SMU - Assignment
MB0028
Roll No - 520934375
Set 1 MB0028
1. Explain the various automated systems for transfer of
materials in the production plant? Illustrate your answer
by considering an example of an automobile showroom.
Ans : Basically, automation system comes to reduce labor power and time in
the production. Here we can see the evolution systems with some examples.
The goods requited by society were produces in small quantities by craftsman
who would know the need of the community and produced them by their own
hands with simple tools. The apprentices or by another craftsman, who would
make them to meet the requests made.
The parts and components used to make these machines had to be replaced
when they wore making parts so that interchangeability was achieved made
setting up standards and specifications important for meeting
Automation systems cost huge sums of money and therefore a deep analysis of
the various factors has to be done. For services, automation usually means
labor saving devices in education, long distance learning technology helps in
supplementing class room instruction. The facilitating goods that are used are
web site and videos.
Automation in the banking sector has resulted in ATMs which same the banks a
huge amount customer satisfaction. Automation is ideas when the service
provided or the product manufactured is highly standardized.
The machines have sensing and control devices that enable them to operate
automobile. The simplest of them called machine attachments replace human
effort. They guide, locate, move and achieve revise position by means of came,
optical sensing. Load sensing mechanisms and activate the controls to remove
human intention.
Robots are higher in the order of automation as they perform a variety of tasks.
They are designed to move movements according to programmers written into
the computer that inside them.
Set 1 MB0028
ensures highest quality identification and movement of materials are helped by
bar codes which are read and fed into the system far monitoring quantity,
location, movement etc. They help the automated systems to start information
and provide information for effecting any changes necessary. To make effective
use of automated machines, we need to have the movement of materials from
and to different time as stores, automated, Automated storage and Retrieval
systems- ASRS- receive orders for materials from anywhere in the production
area, collect materials in the works times. Computers and information systems
are used for placing orders for matters, give commands adjust inventory
records which show the location and quantity of materials needed.
Automated guided vehicle systems- AGVS – are pallet trucks and unit load
carriers follow embedded guide wires or paint strips to destinations as
programmed.
In an automobile showroom we can see all the work automatically with latest
machine.
About the automated flow lines we can say it is a machine which is linked by a
transfer system which moves the parts by using handling machines which are
also automated, we have an automated flow line.
Human intervention ma is needed to verify that the operations are taking place
according to standards. When these can be achieved with the help of
automation and the processes are conducted with self regulation, we will have
automated flow lines established.
Product layouts ate designed so that the assembly tasks are performed in the
sequence they are designed at each station continuously. The finished item
came out at the end of the line.
Set 1 MB0028
In automated assembly lines the moving pallets move the materials from
station to station and moving arms pick up parts, place them at specified place
and system them by perusing, riveting, & crewing or even welding. Sensors will
keep track of their activities and move the assembles to the next stage.
The tools are loaded, movements are effected, speeds controlled automatically
without the need for worker’s involvement.
It helps in con be reforming the design and any shortcomings can be rectified at
low cost.
Flexibility has three dimensions in the manufacturing field. They are variety,
volume and time. Their demands will have to be satisfied. In that sense they
become constraints which restrict the maximization of productivity. Every
business will have to meet the market demands of its various products in
variety volumes of different time.
Ans : At first we will discuss about project management then we will discuss
about players in project management. Project management is the practice of
Set 1 MB0028
controlling the use of resources, such as cost, time manpower, hardware and
software involved in a project. That starts with a problem statement and end
with delivery of a complete product.
Exert influence over the project and its results players or also called “stake
holders’’ of the project.
Project manager - the individual responsible for managing the project.
Customer - the individual or organization that will use the product- the end
result of the project.
An experienced project manager and this team may manage more than one
project at a time.
The project team is responsible for ensuring that the project upon
completion shall deliver the gain in the business for which it is intended for.
• The project team has to properly co-ordinate with each other working
on different aspects of the project.
• The team members are responsible for the completion of the project as
per the plans of the project.
Set 1 MB0028
Characteristics of project mindset: - some of the characteristics of
project mindset are the following –
Time - it is possible to improve the pace of the project by reducing the time
frame of the process. The mindset is normally to work in a comfort made by
stretching the time limits.
Set 1 MB0028
The project manager and the team members should be fully aware of the
techniques and methods to rectify the factors influencing delay of the project
and its product. The methodology of PERT (programmer Evolution Review
Technique) and CPM (critical path method) may be used to analyze the project.
In the PERT method one car find out the variance and use the variance to
analyze the various probabilistic estimates pertaining to the project. Using the
CPM one can estimate the start time and the finish time for every event of the
project in its WBS (work Breakdown Structure).
The analysis charts can be used to monitor, control, track and execute a
project. The various steps involved in monitoring and controlling a project from
start to end are as follows-
b. Project progress- The members must keep a track of the project progress
and communication the same to other related members of the project. They
must monitor and control project progress, through the use of regular check
points, quality charts. Statistical tables, control the quality factors which are
likely to deviate from expected values as any deviation may result in change
to the stage schedule.
c. Stage control- The manager must establish a project check paint cycle. For
this suitable stage version control procedure may be followed.
Set 1 MB0028
d. Resources- Plan the resources required for various stage of the project.
Brief both the project team and the key resources about the objectives of
every stage, planned activities, products, organization. Metrics and project
controls.
g. Approvals - lastly, project sage reviews and the decisions taken and actions
planned need to be approved by the top management. The goals of such
review are to improve quality by finding defects and to improve productivity
by finding defects in a cost effective manner. The group review progress
includes several stage like planning, preparation and overview, a group
review meeting and rework recommendation and follow-up.
• Reduction of inventory
Set 1 MB0028
• Optimization of money flow cycle within the organization as well as to and
from external agencies.
A relatively new SCM option involves web based software with a browser
interface. Several electronic markets place for buying and selling goods and
materials.
Ans : There are many steps which involved in SCM implementation are-
Business Process, sales and marketing. Logistics, costing, demand planning,
trade- off analysis, environmental requirement, process stability, integrated
supply, supplier management, product design, suppliers, customers, material
specifications, etc.
• The level of competition existing in the market and the impact of competitive
forces on the product development.
• Designing and working on a strategic logic for better growth through value
invention.
• Working out new value curve in the product development along with
necessary break point.
Set 1 MB0028
Steps of SCM implementation:
Set 1 MB0028