Sie sind auf Seite 1von 3

Method Statement For Anti Termite Work

METHOD STATEMENT FOR ANTI TERMITE


1. Scope of Work
a) Main contractor shall notify pest control operator 24 hours in advance that anticipates concrete casting
into the area to be treated.
b) Before area treated, Main Contractor shall ensure that all loose timber, wood shaving, loose containing
materials be removed from the said allocation area.
c) Pest control operator shall applied Dynamite EC or Termigard 38.7EC (or any other applicable / approve
with Termicide 38.7 EC) chemical onto entire ground floor slab area prior to concrete casting.
d) The area surrounding all sides of the column stumps extending to 1 meter below the soil surfaces of to the
top of pile cap.
e) Pest control operator shall applied 2 meter all round the building prior to concrete of the apron area.
2. Chemical Preparation and Application
Pest control operator shall mixed the solution at site in the present of Site Supervisor/ Consultant according
to 1:40 as manufacturers specification proposed rate and to apply the mixed solution onto the indicated
allocation area by 4-5 liter to 1m2.
Before soil treatment will be carried out, the ground water table will be checked. Excavation of trial holes of
more than 0.5 meters deep measured from the level of the soil to be treated will be done. As required by
Environmental Department, no treatment is to be carried out if the ground water table is 0.5m of less below
of soil to be treated.
This chemical preparation shall be carried out within a kerb area under a roof with no outlet to the lake, open
drains or public sewer. The waste water containing the chemical shall not be discarded into the lake, septic
tank or open drain.
3. Time of Application
a) Link concrete shall be laid immediately after chemical has been applied on the hardcore as to avoid
exposure to weather.
b) Application of chemical Dynamite EC or Termigard 38.7EC (or any other applicable / approve with
Termicide 38.7 EC) should spray on hard surfaces of hardcore or sand blinding prior to concrete casting.
c) After completion of applying chemical, PVC sheet have to provide to cover up treated area as to avoid
exposure to sun heated and rain wash in case occurred of concreting
d) Immediately after the soil treatment is completed, the treated soil shall be securely covered with black
polyethylene sheet. The layer of lean concrete shall be cast on top of the sheet
e) After completion of applying chemical pest control operator will let the site supervisor/ Consultant to sign
and certify on the job street provided by pest control operator.

4. Allocation Equipment
Pest control operator must provide full range equipment for the job (Mask, Eye protector, Latex Glove, etc).
5. Temporary Drainage
The provision of temporary drainage will be provided of adequate capacity around the whole area to be
treated within an outlet to a sump.
6. Sampling
The examination/ quality control sampling (please refer to chemical manufacturers material safety data
sheet, material identification report)
7. Storage
Pest control operator shall arrange owned transportation and delivery, storage of material at site is not
necessary.
SUBMITTAL OF MATERIAL
a) Sample of material to be used is ready for submission
b) Material for test shall be done at site at any time
MATERIAL
a) Dynamite EC or Termigard 38.7EC (or any other applicable / approve with Termicide 38.7 EC) chemical
must be applied uniformly over the area to be treated at the rate of 4.5 liters to 1m2 or according to
manufacturers specification
b) The area to be chemically treated byDynamite EC or Termigard 38.7EC (or any other applicable / approve
with Termicide 38.7 EC) onto 2 meters all round building perimeter prior concreting of the apron area.
PEST CONTROL OPERATOR
a) Anti Termite Contractor is the operator and XXX Agencies (M) Sdn. Bhd. is the chemical (Dynamite EC
or Termigard 38.7EC (or any other applicable / approve with Termicide 38.7 EC) importer and supplier.
b) Pest control operator (company) is not necessary to register with CIDB (Please refer to CIDB) but our
technicians are trained by CIDB and obtained recognized operators cards issued by CIDB (attached).
c) Poison permit is issued not by Environmental Department but the ministry of agriculture control the
issuing poison permit (please refer to Environmental Department Guideline). The poison permit issued by
the ministry of agricultural is attached for your perusal.
WARRANTY

a) Actual warranty is issued by Anti Termite Contractor immediately upon P.R. request subject to payment
fully settled by the main contractor. The warranty period is 2 years from CPC.
b) The treated subterranean termite be found affected the treated building within warranty period Anti
Termite Contractor undertakes to control by whatever method the company should deem fit free of charge.

METHOD OF APPLYING ANTI TERMITE SOIL TREATMENT (4 Stage)


a) Spraying of surfaces of pile cap and ground beam trenches.
b) Spraying of surfaces below the floor-slab area after laying of hardcore and prior to the final concreting
stage.
c) Spraying of surfaces below apron/ Terraces and area within 2 meters perimeter beyond the edge of
external building wall unless adjoining structures render this impossible.
d) Power spray at any soil surfaces or areas through which termite infestation is likely to occur and as
directed by the S.O.
METHOD OF APPLYING ANTI TERMITE SOIL TREATMENT (2 Stage)
a) Spraying of surfaces below the floor-slab area after laying of hardcore and prior to the final concreting
stage.
b) Spraying of surfaces below apron/ Terraces and area within 2 meters perimeter beyond the edge of
external building wall unless adjoining structure render this impossible.
c) Power spray at any soil surface of areas through which termite infestation is likely to occur and as
directed by the S.O.
EC - EMULSIFIABLE CONCENTRATE

Das könnte Ihnen auch gefallen