Anchor Rod Tightening

for

4
5

Highmast Light Towers and Cantilever Sign Structures

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Michael J. Garlich, S.E., P.E. (Corresponding Author)


Collins Engineers, Inc.
123 N. Wacker Drive, Suite 300
Chicago, Illinois 60606
312.704.9300
312.704.9320 (Fax)
mgarlich@collinsengr.com
Jeremy W. Koonce, S.E., P.E.
Collins Engineers, Inc.
123 N. Wacker Drive, Suite 300
Chicago, Illinois 60606
312.704.9300
312.704.9320 (Fax)
jkoonce@collinsengr.com

Date: July 30, 2010


Word Count: 4155

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

88
89
90

Anchor Rod Tightening


for
Highmast Light Towers and Cantilever Sign Structures
INTRODUCTION
Transportation agencies make extensive use of various configurations of overhead sign
structures, signal structures, and luminaries. Many of these structures are supported by a
cantilevered pole, or are in themselves cantilevers, ie. high mast light poles. Proper performance
of these structures is not only dependant upon a correct design, but also on proper installation.
Design provisions are contained in the AASHTO Standard Specification for the Design of
Structural Supports for Overhead Signs, Signals and Luminaries (AASHTO Specification)
Guidance on proper installation can be found in various NCHRP Reports, as well as the FHWA
Guidelines for the Installation, Inspection and Maintenance of Structural Supports for Overhead
Signs, Signals, and Luminaries. Many structures were installed, however, before much of this
information was available.
Field Inspection
Field inspections of structures located in several states, for both private and governmental
agencies, have identified the wide spread presence of loose anchor rod nuts (Figures 1 and 2).
This is the result of improper installation procedures and compromises the structural integrity of
the pole to foundation connection. It should be noted that the normal method of checking for
loose nuts is to strike the nut and washer with a hammer and listen for a sharp ringing sound
which is indicative of a tight nut, or look for any movement of the washer or nut or a dull tone
when struck, indicative of a loose nut. However, this method actually only detects loose nuts
and cannot differentiate between a merely tight snug tight and a pretensioned connection. Thus
the number of loose nuts reported no doubt underestimates the problem. Increased
understanding of the behavior of this connection and the importance of proper anchor rod nut
installation can eliminate these loose connections and contribute to increased service life as well
as reducing maintenance costs to retighten loose nuts.
65
67
69
71
73
75
77
79
81
83
85
87
FIGURE 1 High mast pole with multiple
loose leveling nuts.

TRB 2011 Annual Meeting

FIGURE 2 Missing top nut on cantilever


support post.

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107

108
109
110
111
112
113
114
115
116
117
118
119
120
121
122

Base Connection
The industry standard anchor rod connection used for traffic sign, signal, and luminary
supports is the double nut moment connection as shown in (Figure 3). As can be seen from the
Figure, this connection essentially clamps the base plate in position between the lower, or
leveling, nut and the top nut. In order to limit secondary bending in the anchor rods and best
distribute loads to the anchor rods, hardened washers should be used with both nuts and the
exposed length of anchor rod between the top of foundation and bottom of the lower nut should
not exceed the diameter of the anchor rod. The double nut moment connection is an attractive
method of securing the structure to the foundation partly because it facilitates leveling of the
base plate and can accommodate minor variations in base plate thickness or deformations. In the
mounting of equipment and industrial structures, it is common to shim under the base plates to
achieve level base plate, snug tighten the anchor rods and then place grout under the base plate.
Once the grout cures, the shims (ideally) are removed and the anchor rods preloaded by final
tightening. This type of mounting is seldom found in highway structures and hence will not be
addressed here. However, some older structures may have been installed in this manner.

FIGURE 3 Double nut moment connection.

For cantilever poles, the governing design condition for anchor rod design is normally the
connection fatigue strength. The double nut moment connection is categorized as a Category D
detail with a constant amplitude fatigue resistance of 7 ksi by the AASHTO Specification (1).
To achieve this fatigue category, the connection must be tightened to provide a preload in the
bolt, similar to other structural bolted connections loaded in tension. An anchor rod with a loose
nut becomes ineffective, except in the case of extreme overload, and hence the remainder of the
anchor rods see increased load. This not only reduces the fatigue life of the anchor rods which
remain engaged, but also increases the flexibility of the base plate. This increased base plate
flexibility increases the stresses in the pole to base plate weld and contributes to fatigue cracking.
Base plates with six or eight anchor rods are now commonly used; four are often found on older
structures. Considering that it is not uncommon to find multiple loose nuts (Figure 4) on a single
pole, a potential for pole cracking or even collapse is readily apparent.

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
124
126
128
130
132
134
136
138
140
142
144
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

FIGURE 4 High mast pole with loose top nuts.

Tightening Procedures
Tightening of anchor rods for a new installation should follow a standard procedure and
assure proper preload of the anchor rod connections. Note that double nut moment connections
preload the connection; they do not produce a pretension between the anchor rod and foundation.
Prior to tightening, the required connection preload must be determined, based upon the anchor
rod material and size.
The anchor rod preload should develop a tension force equal to from 0.5 to 0.6 times the
rod material minimum tensile strength, similar to the preload in standard high strength bolts. To
determine the preload, the material type and anchor rod size must be known. Currently, anchor
rods are supplied in conformance with ASTM F1554 Standard Specifications for Anchor Bolts,
Steel, 35, 55 and 105 ksi Yield Strength, however anchor rods may vary from these
requirements, particularly for structures built prior to the adoption of F1554 in 1994.
The specified minimum yield strength (Fy) and specified minimum tensile strength (Fu)
for common anchor rod materials as given in F1554 (2) are shown in Table 1.

TABLE 1 Anchor Rod Material Properties


Property

165

Anchor Rod Designation


Grade 36
Grade 55
Grade 105

Minimum yield
Strength (Fy), ksi

36

55

105

Minimum tensile
Strength (Fu), ksi

58

75

125

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
166
167
168
169
170

The FHWA Guidelines recommend tightening of anchor rod nuts using the turn-of-nut
method, similar to what is used for high strength structural bolts. Table 2 provides the
recommended nut rotations from a snug tight condition.
TABLE 2 Nut Rotation for Turn-of-Nut
Anchor Rod Dia, in

171
172
173
174
175
176
177
178
179
180
181
182
183
184

185
186
187
188
189
190
191

Nut Rotation from Snug and Tight Condition


F1554
F1554
Grade 36
Grades 55 and 105

Less than 1

1/6 turn

1/3 turn

1 or larger

1/12 turn

1/6 turn

These nut rotations should only be used for double nut moment joints. A tolerance on
rotation of 20 degrees beyond the required rotation is recommended. It is important that the nut
and washer have a flat bearing surface pm the base plate so that secondary bending stresses are
not induced in the anchor rod. When the anchor rod is out of vertical alignment by an angle
exceeding 1:40, a beveled washer or shims should be used to achieve a flat bearing.
Final tightening using the turn-of-nut method should not take place until the leveling nuts
(Figure 5) and top nuts are brought to a snug tight condition. Snug tight is generally defined
as a nut tightened so that all plies in the connection are in firm contact, generally achieved by the
maximum effort of a worker using a hand wrench. In structural bolting snug tight is often
defined as a tightness achieving 10 percent of the minimum preload; this may be difficult to
achieve for large anchor rods. However, the snug tight condition requires the full effort (lean
into it!) applied at the end of the wrench.

FIGURE 5 Tightening leveling nuts with wrench.

Prior to turn-of-nut tightening, the reference position of the top nut in the snug tight
position should be marked on the nut and base plate. The nuts are then rotated as required by
Table 2. Nuts should be tightened in a star pattern, tightening nuts opposite one another until
all nuts are tightened. This brings the connection up to final tightness more uniformly than if the

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207

232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249

nuts were tightened in a simple circular sequence, and applies to both the snug tight condition
and final tightening.
Anchor rod threads and nuts are lubricated prior to shipping to the field. The lubricants
facilitate tightening and must be present when tightening is undertaken. If the lubrication is not
present, as may happen due to weathering effects, a commercial bolt lubricant or beeswax should
be applied. Lock washers should not be used with anchor rod nuts. Considerable force is
required to achieve the required nut rotation, particularly for the larger anchor rods. For smaller
nuts, it may be possible to achieve the required rotation using a standard wrench with an
extension, such as a piece of pipe, attached to the handle. This extension, or cheater bar, may
be several feet long and must be carefully used to avoid possible injury. Final tightening may
utilize striking slugger or knocker wrenches, or hydraulic wrenches. Figure 6 shows a striking
wrench on an anchor rod nut. The heavy end of the wrench is struck repeatedly with a sledge
hammer, generally in the 16 to 20 pound range, till the required rotation is reached. A
hydraulically powered wrench is shown in Figure 7. Hydraulic powered wrenches are very
efficient and can also provide tightening to a specified torque if so desired.
209
211
213
215
217
219
221
223
225
227
229
231
FIGURE 6 Striking or knockerwrench
on leveling nut.

FIGURE 7 Hydraulic wrench tightening


leveling nut.

Retightening Existing Bases


Retightening or replacement of missing or damaged anchor rod nuts follows a similar
procedure to initial installations. While in-place nuts may be retightened, providing new nuts
offers the advantage of a nut that is free of any corrosion or damage, and with the old nut
removed, cleaning and lubrication of the existing anchor rod threads is facilitated and broken or
missing washers can also be replaced. Prior to nut removal, the thread pitch and rod diameter
must be measured to assure proper nuts are available before removal begins. New nuts must
match the existing in size and should be heavy hex nuts. Washers should also be structural
washers conforming to ASTM F436.
For existing installations, the anchor rod material type may not be known. While it is
most likely that the rod material is at least Grade 55, it may be prudent to use the turn-of nut
rotations recommended for Grade 36 material rather than risk damage to the existing anchor
rods. Field hardness testing of the rod end might be utilized to investigate the rod material type.
Before removing any nuts, tighten all leveling and top nuts to a snug tight condition.
Remove the first nut and clean the threads using a wire brush. If threads are severely corroded or

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295

possibly damaged, the threads can be reconditioned by chasing them with an appropriate sized
die. The threads should then be lubricated and the new nut installed to a snug tight condition.
The opposite nut is then similarly retightened, and the process continued till all nuts are snug
tight. Any gaps between the nuts and base plate should be shimmed with tapered washers.
The nuts are then tightened to the required nut rotation in two passes, each pass achieving
one half of the final rotation. Again, tightening should proceed in a crosswise or star pattern.
Replacement nuts and washers should be heavy hex nuts conforming to ASTM. No rotation of
the leveling nut should occur during top nut tightening.
While the turn-of-nut method is recommended for anchor rod tightening, the Guidelines
(3), provide the following equation for determining the torque required to achieve a desired rod
pretension.
T = 0.12dbP
Where
T = Installation torque (inch-kips)
db = nominal body diameter of the anchor rod (inches)
P = installation pretension (kips) equal to 50 percent of the specified minimum tensile
strength of F1554 Grade 36 rods, and 60 percent for Grade 55 and higher strength rods
This equation was taken from NCHRP 469 (4). The 0.12 factor was developed from
research on large diameter anchor rods by Till and Lefke (5).
This torque requirement is based on new and well lubricated anchor rod threads and nuts.
The NCHRP 469 report recommends that new installations have rod tightness rechecked after
two days using a verification torque of 110 percent of that calculated from the above equation.
Apparently, the reason for this check is possible connection loosening due to deformation or
creep of the galvanizing within the threads.
These torque valves are not recommended for use in retightening due to the likely
increase in friction resulting from weathering. They can however be monitored as a precaution
against retightening a bolt to the point of damage.
In addition to use of hydraulic torque wrenches, hand operated torque wrenches with
extension handles and torque multipliers can be used for torque controlled installation.
Installation Inspection
Field inspection during anchor rod nut installation is strongly recommended in order to assure
proper connection tightness. Direct Tension Indicator washers as are used for high strength bolts
are now available in sizes to accommodate anchor rods. These offer an attractive option to
verify proper connection tightness, but their use needs to consider the possible oversize holes
generally present in base plates. Plate washers may be required.
CONCLUSIONS
Loose anchor rod nuts in the base plate connection for cantilever sign, signal, and luminaries can
significantly shorten the life of the structure. Proper installation can, preclude these problems
and is not difficult. Existing structures may have their base connections retightened using a
similar procedure, preferably starting by sequential nut removal.

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.

Michael J. Garlich
Jeremy W. Koonce
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316

REFERENCES
1.

Standard Specification for Structural Supports for Highway Signs, Luminaires and
Traffic Signals, In American Association of State Highway and Transportation Officials,
AASHTO.

2.

Standard Specifications for Anchor Bolts, Steel, 35, 55 and 105 ksi Yield Strength, ASTM
1554, ASTM International.

3.

Garlich, Michael J. and Thorkildsen, Eric T., Guidelines for the Installation, Inspection,
Maintenance and Repair of Structural Supports for Highway Signs, Luminaires and
Traffic Signals, Publication FHWA NHI 05-032, March 1995, Federal Highway
Administration, 2005.

4.

Dexter, R.J. and Richer, M.J., Fatigue-Resistant Design of Cantilever Signal, Sign, and
Light Supports, In NCHRP Report 469, Transportation Research Board, 2002.

5.

Till, R.D., and Lefke, N.A., The Relationship Between Torque, Tension, and Nut Rotation
of Large Diameter Anchor Bolts, Publication Materials and Technology Division,
Michigan Department of Transportation, Lansing, October 1994.

TRB 2011 Annual Meeting

Original paper submittal - not revised by author.