fall 2016
Text book
N.N. Bassak, Irrigation Engineering
Santosh Kumar Garg, Irrigation Engineering and Hydraulic structure
Course Grading
Exams (2)
Project and presentation
80 %
20 %
Course Outline
Introduction
Crop water requirement
Hydrological study
Ground water development
Canal section
Design of unlined canal
Design of lined canal
Hydraulic structure
Diversion head work
Student Project
You will be required to do a class project (group project). This project will represent 10 % of
your grade. It will be evaluated on the substance and creativity. You must submit the project
40 days before the end of semester. You can also submit a rough draft after 4 weeks of start
the course. Oral presentations will last 15 minutes and the written report should be long
enough to represent the same material, however, do not plan merely to read your report to the
class; oral and written presentations of the same material are very different.
Possible topics for presentations (areas for which we will not have sufficient time during
class sessions):
Project topics should be approved by the instructor. Each group should do a different
topic. If you dont submit your project title the topic will be assigned by instructor.
Course syllabus
Irrigation Engineering
Semester Calendar
(tentative)
Date
Whats Due
Topic
week 1
introduction
week 1
Type of irrigation
week 2
Paper topic
week 4
week 5
Irrigation efficiency
week 6
Type of canal
Midterm exam
week 8
Unlined canal
week 9
week 10
Lined canal
week 11
week 12
week 13
Paper rough
draft
week 14
Flume design
week 15
week 16
Review
Final Exam
Ch 1
Introduction
Necessity of Irrigation
week 3
week 7
Text reading
Ch 2
crop water
requirement
Ch 5
Flow irrigation
Ch 6
Canal section
Ch 7
Drainage canal
Ch 9
Irrigation canal
Ch 6
lined canal
Ch 7
Irrigation structure
Ch 8
Head works