Sie sind auf Seite 1von 12

Exercises Corrections

Getting Started

Synchrony Automator
V3.2.0

Documentation title

Copyright Axway Software, 2007


All rights reserved.

Table of contents
1

Synchrony

Exercise 6 : Real operations case

1-1

1.1

Tasks

1-1

1.2

Steps

1-1

Exercise 7 : On error link and or object

2-2

2.1

Tasks

2-2

2.2

Steps

2-2

Exercise 8 : Detailed Scheduling

3-4

3.1

Tasks

3-4

3.2

Steps

3-4

Exercise 9 : Use of the cyclic mode

4-5

4.1

Tasks

4-5

4.2

Steps

4-5

Exercise 12 : Use of the Weight resource

5-7

5.1

Tasks

5-7

5.2

Steps

5-7

Use of the FIFO resource

6-9

6.1

Tasks

6-9

6.2

Steps

6-9

Exercises

ii

1 Exercise 6 : Real
operations case
1.1 TASKS


To create a chart using various types of links, with a real operations case.

1.2 STEPS
Complements on the constraints to be respected


Synchrony

if JOB_1 terminates in error, no other job is executed : it is necessary to set


the option descheduled for the JOB_1 : Arrt_base , and to put
mandatory links for all jobs except Job Erreur
If JOB_2 terminates in error, JOB_3 is not executed, but JOB_4 does : set the
option descheduled for the JOB_2 rplication
If JOB_3 fails, it is necessary nevertheless to execute JOB_4, and one JOB_5 (
which records JOB_3 error logs) : the links are indicated in the chart.

Exercises

1-1

2 Exercise 7 : On error
link and or object
2.1 TASKS



To use the On Error links and the OR object


To use the end of schedule mechanisms when there are failed jobs in the
charts.

2.2 STEPS


Synchrony

Create a model of the following chart

Exercises

2-2

Synchrony

The chart shows five jobs, but this number can be limited to three as indicated
in the instructions
Check the Deschedule and Set Level to Error Status options for the prod_X_CO
jobs
You can try to reprocess the chart by modifying the prod_X_CO jobs, but this
time selecting the Do Not Deschedule option.

Exercises

2-3

3 Exercise 8 : Detailed
Scheduling
3.1 TASKS
To use the advanced features to define scheduling rules.

3.2 STEPS


rule_1

rule_2
o

test{today=monday}
rule_3:

test{today=last.day.work.week-1.day.work}
rule_4:

test{today<first.day.calendar.month+20.day.calendar and today=work}


rule_5:

Synchrony

test{(today=last.day.work.month and today<>friday) or


(today+1.day.work=last.day.work.month and today+1.day.work=friday)}

Exercises

3-4

4 Exercise 9 : Use of the


cyclic mode
4.1 TASKS


To use the cyclic mode in the job and application objects.

4.2 STEPS

Synchrony

Part One

Part Two

Exercises

4-5

Synchrony

Set the option Set Level to error status for the job and the
application

Exercises

4-6

5 Exercise 12 : Use of
the Weight resource
5.1 TASKS


To use the weight resource in charts.

5.2 STEPS


Synchrony

Declaring the weight resource

Exercises

5-7

Synchrony

Declaring the resource wait rule for the jobs

Exercises

5-8

6 Use of the FIFO


resource
6.1 TASKS


Use the FIFO list resource with jobs and applications.

6.2 STEPS


Synchrony

Job parameters

Exercises

6-9

Das könnte Ihnen auch gefallen