Sie sind auf Seite 1von 9

TYEC

RCSH: Navigant Update Note 2


This Note
ThisnotehasbeenpreparedinadvanceofavisittositeinAbuDhabitomeetwithTYECpersonnel
whohavefirsthandexperienceoftheproject.ThepurposeofthevisitisforNaviganttogaina
betterunderstandingofthecriticalactivitiesthatactuallydelayedTYECsworkandhenceenablea
properdelayanalysistobeputtogethertosupporttheirfullEoTclaim.
Anoutlineagendafornextweekhasalreadybeenforwardedbutisrepeatedagainbelow:

Tuesday17thJune:Arrive(am)/MeetMrKimforbriefintroductionsandkickoff/Meet
ProjectDirectorMrByunforprojectoverviewandhighlevelquestionsondelayevents
claimedandotheractivitiespickedupbyNavigantduringtheirinitialanalysis/Provide
Navigantwithaccesstohardcopyandelectronicdataforfurtherreview
Wednesday18thJune:MeetwithMEPmanagersMrDHKimandMrKoo(am+pm??)on
mainMEPinstallation/Meetwith[???](pm)onsnagging,defects,handoverandapprovals/
Navigantreviewofelectronicdataandfurtheranalysis
Thursday19thJune:Navigantreview,analysis&furtherquestionsasrequired/Meetwith
lawyerMrHunt??/MeetMrKim&MrByunforvisitcloseoutandnextsteps/Depart
overnight

TYEC Delay Analysis


FollowingreceiptoffurtherdocumentsfromTYEC,Naviganthavebrieflyundertakenaninspection
ofthedelayanalysis,alreadysubmittedandrebuffedbytheEngineer,andareoftheopinionthatit
doesnotfullysupportTYECsrequirementsforthefollowingreasons:

TheprogrammeisbasedonbothactualandforecastdatesafterJuly2012andthereforein
partbearsnorelevancetoactuallywhathappened.Bearinginmindthedelayanalysiswas
createdmonthsafterfinalcompletionamorerobustanalysisatthattimeshouldhavemade
betteruseofactualdatesandconsideredallotherdelayitems.
TheanalysisiftakenastruedemonstratedthatonlythekitchenandLVworkswereever
likelytohavebeencriticallydelayingtheworks.TheotheritemsreliedonbyTYECtherefore
becomeredundantunlesstheycanbelinkedbacktotheactualcriticalpath.Thishasnot
yetbeendonesuccessfully.
Thereexistssomelargelags(suchasbetweenpoweronandkitchenpoweron)withinhe
programmewhichrequiredfurtherexplanation.
Therearealsoseveralopenendswhichfailtolinkbacktothemaindrivingpaththroughthe
programme.Notwithstandingthisthedelayanalysisinanyeventisstandaloneandfailsto
demonstratehowtheseitemsactuallydelayedthemainprogrammeofworks.
Causeandeffecthasnotbeenestablishedgenerally

ItisclearfromtheEngineerslettersthattheyarealsoofasimilarviewandhenceanyfurther
analysisundertakenbyNavigant/TYECmustaddressalltheseissuesathand.Asimplesubmissionof
thesameisunlikelytorewardTYECwiththeresultsitisseeking.

Navigants Initial Summary Analysis


InourlastnoteweprovidedaverybasicrepresentationofrecordedprogressasgiveninTYEC
weeklyreportsasshownbelow.Itwasclearfromthisthatthreeperiodsexist.Onewithgood
progress,onewithpoorprogressandonewithnegligibleprogress(recorded).
Planned Cum. Prog. Curve vs Actual Cum .Prog. Curve
100.0%

95.0%

90.0%

85.0%

80.0%

75.0%

548days
29-Feb-12
14-Mar-12
28-Mar-12
11-Apr-12
25-Apr-12
9-May-12
23-May-12
6-Jun-12
20-Jun-12
4-Jul-12
18-Jul-12
1-Aug-12
15-Aug-12
29-Aug-12
12-Sep-12
26-Sep-12
10-Oct-12
24-Oct-12
7-Nov-12
21-Nov-12
5-Dec-12
19-Dec-12
2-Jan-13
16-Jan-13
30-Jan-13
13-Feb-13
27-Feb-13
13-Mar-13
27-Mar-13
10-Apr-13
24-Apr-13
8-May-13
22-May-13
5-Jun-13
19-Jun-13
3-Jul-13
17-Jul-13
31-Jul-13
14-Aug-13
28-Aug-13
11-Sep-13
25-Sep-13
9-Oct-13
23-Oct-13
6-Nov-13
20-Nov-13
4-Dec-13
18-Dec-13
1-Jan-14
15-Jan-14
29-Jan-14
12-Feb-14
26-Feb-14

70.0%

Naviganthavesinceundertakentwodifferentreviewsoftheprogrammestoassistthemin
identifyingkeyareasforfurtherinvestigation.
ThefirstreviewwastoexaminewhattheTYECprogrammesunlamenteddefinedasthecriticalpath.
Wenotedinthemthatretainedlogicwastheschedulerspreferredoptionwhentheschedules
wereprogressed.Inourexperienceofthisoption,whensimilarbutstackedactivitiesarebeing
workedonatalllevelsandatalltimestheretainedlogicoptiondoesnotalwaysprovideanaccurate
forecast,especiallywhenthisclosetotheendofaproject.Thereforewehaverescheduledallthe
programmesanalysedusingtheprogressoverrideoptiontoseewhatpossiblealternative
activitiesthenbecomecriticaland/ordriving.Itisofinterestthenthatitemssuchassnagging,
lighting,flushing,T&Celectricalandmechanicalnowappearinthelistofitemsdrivingcompletion.
Inourviewthesearefarmorelikelytobethetruedrivingactivitiesoverthecurrentclaimedlistof
itemsandassuchrequirefurtherinvestigation.Tocompletethiselementofpreliminary
investigationwehavealsoundertakenamanualassessmentofthoseactivitieswhichareequallyas
criticalorsoneartocriticalthattheyshouldalsobeconsideredascandidatesforthetruecritical
path.Thispartoftheinvestigationhighlightedfurtherthebuildingcontrolinspectionandapprovals

alongwithfurtherelectricalandmechanicalwork.Theresultfromthispreliminaryanalysisofthe
programmesisattachedanditisclearthatanynewdelayanalysismustaddresstheelectricaland
mechanicalcompletion,testingandapprovals.
TakingthisastepfurtherpleasealsoseetheattachedA3documententitledOverviewSummary.
Thissummaryhasbeenproducedusingthemonthlyprogrammerecordedactivityprogress.It
providesanindicationinwhichmonthsactualprogresswasmadetotheactivitiesasshown.We
sayindicativeaswehavenowayofvalidatingtheaccuracyoftherecordedprogressandwhether
anyrecordingbiaswasusedforcommercialpurposes.Forpreliminarypurposesanywaytherecords
asprovidedareallwehavetouseandinanyeventthesummarygraphiccorrelateswiththeoverall
progressgraphaboveinthattherearestillthreedefinedperiodsoftimewiththeirowntypical
characteristics.
Period1:goodprogressismadewitharoundamonthslippagerightatthestartwhichiscurrently
unexplained.
Period2:UptoDecember2012thereappearstobealargeamountofmajorelectricaland
mechanicalworkbeingundertakenwhichmustbyinspectionbeonornearthecriticalpathofthe
project.DelaystotheseelementshavenotyetbeenexplainedbyTYECandtheengineerhas
highlightedthisfailingtoexplainthesedelaysinhisletter.Theprogrammesalsorecordthe
completionofmanyapprovalsaroundDecember2012thatthengetrecantedwithinmonths.Again
thisapprovalandchangeinprogrammestatusneedstobeexplained.Therearethenacoupleof
monthswherenotalothasbeenrecordedtohavehappenedbeforeMarch2013.Atwhichpoint
therethenappearstobeaconcertedefforttocompletetheprojectthroughtoJuly2013.
TYECthereforeneedtoexplaininthisperiod:

WhytheElectricalandmechanicalwasdelayed
Whytheapprovalscouldnotbegiven
WhatTYECwasdoingintheperiodsofnoprogressbeingrecorded.
Whatisnotshownontheprogrammesi.e.defectsandsnagging
Whyhandovercouldnotcommence

Period3:TYECappeartohaverecordednegligibleworkafterJuly2013.Thestatusoftheprojectat
thistimeandgoingforwardneedstobebetterexplained.WasitthatTYEChadoutstandingdefects
tocomplete;thatBuildingcompletioncertificateswerelateobtaining;orthattheclientwasjustnot
interestedintakingoverandhencewaspoliticallydelayingTYEC?.

Typical Questions for Interviews during Site Visit


InordertohelpTYECprepareforourvisitweprovidealistofquestionsbelowwhichwillestablish
thelevelofdetailthatisnecessaryforustogointoinordertoprovideananalysistosupportthe
analysisTYECrequire.
Thelistisnotexhaustiveandduringthevisitmorequestionwillbeputforward:
TYECDELAYANALYSIS

Whatelementswithintheanalysisareforecastandwhatelementsareactualrecordeddates?
Wherearethecontemporaneousdocumentstosupporttheanalysisdates.
Whatisthepurposeofthe178daylagbetweenPowersupplyturnonandpowersupplytokitchen
&coldroom(Thereinspectduetokitchenequipment)withoutthislinkthecriticaldelayperiodis
greatlyreduced.
Whatexactkitchenequipmentwasprovided?Whatdidthereinspectionactuallycompriseof?
Wasthekitchencompletelyunusableduringthisperiod?
Thedelayanalysiscontainsmanyopenendswhichdonotlinkeventstosnaggingandcompletion.
Weretheseeventsactuallycriticaltherefore?Whatdidtheyimpactinthemainprogramme?
OTHERISSUES
WastheRev7programmefullycompletewhenissued?Werethereanyitemsintentionally
unknownintheprogramme?
WhatisgenesisofRev7Bprogramme?
WereProvisionalsumitemsfullyinstructedasof16February2012?
Whoisresponsibleforthedesignofprovisionalsums?
WhyistheprogressmadebetweenFeb2012andMay2012somuchbetterthantheperiods
thereafter?Whatchanged?
WhyhaslittleornoprogressbeenrecordedinJan2013andFeb2013?Whatwashappeningatthis
time.
SimilarlytheperiodbetweenJuly2013toOctober2013recordslittleornoprogress.Whatwas
actuallyhappeningonsiteduringthisperiod?WhatdocumentsareavailabletodemonstrateTYEC
workingduringthisperiod?
AgainwehavenorecordsfortheperiodbetweenOctober2013andJanuary2014.WhatwereTYEC
doingandwhatrecordsareavailabletosupportthis?
ELECTRICAL
Explaincriticalelectricalsystemsrequiredforhandover?
Explainreasonsfordelaysandinterdependenciestothefollowingactivities

Generator:
Dampers:
TransformerRoom
Switchgear
Poweron
Lighting
Testingandcommissioning

Howdotheeventscurrentlyclaimedforimpactonanyofthese?
Arerecordsavailablefortestingandcommissioningoffelectricalworks?
WhatactivitiesdelayedtestingandcommissioningtillDecember2012andthenMarch2013?
Dowehavecopiesofrequestsforinspectionbytheclient?
Whatchangesifanyweretheretotheelectricalsystems?
Whatdelayeddrawingsand/orapprovalsarethererelatingtothesesystems?
MECHANICAL
Explaincriticalmechanicalsystemsrequiredforhandover?
Explainreasonsfordelaysandinterdependenciestothefollowingactivities

Plumbing
FlushingofCWS
FlushingofHWS
Elevators
Testingandcommissioning

Howdotheeventscurrentlyclaimedforimpactonanyofthese?
Arerecordsavailablefortestingandcommissioningoffmechanicalworks?
WhatactivitiesdelayedtestingandcommissioningtillMarch2013?
Dowehavecopiesofrequestsforinspectionbytheclient?
Whatchangesifanyweretheretothemechanicalsystems?
Whatdelayeddrawingsand/orapprovalsarethererelatingtothesesystems?
OTHERITEMS
Whydidthenameoccupationalpermitchangetobuildingcompletioncertificate?Wasthisabetter
understandingofwhatwasrequiredornothingmorethananamechange?
WhyinJanuary2013didtheprogrammerecordallinspectionsandapprovalscompeltedbutthen
recantedthisinMarch2013
Whatdoestheoperationtestrequiretobecomplete?Whatwasthestatusoftheseitemswhen
operationtestingwascarriedout?
Explaindelaysthroughobtainingbuildingcompletioncertificate
Providedocumentsoflevelsofsnagging

Providedetailsoflevelsofdefectsornonconformancesneededtobecorrectedpriortohandover
orapprovals.
Explainhistoryofhandovers.Whentheearliestwasthehotelcouldhavebeenhandedover;what
preventedtheinitialdatesfromhappening.

OriginalRetainedLogic
PrimaveraLongestPath
CriticalActivityName
ActivityID
AppointmentbycounsultantSignages A75300
GFRC
forParking&Backyard
Signages
Snagging/PC
A79470
AdditionalPS:ItemsandFurniture
AdditionalPS:ItemsandFurniture
Prepare&SubmitTechnicalDatato
Consultant
Snagging/PC
Snagging/PC
AdditionalPS:ItemsandFurniture
Prepare&SubmitTechnicalDatato
A79390
AdditionalPS:ItemsandFurniture
Snagging/PC
Consultant
Snagging/PC

ReScheduledProgressOverride
CriticalActivityName
InstallGFRC4F

ActivityID
A55590

POTENTIALALTERNATIVES
NewFinish
20/07/2012 Nodelayinprogramme

Prepare&SubmitTechnicalDatato
Consultant
Prepare&SubmitTechnicalDatato
Consultant

A79390

25/07/2012 Signage

A79390

Kitchens
Snagging/PC

AbuDhabiFoodControlAuthority
Approval

A72490

A60340

StormandSoilwaterDischarge
Snagging/PC

A55280

AbuDhabiFoodControlAuthority
Approval

A72490

A71860

Kitchens
Snagging/PC

AbuDhabiFoodControlAuthority
Approval

A72490

4thFloorEquipments

A71860

2960

Kitchens
Snagging/PC

AbuDhabiFoodControlAuthority
Approval

A72490

4thFloorEquipments

A71860

01/10/2012

2960

SprinklerPiping2F
2ndFloorLooseFurnitureWorks

A7460
A71210

PS:PurchaseOrderSinagesfor
Parking&Backyard

A72930

14/01/2013

01/11/2012

2960

SprinklerPiping2F
2ndFloorLooseFurnitureWorks

A7460
A71210

Elevators
T&CMech&Elec
Snagging/PC

Elevators

A56100

09/01/2013 T&C
Flushing

U007168

13/02/2013

13/12/2012

2960

InstallDoor&Hardware3F
A56470
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

Elevators
T&CMech&Elec
Snagging/PC

Elevators

A56100

11/02/2013 T&C
Flushing

U007171

21/02/2013

03/01/2013

2960

A56470
InstallDoor&Hardware3F
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

Elevators
T&CMech&Elec
Snagging/PC

Elevators

A56100

U007176

13/03/2013

07/02/2013

2960

Sprinklers2F/3F
Loosefurniture/Signage/Plants
Lightingworks3F/4F
Snagging/PC
Sprinklers2F/3F
Loosefurniture/Signage/Plants
Lightingworks3F/4F
Snagging/PC
Doors&Hardware
Loosefurniture/Signage/Plants
Lightingworks3F
Snagging/PC
Doors&Hardware3F/4F
Loosefurniture/Signage/Plants
Lightingworks3F
Snagging/PC
Kitchens
Snagging/PC

3F17FEquipments
3F17FLighting
3F17FSignagePlantsArt
Snagging/PC
3F17FEquipments
3F17FLighting
3F17FSignagePlantsArt
Snagging/PC
3F17FEquipments
3F17FLighting
3F17FSignagePlantsArt
Snagging/PC
Signages
Snagging/PC

Storm&SoilWaterDischarge
AuthorityInspection,Approval&
Activation
4thFloorEquipments

27/08/2012 Signage
Generator
ElectircalT&C
17/08/2012 Transformer,Switchgear
ElectricalT&C
Flushing
30/08/2012 StormandSoillag70dtopermit
Kitchens
Flushing
17/09/2012 T&C
Flushing
Elevators
Dampers
14/10/2012 T&C
Flushing
Elevators
Dampers
13/11/2012 T&C
Flushing
Elevators
Dampers
10/12/2012 T&C
Flushing
Elevators

AbuDhabiFoodControlAuthority
Approval

Kitchens

A56110

U0071802

14/05/2013

07/03/2013

2960

Kitchens
T&CKitchens
Snagging/PC
DomesticWaterSupply
Snagging/PC

DomesticWaterSupplyAuthority
Inspection,Approval&Activation

A55310

U0071841

27/05/2013

04/04/2013

2960

InstallDoor&Hardware3F
A56470
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

DomesticWaterSupply
Snagging/PC

DomesticWaterSupplyAuthority
Inspection,Approval&Activation

A55310

U0071881

12/06/2013

02/05/2013

2960

InstallDoor&Hardware3F
A56470
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

Flushing
T&CMechWorks
Snagging/PC

Flushing

A7090

20/02/2013 PlumbingfixturesIntF/18F
SwimmingPool
Flushing
T&C
10/03/2013 AUTHORITYINSPECTIONSAPPROVED27DEC2012
KITCHENS
GYM/SPA
05/05/2013 T&CCompletion
DWS40dlagtooccupationalpermit
BUILDINGCONTROLINSPECTIONS
KITCHENS
27/05/2013 T&CCompletion
DWS40dlagtooccupationalpermit
BUILDINGCONTROLINSPECTIONS
KITCHENS
12/06/2013 Flushing40dlagtoT&Ccompletion
BUILDINGCONTRIOLINSPECTIONS
KITCHENS
GYM/SPA

U0071921

30/06/2013

30/05/2013

2960

InstallDoor&Hardware3F
A56470
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

CarparkVentilation
DomesticWaterSupply
Snagging/PC

CarparkVentilationSystemAuthority A55350
A55310
Inspection,Approval&Activation
DomesticWaterSupplyAuthority
Inspection,Approval&Activation

Project
R00711

Finish
20/07/2012

PrimaveraLongestPath
TimeNow Activities
16/02/2012
2974 PS:Signages
Snagging/PC

U00729

25/07/2012

01/03/2012

2974

U00730

27/08/2012

01/04/2012

2974

U007311

17/08/2012

01/05/2012

2960

Kitchens
Snagging/PC

AbuDhabiFoodControlAuthority
Approval

A72490

U00732

02/09/2012

01/06/2012

2960

BasementCarParking
Snagging/PC

FloorPainting&CoatingB2

U00733

19/09/2012

01/07/2012

2960

Kitchens
Snagging/PC

U00734

15/10/2012

01/08/2012

2960

U00735

15/11/2012

01/09/2012

U00736

13/12/2012

U007162

Doors&Hardware3F/4F
Loosefurniture/Signage/Plants
Lightingworks3F
Snagging/PC
Doors&Hardware3F/4F
Loosefurniture/Signage/Plants
Lightingworks3F
Snagging/PC
Doors&Hardware3F/4F
Loosefurniture/Signage/Plants
Mechanical/Flushing
Lightingworks3F
Snagging/PC
Doors&Hardware3F
Loosefurniture/Signage/Plants
Lightingworks3F
Snagging/PC

0
5

38

28

41

59

86

116

143

173

206

A72490

InstallDoor&Hardware3F
A56470
2ndFloorArtWork,Signage,Plantsand A70980
Accessories

215

233

289

311

327
27/06/2013 BUILDINGCONTROLINSPECTION:SecuritySytem,Fire
Alarm,CentralBattery,FireProtection,
TelecommunicationServices,CarparkVentilation,
Domesticwater
OPERATIONTEST
KITCHEN
GYM/SPA

342

U007198

01/08/2013

15/07/2013

2960

Kitchens

AbuDhabiFoodControlAuthority
Approval

A72490

ClocksandWallPictures
Snagging/PC

Clocks&WallPictures

A56139

U0072021

29/08/2013

12/08/2013

2960

Kitchens

AbuDhabiFoodControlAuthority
Approval

A72490

ClocksandWallPictures
Snagging/PC

Clocks&WallPictures

A56140

U007206

26/09/2013

09/09/2013

2960

Kitchens

AbuDhabiFoodControlAuthority
Approval

A72490

ClocksandWallPictures
Snagging/PC

Clocks&WallPictures

A56140

U007210

24/10/2013

07/10/2013

2961

Kitchens

AbuDhabiFoodControlAuthority
Approval

A72490

ClocksandWallPictures
Snagging/PC

Clocks&WallPictures

A56140

31/07/2013 BUILDINGCONTROLINSPECTION:SecuritySytem,Fire
Alarm,CentralBattery,FireProtection,
TelecommunicationServices,CarparkVentilation,
Domesticwater
OPERATIONTEST
KITCHEN
GYM/SPA
28/08/2013 BUILDINGCONTROLINSPECTION:SecuritySytem,Fire
Alarm,CentralBattery,FireProtection,
TelecommunicationServices,CarparkVentilation,
Domesticwater
OPERATIONTEST
KITCHEN
GYM/SPA
25/09/2013 BUILDINGCONTROLINSPECTION:SecuritySytem,Fire
Alarm,CentralBattery,FireProtection,
TelecommunicationServices,CarparkVentilation,
Domesticwater
OPERATIONTEST
KITCHEN
GYM/SPA
23/10/2013 BUILDINGCONTROLINSPECTION:SecuritySytem,Fire
Alarm,CentralBattery,FireProtection,
TelecommunicationServices,CarparkVentilation,
Domesticwater
OPERATIONTEST
KITCHEN
GYM/SPA/WATERFALL

376

404

432

460

MISA QA
RCSH:
Overview
AUDITSummary
FINDING SUMMARY: MC-01
J

2011
O

PRIVILEGED - Produced on the instructions of counsel for the purposes of litigation


M

2012

2013

2014
F

20/03
Generator procurement
Generator install 16/02

23/01
29/11

ELECTRICAL

Dampers install 16/02


03/07

Transformer room 16/02

17/12

Switchgear 24/05
28/03
Lighting Procurement
12/08

Interior Lighting 16/02

04/08

Lighting Works 16/02


10/07

Lighting Fixtures 16/02


T&C Electrical 19/05

06/03

25/07
Chilled Water Piping

MECHANICAL

Sprinkler 16/02

12/06
25/07

Flushing [CWS] 24/05


19/06

Flushing [HWS] 27/05


24/04

Plumbing Fixtures 16/02


27/05
Swimming Pool Procurement
Swimming Pool Installation 16/02

24/06

Elevators 16/02

24/06
T&C Mechanical 19/05

06/07

07/10

Waterfall 10/06
Gym 17/03

07/10
07/10

OTHER ACTIVITIES

Art Work, Signage, Plants & Accessories 03/03

08/10

Carparking Finishes 16/02

10/10

Kitchen Delivery 17/03


Kitchen Installation 06/09

08/10

Operation Test 03/10

07/10
Kitchen Testing 15/06

12/10
20/10

Authority Approval 16/02


Building Completion Certificate
Snagging 06/10

0d 5d

38d

+5

28d

(-5)

59d

+33

41d

+3

2012
+18

86d
J

116d

+27

143d

+30

173d

+27

206d 215d
N

25/12

23/10
Practical Completion

2011

21/10

+30

+33 +9

233d
J

289d
M

+18

311d

+56

327d

+16

376d

+22

342d

+15

2013

+34

404d

432d

+28

+28

19/01

460d
O

23/10

+28

2014
F