1. Encourage the workers to begin work the next day as their monies have been paid and assured them they
will not be owed
2. Demanded to see and schedule meeting with all labour leads
3. Employed workers to transfer the reinforcement steel to a dry place and close to where they will be needed
to avoid rust
Recommendations
1. Repair of concrete mixers as they will be used for the concrete work to avoid hiring
2. Additional set of carpenters and iron bender be employed/ engaged to speed up the work and commence
casting on time b/cos of the condition of the cement
3. The slab platform/ formwork be coated with used engine oil to ease subsequent removal and forestalling
damages
4. Site be cleared of all debris inclusive of all damaged wood with nails for safety reasons
Please any other observation and recommendations would be given as the work progresses.
Sign
Engr. Vwoke Oyibogare
S/N
O
MATERIAL DESCRIPTION
QTY
OLD STOCK
QTY
NEW
STOCK
TOTAL
REMARK
CEMENT
163
1500
1,663
ROD ( STEEL
REINFORCEMENT)
10MM
12MM
16MM
20MM
25MM
BINDING WIRE
674
600
305
212
28
-
1000
1300
120
40
10
1,674
1,900
305
332
68
10
Scattered
over the site
1500
500
300
Indetermin
ate
Indetermin
ate
20
2
WOOD
2/3
2/4
PLYBOARD
NAILS
3
4
2
Concrete nails
ELECTRICAL PIPES AND
COUPLINGS
20MM PIPES
25MM PIPES
COUPLINGS
Adequate
Adequate
30 pcs additional required
Adequate
Adequate
7 additional required