BILL OF QUANTITIES

BILL OF QUANITITES
11
11.1. Flexible Pavement: - For 1 Km Length
S.
N
o.
1.

2.

3.

Description of Work

Unit Rate
(Rs.)

Preparation
and
consolidation of sub grade
with power road roller of
8 to 12 tonne capacity
after excavating earth to
an average of 22.5 cm.
depth,
dressing
to
camber
and
consolidating with road
roller including making
good
the
undulations
etc. and re-rolling the
sub grade and disposal
of surplus earth lead upto
50 metres.
sqm
Laying
granular
subbase
with
stone
aggregate
and blinding
material,
earth
etc.
including
screening,
sorting and spreading to
template
and
consolidation with light
power
road-roller
etc.
complete. Also providing
stone aggregate.
cum
Laying
spreading
and cum
compacting
stone
aggregate of specified
sizes
to
WMM
specifications
including

Quant Amount
ity
(Rs.)

6640

225096.0

33.90

m3

946.7

2256

2135868.

5
1003.

m3

00
2131587.

10

50

273

BILL OF QUANTITIES

4.

5.

spreading
in
uniform
thickness, hand picking,
rolling with 3 wheeled
road / vibratory roller 8-10
tonne in stages to proper
grade
and
camber,
applying and brooming
requisite
type
of
screening/binding
material
to
fill
up
interstices
of
coarse
aggregate watering and
compacting
to
the
required
density.
Also
providing
stone
aggregate.
Providing and applying
prime
coat using hot
straight run bitumen of
grade 80/ 100 including
heating
the
bitumen,
spraying
the
bitumen
with
mechanically
operated
spray
unit
fitted
on
bitumen boiler, cleaning
and preparing the existing
road
surface
as
per
specifications, on W.B.M.
@ 0.75 Kg / sqm.
sqm
Providing and applying sqm
tack coat using Bitumen
Emulsion (Rapid Setting)
complying with IS 88871995,
spraying
the
bitumen emulsion with
mechanically
operated
spray unit, cleaning and
preparing the existing
road
surface
as
per

2125
m3

23.90
18.00

8500

203150.0

m2
8500

0
153000.0

m2

274

BILL OF QUANTITIES

6.

7.

specifications, on W.B.M
@ 0.3kg/sqm.
Providing
and
laying
Dense
Bituminous
Macadam on prepared
surface with specified
graded crushed stone
aggregate
for
profile
corrective base/ binding
course including loading
of aggregate with FE
loader and hot mixing of
stone aggregate, filler and
bitumen in hot mix plant,
transporting the mixed
material by tippers to
paver and laying the
mixed material with paver
finisher
fitted
with
electronic sensing device
to the required level and
grade and rolling by
road
roller
as
per
MORTH specifications, to
achieve
the
desired
density, but excluding the
cost of primer / tack coat,
80mm
average
compacted
thickness
with bitumen of 60/70
grade @ 5% (percentage
by weight of total mix)
and lime filler @ 2%
(percentage by weight of
Aggregate).
cum
Providing
and
laying
Dense
Bituminous
concrete
on
prepared
surface with
specified
graded stone aggregate

5,366.

660

3541890.

50

m3

00

275

BILL OF QUANTITIES

8.

9.

for
wearing
course
including loading
of
aggregate
with
F.E.
loader , and hot mixing
of
bitumen
with filler
and stone aggregate in
hot
mix
plant
,
transporting the mixed
material by tippers to
paver and laying the
mixed
material with
mechanical
paver
finisher
fitted
with
electronic sensing device
to the required level and
grade and rolling with
road
rollers,
as
per
MORTH specification, to
achieve
the
desired
density and compaction
but excluding cost of
primer/ tack coat. 40 mm
compacted thickness with
bitumen of grade 60/ 70
@ 5.5% and lime @3%
(percentage by weight
of total mix).
cum
Brick edging in full brick
width and half brick depth
including
excavation,
refilling and disposal of
surplus earth lead upto 50
metres. With F.P.S. bricks metr
of class designation 75
e
Dry brick pitching half sqm
brick thick in drains
including supply of bricks
and preparing the surface
complete,
With
F.P.S.
bricks of class designation

5,856.

320

1873936.

05

m3

00

1000
52.35
183.5

m
1140

52350.00
209247.0

m2

276

BILL OF QUANTITIES

10
.

11
.

75
Providing and applying
2.5mm thick road marking
strips (retro-reflective) of
specified
shade/colour
using hot thermoplastic
material
by fully/semi
automatic thermoplastic
paint applicator machine
fitted with profile shoe,
glass beads dispenser,
propane
tank
heater
and profile shoe heater,
driven by experienced
operator
on
road
surface including cost of
material, labour ,T&P,
cleaning
the
road
surface of all dirt, seals,
oil, grease and foreign
material etc. complete as
per direction of Engineerin-charge and accordance
with
applicable
specifications.
sqm
Surface dressing on new
surface
with
paving
bitumen of grade A-90/S90 of approved quality
using
2.25
kg of
bitumen per sqm with
1.65
cum
of stone
chippings
13.2
mm
nominal size per 100
sqm
of
road surface
including
consolidation
with road roller of 6 to
8 tonne capacity etc.
complete.
sqm

497.3

37.35

m2

18574.15

7000

625800.0

m2

Grand Total

1117049

89.40

277

BILL OF QUANTITIES

9.00
So, Total Cost of the Flexible Pavement per km. length = Rs.
1,11,70,499.00

11.2. Rigid Pavement: - For 1 Km Length


S.
N
o.
1.

Description of Work

Unit Rate
(Rs.)

Preparation
and
consolidation of sub grade
with power road roller of
8 to 12 tonne capacity
after excavating earth to
an average of 22.5 cm.
depth,
dressing
to
camber
and
consolidating with road
roller including making
good
the
undulations
etc. and re-rolling the
sub grade and disposal
of surplus earth lead upto
50 metres.
sqm

33.90

Quant Amount
ity
(Rs.)

6500

220350.0

m3

278

BILL OF QUANTITIES

2.

3.

4.

Laying granular sub-base


with
stone
aggregate
and
blinding
material,
earth
etc.
including
screening, sorting and
spreading
to
template
and consolidation with
light
power
road-roller
etc.
complete.
Also
providing
stone
aggregate.
cum
Dry
Lean
Cement
Concrete
sub-base
Construction of dry lean
c/c
sub-base
over
a
prepared sub-grade with
coarse
and
fine
aggregate, the size of
coarse
aggregate
not
exceeding
25
mm,
aggregate cement ratio
not
to
exceed
15:1,
aggregate gradation after
blending, cement content
not to be less than 150
kg/cum,
optimum
moisture content to be
determined during trial
length
construction
concrete strength not to
be less than 10 MPa at 7
days, mixed in a batching
plant, transported to site,
laid with a paver with
electronic
sensor,
compacting
with
8-10
tonne
vibratory
roller,
finishing and curing.
cum
Cement
concrete
pavement Construction of

946.7

2200

2082850.

m3

00

2403.

825

1982862.

47

m3

75

279

BILL OF QUANTITIES

5.

6.

un-reinforced,
dowel
jointed,
plain
cement
concrete pavement over a
prepared sub-base with 43
grade cement @ 400 kg
per cum, coarse and fine
aggregates conforming to
IS: 383, maximum size by
coarse
aggregate
not
exceeding 25 mm, mixed
in a batching and mixing
plant as per approved mix
design, transported to
site, laid with a fixed form
or slip form paver, spread,
compacted and finished in
a continuous operation
including
provision
of
contractor,
expansion,
construction
and
longitudinal joints, joint
filler,
separation
membrane,
sealant
primer,
joint
sealant,
debonding strip, dowel
bar, tie rod, admixtures as
approved,
curing
compound, finishing to
lines and grades as per
drawing.
sqm
Brick edging in full brick
width and half brick depth
including
excavation,
refilling and disposal of
surplus earth lead upto 50
metres. With F.P.S. bricks met
of class designation 75
er
Dry brick pitching half
brick
thick
in
drains
including supply of bricks

5007.
07

2000 10014140
m3

.00

1000
52.35

52350.00

280

BILL OF QUANTITIES

7.

and preparing the surface


complete,
With
F.P.S.
bricks of class designation
75
sqm
Providing and applying
2.5mm thick road marking
strips (retro-reflective) of
specified
shade/colour
using hot
thermoplastic
material
by fully/semi
automatic
thermoplastic
paint applicator machine
fitted with profile shoe,
glass beads dispenser,
propane tank heater and
profile
shoe
heater,
driven by experienced
operator on road surface
including
cost
of
material,
labour
,T&P,
cleaning
the
road
surface of all dirt, seals,
oil, grease and foreign
material etc. complete as
per direction of Engineerin-charge and accordance
with
applicable
specifications.
sqm

183.5

1140

209247.0

m2

497.3

37.35

m2

18574.15

1458037
Grand Total

4.00

So, Total Cost of the Rigid Pavement per km. length = Rs.
1,45,80,374.00