fully operational and enabled in DP and
two DGNSS's fully operational and available for
immediate use.

Any loss of position reference system, alarm, poor


performance, unexpected or unexplained event

Loss of redundancy in relative position


reference systems

Loss of Gyro 2 (or) 1 gyro remaining

Heading Sensors (Gyro) into DP

3 gyros available

Loss of any gyro or alarm

Motion Reference Sensors (MRU) into DP

2 VRUs available

Loss of one VRU or difference alarm

Loss of all VRUs

2 wind sensors available

Loss of wind sensor or any alarms

Loss of all wind sensors and gusty


conditions

Redundant communications

One system remaining

No communications

Fully operational

Loss or reduced capacity of any system

Imminent loss of any DP equipment due


to over temperature

Operating normally with no alarms

Any alarm present or loss of compressed air

Loss of both compressors or any leaks


found

No fire, no fire alarms

Any fire alarm

Fire confirmed

No bilge alarms active, no flooding

Multiple bilge alarms

Flood confirmed

No collision imminent / minimum approach


> 500m

Minimum approach will be < 500m

If collision possible

HVAC
system

Loss or Problem with any Essential Communications


(Bridge/ECR/DECK/Fixed Platform)

Machinery Space Ventilation, DP critical space air conditioning

Compressed Air
Fire - E/R or Elsewhere
Flood
Collision (Errant Vessel)

This document was generated according to:


DNV-RP-E307 Dynamic Positioning Systems - Operation Guidance January 2011
http://exchange.dnv.com/publishing/Codes/ToC_edition.asp#Recommended Practices

Unable to bring the vessel under control

Any other setting

Maximum step change <= 10 degrees

Both < 45%

Air
System

Comms

Exceeding operational limits


Immediately when recognized by DPO

Batteries fully charged and charger supply


available, no alarms

Wind Sensors into DP

Fire / Flood /
Collision

No Discrepancies observed in PRS's and thruster Discrepancies observed in PRS's or an inexplicable ramp
loading as expected
up of thrusters observed

CEASE OPERATIONS, BRING VESSEL


TO SAFE POSITION, EXIT 500m ZONE.
CEASE OPERATIONS - LEAVE 500M
(DEFAULT WORKSITE TO 200m ON DP;
ZONE / WORK AREA IMMEDIATELY
200m TO 500m MAY EXIT ON
JOYSTICK OR MANUAL)

09/13/2016

Complete loss of networks

Collision imminent

329490521.xls

GIS/Shell _ASOG_Std_Doc_Rev: A

Page 4 of 22

SIMOPS - Activity Specific Operating Guidelines - xxx xxx


GREEN

ADVISORY

YELLOW

RED

NO

YES

YES

YES

Action

CONTINUE NORMAL OPERATIONS

INFORM / CONSULT / RISK ASSESS (CONSIDER


ONGOING AND UPCOMING OPERATIONS)

SIMOPS

Condition
Notify Master, Chief Engineer, Client, Fixed Platform and any other vessels
in the field

Change from Green DP Status of any other vessel in the field


Comms/interaction with Surface Facility Control Room & other vessels

CEASE OPERATIONS, BRING VESSEL


TO SAFE POSITION, EXIT 500m ZONE.
CEASE OPERATIONS - LEAVE 500M
(DEFAULT WORKSITE TO 200m ON DP;
ZONE / WORK AREA IMMEDIATELY
200m TO 500m MAY EXIT ON
JOYSTICK OR MANUAL)

Green

Advisory

Advisory

Vessels operating normally with no known


problems. Redundant comms

Comms problem or possible position conflict

No comms or definite position conflict

Advisory

Sign, print & date


On behalf of Operator

On behalf of Shell

This document was generated according to:


DNV-RP-E307 Dynamic Positioning Systems - Operation Guidance January 2011
http://exchange.dnv.com/publishing/Codes/ToC_edition.asp#Recommended Practices

09/13/2016

329490521.xls

The DP control system is supplied by ConverTeam, including independent joystick

The DP system includes the following position reference systems and sensors:2 x DGPS Veripos LID2-G2
1 x CyScan Mk2
1 x RadaScan mini

3 x Gyro Anchutz STD22


2 x Wind Sensor Gill Ultrasonic
2 x VRU Teledyne DMSRP3-30

DP Equipment
Converteam Dual Controller DP system.
IJS (GE Converteam)
Position Reference System
2 x DGNSS Veripos LID2-G2
1 X Cyscan Mk 2
1 X Radascan
Sensors

3 x Gyro Anchutz STD22


2 x Wind Sensor Gill Ultrasonic
2 x MRU Teledyne DMSRP3-30
UPS1, 240Vac BB1
CC01
WS1
alarm Printer
DGPS1
Cyscan

Gyro 1
Gyro 2
Gyro 3

BC
BC
BC
BC
BC

UPS2, 240Vac ESB


CC02
WS2
DGPS2

Gyro Power Supply


DCDB1
DCDB2
DCDB1

1
2
3
4
5

24 VDC Battery Chargers


Supply
440Vac BB1
440Vac ESB
440Vac ESB
440Vac BB1
440Vac ESB

Control Voltages
BT 1 Control Voltage
BT 2 Control Voltage
BT 3 Control Voltage
Port Azi
Stbd Azi
ME (P)
ME (S)
Port MSB
Stbd MSB
DG 1

Main Supply
Internally derived
Internally derived
Internally derived
440Vac BB3
440Vac BB4
DCDB4
DCDB3
Internally derived
Internally derived
Internally derived

DG 2

Internally derived

**Control Voltages with dual supplies will be isolated as stipulated in the


Strike through = isolated In the ASOG

M E (P) Aux
ME (P) FO Pump
ME Stby FO Pump
ME (P) LO Pump
ME (S) Stby LO Pump
ME (P) HT FW Pump
ME (P) LT FW Pump
ME HT FW Stby
ME LT FW Stby
ME (P) & Port Azi SW Pump
ME & Azi Stby SW Pump

Port Azi Aux


Port Azi Steering & Pitch Hydraulic p/p

Port Azi Pitch Stby p/p

Bow Tunnel 1 Aux


BT 1 Pitch Servo Motor 1
BT 1 Pitch Servo Motor 2

Chargers
Distribution
DCDB1, DCDB2
DCDB1, DCDB2
Emgy Lights
DCDB4, DCDB3
DCDB4, DCDB3

Backup
DCDB4
DCDB3
DCDB3
DCDB4
DCDB3
DCDB3
DCDB4
DCDB3
DCDB4
DCDB4

If BT3 powered from BB1, backup supply DCDB3 to be isolated

DCDB3

solated as stipulated in the ASOG**


d In the ASOG

Power
Engine Driven
440Vac BB1
Engine Driven
440Vac BB1
Engine Driven
Engine Driven
440Vac BB1
440Vac BB1
440Vac BB3

Power
Engine Driven
440Vac BB3

Power
Internally derived
Internally derived

DCDB3 to be isolated

M E (S) Aux
ME (S) FO Pump
ME (S) LO Pump
ME (S) HT FW Pump
ME (S) LT FW Pump

ME (S) & Stbd Azi SW Pump

Stbd Azi Aux


Stbd Azi Steering & Pitch Hydraulic p/p

Stbd Azi Pitch Stby p/p

Bow Tunnel 2 Aux


BT 2 Pitch Servo Motor 1
BT 2 Pitch Servo Motor 2

Power
Engine Driven
Common
Engine Driven
Common
Engine Driven
Engine Driven
Common
440Vac BB4
440Vac ESB

Power
Engine Driven
440Vac BB4

Power
Internally derived
Internally derived

Common

Acronyms
ACOS
AFI
AGS
AHC
AHU
AHV
ASOG
ASOP
Aux
BOP
CAM
CE
CHP
CIMV
COG
COMMS
COR
CPP
DG
DGNSS
DORA
DP
DPCS
DSV
DSV
ECDIS
ECR
EDE
EDS
EFC
ELP
ER
ERA
ESB
ESD
F&G
FCC
FIR
FO
ft
FVV
FSW
FW
GUI
Gyro
HiPAP
HV

Definition
Automatic Change Over Switch
Agreed For Implementation
Advanced Generator Supervisor
Active Heave Compensation
Air Handling Unit
Anchor Handling Vessel
Activity Specific Operating Guidelines
Activity Specific Operating Plans
Auxiliary
Blowout Preventer
Critical Activity Mode
Chief Engineer
Charging Panel
Chemical Injection Metering Valve
Center Of Gravity
Communications
Center Of Rotation
Controllable Pitch Propeller
Diesel Generator
Differential Global Navigation Satellite System
Drift Off Riser Analysis
Dynamic Positioning
Dynamic Positioning & Control System
Drilling Supervisor
Dive Support Vessel
Electronic Chart Display & Information System
Engine Control Room
Emergency Disconnect Equipment
Emergency Disconnect System
External Force Compensation
Emergency Lighting Panel
Engine Room
Electric Riser Angle
Emergency Switchboard
Emergency Shut Down
Fire and Gas
Following Conference Call
Following Internal Review
Fuel Oil
Feet
Following Vessel Visit
Feet of Salt Water
Fresh Water
Graphical User Interface
Gyrocompass
High Precision Acoustic Positioning
High Voltage

HVAC
I/O
IJS
IRM
kts
LDP
LED
LFJ
LLC
LMRP
LOP
LVS
LWTW
m
MCC
MCOS
m/s
ME
Min
MODU
MP
MRU
OEM
OFI
OIM
OSV
P&C
PME
PMS
PMS
POD
PPU
Prop
PRS
PSV
PTW
REP
RAM
RPM
ROV
SME
SOP
SW
SWBD
TA
TAGOS
TAM
TBD

Heating Ventilation & Air Conditioning


Input/Output
Independent Joystick System
Inspection Repair and Maintenance
Knots
Lighting Distribution Panel
Light Emitting Diode
Lower Flex Joint
Low Loss Concept
Lower Marine Riser Package
Loss Of Position
Low Voltage Switchboard
Light Weight Taut Wire
Meters
Motor Control Center
Manual Change Over Switch
meters per second
Main Engine
Minute
Mobile Offshore Drilling Unit
Main Propulsor
Motion Reference Unit
Original Equipment Manufacture
Opportunity For Improvement
Offshore Installation Manager
Offshore Support Vessel
Project & Construction
Port Main Engine
Power Management System
Planned or Preventive Maintenance System
Point Of Disconnect
Power Parallel Unit
Propulsor or Propeller
Position Reference Sensor (System)
Platform Supply Vessel
Permit To Work
Representative
Remote Access and Monitoring
Revolutions Per Minute
Remote Operated Vehicle
Starboard Main Engine
Standard Operating Procedure
Salt Water
Switchboard
Technical Authority
Thruster And Generator Operating Strategy
Task Appropriate Mode
To Be Determined

TBSS
THS
UFJ
UPS
Vac
Vdc
VMS
VRU
WBF
WCF
WD
WHP
WSOG
WTD

Terminal Board Serial Switch


Tubing Head Spool
Upper Flex Joint
Uninterruptable Power Supply
Voltage Alternating Current
Voltage Direct Current
Vessel Management System
Vertical Reference Unit
What Breaks First
Worse Case Failure
Water Depth
Well Head Position
Well Specific Operating Guidelines
Water Tight Doors

Das könnte Ihnen auch gefallen