Beruflich Dokumente
Kultur Dokumente
FTC - SWT
28-Apr-03
FTC - SWT
28-Apr-03
FTC - SWT
28-Apr-03
Floaters rigs
Semisubmersible
FTC - SWT
28-Apr-03
Floaters rigs
FTC - SWT
28-Apr-03
SAFETY SYSTEMS
COMPULSORY
ON ALL FLOATERS :
SENTREE
FTC - SWT
28-Apr-03
FTC - SWT
28-Apr-03
Floater rig
All Floaters:
BOP stack is
located on the
SEA-BED
FTC - SWT
28-Apr-03
Sentree 3 System
FTC - SWT
28-Apr-03
Sentree 3 System
with standard
Control system
FTC - SWT
28-Apr-03
Sentree
Control
Systems
FTC - SWT
28-Apr-03
As water
depth increases
it is necessary to
use additional
equipment to
maintain
response times
for close and
unlatch.
15 Kpsi WP
FTC - SWT
28-Apr-03
Sentree 3
Modularity
FTC - SWT
28-Apr-03
RETAINER VALVE
(basically to prevent pollution)
FTC - SWT
28-Apr-03
SENTREE SYSTEM
The sequence of disconnection would be as follows:
The valves in the subsea valve assembly are closed.
The retainer valve is closed and the pressure between both valves
is bled off.
The connector is unlatched from the valve assembly.
The connector and the string above it are pulled clear of the BOP
stack.
The BOP blind rams are closed.
The riser is disconnected.
The vessel can move off location leaving the well under control.
FTC - SWT
28-Apr-03
LUBRICATOR VALVE
(basically for W/L jobs only)
The Lubricator Valve (LUBV) is a surface-operated
hydraulic valve run one or two joints below the
flowhead during well testing operations.
It enables the top of the test string to be used as a
lubricator for the introduction of wire-line tools, and
reduces the amount of surface pressure risers above
the flowhead
It is connected by a two or three (chemical injection)
line hose bundle to a surface operating console.
FTC - SWT
28-Apr-03
LUBRICATOR VALVE
(basically for W/L jobs only)
It is balance: Pressure to open
and Pressure to close
Fail in last position (but
possibility to pump above it, to
kill the well)
Cutting capability for wireline
and coil tubing
Below valve chemical injection
Connections: 3 ID & 5 ACME
BOX x BOX
10Kpsi & 15Kpsi WP
FTC - SWT
28-Apr-03
FTC - SWT
28-Apr-03
EQUIPMENT - ACCESSORIES
FTC - SWT
28-Apr-03
Land Rigs
FTC - SWT
28-Apr-03
Barges
Jack-up
FTC - SWT
28-Apr-03
Floater
EZ-VALVE
It is designed for installation in the BOP stack of a
Jack-up or Land rig (NO UNLATCH FACILITY)
The pipe rams are closed around a slick joint
above the valve, protecting the annulus, while the
EZ-valve (ball valve) can be closed to secure the
well at BOP level.
It is normally closed by a spring and nitogen
pressure, and is open by hydraulic pressure applied
from a console on the rig floor.
FTC - SWT
28-Apr-03
EZ-VALVE
Fail safe
Cutting capability for
wireline and coil tubing
with pressure assist
closure.
Below valve chemical
injection
Connections: 3 ID &
5ACME BOX x BOX
15 Kpsi WP
FTC - SWT
28-Apr-03
FTC - SWT
28-Apr-03
POM -
FTC - SWT
28-Apr-03
EZ-VALVE
Compulsory when:
WHSIP > 3000 psi and H2S
WHSIP > 5000 psi and NO H2S
HIGH Flowrates Oil or Gas wells
FTC - SWT
28-Apr-03
Exxon
Landing String
MG Hulme Junior
30013
SCARABEO # 7
Riser ID
= 19 3/4"
FLOW HEAD
Stack ID =
18 3/4"
Shaffer , 15k
Ram s thickness =
8.00 "
#VALUE!
ID
Inch
3.00
18.6
ROTARY TABLE
1.53
1.53
LUBRICATOR VALVE
X -OVER :5" SA pin x 3 1/2" PH6 pin
5.00
3.00
8.13
3.00
5.00
3.00
SHEAR RAMS
Bot. of shear =
6.06
2.75
0.84
11.20
3.00
0.49
B.O.V. 15K
16.00
3.00
1.5
SHEAR SUB
3.94
3.00
16.20
3.00
7.85
15K
5.49
1.06
5.02
VAR RAMS 3 1/2" - 5"
NOT USED
1.34
1.34
0.92
SENTREE 3"
Mech.Unlatch
shear pins :
ASSEMBLY
2500 + 2500
5000 ft-lbs
5" RAMS
Top of RAMS =
3.29
0.86
2.23
1.83
1.80
3.68
5.00
3.00
0.21
7.09
3.00
11.00
3.00
6.53
2.50
5" RAMS
Bott. of RAMS =
1.50
To p c o nne c tio n : 5 " S A bo x
DATUM
0.50
0.17
FTC - SWT
28-Apr-03
OD
Inch
6.20
The END
FTC - SWT
28-Apr-03