ON PRACTICAL TRAINING
TAKEN AT
BHILAI STEEL PLANT STEEL AUTHORITY OF INDIA LTD. BHILAI,
CHATISHGAD
Blast furnace
There are 2 main section of the department:
1. Raw material section
2. Furnace section
Furnace Section:
Bustle pipe
The furnace is provided with a tap hole, which is enclosed in a steel cast
frame and is cooled by two Tap hole coolers, which have their own supply
of water.
The hot metal is tapped out at an interval of 1-2 hrs depending upon the
furnace condition.
The usual way of opening the tap hole is to drill the tap hole until the skull
is reached. Oxygen lancing is carried out melt the skull.
The hot metal continues to flow down the bend runner form, which it
is diverted into individual metal ladles.
At the end of tapping the tap hole is closed with mudgun, which is electrically or
hydraulically operated
Fleets of 78-iron ladles car are available, out of which normally 48 are in
circulation in cases all seven furnace are in operation.
Source of Raw Materials:
1.
2.
3.
4.
5.
6.
Iron Ore
Lime Stone
Manganese
Sinter
Coke
Converter Slag
Coke
Converter
.
Slag
PIG IRON
08 Kg
.
30kg