Sie sind auf Seite 1von 2

Document Front Page

01

16.01.13

Proj. rev.

Issued for Approval

Issue date

Reason for issue

P.O. Number

AG

BE

SB

Made
by

Chk'd
by

Appr.
by

Package Title

TELESCOPIC GANGWAY
Tag No.(s)
For Project use only:

Supplier Logo

2A

Date

Sign.

Proprietary Rights, Intellectual Property and Confidentiality Notice


Copyright 2010 Marine Aluminium, a.s. All right reserved
This document contains and is intended to convey confidential and proprietary information which is the exclusive
intellectual property of Marine Aluminium, a.s. This document, in electronic or hard copy format and any
attachments included with or reference therein, MAY NOT by any means be reproduced, duplicated, distributed,
shared, disclosed or used for any purpose without the express written permission of Marine Aluminium, a.s.
Project Document Number
Project Code

Suppliers Doc. Number

System Code

1340581-MA-4010-N-KA-003-0003
Project No. 1340581

Contract No.: SS348017

Telescopic Gangway 45,5m


Document title:

FACTORY LOAD TEST PROCEDURE

____________________________________________________________________________________

FACTORY LOAD TEST OF STANDARD 45,5 M GANGWAY At Marine Aluminium,

The loadtest to be carried out with a load of 10,0T connected to a wire on both sides of outer end of
inner fixed part of the gangway.

The gangway shall be lifted into horizontal position.


A 10,0T load to be connected to the outer end of the fixed gangway part.

The gangway is then extended completely, and the load lifted. Afterwards the manouvering handles
shall be placed in neutral position and the gangway operator shall not touch the handles.

Check that there is no leakage in the lifting system while keeping the gangway remained in lifted
position for about 3 minutes.

The gangway is retracted completely, and the load disconnected. A visual inspection is made to
check that no damage has occurred during the load test.

Loadtest of the telescopic part to be carried out with a load of 1,9 T connected to a wire on both
sides of outer end of telescopic part of the gangway.

The gangway shall be lifted into horizontal position and the 1,9T load are connected to the outer end
of the telescopic gangway part.

When the gangway is retracted completely, and the load lifted. Afterwards the manouvering
handles shall be placed in neutral position and the gangway operator shall drive the telescopic part
to outer position and back to inner position.

The gangway is retracted completely, and the load disconnected. A visual inspection is made to
check that no damage has occurred during the load test.

LOAD TEST WITNESSED:

___________________________
Class Surveyor
___________________________
Client Representative

-------------------------------------------------For MARINE ALUMINIUM A/S

Page no. 2 of 2

Das könnte Ihnen auch gefallen