Sie sind auf Seite 1von 5

Muhammad Alam

Civil Engineer

OBJECTIVES

Aspiring for a challenging job where in my qualification and acquired


skills are put to best use, providing me with an opportunity to grow
professionally to my full potential, also where I can share, contribute
and upgrade my knowledge and experience for the development of organization
served as well as self-development.

EDUCATION
Date of Birth:
21/05/1992
Nationality

Pakistan
CNIC No.
71704-0339963-1

Address:
Village and P.O. Chalt
Tehseel Nagar 2
District Hunza
Nagar G.B.
Mob:
+92312-9531344
Phone:
+92344-5008643

Email:
nagri34@gmail.com

Department Of Civil Engineering


Mirpur University of Science
And Technology,
Mirpur(A.K)

2010-2014

B.Sc. Civil Engineering


Major Subjects:
Theory of Structures, Strength of Materials, Highway Engineering,
Fluid Mechanics,
Plain and Reinforced Concrete, Construction Management.

Scored:

4.00/4.00 C G P A

P o s i t i o n : 2nd/80
Army Public School and College System Westridge
Rawalpindi 2007-2010
FSC Pre-Engineering
Major Subjects:
Physics, Mathematics, Chemistry

Scored:

80.8% marks

Grade (A+)

Cadet College Skardu 2005-2007


Matriculation
Major Subjects:
Mathematics, Physics, Biology

Scored: 82.47%

Grade (A+)

ILETS:
6 Band from British Council

Page 1

Muhammad Alam

FINAL YEAR PROJECT


High Performance Concrete
Generation Super plasticizers.

using

Admixtures

and

Third

RESEARCH PAPER
SMART CONCRETE: REVIEW (published in International Journal of Advances in Life
Science and Technology in 2014.

SPECIALITIES

Planning and managing Mass concrete placement


Tunnel construction
Supervision of RCC buildings structures
Grouting works in tunnels and dams
Slope stabilization measures
QA/QC procedures
Material testing
HSE regulations
Massive rock excavation works

KEY SKILLS
Good Communication & Language Skills.
Ability to apply mathematical & scientific knowledge in solving
engineering problems.

Ability to work effectively in harsh field conditions at


undeveloped locations.

Competent in use of AutoCAD


Competent in use of Microsoft office suite programs
Competent in use of Microsoft Project

Page 2

Muhammad Alam

SPECIAL COURSES
AutoCAD 2007 (2d &3d)
TEVTA Board Muzaffarabad AJK

Primavera Professional P-6 (R 8.3)


Skill Development Council Islamabad
(One month training course)

Survey Camp Certificate at New site of Mirpur University of


Science and Technology MUST Mirpur A.K.

EXPERIENCE
Pakistan Engineering Services
Junior Engineer (Civil)
Patrind Hydropower Project (150MW)
Project Description:
Patrind Hydropower Project is 150MW runoff river medium head project.
Major structures include a diversion tunnel, Concrete coffer dam (18m
height), HRT (2.1Km) Concrete Gravity Weir (43m height), Surge shaftand
Powerhouse (3 Francis turbines each of 50MW).
Project Cost:
280Million USD (Estimated)
Duration:

September 2014 Present

Duties & Responsibilities:

Supervision of tunnel construction using Drill & blast technique and


NATM design type (temporary Underground support system using Fiber
Reinforced Shotcrete, Rock-bolts and Lattice Girder/H-Beam) in foliated
metamorphic rock (Slates and Phyllites).

Supervise the planning, inspection and supervision of mass concrete


placement in hydraulic structures and buildings.

Page 3

Muhammad Alam

Supervise the placement of concrete and ensure proper mixing,


placement and consolidation of concrete as per project specifications

Steel and survey inspections of civil structures i.e buildings, tunnels etc.
Verify the conformance of construction material with technical
specifications, manuals and codes along with review of suppliers
certificates

Supervise the quality control procedures for installation of PT anchors for


slope stabilization

Supervise the placement of shotcrete on slopes for stabilization and


associated quality control issues

Supervise the stone pitching works for slope stabilization


Supervise the installation of rockbolts for slope construction and
associated quality control issues

Supervision of tests for curtain and consolidation grouting by GIN method


(Grouting Intensity Number) to verify parameters

Monitoring the convergence measurements in Tunnels


Review QA/QC documents including checklists, RFIs and material testing
sheets

Supervise the concrete lining in tunnels


Supervise the preparations of concrete mix designs as per design and site
constraints

Supervision of installation of mini-pipe roofing in tunnels


Setting up control points for survey and checking the tunnel profile &
alignment

Reviewing Method statements related to excavation, slope stabilization


and structure works

Supervise the installation of geotechnical instruments in weir structure


Technical Report writing
Preparing weekly and monthly progress reports

Public Works Department Hunza Nagar


Internee (Civil)
Duration: 02 months

Public Health Department Mirpure Azad Kashmir


Internee (Civil)
Duration: 02 months

Page 4

Muhammad Alam

LANGUAGES

English
Urdu
Shina
Brushishki

REFRENCES
Will be provided on demand.

Page 5

Das könnte Ihnen auch gefallen