ELECTRICALINSPECTORATEDEPARTMENT

ELECTRICALINSPECTORATEDEPARTMENT
CITIZENSCHARTER

1.FUNCTIONSOFELECTRICALINSPECTORATEORGANISATION:
TheElectricalInspectorateorganisationisresponsibleforenforcementoftheprovisionsof
1.TheElectricityAct,2003andIndianElectricityRules,1956.
2.A.P.Cinemas(Regulations)Act,1955andA.P.Cinemas(Regulations)Rules,1970RulesforPublicExhibitionofVideos.
3.A.P.ElectricityDutyAct,1939andRulesmadethereunder.
4.TheA.P.ElectricalLicensingRegulations,1987.
5.HouseHoldElectricalAppliances(QualityControl)Order,1981,19881989and1993.
ThisorganisationisundertheadministrativecontroloftheEnergyDepartment,GovernmentofAndhraPradeshandisheadedby
theChiefElectricalInspectortoGovernment.
1.TheElectricityAct,2003andIndianElectricityRules,1956.
(a)ApprovalofdrawingsforfreshandAdditions/AlterationsintheexistingEHV/HV/Generatorinstallations.
(b)InspectionandissueofstatutoryapprovalsforEHVandHVInstallationsofconsumers(newaswellasadditionsand
alterationsintheexistinginstallations)underRules63ofTheElectricityAct,2003.
(c)InspectionandissueofStatutoryapprovalsforGeneratorsinstallationsmorethan10KWofIPsandothersunderRule47A
ofIndianElectricityRules,1956.
(d)InspectionandapprovalofElectricalinstallationinhighrisebuildings(ofmorethan15metersheight)underRule,50Aof
I.E.Rules,1956.
(e)StatutoryinspectionsoftheElectricalInstallationsofLicenseesandsanctionholders.
(f)AnnualInspectionofallEHV/HVconsumersinstallationunderRule,46ofI.E.Rules,1956.
(g)InspectionandissueofstatutoryapprovalsforallNeonSignandXRayinstallationunderRules71and73ofI.E.Rules,
1956.
(h)Inspectionoftemporaryinstallationpertainingtoexhibitionpublicfunctionsetc.,underSection154ofTheElectricityAct,
2003.
(i)InvestigationofFatalandNonfatalelectricalaccidentsandanalyzethecausesthereofandrecommendedremedial
measures.
(j)Examineandfinalisearbitrationcasesbetweentheconsumersandthesuppliers/Licensees.
2.A.P.CINEMAS(REGULATIONS)ACT,955,A.P.CINEMAS(REGULATION)RULES,1970,RULESFORPUBLIC
EXHIBITIONOFFILMSONVIDEOSANDRULESFORCONSTRUCTIONOFDRIVEINCINEMAS:
(a)GrantingofconstructionpermissionforalltypesofCinemas(temporary,permanent&Semipermanent)inspectionsand
grantingofElectricalandfirecertificatesinFromD.
(b)InspectionandgrantingofElectricalandFirecertificateforVideoinstallationsinFormD(V).
(c)InspectionofallexistingCinemashallsbiannually.
(d)ConductingexaminationsforCinemasOperatorsandgrantofcompetencycertificatesandCinemaOperatorlicensesto
successfulcandidates.
3.A.P.ELECTRICITYDUTYACT,1939ANDRULESMADETHEREUNDER.
(a)InspectionofAccountsofallSAOsofDiscoms,Licensees/IPPs,etc.,forthepurposeofassessingtheElectricityDuty
payableonthesaleofenergyandraisetheDebit.
(b)InspectionofaccountsofallLicenseesandsanctionholdersinthestateandassesstheElectricityDutypayableandraise
theDebit.
(c)TherateofElectricityDutyis6paiseperunitofsaleandconsumptionofenergy.
(d)TheElectricityDutyisexemptedwhenthegenerationisforcaptiveconsumptionbutdutyisleviableonentireconsumption
salewhenthereisthirdpartysale.
http://www.aponline.gov.in/Quick%20Links/Departments/Energy/Office%20of%20the%20Chief%20Electrical%20Inspector/RTI%20Act/citizen_charter.html

1/4

8/27/2016

ELECTRICALINSPECTORATEDEPARTMENT

(e)TheDutyisnotchargeableonsaleofpowerwhereverthepriceperunitis12paiseandbelow.
(f)TheconsumptionbyCentralGovernmentinstallation,includingrailwaysisnotdutiable.
(g)Thedutyisnotleviableonconsumption/saleofenergyupto16,666unitsp.m.or2lakhsunitsinayear.
4.A.P.ELECTRICALLICENSINGREGULATIONS,1987:
(a)GrantLicensestoelectricalcontractors(AandBGrade).
(b)GrantofSupervisorandWiremancertificateofcompetencyandPermitstoeligiblepersons.
(c)OverseetheproperimplementationofLicensingRegulationsthroughoutthestate.
5.HOUSEHOLDELECTRICALAPPLIANCES(QUALITYCONTROL)ORDER,1981,1988and1993.
(a)FortheimplementationoftheHouseHoldElectricalAppliances(QualityControl)order,1981,1988,1989and1993,the
ChiefElectricalInspectortoGovernmentisappropriateAuthorityandthePrincipalSecretary,EnergyDepartmentistheAppellate
Authority.TheseordersareissuedundertheprovisionofSection3ofEssentialCommoditiesAct,1955.
(b)Themainobjectsoftheorderistopreventmanufacture,distributionandsaleofsubstandardDomesticelectricalappliances
in the interest of public safety. Under the provisions of this order it is an offence to manufacture, distribute, store or sell any
substandardappliancewhichisnotinconformitywiththespecifiedstandardwithaviewtostrictlyimplementtheseordersthe
Appropriate Authority i.e. the Chief Electrical Inspector to Government has authorised all Deputy Electrical Inspectors of the
organisationtosearchalltheelectricalshopssellingofHHEAandseizeanyunaithorisedandsubstandardgoods/appliances
andinitiateactionaspertheprovisionsofessentialcommoditiesAct.
6.THESTANDARDSLABORATORYOFTHEELECTRICALINSPECTORATEHASTHEFACILITIESTOTESTTHE
FOLLOWING:
(a)Energymeters,RSS(RotationSubStandard)meters,Meggers,Directindicatinginstruments,currenttransformers,
rubberglovesandtransformeroilsamples.
1.CopperChokes.
2.Tubelightfittings.
3.Rubberpads.
4.P.V.C.Cables.
5.Bearingpads.
6.XRods.
7.Switches,Sockets,MCCBs.
8.CeilingFans.
9.Capacitors.
10.Automaticstreetlightswitches.
11.ElectronicBallast.
12.CFLadopter.
13.AAAConductors.
14.HeavydutyChokes(SV&MV).
15.StatorsforFluorescentLamps.
TheElectricalInspectoralsoundertakestestingofconsumerinstallationsforleakage,measurementofinsulationresistanceof
equipmentandearthresistanceattherequestofconsumersandonpaymentofrequisitefees.
II.SERVICEDELIVERYSTANDARDS:
1)ApprovalofElectricityDrawingsofEHV/HV/MV:
Installationsifitisreceivedinfullshape.3workingdays.
2)IfstatutoryApprovalsofEHV/HV/MV
Installations/Section1547workingdays.
3)ArbitratorCases.
(Judgementwillbeissuedafterfinalhearing)25workingdays.
4)PeriodicalinspectionsofEHV/HVInstallationsAspercalendermonth
willbeconductedafterreceiptof
installationfeesasperG.O.Ms.No.45,
dated452002wellinadvance.
5)ElectricalAccidents:
1)Supplier/Owner/UsertointimatetheElectricalInspectoroverphoneorbyTelegramwithin24hoursfollowedbywithin48
hoursawrittenreportintheprescribedforasperRule44AofI.E.Rules,1956.
2)InvestigationandfinalisationandsubmissionofInvestigationreportwithin45workingdays.

http://www.aponline.gov.in/Quick%20Links/Departments/Energy/Office%20of%20the%20Chief%20Electrical%20Inspector/RTI%20Act/citizen_charter.html

2/4

8/27/2016

ELECTRICALINSPECTORATEDEPARTMENT

6.IssueofElectricalandFireCertificate15workingdays.
FormDandD(V)afterreceiptof
Applicationinfullshape.
7.CinemaOperatorsLicenses(Fresh)
Examinationswillbeconductedonce
InayearinthemonthofDecember.
Resultswillbepublishedinlocalpaper
Within(90)days.
(a)Issueofcompetencycertificateand30workingdays.
CinemaOperatorsLicenses.
(b)RenewalofCinemaOperatorLicenses.15workingdays.
8.DutyrealizedfromLicenseesisa
continuousprocess.
9.ApplicationsforissueofSupervisorand
WiremanPermitisacontinuousprocess
throughouttheyear.
(a)LicensingCommitteewillmeetonce45workingdays.
in6monthsapproximately.After
approvalofCommitteeCertificates,
permitsandlicensesforbothAandBgrade.
(b)Willbeissuedfresh.
(C)RenewalsofPermitofthePermit15workingdays.
holders.
10.AGradeandBGrade.
(a)ElectricalContractorLicenses.After7workingdays.
receiptofapplicationinfullshape.
(b)RenewalsofAGradeandBGrade5workingdays.
ElectricalContractorLicenses.After
Receiptofapplicationinfullshape.
11.IssueofauthorisationtoTestthe7workingdays.
Transformeroilandprotectiverelayskit.
Afterreceiptofthereportfrom
Concernedauthorities.
12.TestingofTransformeroil,Rubber7workingdays.
Gloves,Cablesetc.
13.SearchingandSeizingofspurious
materialscontinuousprocess.

III.AvailabilityofInformation:
Sl.
No.

Informationrelating
to

Designation

Locatedat

TelephoneNos.

1.

I.E.RulesandThe
ElectricityAct,2003.

a)DeputyChiefElectrical
InspectortoGovt.,Hyd

MintCompound,
Hyderabad.

23453613.

b)ElectricalInspector
O/oC.E.I.G.,Hyd.

do

23453613

c)DeputyChiefElectrical
InspectortoGovt/Rural/Hyd.

Chikkadpally,Hyderabad. 27664516

d)ElectricalInspector
Kurnool

10/72,Krishnanagar,
Kurnool

e)ElectricalInspector
Vijayawada.

D.No.27630,1stFloor
2569729.
PrakashamRoad,
Governerpet,Vijayawada.

229806.

http://www.aponline.gov.in/Quick%20Links/Departments/Energy/Office%20of%20the%20Chief%20Electrical%20Inspector/RTI%20Act/citizen_charter.html

3/4

8/27/2016

ELECTRICALINSPECTORATEDEPARTMENT

f)ElectricalInspector,
Visakhapatnam.

PlotNo.2/1,Sector10,
M.V.P.Colony,Vizag17

2551861.

2.

APC(R)Rules,1970 AlltheDeputyElectrical
Vizianagaram,Visakhapatnam,Rajahmundry,
andH.H.E.A.
InspectorsoffieldSubDivisions Kakinada,Eluru,Vijayawada,Guntur,Nellore,
Locatedat
Tirupathi,Cuddapah,Mahaboobnmagar,
Karimnagar,Warangal,Nalgonda,
NizamabadandChikkadpally.

3.

DutyAct

AccountsOfficer

MintCompound,
Hyderabad.

23453023

4.

Licensing

ElectricalInspector,O/oC.E.I.G, MintCompound,
Hyd.
Hyderabad.

23453613

IV.ComplaintRedressals:
AllRegionalOfficessituatedatHyderabad,Kurnool,VijayawadaandVisakhapatnam.
EverycitizenshallfollowBISstandards/NationalElectricCode,I.E.Rules,1956andA.P.Cinema(Regulation)Rules,1970while
establishing EHV/HV/MV Installations, or purchasing of electrical equipment/Electrical Appliances to minimise the Electrical
Accidentsandlossoflifetohuman,AnimalsandlossofEquipmentandpropertyandthussaveenergy.
V.Thereferencebookspertainingtotheaboveinformation:
1.TheElectricityAct,2003.
2.IndianElectricityRules,1956.
3.A.P.Cinema(Regulation)Rules,1970.
4.A.P.ElectricityDutyAct,1939.
5.A.P.ElectricalLicensingRegulations,1987.
6.HouseHoldElectricalAppliances(QualityControl)1981,1988,1989,1991and1993.
7.ISIStandards.
8.NationalElectricCode.
9.A.P.Portal.

CHIEFELECTRICALINSPECTOR
TOGOVERNMENT