Province of Northern Samar

Message

yphoon Nonas unwelcome sojourn to the Province of Northern Samar on 14 December


2015 has caused widespread displacement among our people. Economic viability was
down as the disaster created tremendous impacts across the four major sectoral groupings,
viz: infrastructure, productive, social and cross-sectoral. Weeks later, images of despair,
discontent, and disenchantment were largely felt. But amidst these growing concerns, the
Provincial Government of Northern Samar (PGNS) stood on its feet and came to the aid of 24
municipalities of the province especially to the hard-hit coastal and island towns by releasing
its Quick Response Fund (QRF) with dispatch. Relief distribution commenced with the DSWD
complementing the meager resources of the Provincial Government. Civil society groups,
NGOs/INGOs, volunteer organizations, and private donors were likewise on site and provided
varying humanitarian assistance. From this backdrop was seen the Nortehanons undaunted
stance to rise and move forward. Life goes on, as the infamous proverbial line provides, and
for which the word Padayon resonates.
With the able leadership and technical assistance of OCD-8, a select group of representatives
coming from Regional Line Agencies (RLAs) assisted by Provincial Lines Agencies (PLAs) and
PGNS employees, the Comprehensive Damage Assessment and Needs Analysis (CDANA) was
conducted province wide which yielded around P21B estimates in damages, losses and needs
across all sectors. This, they did in 41 excruciating field works including late-night meetings
and brainstorming sessions. The CDANA results provided the necessary inputs of Programs,
Projects, and Activities (PPA) and their corresponding strategies or implementation schemes
which are laid down and crafted under the Typhoon Nona Rehabilitation and Recovery Plan for
Northern Samar (NRRP-NS) in the next three years (2016-2019).
This master plan provides specific details of Northern Samars recovery road map with emphasis
on priority programs, projects, and activities across all sectors and their corresponding fund
allocations. The national government can be assured that the funds it will provide would cater
to and be responsive with the Nortehanons quest for better, disaster-resilient Northern Samar
since the Build Back Better principle has been embedded in this carefully crafted piece of
work. Thanks to the expertise of NEDA-8, OCD-8, and select group of technical writers from the
PGNS. It is my wish that life after Nona would be better off for every Nortehanon.

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

ii

My administration will continue to work hard in order to achieve a sustained, equitable, and
inclusive growth for Northern Samar. Alongside the priority programs identified in the NRRP, the
PGNS under my watch will remain focused on finding long-term solutions to the lingering issue
of high poverty incidence in some parts of the province. Infrastructure development, livelihood
opportunities, agri-fishery support and other basic social services aimed at generating additional
income to the Nortehanon will be at the forefront of my public service initiatives in the next
three years. These, I will do, without shifting the focus in the realm of providing safer, better,
and disaster-resilient infrastructure support system physical and social - for each and every
Nortehanon. This is not my promise. This is my commitment.
I therefore call on all Nortehanons, irrespective of creed and conviction, to rally behind this
cause. Together, this will be our collective goal.

Padayon!

JOSE L. ONG, JR.


Governor

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

PDC Resolution

iii

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

iv

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Contents
TYPHOON NONAS REHABILITATION AND
RECOVERY PLAN

Message

1
2
5
5

7
7
9

10
11
12

13
13
13
14

15

PDC Resolution No. 5, Series of 2016


Abbreviations and Acronyms

Introduction

Chapter 1: Typhoon Nona (Melor)


Chapter 2: Northern Samar before Nona
General Profile

Socio-Economic Situation
Health and Nutrition
Education
Inflation

Labor and Employment


Peace and Order

Provincial Development Framework


Vision and Mission
Spatial Strategy

Development Agenda

Chapter 3: Nonas Impact to Northern Samar

15

Infrastructure Sector

24

Cross Sector

18
22

26

Productive Sector
Social Sector

Chapter 4: Summary of Rehabilitation and


Recovery Interventions

26

Infrastructure Sector

27

Cross Sectoral Interventions

26
27
28

46
144

Productive Sector
Social Sector

Policy Recommendations

Chapter 5: Nona Investment Program 2016 - 2019


Chapter 6: Plan Implementation and Monitoring
and Evaluation Mechanism
Nona Rehabilitation and
Recovery Plan

Province of Northern Samar

LIST OF TABLES
9

Table 1

16

Table 3

11
18
19
20
vi

21
21
22
22
24
47

Table 2
Table 4
Table 5
Table 6
Table 7
Table 8
Table 9

Table 10
Table 11
Table 12

Selected Education Performance Indicators, Eastern Visayas and


Northern Samar: SYs 2012-2013 and 2013-2014

Labor and Employment: Philippines vs. Eastern Visayas, Q3 2015


Summary of the Damage, Losses and Needs in the Infrastructure
Sector
Summary of Damage, Losses, and Needs under Productive
Sector
Damage, Losses and Needs under Agriculture

Damage, Losses, Needs of Agricultural Commodity


Details of Damages under Fishery Sector
Damage, Losses and Needs of Livestock

Damage, Losses and Needs of DTI and DOST

Damage, Losses and Needs under Social Sector

Summary of Damage, Losses, and Needs of Cross Sectoral Sector


Nona Investment Program: 2016 - 2019

LIST OF FIGURES
3

Figure 1

Figure 3

6
10
11
12
14
48

145
146
147

Figure 2
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9

Figure 10
Figure 11

Nona Rehabilitation and


Recovery Plan

Track of Typhoon Nona (Melor)


Map of Northern Samar

Maternal Mortality, Under-Five Mortality and Infant Mortality Rates


Eastern Visayas, 2014
Inflation Rate, Northern Samar 2005-2014

Labor Force Participation Rate and Employment Rate by Province,


Eastern Visayas
Crime Volume, Northern Samar (Q3 2015)
Growth Corridors

Summary of Investments by Sector

Implementation Mechanism of the PGNS


Local Inter-Agency Committees (LIACs)

Padayon Project Monitoring and Evaluation Team (PPMET)

Province of Northern Samar

Abbreviations and Acronyms


ADB
Asian Development Bank
AP Ante-Partum
BCPC
Barangay Council for the Protection of Children
BFAR
Beaureau of Fisheries and Aquatic Resources
BHS
Barangay Health Station
BHSs
Barangay Health Stations
BPI
Bureau of Plant Industry
CAC
College of Arts and Communication
CARP
Comprehensive Agrarian Reform Program
CBA
College of Business Administration
CC Climate Change
CDANA
Comprehensive Damage Assessment and Needs Analysis
CF Composting Facility
CHANGE
Community Based Eco-tourism and Community Empowerment,
Health and Other Social Services, Agri-Industrial Development,

Natural Environment Protection and Management,Good Governance

and Education, Economic Development and Employment Generation
CICL
Children in Conflict with the Law
COED
College of Education
COMELEC
Commission on Election
CSO
Civil Society Organization
CVM
College of Veterinary Medicine
DCW
Day Care Worker
DENR
Department of Environment and Natural Resources
DepEd
Department of Education
DILG
Department of Interior and Local Government
DOH
Department of Health
DOST
Department of Science and Technology
DPWH
Department of Public Works and Highways
DRRM
Disaster Risk Reduction and Management
DRRMC
Disaster Risk Reduction and Management Council
DSWD
Department of Social Welfare & Development Office
DTI
Department of Trade & Industry
ECCD
Early Childhood Care and Development
EDT
Entrepreneurial Development Trainings
ESA
Emergency Shelter Assistance
ESWM
Ecological Solid Waste Management
FMR
Farm to Market Road
HCA
Home for Children and Adolescent
HEMS
Health Emergency Management Staff
HRM
Human Resource Management
Nona Rehabilitation and
Recovery Plan

vii

Province of Northern Samar

viii

IEC
Information Education Campaign
ILWARM
Institute of Land and Water Resource Management
IME
Implementation, Monitoring and Evaluation
INGO
International Non-Government Organization
IOs
Information Officers
IT
Information Technology
ITS
Industry, Trade and Services
JTWC
Joint Typhoon Warning Center (JTWC)
LDRRMO
Local Disaster Risk Reduction and Management Office
LGUs
Local Government Units
LWUA
Local Water Utilities Association
MCPC
Municipal Council for the Protection of Children
MDG
Millennium Development Goals (MDG)
MDRRMC
Municipal Disaster Risk Reduction and Management Council
MHO
Municipal Health Officer
MOA
Memorandum of Agreement
MRF
Material Recovery Facility
NDRRMC
National Disaster Risk Reduction and Management Council
NEA
National Electrification Authority
NEDA
National Economic and Development Authority
NFA
National Food Authority
NGA
National Government Agency
NGCP
National Grit Corporation of the Philippines
NGO Non-Government Organization
NHA
National Housing Authority
NIA INSIMO
National Irrigation Administration - Interim Northern Samar

Irrigation Management Office
NIA
National Irrigation Authority
NNC
National Nutrition Council
NORSAMECO
Northern Samar Electric Cooperative
NORSARC
Northern Samar Research Center
NSPESO
Northern Samar Provincial Employment and Service Office
NSPH
Northern Samar Provincial Hospital
OCD
Office of Civil Defense
PAGASA
Philippine Atmospheric, Geophysical and Astronomical Services
Administration
PAR
Philippine Area of Responsibility
PCAT
Provincial Committee on Anti Trafficking
PDPFP
Provincial Development and Physical Framework Plan
PDRRMC
Provincial Disaster Risk Reduction and Management Council
PDRRMO
Provincial Disaster Risk Reduction and Management Office
PES
Parent Effectiveness Seminar
PGENRO
Provincial Government Environmental and Natural Resources Office
PGNS
Provincial Government of Northern Samar
PGSO
Provincial General Services Offices
PHO
Provincial Health Office
PIO
Provincial Information Office
PMO
Project Management Office
PNO
Provincial Nutrition Office
PNP
Philippine National Police
Nona Rehabilitation and
Recovery Plan

Province of Northern Samar

Acknowledgment
We would like to thank everyone who contributed in crafting this Northern Samar Nona
Rehabilitation and Recovery Plan (NS-NRRP).

This document would not have been possible without the full support of the two agencies--the
National Economic and Development Authority (NEDA) Region VIII and the Office of the Civil
Defense (OCD) VIII.

With deep gratitude, we also thank the National Line Agencies, the Local Government Units,
University of Eastern Philippines (UEP), Private Organizations and Individuals who provided
inputs concerning the Damages, Losses and Needs (DALAN) brought about by Typhoon Nona.
Also for their participation in the various activities conducted such as, but not limited to,
sectoral rehabilitation planning workshops, agency visits, and distribution of letter-requests
to get the results for the completion of the Comprehensive Damage and Needs Assessment
(CDANA) Report and this NS-NRRP.
National Line Agencies
NEDA, OCD, DA, DENR, DAR, DepEd, DPWH, DOH, DOST, DTI, BFAR, PCA, PNP, AFP, NSO, NSCB,
PAG-ASA, PhilFIDA, PPA, NHA, TESDA, NNC, BFAR, BIR, CAAP, EMB, DOLE, DOT, DILG
Local Government Units
Provincial Government of Northern Samar (PGNS), Municipalities of the First District: Allen,
Biri, Bobon, Capul, Catarman, Lavezares, Lope de Vega, Mondragon, Rosario, San Antonio, San
Isidro, San Jose, San Vicente, Victoria; and Municipalities of the Second District: Catubig, Gamay,
Laoang, Lapinig, Las Navas, Mapanas, Palapag, Pambujan, San Roque, Silvino Lubos.
State Universities and Colleges
University of Eastern Philippines (UEP)

Non-Government Organization and Private Organization


PLAN Philippines, INSERT, ADWEMPC, NSSPI, NSSWD Inc., NSPDF, SAC, SCJ

Individuals
NEDA RO-8 and OCD-8 Officials
NEDA VIII Regional Director Mr. Bonifacio Uy, Assistant Regional Director, Engr. Alan L.
Olavides Regional Director, Dr. Edgar L. Posadas, and OCD VIII Assistant Regional Director
Mr. Rey M. Gozon.

Nona Rehabilitation and


Recovery Plan

ix

Province of Northern Samar

Provincial Government Officials:


Governor Jose L. Ong Jr., Vice Governor Gary M. Lavin, and Provincial Administrator Efren
Sabong.
NRRP Writers:
Headed by Ms. Mylene Rosales and Engr. Romeo Cardenas, and the following writers from
NEDA RO-8 and PGNS; Mr. Jay-ar Ragub, Ms. Annie, Ms. Alma Moreno, Ms. Grace , Ms. Sylma
Lutao, Ms. Arlene Cui-Tepace, Ms. Lilia Varela, Mr. Michael Lucman, Mr. Robin Cardenas, Mr.
Silvio P. Abella, Mr. Bernard Balanquit

Lay-out Artists:
Mr. Ernie Lopez and Ms. Christine Megenio

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Introduction
Typhoon Nona (with international name Melor), considered as the strongest typhoon to hit
Northern Samar in 34 years, brought human casualties, massive loss of livelihood and assets,
and disruption of economic activities and social support systems. The extent of damage
prompted the declaration of the province of Northern Samar under State of Calamity by
President Benigno Simeon C. Aquino III thereby directing all government instrumentalities to
hasten rescue, relief, rehabilitation and recovery efforts. We cannot rebuild communities as
before President Aquino told ADB publication Development Asia. We cannot. That would
only ensure a rerun of the same results. Instead, the country must rebuild in a resilient manner.
In the aftermath of the Typhoon Nona, national government agencies, local governments, civil
society groups, the private sector, and the international community responded with generous
support for humanitarian relief and immediate post-disaster needs. In order to fast track the
early initiation of the rehabilitation and recovery phase, the Provincial Government of Northern
Samar sought the assistance of the RDRRMC through NEDA RO8 as vice-chair on rehab and
recovery to jump start the formulation of the Rehabilitation and Recovery Plan (RRP).

As the basis in the RRP formulation, the conduct of a Comprehensive Disaster Assessment
and Needs Analysis (CDANA)was spearheaded by OCD RO8 to validate submitted damage
reports of various agencies and Local Government Units. The objectives of the CDANA report,
Padayon, were to assess the total socio-economic damages and losses caused by Typhoon
Nona; its impact on the macro-economy, poverty, incomes and employment; and determine the
short- and medium-term recovery and reconstruction needs.
The set back in socio-economic development caused by Typhoon Nona created a window of
opportunity for the province of Northern Samar to strengthen resiliency, address development
issues and effectively overcome the cycle of destruction and reconstruction. Seizing the
opportunity and guided by the building back better principle, province initiated a multisectoral inter-agency planning process with the technical assistance of NEDA RO8 and OCD
RO-8 towards crafting the Rehabilitation and Recovery Plan.

Padayon RRP presents a wide range of recovery and reconstruction interventions over the
short to medium term and policy recommendations in order to restore the economic and social
conditions of the affected areas not only to their pre-typhoon levels but to a higher level of
disaster resilience. The Rehabilitation and Recovery Plan also includes an Investment Program
for 2016-2019 and the Implementation, Monitoring and Evaluation (IME) mechanisms.

Nona Rehabilitation and


1
Recovery Plan

Province of Northern Samar

Chapter

source:http://eoimages.gsfc.nasa.gov/

Typhoon Nona (Melor)

General Description. Before making landfall in the Philippines, Typhoon Nona, with
international name Melor, was then forecasted to develop into super typhoon. As it struck
the Province of Northern Samar, the Philippine Atmospheric, Geophysical and Astronomical
Services Administration (PAGASA) state weather bureau recorded a peak intensity of ten-minute
maximum sustained winds at 175 km/h (110 mph) and a central pressure of 935 hPa (27.61
inHg). The intensification occurred due to warm sea surface temperatures above 28 C (82.4
F) and a highly efficient poleward outflow. It was considered as the strongest typhoon to hit
Northern Samar in 34 years that wrought catastrophic loss of life and damages to properties and
livelihood as well as disrupted economic activities.

Movement. Typhoon Nona was the eighteenth typhoon of the annual typhoon season that struck
the Philippines in 2015. It started on December 7 as a low-pressure area 120 km (75 mi) of
China and soon turned into a tropical depression on December 9, and into a tropical storm south
of Yap, and was then named Melor. On December 12, the tropical storm entered the Philippine
Area of Responsibility (PAR) and was named Nona (instead of its former name Nonoy which
2

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

was apparently dropped by the PAGASA due to its closeness to President Benigno Aquino IIIs
nickname Noynoy).

On December 14, 2015 at around 11:00 A.M., Typhoon Nona was spotted at 85 kilometers
east of Catarman and made its first landfall in the northern tip of Northern Samar over Batag
Island in the Municipality of Laoang. Storm warning signal was raised to number three in the
entire province including its neighboring provinces. The typhoon formed a well-defined eye
and maintained it for several hours while crossing the coastal towns of the Northern Samar.
Satellite-based intensity estimates suggested Nona's maximum wind speeds rapidly increased
from approximately 100 mph (155 kph) at 3 A.M. to about 135 mph (220 kph) by 10:20 A.M. It
traversed towards northwest direction before making its second landfall over Bulusan, Sorsogon
at around 4:00 P.M. The third on December 15 at around 5:30 A.M., Typhoon Nona made its
fourth landfall over Banton Island in Romblon and intensified again with a distinct 25-km (15mile) eye and a compact core.
The fifth landfall was over Pinamalayan, Oriental Mindoro at around 10:30A.M. having notable
peak intensity with one-minute maximum sustained winds at 230 km/h (145 mph) that
prompted Joint Typhoon Warning Center (JTWC) to upgrade Nona from a tropical storm to a
Category 4 equivalent typhoon within an 18-hour span.

Finally, on December 17, Typhoon Nona curved southward to West Philippine Sea before
completely dissipating in Sulu Sea before 12:00 NN.
Figure 1. Track of Typhoon Nona (Melor)

Source: PPDO-GIS

Nona Rehabilitation and


3
Recovery Plan

Province of Northern Samar

General Impact. Despite constant monitoring and timely warning,Typhoon Nonas packed strong
wind and profuse volume of rain left Northern Samar with massive devastation, especially in the
Pacific part of the Province. The destruction annihilated lives and billions of properties from
agriculture, fisheries and infrastructure placing the entire province under the state of calamity. The
Comprehensive Damage Assessment and Needs Analysis (CDANA) Report, accounts an estimated
damage of PhP5,456,419,698 across all sectors covering the twenty-four (24) municipalities.

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Chapter

source: http://callezaragosa.com/gerryruizphotoblog

Pre-Disaster Condition of Northern Samar

General Profile
Northern Samar is one of the three (3) provinces in Samar Island. It is a part of Region VIII, the
Eastern Visayas Region, and its provincial capital is Catarman. The province is classified as 2nd
class, and has a total land area of 3,498 square kilometers or 349,800 hectares. It is composed
of 24 municipalities and 569 barangays.

Nona Rehabilitation and


5
Recovery Plan

Province of Northern Samar

Figure 2. Map of Northern Samar

Source: PPDO, Provincial Profile 2015

It is located on the eastern edge of the Philippine Archipelago. Its boundaries are the San
Bernardo Strait on the North, Samar Sea on the West, Pacific Ocean on the East, and the provinces
of Western and Eastern Samar in the South. It is strategically located as the gateway from Luzon
to Visayas and Mindanao. Based on the 2010 data from the Philippine Statistics Authority (PSA),
the total population of the province is 589,013 with an average growth rate of 1.64% from 20072010 population census. The total number of households is 113,980 and the average household
size is 5.2. Also, based in 2010 household population, males accounted for 51.3 percent while
females com- prised 48.7 percent. These figures resulted in a sex ratio of 105 males for every
100 females
The province is composed of two (2) legislative districts, the first and second districts. The
first district is composed of fourteen (14) municipalities: San Vicente, Capul, San Antonio, San
Isidro, Victoria, Allen, Lavezares, Biri, Rosario, San Jose, Bobon, Lope de Vega, Mondragon, and
Catarman, the capital town. Ten (10) municipalities comprise the second district: San Roque,
Pambujan, Silvino Lobos, Laoang, Catubig, Las Navas, Palapag, Mapanas, Gamay, and Lapinig.
Northern Samar is exposed to a range of natural hazards such as storm surges, floods, landslides,
liquefaction, earthquakes and tsunamis. 70% of the municipalities are highly susceptible to these
natural hazards.

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Social
Health and Nutrition
In 2014, for every 100,000 livebirths in the region, 128 women die during pregnancy and
childbirth. Despite a slight decline from 2013, the maternal mortality rate in the region is still
high attributed to poor utilization of health care facilities. Specific reasons cited for the increase
in maternal mortality include: delay in identification and management of complication, delay
in referrals, not seeking adequate care during the course of pregnancy, delivery without being
attended by skilled birth attendants, and not securing post-partum and newborn care. At
128.38 deaths per 100,000 livebirths, the health program implementers need to redouble their
efforts to attain the Millennium Development Goals (MDG) target of 56.5 per 100,000 livebirths
by 2015.
Figure 3. Maternal Mortality, Under-Five Mortality and Infant Mortality Rates Eastern Visayas, 2014
173

128.38
99

89
51

Source: DOH VIII

Maternal Mortality Rate

Infant Mortality Rate

45

50

Under-Five Mortality Rate

Across provinces, Northern Samar had the highest maternal mortality rate at 173 per 100,000
livebirths in 2014, even higher than the regional average. The rest of the provinces recorded
rates lower than that of the region.
The regions infant mortality rate slightly improved in 2014. At 8.97 deaths per 1,000 livebirths
in 2013, it declined to 5.33 deaths per 1,000 livebirths the following year. The infant mortality
rates in Northern Samar, Biliran and Southern Leyte showed significant decline from 2012-2014.
A notable reduction was felt in Northern Samar with 58 deaths per 1,000 livebirths in 2012 to
only 5.13 per 1,000 livebirths in 2014. Despite the discrepancies in provincial performance, it

Nona Rehabilitation and


7
Recovery Plan

Province of Northern Samar

is noteworthy to note that the region has already surpassed the MDG target of 20.3 per 1,000
livebirths in 2015.

Except for So. Leyte, the under-five mortality rates in the remaining five provinces of the region
barely improved. In Northern Samar, from only 5 deaths per 1,000 livebirths in 2013, it climbed
to 17 deaths per 1,000 livebirths in 2014.

On the nutritional status of children, the regions prevalence of underweight children under
five years of age (0-59 months old) was down to 10.24 percent in 2014 from the 10.88 percent
in 2013. The improved condition could be due to the implementation of nutrition programs of
the government such as supplemental feeding program of the DSWD; nutrition programs in
schools of the DepEd; food technology and nutrition dissemination programs of the DOST, and
monitoring activities of the NNC.

In contrast, there was an increase in the prevalence of underweight preschoolers aged


0-71months old in 2014 by 1.32 percent from the prior year. Nevertheless,the situation is
already being addressed through continuous advocacy on good nutrition practices initiated by
the national government with the help of the LGUs and the private sector.

Improved sanitation could have a direct impact to malnutrition. In 2014, 82 percent of the total
households have access to safe source of water supply, a progress from the 73.3 percent recorded
in 2013. It is sad to note that Eastern Samar and Northern Samar had the least proportion of
households with access to safe source of water supply, at 71 and 73 percent, respectively. A lot
of work needs to be done to be able to reach the 2015 MDG target of 82.6 by 2015.
On the other hand, the proportion of households using sanitary toilets in the region is only
70 percent. Despite a remarkable progress from the previous year, only 60 percent of the
households in Northern Samar have access to sanitary toilets in 2014. The province came next
to Eastern Samar with a record of only 52/100.

For the year 2014, there were a total of 12 hospitals (9 government and 3 private hospitals),
24 Health Centers, and 135 Barangay Health Stations (BHSs) serving the populace of Northern
Samar and the nearby areas. Also, the province has a total of 87 doctors, 185 nurses, 162 midwifes,
38 rural sanitary inspectors, 24 dentists, 1 dietician/nutritionist, 36 medical technologists,
75 nursing aides, 15 medical laboratory technicians, 8 radiologist, 15 pharmacists and 2,859
barangay health workers.

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Education
Despite the government efforts in ensuring equal access to formal basic education, the region is
still faced with a formidable challenge of ensuring school participation in both elementary and
secondary level.

In school year 2013-2014, the regions participation rates in both elementary and secondary
levels were at 88.29 and 50.92 percent, respectively. Northern Samar showed a much better
performance than that of the region in elementary participation rate but it has to catch up
in terms of participation rate at the secondary level. Although not high enough, only Eastern
Samar is close to achieving the 2015 MDG target of 100 participation rate in primary education.
Table 1. Selected Education Performance Indicators, Eastern Visayas and Northern Samar: SYs 2012-2013 and 2013-2014

Indicator

Region

Northern Samar

MDG Target

2012 - 2013

2013 - 2014

2012 - 2013

2013 - 2014

2015

Elementary

91.34

88.29

94.08

90.86

100

Elementary

74.77

82.06

67.96

78.22

100
100

Net Enrolment Rate


Secondary

Cohort Survival Rate


Secondary

Completion Rate

51.13
72.20

50.92
77.06

47.42
69.16

49.88
76.65

Elementary

73.46

80.59

66.18

76.29

Elementary

1.15

0.91

1.59

0.97

Secondary

Drop-out Rate
Secondary

Source: DepEd VIII

68.61
4.58

74.03
3.38

65.30
4.88

73.71
4.21

The regions cohort survival rate of the percentage of enrollees who reached the final grade/
year for both elementary and secondary improved in SY 2013-2014 compared to the previous
school year. The cohorts survival rate in Northern Samar had been higher than the regions
rates for both elementary and secondary level. The Northern Samars completion rate has
accelerated in the elementary level but the MDG target of 100 percent cohort survival rate in
2015 remains unachievable.
Completion rate in both elementary and secondary level showed an increasing trend. Compared
to the regional average, Northern Samars completion rates is a bit low, same with Biliran and

Nona Rehabilitation and


9
Recovery Plan

Province of Northern Samar

Samars elementary completion rates. Again, the region is still far from achieving the 100
percent elementary completion rate.
Drop-out rate has improved from SY 2012-2013 to SY 2013-2014. In elementary level, only
Eastern Samar exhibited a drop-out rate above 1.0 percent. The rest of the provinces have rates
below 1 percent. If this will be sustained, the region will most likely achieve the zero drop-out
rate by 2015. Common reasons cited for dropping out of school were looking for work and lack
of interest to continue with studies.
Out of the 4,141 schools throughout the region, 14.4% or 598 elementary and secondary schools
are located in Northern Samar. Currently, the province has 5,835 elementary and secondary
classrooms with 4,852 elementary and secondary public school teachers.

Inflation
Inflation Rate in Northern Samar was pegged at 7.26% in 2014. This was an upsurge from the
prior years 3.2% after Super typhoon Yolanda ravaged most part the region in the latter part
of 2013. The ill effects of Yolanda were heavily felt in 2014, the year after the onslaught of the
disaster. Prices of goods and services in all provinces went up due to scarcity of supply.
Figure 4. Inflation Rate, Northern Samar 2005-2014
10.7

10.6

7.3

3.1

3.3

3.2

3.6

3.2

2.4
1.3

2005

2006

2007

2008

Source: Philippine Statistics Authority (PSA) VIII

2009

2010

2011

2012

2013

2014

From 2005-2015, annual inflation rate of the province was mostly lower than the regional
average (Figure 4). Likewise, over those years, Northern Samar had consistently one of the
lowest inflation rates among provinces.

Meanwhile, as a result of higher prices of goods and services after Yolanda, the consumers
buying power weakened from 0.77 in 2013 to 0.71 in 2014. This means that a peso in 2006
(base year) was only worth 0.71 centavos in 2014.
10

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Labor and Employment


Employment rate in Eastern Visayas during the third quarter of 2015 settled at 95.0%, higher
than the national average of 93.5% and the 5th highest across regions. The rate of jobless persons
was lower too at 5.0% than the 6.5% of the country. Regrettably, underemployment rate stood
high at 27.6%. This indicates that more than one fourth of the total employed persons in the
region are wanting for additional hours of work or additional/another job, mainly because they
are not earning enough to pay for their basic needs or because of job mismatch.
Table 2. Labor and Employment: Philippines vs. Eastern Visayas, Q3 2015

3rd Quarter 2015

Indicator

Philippines

Household Population 15 Years Old


and Over (in 000)

Eastern Visayas

66,613

3,121

Labor Force Participation Rate (%)

62.9

59.7

Employment Rate (%)

93.5

95.0

6.5

5.0

21.0

27.6

Unemployment Rate (%)


Underemployment Rate (%)
Source: PSA VIII

For Northern Samar, the rate of economically active population or those who are employed
or actively looking for work was only a little over 50% of the provinces aggregate household
population 15 years old and over. This is the lowest among provinces in the region. In terms of
employment rate, the province was the second highest at 95.2%, next to Biliran (Figure 5).
Figure 5. Labor Force Participation Rate and Employment Rate by Province, Eastern Visayas
80.0

95.4

60.0

95.2

95.3

70.0

95.1

50.0

95.0

40.0

94.9

30.0

94.8

20.0

94.7

10.0
-

Source: www.psa.gov.ph

Labor Force Participation Rate

94.6
94.5

Employment Rate
Nona Rehabilitation and
11
Recovery Plan

Province of Northern Samar

Peace and Order


Northern Samar recorded a total crime volume of 739 in the third quarter of 2015. This is
a reduction of almost 9% than the same period in 2014. The downtrend is attributed to the
strict implementation of the operational procedures in managing police operations through
the conduct of checkpoints, foot and mobile patrols. Likewise, increased police visibility and
deployment of police personnel particularly in crime-prone areas, and Oplan Lambat-Sibat
resulted to this decline.

Non-index crimes or violations against special laws comprised majority or 443 (60%) of the
total crime in the province. Index crimes or crimes against property and persons accounted for
40% or 296 of the total crime (Figure 6).
Figure 6. Crime Volume, Northern Samar (Q3 2015)

500

450

443

400
350
300
250
200

296

150
100

50
0

Index Crime

Source: Philippine National Police Regional Office VIII (PRO VIII)

12

Nona Rehabilitation and


Recovery Plan

Non-Index Crime

Province of Northern Samar

Provincial Development Framework


Vision and Mission
Northern Samar development is bias towards agri-industry and eco-tourism because of its
physical characteristics and having endowed with tourism resources. This is reflected in the
Provincial Governments development vision which states that:

Northern Samar shall be a


Progressive Province with a vibrant Economy anchored on
Agri-industry and eco-tourism, led by Competent LGUs and
Empowered people enjoying peace with dignity in a protected,
resilient and balanced Environment.
By the year 2019 and beyond,

Together with the vision, the Provincial Government sets its mission statement, which states
that:

The PGNS shall provide the necessary leadership and create


the appropriate environment conducive to growth and
development by mobilizing and harnessing each resource and
building a culture of resilience and disaster preparedness to
ensure the realization of its vision for the Nortehanons

The province sets two strategies to achieve this vision, these are agro- industrialization and
eco-cultural tourism development. To support these strategies the province will undertake
not only to ensure peace but also to protect its environment.

Spatial Strategy
To complement these strategies, the Provincial Development and Physical Frameweork Plan
(PDPFP 2011-2016) identified three growth corridors through clustering of municipalities, as
set out in the spatial strategy of the 2004-2013 Provincial Physical Framework Plan, namely:
western, central and eastern growth corridors.

The Western Cluster is the center for ecotourism development, the Central Cluster is the
center for agri-industry or ecozone development while Eastern Cluster is being developed as
the provinces leading agricultural zone and food basket.

Nona Rehabilitation and


13
Recovery Plan

Province of Northern Samar

Figure 7. Growth Corridors

Source: PDPFP 2011-2016

CHANGE Development Agenda


In response to these development directions of the province, the current administration of
the Provincial Government laid down its development agenda with acronym, CHANGE
which stands for Community Based Eco-tourism and Community Empowerment, Health
and Other Social Services, Agri-Industrial Development, Natural Environment Protection
and Management, Good Governance and Education, Economic Develoment and Employment
Generation.

14

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Chapter

source: www.scoopnest.com

Typhoon Nonas Impact to Northern Samar

Infrastructure Sector
Typhoon Nona wrought damages to infrastructure sector andannihilated losses to government
structures, transport facilities, tourism facilities, agricultural support systems, flood control
as well as utilities like water supply, power transmission and distribution system and
telecommunications.
The damage to the infrastructure sector amounted to PhP754,256,940.84 while losses stood
at PhP140,384,192.02. The total recovery and reconstruction needs were estimated at PhP
2,003,931,854.24.

Nona Rehabilitation and


15
Recovery Plan

Province of Northern Samar

Table 3. Summary of the Damage, Losses and Needs in the Infrastructure Sector

Infrastructure

Government Buildings
Transport
Roads

Bridges

Seaports
Airport

Flood Control
Water

Power

Damage

Losses

Needs

128,920,418.20

5,828,780.00

313,011,895.42

114,440,500.00

960,000.00

381,101,220.00

131,369,100.00
5,084,000.00

10,650,000.00
1,194,600.00

20,632,000.00
2,350,000.00

1,690,000.00
341,000.00
264,000.00

671,667,908.95
23,290,000.00
35,763,600.00

125,000.00

231,513,088.95

40,000.00

5,890,085.00

145,500.00

123,810,000.00

336,199,362.01

122,464,312.02

675,025,936.51

Irrigation

45,700,000.00

450,000.00

47,191,900.00

State University and


Colleges (SUCs)

78,645,290.63

4,442,750.00

124,485,128.36

Telecommunication
Tourism Infra

Total

7,901,570.00
2,539,200.00

754,256,940.84

5,258,850.00
64,000.00

140,384,192.02

9,085,000.00

33,764,000.00

2,003,931,854.24

Source: CDANA-Infrastructure Sector, January 2016

Government Buildings. There were 4 affected structures of DPWH District Office buildings
that were damaged by the typhoon, which generally caused by strong winds.

The total damage to local government buildings was PhP126 Million and estimated amount of
loss was PhP5 Million. The amount of reconstruction needs reached PhP313 Million which was
covered under cross sectoral section.

Roads and Bridges. The total damage incurred in about 16 road structures amounted to
PhP114.44 Million while the total damage to 12 bridges was estimated at PhP5 Million. The
damage included collapsed embankment due to landslide, eroded slope protection or washed
out shoulder materials, cut roads, collapsed/eroded abutment protection and bridge approaches
as well as totally and partially destroyed bridges. Total losses for these two sub-sectors were
PhP0.96 Million and PhP0.341Million, respectively. The amount needed to repair and reconstruct
the damaged roads totaled PhP381.1 Million, while reconstruction and rehabilitation of affected
bridges required PhP23.29 Million.
Sea Ports. The total damage to ports amounted to about PhP10.65 Million. Total loss was
placed at PhP0.264 Million with estimated needs of almost PhP35.76 Million for reconstruction.
Majority of the damages were reported in the municipal ports of Lapinig, Palapag, Laoang and

16

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

San Vicente.

Airport. The total damage incurred in the domestic airport amounted to PhP1.19 Million. This
included damages sustained by the departure/arrival terminal, control tower, runway and guard
house structures. Estimated losses were placed at PhP0.125 Million. The total amount needed to
repair and reconstruct the airport is more than PhP231.51 Million.
Flood Control. Damages to sea walls, slope protection, drainage systems and river control and
landing totaled to an estimated PhP20.63 Million. Total loss recorded was PhP0.145 Million. The
total needs to reconstruct flood control infrastructure were placed at PhP123.8 Million.
Recovery and reconstruction of flood control infrastructure is necessary to improve their
structural capacity and prevent or mitigate future potential flood impacts.

Water Supply. Supply of potable water in affected municipalities was considerably affected in the
wake of Typhoon Nona. The province-wide power outage rendered the systems non-operational
for several days. Local water districts reported damages amounting to PhP2.35 Million. Losses
incurred were PhP0.04 Million. To rehabilitate and build back better water supply and distribution
systems, at least PhP5.89 Million would be needed.
Power Supply. The total damage in the power sector was estimated at PhP336.19 Million, inclusive
of additional labor cost amounting to PhP78.7 Million. Losses arising from foregone revenues
were pegged at PhP122.46 Million. Recovery and rehabilitation needs assessment yielded a total
of PhP675.02 Million for all three cluster areas.

The East/Pacific Area sustained the worst damage with PhP148.24 Million, while the Central
Area and the West/Balicuatro Area reported PhP95.87 Million and PhP92.08 Million of damages,
respectively. The East Area also topped in incurred losses with PhP183.6 Million while the Central
Area registered PhP155.5 Million and the West Area, PhP5.166 Million. Mapanas reported the
highest amount of damage with PhP36 Million, followed by Laoang with PhP34 Million and
Lavezares with PhP26 Million.
Telecommunications. Typhoon Nonas occurrence brought down all telecommunication facilities
resulting in the total breakdown of communications for several days. The post disaster CDANA,
however, reported only minimal and partial physical damages consisting mostly of misaligned
parabolic dish. Out of the 56 cell sites in the province, only those in the municipalities of Biri and
Mondragon were severely damaged.

Total damages in the telecommunications sub-sector amounted to PhP7.9 Million for the Broadcast
Industry and Fixed Land Mobile Services, with total computed losses of PhP5.25 Million for the
disaster year and next years cost of foregone income. Reconstruction and rehabilitation needs
were pegged at PhP9.08 Million.

Nona Rehabilitation and


17
Recovery Plan

Province of Northern Samar

Irrigation. The National Irrigation Administration - Interim Northern Samar Irrigation


Management Office (NIA INSIMO) reported nine damaged structures in both the first and
second districts of the province with a total cost of PhP45.7 Million. Total loss incurred was
estimated at PhP0.45 Million, while financing needs for reconstruction amounted to PhP47.19
Million.

Tourism Infrastructure. Total damages in this sub-sector was estimated at PhP2.53 Million
which included damages to two of the popular icons in Northern Samars tourism industry, the
Batag lighthouse in Laoang and the Capul lighthouse. Total loss was placed at PhP0.064 Million
while reconstruction and rehabilitation needs reached PhP33.76 Million.

Productive Sector
The productive sector covers the major sub-sectors of agriculture and industry, trade and
services. This sector is vital considering that the provincial economy is mainly driven by
agriculture, agriculture-based industries and micro, small and medium enterprises.
A total of 206,307 hectares or 58% of Northern Samars land area is devoted to agriculture.
Twenty (20) out of its 24 municipalities are coastal. Meanwhile, 37.83% of the provinces total
labor force are into agriculture and fishery (FIES, 2000; PDPFP) .

Based on the Comprehensive Damage Assessment and Needs Analysis (CDANA) report, the total
damage and losses incurred by the productive sector was estimated at PhP417,164,731.00 and
PhP985,970,443.52, respectively. The reconstruction and rehabilitation needs on the other hand
were estimated at PhP590,223,268.32 (Table 4). Almost 80% of which or more than PhP400
Million will be for agriculture.

By sub-sector, agriculture had the biggest amount of damage at PhP352,505,376.00 or 84.00%


of the total damage of the productive sector while the industry, trade and services suffered a
damage worth PhP64,659,355.00 or 16% of the total.
Table 4. Summary of Damage, Losses, and Needs under Productive Sector
Sector

Damage

Agriculture

352,505,376.00

960,690,993.52

Fishery

52,719,462.00

89,947,616.00

Crops

Livestock

Industry , Trade and


Services
Total

272,947,251.00
26,838,663.00

64,659,355.00

417,164,731.00

Source: CDANA-Productive Sector, January 2016

18

Losses

Nona Rehabilitation and


Recovery Plan

Needs
508,555,916.43

834,436,105.52

401,294,700.73

36,307,272.00

42,941,861.00

25,279,450.00

985,970,443.52

64,319,354.70

81,667,352.09

590,223,268.32

Province of Northern Samar

Agriculture
Agriculture sub-sector is composed of crops, fishery and livestock. This area is critical not only
because Northern Samars economy is agriculture-driven but because it serves as the main
source of income among families in the province. Likewise, agriculture is highly vulnerable to
natural calamities such as typhoons, El Nio, La Nia, among others.

As shown in Table 5, crops sustained majority of the damage and losses with PhP272,974,251.00
and PhP834,436,105.52, respectively. Far second was fishery with PhP52,719,462.00 worth of
damage and PhP89,947,616.00 losses. Livestock got the smallest damage and losses amounting
to PhP26,838,663.00 and PhP36,307,272.00, respectively.
Table 5. Damage, Losses and Needs under Agriculture
Sector

Crops

Fishery

Livestock

Total

Damage

Losses

Needs

272,947,251.00

834,436,105.52

401,294,700.73

26,838,663.00

36,307,272.00

42,941,861.00

52,719,462.00

352,505,376.00

89,947,616.00

960,690,993.52

64,319,354.70

508,555,916.43

Source: CDANA-Productive Sector, January 2016

Agricultural Commodity
Crops
Among crops, rice was heavily damaged with an estimated value of PhP97,257,143.00 (Table 6).
However, losses, which is the foregone income, of rice farmers reached more than P350 Million
or more than three (3) times the amount of the estimated damage. Based on the report of the
Department of Agriculture, about 6,900 hectares of rice area were totally damaged while almost
3,000 hectares were partially damaged and affecting around 7,000 rice farmers.

Coconut is next with PhP51,808,245.00 million damages incurred with a total of 512,402
damaged trees and affecting around 3,700 coconut farmers. Out of the total coconut trees
damaged, 451,341 trees were considered with a chance of recovery while 67,061 trees with no
chance of recovery. Next to coconut are fruit trees, banana, rootcrops, vegetable, cassava, abaca
and corn with combined damage amounting to more than P123.8 Million. The area of these
affected crops reached 14,293 hectares and around 19,829 farmers.
Nona Rehabilitation and
19
Recovery Plan

Province of Northern Samar

Table 6. Damage, Losses, Needs of Agricultural Commodity

Commodity

Rice

Coconut
Abaca

Damage

Losses

Needs

97,257,143.00

359,452,165.70

116,708,571.08

7,285,000.00

41,670,450.00

82,500,000.00

51,808,245.00

355,554,185.00

Vegetable

15,603,556.04

Banana

31,039,910.00

44,243,376.00

37,247,892.00

Fruit Trees

41,273,622.00

2,544,925.00

49,528,346.40

834,436,105.70

401,294,700.73

Corn

Cassava

Rootcrops

Total

1,597,050.00
3,532,000.00

23,550,725.00

272,947,251.04

13,549,851.00

62,169,894.00

1,144,225.00
6,513,480.00
9,763,448.00

18,724,267.25
1,916,460.00
4,238,400.00

28,260,870.00

Source: Department of Agriculture Report-CDANA, January 2016

Fishery
Like crops, fishery also incurred heavy damage estimated at PhP52,719,462.00 while losses
amounted to PhP89,947,616.00. The needs for rehabilitation and recovery was valued at
PhP64,319,354.70.
Out of the total damage in fishery, more than PhP18 Million or around 35% was incurred by
BFAR facilities like hatcheries and production centers. Damages to boats comprised of motorized
and non-motorized bancas, amounting to more than PhP9 Million. Table 7 shows the details of
damages obtained by the fishery sector.

Per CDANA Report, among municipalities, the Municipality of San Jose incurred with most
damage amounting to more than PhP11 Million followed by Laoang, Catarman, Lavezares, San
Roque, Biri, Mapanas, Mondragon, Catubig and Capul with incurred damages ranging from
PhP9 Million to PhP1 million. Total damage sustained by these municipalities was estimated at
more than PhP36 Million.

20

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Table 7. Details of Damages under Fishery Sector

Damaged Items

Amount Of Damage

Boats

9,284,500.00

Fishing Gears

3,045,400.00

Seaweeds

2,796,365.00

Mariculture

11,110,711.00

Fishpond

2,297,486.00

Hatchery/Fish Processing Center

350,000.00

Mangrove

Fish Sanctuary

5,090,000.00
220,000.00

BFAR Facilities and Stocks

18,525,000.00

Total

52,719,462.00

Source: BFAR reports, CDANA January 2016

Livestock
Although not as badly affected as farming and fishing, livestock sub-sector still suffered an
estimated damage of PhP26,838,663.00. Losses amounted to PhP36,307,272.00 and total
needs of the sub-sector was at PhP42,941,861.00. (Table 8).
Table 8. Damage, Losses and Needs of Livestock

Damage

Losses

PhP26,838,663

PhP36,307,272

Source: Livestock Report-CDANA, January 2016

Needs
PhP42,941,861

Industry, Trade and Services


Industry, trade and services got an estimated damage of PhP64,659,355.00, losses at
PhP25,279,450.00 and needs of PhP81,667,352.09. Based on the CDANA, there were 441
affected private business establishments in 24 municipalities, with damage amounting to
PhP58,144,855.00. These establishments were micro and small enterprises.

Meanwhile, damage incurred by DOST assisted establishments/businesses totaled to


PhP6,514,500.00. This consists twenty (20) DOST-SET-UP assisted firms. Out of which,
sixteen (16) were from 1st district and four (4) from the 2nd district. There were also three
(3) DOST-8 GIA assisted projects, which sustained an estimated damage of PhP6,514,500.00,
PhP147,000.00 losses and an estimated PhP8,072,692.00 for its recovery and rehabilitation
needs (Table 9).

Nona Rehabilitation and


21
Recovery Plan

Province of Northern Samar

Overall, the DOST and DTI reported damage, losses and needs are reflected in the table below.
Table 9. Damage, Losses and Needs of DTI and DOST

Agency Report

DOST
DTI

Damage

Losses

6,514,500.00

Total

147,000.00

58,144,855.00

25,132,450.00

64,659,355.00

Needs
8,072,692.00

73,594,660.00

25,279,450.00 81,667,352.09

Source: CDANA, DTI, DOST, OCD-8, January 2016

Social Sector
The social sector registered the greatest damage among sectors at PhP4.15 Billion and total
needs of PhP11.6 Billion, about four times greater than all other sectors combined (Table 10).
Table 10. Damage, Losses and Needs under Social Sector

Social Sub-Sector

Housing
Health

Public Health
Water, Sanitation &
Hygiene (WASH)

Education

Total

Damage

Losses

Needs

3,189,564,176.80

637,912,835.36

9,333,380,300.00

18,535,291.32

1,028,100.00

31,118,697.41

273,691,771.32
255,156,480.00

689,384,100.00

4,152,640,048.12

45,326,100.00
44,298,000.00

57,525,000.00

740,763,935.36

739,886,697.41
708,768,000.00

1,573,822,350.00

11,647,089,347.41

Source: Social Sector - CDANA Report as of February 29, 2016

Housing and Shelter. Damage to the housing sector was widespread, affecting a total of
109,206 houses in the province. Out of these, 27% or 29,532 were totally damaged and 73% or
79,674 were partially damaged. Makeshift houses account for most of the totally damaged at
68% or 19,946, composite at 25.3% or 7,477 and concrete at 7% or 2,108.

On the otherhand, partially damaged consisted mainly of composite houses at 33,412, makeshift
- 32,234 and 14,029 - concrete. Overall, the housing sector incurred a total damage of PhP
3,189,564,176.80 and losses of PhP 637,912,835.36. Losses were estimated based on foregone
income, cost of clearing of debris, repair and setting up of temporary shelters.
22

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

To be able to rebuild back the sector making it more resilient to future disasters, an amount
of PhP9,333,380,300.00 is needed for both immediate and medium-term reconstruction
and recovery investments. Immediate needs cover dwelling assistance package to affected
households which includes GI sheets, plywood, cement, carpentry tools, tarpaulin, nails and
other construction materials. Medium-term needs include resettlement activities such as land
acquisition, land development and housing construction program.
Health, Food and Nutrition. The delivery of health services was affected with public hospitals,
rural health units and barangay health stations damaged by the typhoon. The CDANA Report
reveals damage to health infrastructure and equipment amounting to PhP18,535,291.00. Losses
from foregone revenue expected out of PhilHealth reimbursements, cost of quick fixes, clearing
and grubbing as well as temporary roofing, ceiling and walls reached PhP1,028,100.00.

A total of about PhP31,118,697.00 is needed for the reconstruction and recovery of the damaged
health facilities. The figure however does not include capacity-building needs and other facility
enhancement measures which could be incurred after the typhoon. On food and nutrition, except
for San Isidro, the rest of the municipalities in the province reported inadequate food supply
after the typhoon struck the province. Some of the affected families relied on food aid/donation
from the government and private donors while others resorted to exchange of root crops owing
to their limited capacity to buy food. Aside from the food items from the DSWD, non-food items
were likewise distributed that includes malong, hygiene kits and water jugs.
The town of Las Navas and Lope de Vega specifically cited the need for supplemental school
feeding for malnourished children. Most common needs of the affected families were immediate
and confined to food commodities.

Water, Sanitation and Hygiene (WASH). Under the WASH Sector, poor access to safe water,
limited water supply and damaged toilets were commonly felt with the occurrence of the typhoon.
Without electricity and faced with the high cost of running generator sets, most households were
met with the problem of getting safe water for drinking. Despite the distribution of aquatabs and
hyposols to RHUs by the Department of Health, there were still reported cases of water-borne
diseases such as diarrhea, acute gastro-enteritis, typhoid fever, and amoebiasis in the towns of
Mondragon, Silvino Lubos, Lope de Vega, San Roque, Rosario and Pambujan.

Damage to toilets were estimated at PhP255,156,480.00 and losses pegged at PhP44,298,000.00,


which was derived from the estimated 29,532 totally damaged houses. While the sector include
water systems and other sanitation facilities, damage assessment was however limited to sanitary
toilets as the damage and needs of the water supply was reflected under the infrastructure sector.
A total of PhP708.768 million is the estimated needs for the reconstruction of the damaged toilets
following the DPWH standard in toilet construction. A separate funding is needed for capacitybuilding/education, repair of water facilities and service delivery enhancement.

Nona Rehabilitation and


23
Recovery Plan

Province of Northern Samar

Education. In the education sector, all 598 public elementary and secondary schools in the
province sustained damage in varying degrees from the typhoon destroying furniture, IT
equipment, school equipment, textbooks and learning materials. Of the 5,835 elementary and
secondary classrooms, 57.06% or 3,330 classrooms were damaged. Out of this, 31.21% or 771
were totally damaged, 20.1% or 1,197 incurred major damages while 23.34% or 1,362 incurred
minor damages. The total damage to educational facilities was estimated at PhP689,384,100.00
and losses amounting to PhP57,525,000.00.
The total rehabilitation and reconstruction needs of the education sector was estimated to be
PhP1,573,822,350.00, placing foremost priority on the repair of partially damaged schools,
reconstruction of new classrooms with resilient designs, replacement of damaged school
furniture and equipment and damaged textbooks and other reference materials.

Cross - Sector
Cross-cutting damage and losses is placed at PhP258,478,396.20 and PhP31,196,372.00,
respectively. While total needs is estimated at PhP460,787,078.42. Table 11 shows the estimated
breakdown of the damage, losses and needs of the said sector.
Local Government and Community Infrastructure. The total damage to the local government
sector is estimated as PhP126,120,418.20. Around 379 government-owned structures across
the Central, Pacific and Balicuatro areas were reported to have sustained varying degrees of
damage. These include municipal buildings, barangay halls, day care centers, covered courts,
public markets, and other government facilities. Coastal towns affected by the strong winds
experienced massive destruction. Meanwhile, total losses reached PhP5,581,780.00. The LGUs
need about PhP302,911,895.42 for their reconstruction and recovery.
Table 11. Summary of Cross Sectoral Damage, Losses, and Needs

Area

Local Government Units


Infrastructures
MRFs /CFs

Upland Forest

Mangrove & Beach Forest

Total

Damage

Nona Rehabilitation and


Recovery Plan

Needs

126,120,418.20

5,581,780.00

302,911,895.42

95,415,575.00

17,863,189.00

113,184,764.00

1,152,000.00

35,790,403.00

258,478,396.20

Source: CDANA Report - Cross Sectoral, January 2016

24

Losses

288,000.00

7,463,403.00

1,440,000.00

43,250,419.00

31,196,372.00 460,787,078.42

Province of Northern Samar

Environment.
The environment sector sustained a total estimated damage of
PhP132,357,979.00. It has an estimated loss of PhP25,614,592.00. Needs assessment vis-vis said damage and losses were fixed at PhP157,875,183.00. Among the areas considered in
this sub-sector, upland forest sustained the biggest damage of PhP95,415,575.00. Similarly,
it posed the highest losses at PhP17,863,189.00; and needs assessment for rehabilitation and
recovery at PhP113,184,764.00.
Typhoon Nona left behind massive dumps of debris and rubble in hardly hit municipalities.
But the estimated cost of solid waste clearing was overlooked in the computation of the needs.

Nona Rehabilitation and


25
Recovery Plan

Province of Northern Samar

Chapter

Summary of Rehabilitation and Recovery Interventions

Infrastructure Sector
1. Repair/rehabilitation/construction of roads and bridges

2. Repair/rehabilitation/construction of airports and seaports

3. Repair/rehabilitation/construction of Flood Control Structures, Water Supply &


Irrigation Systems
4. Repair of damaged Power Supply and Telecommunication System
5. Health Infrastructure Support Program

6. Education Infrastructure Support Program


7. Tourism Infrastructure Support Program

Productive Sector
1. Coconut Rehabilitation, Recovery and Development Program
2. Rice Rehabilitation, Recovery and development Program

3. High Value Commercial Crops Rehabilitation, Recovery and Development


Program
4. Fishery Rehabilitation and recovery development program

5. Trade and Industry Rehabilitation, Recovery and Development Program


6. Technical Education and Skills Development Program

7. Science and Technology Rehabilitation, Recovery and Development Program


8. Abaca Rehabilitation, Recovery and Development Program

9. Livestock Rehabilitation, Recovery and Development Program

26

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Social Sector
1. Housing and Resettlement Assistance Program
2. Basic Education Program

3. Repair of Damaged School Buildings and provision of school facilities (e.g.


textbooks, chairs, blackboards & other school supplies)
4. Health Enhancement Program
5. Food and Nutrition Program

6. Water, Sanitation and Hygiene Program


7. Core Shelter Program

8. Emergency Shelter Assistance (ESA)Program


9. Social Welfare Program

Cross-Sectoral Interventions
1. Local Governance & Disaster Risk Reduction and Management Program
2. Social Protection Program
3. Reforestation Program

4. Risk Transfer Program (Provision of Insurance to Vulnerable Groups)


5. Ecological Solid Waste Management (ESWM)Program
6. Waste Water and Water Conservation Program
7. Data Bank Establishment

8. Establishment of Sanitary Landfill


9. Provision of Evacuation Centers

Nona Rehabilitation and


27
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Infrastructure Sector - DPWH


Policy Recommendation
Expedite funding of rehabilitation works
Rehabilitation of damaged roads

Conform with the DPWH standard design


and specifications for buildings, roads and
bridges
Perform structural retrofitting works on
partially damaged bridges

Specific Action to be Undertaken


Accomplish all required documents needed for funding

Implementation
Schedule

Lead Entity

2016

DPWH and LGUs

Strict Implementation of DPWH standards on infrastructure


projects

2016

DPWH and LGUs

Restoration/Improvement of Bridge Slope Protection

2016

DPWH and LGUs

Prepare Program of Works and Detailed Unit Price Analysis for


the Project
Complete all documents needed for bidding process

Monitoring and supervision during rehabilitation/construction

2016

DPWH and LGUs

Infrastructure Sector - UEP


Policy Recommendation

Restoration and reconstruction of academic


research service facilities in consonance
with the NBC of the Philippines.

Specific Action to be Undertaken


Instruct the PPDO director to prepare POWs on the identified
building/facilities for restoration and reconstruction.
Follow the international standards/NBC of the Philippines
to ensure that buildings are resistant to calamities (typhoon,
earthquake, flood, etc.)

Implementation
Schedule

4th quarter of 2016 or


every succeeding year

Lead Entity

UEP
UEP

Province of Northern Samar

28

POLICY RECOMMENDATIONS

Infrastructure Sector - UEP ...continuation


Policy Recommendation

Implementation
Schedule

Specific Action to be Undertaken

Lead Entity

Creation of the University Disaster


Management Team or University DRRM Unit
to effectively address the calamity related
activities (disaster warning, preparedness,
response, evacuation, etc.)

Seek approval from the University President in the composition of


April 2016
UDMT/UDRRM Unit.

UEP

UEP

2016 and onwards

UEP

Timeliness release of funds

Send the UDMT/UDRRM members to trainings/seminars


specifically on disaster preparedness.
Consistent follow up of funds from concerned agencies

2016

UEP

Provision of DRRM trainings/seminars and


capacity-building activities and evacuation
drills.

Seek assistance from the Barangay Chairperson for their active


participation during calamities.

Power
Policy Recommendation

Specific Action to be Undertaken

Nona Rehabilitation and


29
Recovery Plan

1. To forge a MOA with DENR/PCA such which that any vegetation


may pose threat to the transmission lines can be easily cut/
cleared to avoid breach of allowable clearance thereby preventing
unplanned power interruptions.

Right of Way (ROW) corridors of


transmission lines as specified depending
2. LGUs may intervene with hesitant landowners such that
on its nominal voltage rating must be always
vegetation or infrastructure can easily be negotiated for clearing
free from infrastructures and vegetation.
or demolition; LGUs to propose local ordinance such that
vegetations that grows beyond 3 feet must not be allowed to be
planted or germinated within the ROW corridor of the line.

Lead Entity

2017-2019

ERC, NGCP

Immediate

NGCP, DENR, PCA,


LGUs, OBO

Province of Northern Samar

ERC approval on the proposed rehabilitation To apply said proposal to ERC and wait for its approval. NGCP is
and installation of the transmission lines
regulated by the ERC hence NGCP cannot implement such CAPEX
leading to Northern Samar as identified.
activities without ERC's nod.

Implementation
Schedule

Nona Rehabilitation and


Recovery Plan

Policy Recommendation
Right of Way (ROW) corridors of transmission
lines as specified depending on its nominal voltage
rating must be always free from infrastructures and
vegetation.
Reduction of pole spans to ensure stronghold and
prevent/lessen damage cause by strong winds
during typhoons and other natural calamities

NDRRMC/RDRRMC to grant financial assistance/


subsidy to the cost of restoration and rehabilitation
of distribution line in order to prevent the pressing
of the said cost to the consumers

Implementation
Schedule

Specific Action to be Undertaken


3. LGUs thru the OBO must not approve building permit
to applicants if said buildings/infrastructures are located
under the transmission line or within its ROW corridor
since its very dangerous to life and property.
Task force KAPATID Restoration and Rehabilitation

Lead Entity

Immediate

NGCP, DENR, PCA,


LGUs, OBO

Dec. 2015-2016

NORSAMELCO/
NEA/FRECOR 8

Calamity loan to NEA

Dec. 2015-2016

NDRRMC/
RDRRMC/NEA/DOE

Replacement and upgrading of poles based on NEA


Policy Standards

Task force KAPATID Restoration and Rehabilitation

Dec. 2015-2016

NORSAMELCO/NEA

Upgrading of substation structure including the


sub-station house

Dec. 2015-2016

NORSAMELCO/NEA

Partial upgrading is being undertaken for lack of fund

Dec. 2015-2016

NORSAMELCO/NEA

Compliance with the standard minimum depth in


setting poles.

NEA

Upgrading and distribution structure based on NEA


Policy Standards
Fund allocation/subsidy to finance restoration/
rehabilitation of damaged power structures/lines.
Reconstruction/replacement of distribution line
structure based on NEA Bulletin Standard

Utilization of standard materials and equipment in


reconstruction/ rehabilitation works.

NEA

NEA
NEA

Province of Northern Samar

30

Power ...continuation

Power ...continuation
Policy Recommendation

Implementation
Schedule

Specific Action to be Undertaken

Lead Entity

Utilization of standard materials and equipment in


reconstruction/ rehabilitation works.

NEA

Forging a MOA with LGUs, other key national


government agencies, NGOs and INGOs in terms
of clearing operations and providing fund support
for the immediate restoration of power lines along
town centers and essential government structures.

NORSAMELCO

Strict assessment/monitoring of restoration/


reconstruction works.

NEA

ICT and Telecommunications


Policy Recommendation

Specific Action to be Undertaken

Implementation
Schedule

Nona Rehabilitation and


31
Recovery Plan

Install effective alternative modes of communication


system, such as Radyo ng Bayan and ERCs, and
SP Resolution
process the necessary equipment

2016-2019

NTC
NTC

Province of Northern Samar

Moratorium and/or reduction of annual fees


supervisory fees and regulatory fees by the NTC and SP Resolution requesting the NTC to issue memorandum to
2016-2019
other government agencies within the 3 year rehab that effect
and recovery period

Lead Entity

Nona Rehabilitation and


Recovery Plan

Policy Recommendation
Immediate repairs and rehabilitation works on
damaged port/transport facility

Specific Action to be Undertaken


These damaged ports and its estimates were already
submitted to GSIS for immediate action (since ports are
under insurance)

Implementation
Schedule
3rd Quarter of 2016

Lead Entity
PPA-PMO Eastern
Leyte/Samar

Irrigation
Policy Recommendation
Monitoring and supervision of construction to
ensure project design standards are followed
Optimize disaster-resilient design options

Financing of structural retrofitting works on the


existing and partially damaged structures

Improve safety and other disaster risk reduction


measures including the training of personnel on
disaster preparedness measures

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

Province of Northern Samar

32

Transportation

803rd Brigade, Philippine Army


Policy Recommendation

Provision of workers safety

Provision of workers hand tools


Repair/rehabilitation of the office
buildings
Procurement/provision of additional
disaster response equipment

Specific Action to be Undertaken


-Safety of workers be given importance. Accidents due to lack of
safety equipment will weaken performance during disaster response
operations, rehabilitation, repair and recovery of buildings

-Any government office must include and overlook recommendations for


provision of safety equipment for working troops to avoid disapproval or
delay of budget release.
Hand tools for constructions are disposable and most of it are disposed/
useless after each project are completed. Construction tools must be
included in the budget for each project and should not be personally
provided by each worker.

Separately request for funding to repair affected unit/office buildings for


faster recovery of the unit/office.
Concerned offices personally inspect unit equipment to realize
effectiveness of equipment to avoid disapproval of recommendations or
any delay of the release of funds.

Implementation
Schedule

Lead Entity

2016

543rd Engineer
Construction
Battalion

2016

543rd Engineer
Construction
Battalion

2016

2016

543rd Engineer
Construction
Battalion
543rd Engineer
Construction
Battalion
Province of Northern Samar

Nona Rehabilitation and


33
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Productive Sector - TESDA


Policy Recommendation
Establishment and institutionalization of
operating unit in the LGUs to address the
employment and training needs of their
constituents

Specific Action to be Undertaken

Local ordinance establishing operating units of the LGU to look


into the needs for training and employment of their constituents

Implementation
Schedule
January - December
2016

Lead Entity

LGU/other
agencies/TESDA

Productive Sector - DA
Policy Recommendation

Specific Action to be Undertaken

Mainstream climate change adaptation


principles in farming, livestock raising,
fishery and enterprise venture

Promote use of high yielding varieties and calamity (drought,


typhoon, etc.) resistant farm seeds and animals

Facilitate farmers access to financial


institutions

Conduct information dissemination through pulong-pulong,


community assembly, etc.

Implementation
Schedule

Lead Entity

2016

DA/LGUs

Conduct information dissemination through pulong-pulong,


community assembly, etc.

2016

DA/LGUs

2016

DA/LGUs

Institute measures for displaced farmers to Assess/identify needs for alternative livelihood of affected/
avail alternative livelihood after the calamity displaced farmers

2016

DA/LGUs

Massive campaign to farmers to avail crop


insurance

Province of Northern Samar

34

ECONOMIC SECTOR

SOCIAL SECTOR
Education - DepEd
Policy Recommendation

All education facilities / school buildings to be


built must be in accordance to DepED standard
design (Typhoon Proof & Earthquake Resilient
Classrooms)
Allow use of timber/wood for the construction
of school buildings.
Mobilize resources including the private sector
to hasten the reconstruction and recovery
process of the education sector.

Creation of provincial level committee that will undertake


assessment and evaluation of proposed school sites.

Adopt DepED standard design in the construction of school


buildings.

Request DENR to issue special permits to cut hardwood that will


be used in the construction of Type III (Timber Design) School
Buildings.
Identify possible fund provider. Build partnership with private
sectors (INGOs, NGOs & individuals) capable in donating
equipment / infrastracture & other services.

Nona Rehabilitation and


35
Recovery Plan

Recommend expansion of the implementation of 4Ps to DSWD


to cover all qualified beneficiaries. Strict implementation and
monitoring of 4Ps program. Proper and timely reporting of the
program to DepED and LGUs.

Implementation
Schedule

Lead Entity

2016

School Board/
Sangguniang
Panlalawigan

2016

School Board/
DENR

2016

School Board

2016-2017

DSWD/ DepED
Province of Northern Samar

Increase coverage of 4Ps to lessen school drop


outs

Specific Action to be Undertaken

Nona Rehabilitation and


Recovery Plan

Policy Recommendation

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

Database for PWDs, Senior Citizen, Children


and Women should be available at the
Provincial and Municipal levels

The R/PDRRMC, with support of the DSWD, to enjoin the


MDRRMCs/LCEs to establish said database

2016-2017

R/PDRRMC/
DSWD

Insurance coverage for government


buildings.

The R/P/MDRRMC to explore the viability of said assistance


R/P/MDRRMC to recommend to LCES the adoption of the
proposed policy

2016-2017

R/P/MDRRMC

2016-2017

R/P/MDRRMC

2016-2017

R/P/MDRRMC

Financial assistance to government


employees during disaster.

Insurance coverage for disaster workers.

R/P/MDRRMC to recommend to LCES the adoption of the


proposed policy. The concerned councils to define the roles of
disaster workers.

Social Sector: Education - UEP


Policy Recommendation

Specific Action to be Undertaken

Review of 2017 budget plan to include said allotment


Inclusion in the regular annual budget allocation for
the procurement of books and laboratory apparatus/
Submit budget proposals to CHED, DOST, PCAARD, and
equipment
other funding agencies
Increase budget allotment to increase number
of ESGPPA (4Ps) scholars, CHED/Congressional
scholars, PEAP, MEAP, CEAP, etc

Submit proposal to DSWD, CHED/Congress, Province,


Municipal Scholarship Programs
UEP to identify prospective scholars

Implementation
Schedule
April 2016
April - June 2016
April - May 2016

Lead Entity
VP for Admin and
Finance

VP for Research and


Extension, College
Deans, CHED

VP for Academic
Affairs, DSWD, CHED,
Provincial/Municipal
LGU

Province of Northern Samar

36

Social Protection Sector: DSWD/R/PDRRMC

Social Sector: Education - UEP ...Continuation


Policy Recommendation

Institutionalize the University (or school) Disaster


Management team and create similar bodies in the
organizational structure of the school

Specific Action to be Undertaken


Identification of Team members (from Univ/School level
to the Student level)

Issuance of Special Order for its creation and definition of


functions

Lead Entity

June - December
2016

University President/
School Administrator

Creation of IEC Production Team and drafting of info


materials

June - September
2016

UDMT

Distribution of info materials

1st Quarter 2017

Conduct five-day training for all groups/teams


Submit proposal to Plan International

Intensify IEC through the production of infomaterials (printed, multimedia)

Implementation
Schedule

Production/reproduction of info materials

Enhancing disaster preparedness for effective


response and to infuse Build Back Better in recovery,
rehabilitation and reconstruction (FDS Module, Active
Citizenship, Community Assembly and Brgy. Assembly)

October December 2016

2016-2019

University President/
School Administrator
IEC Production Team/
Plan International

Province of Northern Samar

Nona Rehabilitation and


37
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Policy Recommendation
Updating of CLUPs

Relocate to safe and habitat areas those informal settlers


living in the danger zones, to be implemented by the
LGUs and other concerned stakeholders such as NGOs,
NGAs, etc.
Conduct a regular housing forum or housing congress
that tackles and emphasized the vital role of the housing
sector in the nation's development and underscores the
sector's strength towards achieving safer and disasterresilient dwellings
Grant government subsidy, expand the government's
Core Shelter Program and provide Emergency Shelter
Assistance to qualified beneficiaries for their immediate
reconstruction and recovery efforts
Integrate and infuse the "BUILD BACK BETTER
PRINCIPLE" in the building reconstruction and repair
of houses in the recovery rehabilitation process in the
community

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

LGUs to update their CLUPs document

2016 onwards

LGU, HLURB

LGUs to identify and acquire safe and habitable areas

2016 onwards

LGUs, NHA

Social preparation to the community

2016 onwards

NHA, DSWD

Social preparation to the community

2016 onwards

DSWD, LGU

Community-level awareness

Monthly

Enhancing disaster preparedness for effective


response and to (Bulld Back Better) in recovery,
rehabilitation & reconstruction (FDS Module, Active
Citizenship, Community Assembly & Brgy. Assembly)

2016-2019

DSWD core Programs


w/ LGUs, BDRRMC,
BDC

Province of Northern Samar

38

Housing Sector: HLURB/NHA/DSWD/LGU

Health Sector
Policy Recommendation

Implementation
Schedule

Specific Action to be Undertaken

Lead Entity

Strengthening the disaster program implementation


Institutionalization of the emergency
preparedness and response program

Construction of typhoon-resilient health


infrastructure in safe areas

Capability building/conduct of trainings:


- Emergency preparedness and disaster response training
for all health personnel from hospital to community health
workers
- Basic Life Support (BLS) Training for community health
workers
- Emergency Rescue Training
- Secure adequate funding for program sustainability

Follow the international standards/NBC of the Philippines to


ensure that health infrastructure are resistant to calamities
and located in hazard-free areas

DOH

DOH/DPWH

Identify source of safe water

DOH

Prepare cost estimate and other documents for immediate


installation of water system
Create task force to formulate the Comprehensive Health
Emergency and Disaster Preparedness Plans

DOH

DOH

Province of Northern Samar

Nona Rehabilitation and


39
Recovery Plan

Development of a comprehensive health


emergency, disaster preparedness and other
plans

DOH/PHO

Prepare Program of Work and Detailed Unit Price Analysis


each Project

Provision of back-up power and emergency lights Immediate procurement of back-up power and emergency
to RHUs and hospitals
lights
Installation of water system in RHUs

2016

Nona Rehabilitation and


Recovery Plan

Policy Recommendation

Development of a comprehensive health


emergency, disaster preparedness and other
plans
Reactivate Surveillance in Post Extreme
Emergency and Disaster (SPEED) System

Management of the Dead and Missing Persons


(MDM) during emergencies and disasters (A.O.
2007-001B) by concerned agencies

Implementation
Schedule

Specific Action to be Undertaken


Formulate the Comprehensive Health Emergency and
Disaster Preparedness Plans

Plans implementation

Presentation of plans for approval by concerned agency


Identify members who will comprise the Surveillance in
Post Extreme Emergency and Disaster System

Issue executive order or memorandum for the team


composition and responsibilities of the Surveillance In Post
Extreme Emergency and Disaster (SPEED) System

Lead Entity

DOH

DOH

DOH/PHO

Installation of emergency communication system


for members of the health sector

DOH

Augmentation of health personnel

DOH

DOH

DOH

Setting-up of a functional Health Emergency


Management System (HEMS)
Extra compensation to health workers for
services rendered during an emergency or
disaster Enhancement of Service Delivery

More effective mobilization of response teams

DOH/PHO

Province of Northern Samar

40

Health Sector ..Continuation

Health Sector ..Continuation


Policy Recommendation
Enhancing disaster response services

Implementation
Schedule

Specific Action to be Undertaken

Lead Entity

DOH

DOH

Strict implementation of ordinance on


management of human corpses

DOH

Availability of warehouse based on existing


standards

DOH

DOH

DOH

Advocacy on disaster preparedness among


community members

Support the endorsement of House Bill on Right


to Adequate Food.

Agreement between the local suppliers and


LGUs to ensure availability of supplies at regular
market price.

Province of Northern Samar

Nona Rehabilitation and


41
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Policy Recommendation

Strict implementation of PD 856, The Sanitation Code of the Philippines

Development and installation of water systems

Construction/establishment of water reservoir

Rehabilitation of water systems, water pumps, aqueducts and storage tanks

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

Strengthening of waste segregation and


waste management policies through SB
resolution

PHO

Strict implementation of ordinance on


management of human corpse through SB
Resolution

DOH/PGNS
DOH/PGNS

DOH/PGNS

Provision of water disinfectants (aquatabs and hyposols) or water


treatment kits and water containers/jerry cans to households Capacitybuilding/Education

DOH/PGNS

Conduct of health education in communities

DOH/PGNS

Procurement of equipment: portable water bacteriological testing machine,


truck-mounted purifying machines, rubberized water bags, and water
desalination machines for island municipalities; water chlorinator for Level
2 water systems

Treatment of water sources

Construction of sanitary toilets in households


Employment of rural sanitation inspector
Provision of hygiene kits

Repair of damaged MRFs

Cash/Food for Work to increase clearing/garbage disposal efforts

Expansion or relocation of cemeteries for the management of corpses

Strict implementation of ordinance on management of human corpses

DOH/PGNS

DOH/PGNS
PGNS

LGU Allen and


San Vicente
DOH

PGNS
DOH
LGU
LGU

Province of Northern Samar

42

Health Sector: WASH

CROSS SECTOR
Environment Sector - DENR
Policy Recommendation

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

Preparedness of all levels of Local Government Units


(LGUs) in the disaster response based on their approved
Local Climate Change Action Plan (LCCAP)

Direct LGUs to formulate Local Climate Change Action


Plan (LCCAP through the Issuance of memorandum or
ordinance

2016

Encourage LGUs, private landowners, Peoples


Organization (PO), NGOs to engage in tree plantation to
supply the needs of the legitimate lumber dealer in the
province, provided, that the utilization should be strictly
within the province until and unless the supply is enough

Community awareness on the no build zone and danger


zones

2016 and onwards

DENR/DILG/
LGUs

Conduct massive tree plantation in the province through

2016 and onwards

DENR/DILG/
LGUs

Issue memorandum or ordinance to plant endemic forest


species within the no build zone areas, to serve as buffer
zone during catastrophes

2016

DENR/DILS/
LGUs

2016 and onwards

DENR/DILG/
LGUs

Strict observance of the no build zone and danger zones

Encourage individuals to plant within the no build zone


areas with variety of endemic beach forest species that
are wind resistant;

Strict enforcement of existing rules, laws and regulation


governing the conservation and protection of important
endemic tree species and habitat but not limited to
important flora and fauna

Conduct aggressive IEC on PD 705

Create task force in every municipality to patrol the


mangroves and beach forest species
Issuance of a memorandum or ordinance

2016

Setting up of a Green Court

2017

Creation/activation of Bantay Kalikasan

2016

DENR/DILG/
LGUs
DOJ/DILG/

Province of Northern Samar

Nona Rehabilitation and


43
Recovery Plan

Strengthen the no cutting policy of mangroves and beach


forest species, including the protection of at least 20
meters strips of all rivers banks in the province (PD 705

DENR/DILG/
LGUs

Nona Rehabilitation and


Recovery Plan

Policy Recommendation

Specific Action to be Undertaken

Implementation
Schedule

Lead Entity

Inventory of important forest and coastal resources in


each municipality

Creation of a team to conduct inventory of forest and


coastal resources through an executive order

20176-2017

DENR/DILG/
LGUs

Seedlings to be procured within the province.

DENR VIII and PGENRO to consider the recommended


policy

2016-2018

DENR/PGENRO

Approval of the draft environment code for the province


of Northern Samar.

SP to expedite the review and approval of the said


environment code.

2016-2017

DENR/SP

Damage assessment reports (e.g. CDANA, PDNA) to


account for biodiversity losses

The RDRRMC, through the OCD VIII, to incorporate a


methodology on the assessment of biodiversity losses

2016-2018

RDRRMC/OCD

Province of Northern Samar

44

Environment Sector - DENR ...Continuation

Province of Northern Samar

Northern Samar

Nona Investment Program


2016 - 2019

23 May 2016

Nona Rehabilitation and


45
Recovery Plan

Province of Northern Samar

Chapter

Nona Investment Programming:2016 - 2019


Executive Summary

The Nona Investment Plan enumerates the PhP17.977 Billion worth of government interventions
to build back better and safer Northern Samar after it was devastated by typhoon Nona. The plan
contains the ongoing and proposed programs, projects and activities (PPAs) of the PGNS, the 19
key national line agencies thru their respective regional and provincial offices and the University
of Eastern Philippines, the lone state universities of the province, which all play vital roles and
united in one common goal to restore Northern Samars socio-economic conditions.
The list of interventions submitted in this document are along infrastructure sector, social
services sector, cross-sector and productive sector. Under the Infrastructure Sector, the subsectors that were given priority for rehabilitation and recovery are the a) Transport Sector which
include among others Roads, Bridges, Ports, Seaports, Airport; b) Government Buildings; c)
Flood Control; d) Water Supply; e) Power Supply; f) Telecommunications; g) Irrigation Systems;
h) Tourism Infrastructure; and i) State University and Colleges (SUC) which for the province of
Northern Samar has only one-- the University of Eastern Philippines (UEP);

Social Sector PPAs focuses on interventions to the following sub-sectors; a) Housing or


Resettlement; b) Health; c) Water, Sanitation and Hygiene (WASH); d) Food and Nutrition; and e)
Education. Housing programs and projects for Nona-affected families and communities are cited
under the Resettlement Cluster.
Rehabilitation and recovery interventions that focus to provide and restore employment and
income after Nona are listed under the Productive Sector. This sector is further broken down
into two major sub-sectors which are the Agriculture and Industry, Trade and Services. The
Agriculture sub-sector includes among others Crops, Fishery, and Livestock. While the Industry,
Trade and Services list down proposed interventions of the National Line Agencies like the
Department of Trade and Industries (DTI), Technical Education Development Authority (TESDA),
Department of Science and Technology (DOST), Department of Labor and Employment (DOLE)
and other non-government agencies;
The Cross Sector provides the interventions dealing on Disaster Risk Reduction and Management,
Social Protection, Ecological Solid Waste Management and Waste Water Management, and
Environment to include reforestation of forestland, mangrove, beach forest and denuded areas.
All of the proposed PPAs are geared towards making the province resilient to disaster and a safer
place to live.
46

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Table 12. Nona Investment Program: 2016 - 2019

Proposed Amount for PPAs (PhP)

Sector

2016

2017

2018

Total

2019

% Share

Infrastructure

3,550,008,028.24

2,223,501,028.70

180,748,731.75

566,926,915.00

6,521,184,703.69

36.27%

Social

2,249,923,632.32

4,517,620,789.60

1,250,461,964.64

1,205,279,070.85

9,223,285,457.41

51.30%

Total

6,204,746,205.31

Productive

Cross-sector

140,612,144.75

264,202,400.00

201,486,751.00

416,054,000.00

195,176,400.00

317,106,500.00

190,715,000.00

507,961,500.00

7,358,662,569.30 1,943,493,596.39 2,470,882,485.85

727,990,295.75

1,505,324,400.00

4.05%

8.37%

17,977,784,856.85 100.00%

Distribution and Percent Share of Programs and Projects by Sector


The bulk of Nona Rehabilitation and Recovery Investment Program are on reconstruction
programs and projects intended to hasten infrastructure recovery, which is pegged at around
PhP6.521 Billion spread over the four-year implementation period. This constitutes 36% of the
total public investment requirements. The rationale behind such appropriation is that public
and private sectors production and service delivery cannot be possibly started without the
necessary infrastructure support.

Livelihood interventions which is contained in the Productive Sector would need PhP0.728
Billion, representing 4% of the total amount of PhP17.977 Billion. Social sector investment
requirement amounts to PhP9.223 Billion or about 51% of the total amount. Investments
along cross sector amounted to Php 1.505 Billion, representing 8% of the needed amount.
These investments are expected to perk up the provinces stages of production value chains
effecting necessary increases in the Gross Regional Domestic Product (GRDP) of the region.

Among the four sectors, Social Sector takes the lion share while the Productive Sector gets the
lowest share at 4%. Interventions intended to meet the demand for basic needs gets the 36%
as reflected in the Infrastructure. While the remaining chunk goes to Cross Sector at 8%. Figure
8 shows the NRRP Summary of Investments by Sector.

Nona Rehabilitation and


47
Recovery Plan

Province of Northern Samar

Figure 8. Summary of Investments by Sector

Cross-sector,
1,505,324,400.00 ,
9%

Productive ,
727,990,295.75 ,
4%

Infrastructure,
6,521,184,703.69 ,
36%

Productive

48

Nona Rehabilitation and


Recovery Plan

Social,
9,223,285,457.41 ,
51%

Social

Infrastructure

Cross-sector

Province of Northern Samar

Infrastructure

Sector

Nona Rehabilitation and


49
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Transportation
Roads
1
2
3
4
5
6
7

Repair and Rehabilitation of


Pangpang-Palapag-MapanasGamay-Lapinig Road,
Magtaon-Mapanas Section
Repair and Rehabilitation of
Pangpang-Palapag-MapanasGamay-Lapinig Road, AnitoGamay Section

Repair and Rehabilitation of


Pangpang-Palapag-MapanasGamay-Lapinig Road, Lapinig
Section
Repair and Rehabilitation of
Pangpang-Palapag-MapanasGamay-Lapinig Road, NipaCabatoan Section
Rehabilitation of Daang
Maharlika Road, and
Catarman-Laoang Road

Rehabilitation of CatarmanCalbayog Road


Rehabilitation of BugkoNenita Road

Mapanas, Northern
Samar

15,000,000

15,000,000 DPWH

Gamay, Northern
Samar

10,000,000

10,000,000 DPWH

Lapinig, Northern
Samar

10,000,000

10,000,000 DPWH

Palapag, Northern
Samar

5,000,000

5,000,000 DPWH

Northern Samar
1st District

3,000,000

3,000,000 DPWH

30,000,000

30,000,000 DPWH

2,000,000

2,000,000 DPWH

Brgy. Somoge,
Catarman,
Northern Samar
Mondragon,
Northern Samar

Province of Northern Samar

50

INFRASTRUCTURE SECTOR

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Rehabilitation of AllenCabacungan Road

Brgy. Calarayan,
Allen, N. Samar

20,000,000

20,000,000 DPWH

10

Rehabilitation of CatarmanCalbayog Road

Brgy. Magsaysay,
Lope de Vega, N.
Samar

10,000,000

10,000,000 DPWH

Lope de Vega, N.
Samar

Brgy. Bayho, Lope


de Vega, N. Samar

2,000,000

2,000,000 DPWH

Brgy. Talolora,
Mondragon, N.
Samar

5,000,000

5,000,000 DPWH

Pob. Lapinig, N.
Samar

2,000,000

2,000,000 DPWH

20,200,000

20,200,000 DPWH

Catubig, N. Samar

17,300,000

17,300,000 DPWH

60,000,000

60,000,000 DPWH

11
12
13
14
15

17
18

Rehabilitation of Giratigan
Road Slip

Rehabilitation of CatarmanCalbayog Road


Rehabilitation of Talalora
RCPC
Repair/Rehabilitation of
Municipal Road

Repair/Rehabilitaion of
Cagamutan-Bangon Road

Repair/Rehabilitation of San
Jose-CM Recto FMR Road
Repair/Rehabilitation of San
Jose-Roxas FMR Road

Construction of Access Road


to Schools on Remote Areas in
Northern Samar (30 schools)

Kinabrahan, Allen,
N. Samar

Gamay, N. Samar

Catubig, N. Samar

2,000,000

807,000

34,600,000

2,000,000 DPWH

807,000 DPWH

34,600,000 DPWH

Province of Northern Samar

Nona Rehabilitation and


51
Recovery Plan

16

Rehabilitation of Daang
Maharlika Road

Nona Rehabilitation and


Recovery Plan

19

Construction of Farm to
Market Roads (FMRs)

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Allen, N. Samar

91,000,000

91,000,000 PGNS

Bobon. N. Samar

104,000,000

104,000,000 PGNS

39,000,000

39,000,000 PGNS

Biri, N. Samar

Capul, N. Samar

Catarman. N. Samar
Lavezares, N.
Samar

Lope de Vega, N.
Samar
Mondragon, N.
Samar

Rosario, N. Samar
San Antonio, N.
Samar
San Isidro, N.
Samar

San Jose, N. Samar


San Vicente, N.
Samar

Victoria, N. Samar
Catubig, N. Samar
Gamay, N. Samar

Laoang, N. Samar

Lapinig, N. Samar
Las Navas, N.
Samar

52,000,000
91,000,000

143,000,000
39,000,000

52,000,000 PGNS
91,000,000 PGNS

143,000,000 PGNS
39,000,000 PGNS

104,000,000

104,000,000 PGNS

26,000,000

26,000,000 PGNS

26,000,000
26,000,000
26,000,000
26,000,000
26,000,000
65,000,000
39,000,000
39,000,000
52,000,000
91,000,000

26,000,000 PGNS
26,000,000 PGNS
26,000,000 PGNS
26,000,000 PGNS
26,000,000 PGNS
65,000,000 PGNS
39,000,000 PGNS
39,000,000 PGNS
52,000,000 PGNS
91,000,000 PGNS

Province of Northern Samar

52

Program/Project/Activity

Program/Project/Activity

Location
Mapanas, N. Samar
Palapag, N. Samar
Pambujan, N.
Samar

San Roque, N.
Samar
20

Construction of Barangay
Roads

Silvino Lobos, N.
Samar
Allen, N. Samar
Biri, N. Samar

Bobon. N. Samar
Capul, N. Samar

Catarman. N. Samar
Lavezares, N.
Samar

Lope de Vega, N.
Samar
Mondragon, N.
Samar
Nona Rehabilitation and
53
Recovery Plan

San Antonio, N.
Samar
San Isidro, N.
Samar

San Jose, N. Samar

2016

2017

2018

2019

Total

Implementing
Agency

78,000,000

78,000,000 PGNS

78,000,000

78,000,000 PGNS

91,000,000
65,000,000
39,000,000
20,000,000
10,000,000
10,000,000
10,000,000
20,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000

91,000,000 PGNS
65,000,000 PGNS
39,000,000 PGNS
20,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
20,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS

Province of Northern Samar

Rosario, N. Samar

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

Agency

10,000,000 PGNS

Gamay, N. Samar

10,000,000
10,000,000

10,000,000 PGNS

10,000,000

Laoang, N. Samar

10,000,000

Lapinig, N. Samar

10,000,000

Las Navas, N.
Samar

10,000,000

Mapanas, N. Samar

10,000,000

Palapag, N. Samar

10,000,000

Pambujan, N.
Samar

10,000,000

San Roque, N.
Samar

Silvino Lobos, N.
Samar

21

Repair/Rehabilitation of
Barangay Road

Brgy. Punta, San


Vicente, N. Samar

23

Repair/Rehabilitation of Libjo
Catarman, N. Samar
Gravel Road

Repair/Rehabilitation of Farm Mondragon, N.


to Market Roads (FMR)
Samar
Repair/Rehabilittion of
Salvacion Gravel Road

2019

10,000,000

Catubig, N. Samar

24

2018

Implementing

San Vicente, N.
Samar

Victoria, N. Samar

22

2017

Total

Catarman, N. Samar

10,000,000

720,000

10,000,000

10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS
10,000,000 PGNS

720,000 LGU San Vicente

69,200,000

69,200,000 LGU Mondragon

8,650,000

8,650,000 LGU Catarman

13,840,000

13,840,000 LGU Catarman

Province of Northern Samar

54

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

25

Repair/Rehabilitation of Guba
Catarman, N. Samar
Pathway

560,520

560,520 LGU Catarman

27

Repair/Rehabilitation of
Aguinaldo Pathway

163,485

163,485 LGU Catarman

26

28
29
30
31
32

Catarman, N. Samar

Repair/Rehabilitation of
Poblacion-Balud-Coroconog
FMR

Brgys. Poblacion,
Balud, and
Coroconog, San
Roque, N. Samar

15,000,000

5,000,000

20,000,000 LGU San Roque

Brgys. Balud and


Balnasan, San
Roque, N. Samar

Brgy. Zone 3, San


Roque, N. Samar

5,000,000

5,000,000

10,000,000 LGU San Roque

Brgy. Bantayan, San


Roque, N. Samar

5,000,000
5,000,000

5,000,000

10,000,000 LGU San Roque

Repair/Rehabilitation of
Balud-Balnasan FMR

Rehabilitation of NaperesMalaguinara FMR

Rehabilitation of BantayanCamambanan FMR


Rehabilitation of InilianGalutan-CoroconogHinabang-at FMR

Nona Rehabilitation and


55
Recovery Plan

Rehabilitation of InilianGalutan-CoroconogHinabang-at FMR


Total for Roads

Catarman, N. Samar

Brgys. Balud and


Coroconog, San
Roque, N. Samar
Brgys. Balud and
Coroconog, San
Roque, N. Samar

233,000

233,000 LGU Catarman

5,000,000 LGU San Roque

5,000,000

5,000,000 LGU San Roque

5,000,000

5,000,000 LGU San Roque

377,274,005

1,731,000,000

- 2,108,274,005

Province of Northern Samar

34

Repair/Rehabilitation of
Bocsol Pathway

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Bridges
1
2
3
4
5
6
7
8
9
10

Repair and Rehabilitation


of Tabonon Bridge along
Catarman - Rawis Road

San Roque, N.
Samar

Repair and Rehabilitation


of Burabod Bridge I along
Catarman - Rawis Road

Repair and Rehabilitation


of Cadat-olan Bridge along
Catarman - Rawis Road

Repair and Rehabilitation of


Simora Bridge along Rawis
(Junction)-Catubig Road

Repair and Rehabilitation of


Opong Bridge II along Rawis
(Junction)-Catubig Road
Rehabilitaion of Makiwalo
Bridge
Repair/Rehabilitation of
Gamay Steel Foot Bridge
Repair/Rehabilitaion of
Concrete Foot Bridge

Repair/Rehabilitation of
Wooden Bridge (3-Units)

Repair/Rehabilitation of Box
Culvert

2,000,000

2,000,000 DPWH

Pambujan, N.
Samar

2,000,000

2,000,000 DPWH

Laoang, N. Samar

2,000,000

2,000,000 DPWH

Catubig N. Samar

2,000,000

2,000,000 DPWH

Catubig N. Samar

2,000,000

2,000,000 DPWH

4,000,000

4,000,000 DPWH

150,000

150,000 DPWH

Brgy. Makiwalo,
Catarman, N. Samar
Gamay, N. Samar

Brgy. Campedico,
Palapag, N. Samar

Brgys. Mabaras,
Monbon & Jangtud,
Palapag, N. Samar
Brgy. Guindaulan,
Mondragon, N.
Samar

1,800,000

1,800,000 DPWH

240,000

240,000 DPWH, PGNS


1,500,000

1,500,000

DPWH, PGNS,
NDRRMC

Province of Northern Samar

56

Program/Project/Activity

Program/Project/Activity

11
12
13

Repair/Rehabilitation of
Timber Bridge

Repair/Rehabilitation of Box
Culvert
Repair/Rehabilitation of
Timber Bridge
Total for Bridges

Location

Estimated Cost (PhP)


2016

Brgys. 1 and 2,
Mondragon, N.
Samar

Rosario, N. Samar
Rosario, N. Samar

4,800,000

20,990,000

Seaports
1
2
3

Repair of Damaged Causeway


of Biri Port
Repair of Passenger Terminal
of San Isidro Ferry Terminal
Repair of Causeway of
Paninirong Port

Repair of Damaged
Causeway/Riprap of San
Antonio Port

4,285,000

Biri, N. Samar

1,933,000

San Isidro, N.
Samar

204,000

Pambujan, N.
Samar

Brgy. Vinisitahan,
San Antonio, N.
Samar

7,446,000
183,000

2018

2019

Implementing
Agency
DPWH, PGNS,
NDRRMC

4,800,000

4,800,000

1,500,000

1,500,000 LGU Rosario

7,800,000

4,800,000 LGU Rosario

28,790,000

PPA-PMO
4,285,000 Eastern Leyte/
Samar
PPA-PMO
1,933,000 Eastern Leyte/
Samar
PPA-PMO
204,000 Eastern Leyte/
Samar

PPA-PMO
7,446,000 Eastern Leyte/
Samar
PPA-PMO
183,000 Eastern Leyte/
Samar

Province of Northern Samar

Nona Rehabilitation and


57
Recovery Plan

Repair of Causeway/Riprap of
San Jose, N. Samar
San Jose Port

2017

Total

Nona Rehabilitation and


Recovery Plan

6
7
8
9
10
11
12
13
14
15
16

Location

Repair of Damaged Causeway


of Rosario Port

Brgy. Ligaya,
Rosario, N. Samar

Repair/Rehabilitation of 2
Units of Fish Ports

Brgys. Mapno
& Cabariwan,
Palapag, N. Samar

Repair/Rehabilitation of
Municipal Port of Lapinig

Repair/Rehabilitation of
Laoang Sea Port Landing

Repair/Rehabilitation of
Damaged Bridge in Palapag
Wharf

Repair/Rehabilitation of Foot
Bridge
Repair/Rehabilitation of
Seaport/Seawall
Repair/Rehabilitation of
Seaport
Repair/Rehabilitation of
Palapag Wharf
Repair/Rehabilitation of
Wharf
Repair/Rehabilitation of
Seawall
Total for Seaports

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

PPA-PMO
428,000 Eastern Leyte/
Samar

428,000

Lapinig, Northern
Samar

21,000,000
2,400,000

2,400,000 DPWH

Laoang, N. Samar

5,000,000

5,000,000 DPWH

1,169,000

1,169,000 LGU Palapag

1,700,000

1,700,000 LGU Biri

5,500,000

5,500,000 LGU San Vicente

1,200,000

1,200,000 LGU San Vicente

Brgy. Binay,
Palapag, N. Samar
Biri, N. Samar

Brgy.
Mongolbongol, San
Vicente, N. Samar
Brgy. Sangputan,
San Vicente, N.
Samar

Palapag, N. Samar
Brgy. Bani,
Lavezares, N.
Samar

Brgy. Sangputan,
San Vicente, N.
Samar

21,000,000 DPWH, PGNS

600,000

600,000 DPWH

64,000
1,400,000

54,512,000

64,000

LGU Lavezares

1,400,000 LGU San Vicente

54,512,000

Province of Northern Samar

58

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Airport
1

Catarman Airport Runway


Asphalt Overlay

Catarman, N. Samar

157,594,320

157,594,320 CAAP

Repair of Catarman Airport


Terminal Building

Catarman, N. Samar

3,014,538

3,014,538 CAAP

2
4
5
6

Expansion of Ramp Area


Repair of Signages and
Markers

Catarman, N. Samar
Catarman, N. Samar

Repair of Fire Station Building


Catarman, N. Samar
along Airport Terminal
Repair/Construction of Guard
House (3 units)
Total for Airport

Catarman, N. Samar

Total for Transportation

70,000,000
20,000

3
4

585,120 CAAP

75,000

75,000 CAAP

231,288,978

684,064,983

1,738,800,000

- 2,422,864,983

231,288,978

Repair and Rehabilitation


of Drainage Structure along
Catarman-Rawis Road,
Bagasbas-Bantayan Section

San Roque, N.
Samar

Repair and Rehabilitation of


River Control along CatubigLas Navas Road

Lapinig, N. Samar

10,000,000

10,000,000 DPWH, PGNS

Catubig, N. Samar

10,000,000

10,000,000 DPWH

Palapag, N. Samar

175,000

Repair/Rehabilitation of
Breakwater of Lapinig

Repair/Rehabilitation of
Drainage System

2,327,000

2,327,000 DPWH

175,000

Province of Northern Samar

Nona Rehabilitation and


59
Recovery Plan

20,000 CAAP

585,120

Flood Control

70,000,000 CAAP

Nona Rehabilitation and


Recovery Plan

5
6

Rehabilitation of Flood
Control
Rehabilitation of River
Control

Location
Brgys. Eco and
Chitongco,
Mondragon, N.
Samar

Brgys. Makiwalo
and Mirador,
Modragon, N.
Samar

Repair Improvement River


Control

Brgys. Sabang and


Repair/Rehabilitation of River
Looc, Allen, N.
Control
Samar

10
11
12
13
14
15
16

Repair/Rehabilitation of
Lipata Shore Protection

Brgy. 3, Rosario, N.
Samar

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

1,000,000

1,000,000 DILG, NDRRMC

1,000,000

1,000,000 DILG, NDRRMC


2,240,000

2,240,000 DILG, NDRRMC

Brgy. Lipata, Allen,


N. Samar

13,000,000

Repair/Rehabilitation of Sea
Wall

Brgy. Kinaguitman,
Allen, N. Samar

22,850,000

22,850,000 LGU Allen

17,000,000

17,000,000 LGU Allen

Repair/Rehabilitation of
Shore Protection

Brgy. Lagundi,
Allen, N. Samar

5,450,000

5,450,000 LGU Allen

Repair/Rehabilitation of
Shore Protection
Repair/Rehabilitation of
Shore Protection
Repair/Rehabilitation of
Shore Protection
Repair/Rehabilitation of
Shore Protection
Repair/Rehabilitation of
Shore Protection

Brgy. Victoria,
Allen, N. Samar

Brgy. Cabacungan,
Allen, N. Samar

Brgy. Guinarawayan, Allen, N.


Samar
Brgy. Calarayan,
Allen, N. Samar
Kinabrahan II,
Allen, N. Samar

7,300,000

13,000,000 LGU Allen

7,300,000 LGU Allen

11,000,000

11,000,000 LGU Allen

2,500,000

2,500,000 LGU Allen

4,200,000

4,200,000 LGU Allen

5,500,000

5,500,000 LGU Allen

Province of Northern Samar

60

Program/Project/Activity

Program/Project/Activity
17
18
19
20
21
22

Repair/Rehabilitation of Sea
Wall
Repair/Rehabilitation of Sea
Wall

Location
Biri, N. Samar

Brgy. Maravilla,
Lavezares, N.
Samar

Repair/Rehabilitation of River
Rosario, N. Samar
Control
Repair/Rehabilitation of Sea
Wall

Brgy. Ward 1, San


Antonio, N. Samar

Repair/Rehabilitation of
Drainage Canal

San Roque, N.
Samar

Repair/Rehabilitation of Sea
Wall

24

Construction of Sea Wall

25

Repair/rehab of breakwater

26

Construction of Sea Wall


Total for Flood Control

Brgys. Poblacion,
Dale, Lao-angan,
and Bantayan, San
Roque, N. Samar

2016

2018

2019

3,000,000

2,200,000 LGU Rosario

2,300,000

2,300,000

1,100,000

1,100,000

700,000

Poblacion, Lapinig

124,197,000

Agency

795,000 LGU Lavezares


2,200,000

3,000,000

Implementing

3,000,000 LGU Allen

795,000

Brgy. Balite, San


Jose, N. Samar

Brgy. Geratag, San


Jose, N. Samar

2017

Total

LGU San
Antonio
LGU San
Antonio

700,000 LGU San Roque


2,000,000

5,000,000 LGU San Roque

1,500,000

1,500,000 LGU San Jose

10,000,000

10,000,000 LGU-Lapinig

1,500,000

1,500,000 LGU San Jose

19,440,000

143,637,000

Province of Northern Samar

Nona Rehabilitation and


61
Recovery Plan

23

Rehabilitation of Drainage
System

Brgy. Pilar, San


Antonio, N. Samar

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Water Supply
1
2

Repair of the damaged


mainline Water System Level
II
Rehabilitation of Water
System Level 1 and 2
Total for Water Supply

Brgy. Poblacion,
Lope De Vega

Brgys. Poblacion,
Balud, Corocono
and Balnasan, San
Roque, N. Samar

1,000,000

1,000,000

LGU- Lope De
Vega

3,000,000

2,000,000

5,000,000

MLGU/DILG/
OCD/PGNS

3,000,000

3,000,000

6,000,000

Telecommunications
1
2
3
4
5

Alternative Information
Communication and
Technology (ICT)

All 24
Municipalities

Altenative
Telecommunication System

Provincial Office

300,000

Provincial Office

3,500,000

Alternative
Telecommunication System
Provision of Emergency
Communication System

Construction of AM Radio
Station (Radyo ng Bayan) to
be owned and managed by
PGNS

All 24
Municipalities

10 Barangays/
MDRRMC

Total for Telecommunications

3,800,000

4,800,000

4,800,000 LGUs

2,400,000

2,400,000 LGUs

1,000,000

1,000,000

300,000 PLGU

LGU-San
Antonio

3,500,000 PLGU
8,200,000

12,000,000

Province of Northern Samar

62

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Power Supply

Repair of Street Lights

Provision of Emergency
Generator Set/Solar Power

Power House

Rehabilitation of Street Lights

Brgy. UEP, Brgy.


Cawayan, Brgy.
Molave and Brgy.
Bangkerohan,
Catarman

3,278,000

Poblacion, San
Roque

3,000,000

San Antonio
Biri

"Catubig
"
Gamay

Lapinig
Restoration and rehabilitation
Las Navas
of distribution line:
5

Mapanas
Palapag

32,806,000
30,259,000
14,411,000
22,729,000
44,246,000

20,000,000

20,000,000
3,000,000

LGU-San
Antonio

MLGU/DILG/
OCD/PGNS

150,000,000 LGU Biri

32,806,000 NORSAMELCO
30,259,000 NORSAMELCO
14,411,000 NORSAMELCO
22,729,000 NORSAMELCO
44,246,000 NORSAMELCO

551,600,000

551,600,000 NORSAMELCO

Pambujan

35,628,000

35,628,000 NORSAMELCO

San Isidro

10,169,000

10,169,000 NORSAMELCO

Silvino Lobos
Victoria

Lavezares
Rosario

San Antonio
Capul

6,760,000
8,412,000

6,760,000 NORSAMELCO
8,412,000 NORSAMELCO

278,349,000

278,349,000 NORSAMELCO

5,602,000

5,602,000 NORSAMELCO

10,173,000
5,572,000

10,173,000 NORSAMELCO
5,572,000 NORSAMELCO

Province of Northern Samar

Nona Rehabilitation and


63
Recovery Plan

a. Massive change meter and


clustering of kwhr meter;
b. Installation of check meter
or system loss reduction;
c. Rehabilitation of substation
structure and installation
of protection equipment (3
substation)

150,000,000

3,278,000 Province

Nona Rehabilitation and


Recovery Plan

Location
San Vicente
Biri

Catarman
San Jose

Mondragon

Lope de Vega
Bobon
Allen

6
7
8
9

Proposed Rehabilitation of
Palanas Cara-Catarman 69kV
transmission line
Proposed Rehabilitation
of Catarman-Laoang 69kV
transmission line
Proposed Rehabilitation
of Catarman-Allen 69kV
transmission line portion

Proposed Calbayog-Allen
69kV transmission line loop
project
Total for Power Supply

Laoang

"Northern Samar
(whole
NORSAMELCO
Franchise)"

Estimated Cost (PhP)


2016

2017

2018

5,688,000

Implementing
Agency

5,688,000 NORSAMELCO

94,570,000

94,570,000 NORSAMELCO

119,560,000

119,560,000 NORSAMELCO

40,313,000

40,313,000 NORSAMELCO

21,658,000

21,658,000 NORSAMELCO

41,313,000

41,313,000 NORSAMELCO

14,281,000

14,281,000 NORSAMELCO

14,353,000

14,353,000 NORSAMELCO

89,847,000

89,847,000 NORSAMELCO
60,000,000

Norsamelco
(Bobolosan SubStation)

60,000,000 NGCP
25,000,000

NORSAMELCO
(Allen Sub-Station)
"Northern Samar
(whole
NORSAMELCO
Franchise)"

2019

Total

1,654,577,000

80,000,000

25,000,000

25,000,000 NGCP
200,000,000

200,000,000 NGCP

350,000,000

350,000,000 NGCP

550,000,000

2,309,577,000

Province of Northern Samar

64

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Irrigation System

1
2
3
4
5
6

Rehabilitation of Irrigation
System

Rehabilitation of Communal
Irrigation System (CIS)

Rehabilitation of Macagtas
Communal Irrigation System
(CIS)
Rehabilitation of Bobon
Irrigation Project (IP)

Rehabilitation of Cal-igang
Communal Irrigation Project
(CIP)
Rehabilitation of Bugko IP

Rehabiliation of Bantayan IP

Rehabilitation of Matambag
CIS

8
Nona Rehabilitation and
65
Recovery Plan

10

Rehabilitation of Palapag CIS

Brgy. Gengarog,
San Jose, N. Samar
Brgy. Macagtas,
Catarman, N.
Samar

5,000,000

15,000,000 LGU San Roque

2,595,560

2,595,560 NIA

2,870,000

2,870,000 NIA

Brgy. Casapinitan,
Bobon, N. Samar

13,633,000

Brgy. Mirador,
Mondragon, N.
Samar

24,225,000

24,225,000 NIA

Brgy. Bagacay,
Palapag, N. Samar

6,088,340

10,065,000

6,088,340 NIA

10,065,000 NIA

14,062,500

14,062,500 NIA

Brgy. Salvacion,
Catarman, N.
Samar

Brgy. Lawaan, San


Roque, N. Samar
Brgy. Matambag,
Palapag, N. Samar

Rehabilitation of Mapanas CIS Mapanas, N. Samar


Total for Irrigation System

10,000,000

13,633,000 NIA
3,720,000

16,082,500
94,156,340

3,720,000 NIA

16,082,500 NIA
14,185,560

108,341,900

Province of Northern Samar

Brgys. Zone 3,
Balud, Coroconog,
and Balnasan, San
Roque, N. Samar

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Tourism Infrastructure
1
2
3
4
5
6

Structural Retrofitting Works


for the Biri Tourism Office
Construction of a Provincial
Tourism Exhibition and
Convention Center/
Evacuation Center

Construction of Signages in 3
Tourism Areas

Biri, N. Samar

Capitol Grounds,
Catarman, N.
Samar

Laoang, Biri, and


Capul, N. Samar

Repair/Rehabilitation of Light Brgy. Marubay,


House in Batag Island
Laoang, N. Samar
Tourism Office Building

Biri, N. Samar

Repair/Rehabilitation of Light
Capul, N. Samar
House in Capul Island
Total for Tourism Infrastructure

100,000

100,000 PGNS
10,000,000

10,000,000

20,000,000 PGNS

180,000

180,000 PGNS

26,664,000

26,664,000 PGNS

7,000,000

7,000,000 PGNS

100,000

34,044,000

100,000 LGU Biri

10,000,000

10,000,000

54,044,000

State University and Colleges (SUCs)


1

Repair/Rehabilitation of Damaged Buildings of University of Eastern Philippines (UEP)


Administration Building (Left
Wing)

Catarman, N.
Samar

2,200,000

2,200,000 UEP, CHED

Administration Building
(Center)

Catarman, N.
Samar

300,000

300,000 UEP, CHED

Administration Building
(Right Wing)
Warehouse Building

Catarman, N.
Samar
Catarman, N.
Samar

1,800,000

200,000

1,800,000 UEP, CHED

200,000 UEP, CHED

Province of Northern Samar

66

Program/Project/Activity

Program/Project/Activity
Machinery Dept. Building

Flagpole & Landscaping at


the University Management
Center
Kapihan
Hostel

Ladies Dormitory (Old)

Ladies Dormitory (New)

University Business Arcade


Medical Dental Clinic

UEP Holticulture Center


UEP Petron

Center for Advance Studies


Building
Water Refilling Station

Fisheries Laboratory Building

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Catarman, N.
Samar

800,000

800,000 UEP, CHED

Catarman, N.
Samar

150,000

150,000 UEP, CHED

500,000

500,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar

4,000,000

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

1,500,000

100,000

1,000,000

2,000,000

Catarman, N.
Samar

1,400,000

Catarman, N.
Samar

1,600,000

Catarman, N.
Samar

250,000

600,000 UEP, CHED


100,000 UEP, CHED

1,500,000 UEP, CHED


1,000,000 UEP, CHED

300,000

Catarman, N.
Samar
Catarman, N.
Samar

600,000

4,000,000 UEP, CHED

300,000 UEP, CHED

750,000

2,000,000 UEP, CHED


750,000 UEP, CHED

1,400,000 UEP, CHED


250,000 UEP, CHED

1,600,000 UEP, CHED

Province of Northern Samar

Nona Rehabilitation and


67
Recovery Plan

UEP-Grameen Building

Location

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

Fisheries Classroom Building

Catarman, N.
Samar

Hatchery

Catarman, N.
Samar

1,500,000

Catarman, N.
Samar

800,000

Fisheries Dept. Perimeter


Fence
Research Building 1
Research Building 2

White Beach Entrance/Guard


House
White Beach Pavillion

White Beach VIP Cottages


White Beach Overnight
Cottages
White Beach HRM Lab.
Cottages

White Beach Swimming Pool


structures
White Beach Stall

ILWARM Building
CVM Laboratory
CVM Hospital

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

2017
1,500,000
200,000

1,200,000

200,000

2018

2019

Total

Implementing
Agency

1,500,000 UEP, CHED


200,000 UEP, CHED

1,500,000 UEP, CHED


1,200,000 UEP, CHED
800,000 UEP, CHED
200,000 UEP, CHED

1,600,000

1,600,000 UEP, CHED

Catarman, N.
Samar

1,800,000

1,800,000 UEP, CHED

Catarman, N.
Samar

1,200,000

1,200,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

150,000

1,200,000

350,000
500,000
150,000
100,000

150,000 UEP, CHED

1,200,000 UEP, CHED

350,000 UEP, CHED


500,000 UEP, CHED
150,000 UEP, CHED
100,000 UEP, CHED

Province of Northern Samar

68

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

CVM Classrooms & Offices

Catarman, N.
Samar

2,000,000

2,000,000 UEP, CHED

Covered Walk infront of


Admin. Bldg.

Catarman, N.
Samar

650,000

650,000 UEP, CHED

CVM Diagnostic and


Pathology Bldg.

College of Law Building


College of Law Building
(New)
OSA Complex

Farmer's Training Center


Tennis Court

Sports Director's Office


Grand Stand-1

Nona Rehabilitation and


69
Recovery Plan

Grand Stand-3
Grand Stand-4
Gymnatorium

Volley Ball Court

350,000

350,000 UEP, CHED

Catarman, N.
Samar

1,600,000

1,600,000 UEP, CHED

Catarman, N.
Samar

2,800,000

2,800,000 UEP, CHED

Catarman, N.
Samar

200,000

200,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

650,000

800,000

250,000

Catarman, N.
Samar

Catarman, N.
Samar
Catarman, N.
Samar

800,000 UEP, CHED

250,000 UEP, CHED

700,000

700,000 UEP, CHED

200,000

Catarman, N.
Samar
Catarman, N.
Samar

650,000 UEP, CHED

200,000 UEP, CHED

200,000

3,000,000

200,000 UEP, CHED

100,000

100,000 UEP, CHED

150,000

3,000,000 UEP, CHED


150,000 UEP, CHED

Province of Northern Samar

Grand Stand-2

Catarman, N.
Samar

Nona Rehabilitation and


Recovery Plan

Location

Covered Walk (Fr: Mag. Park


to Acad. Lane)

Catarman, N.
Samar

CBA Building

Catarman, N.
Samar

COED Building

CBA Annex Building

Samar Studies Center


CAC Building

CAC Annex Building

Main Library Building


Main Library Annex
ULES Building

KLC Classrooms

Univ. Business Stalls (Infront


of CAC)
ULHS Classrooms
ULHS Stage

ADFC Classroom Building

Estimated Cost (PhP)


2016

2017

2018

2019
750,000

Total

Implementing
Agency

750,000 UEP, CHED

Catarman, N.
Samar

1,000,000

1,000,000 UEP, CHED

Catarman, N.
Samar

750,000

750,000 UEP, CHED

1,800,000

Catarman, N.
Samar

1,800,000

Catarman, N.
Samar

1,800,000

Catarman, N.
Samar

1,200,000

Catarman, N.
Samar

3,500,000

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

1,200,000

850,000

2,000,000

1,800,000 UEP, CHED

1,800,000 UEP, CHED


1,200,000 UEP, CHED
1,800,000 UEP, CHED
3,500,000 UEP, CHED
1,200,000 UEP, CHED
2,000,000 UEP, CHED
850,000 UEP, CHED

Catarman, N.
Samar

1,200,000

1,200,000 UEP, CHED

Catarman, N.
Samar

300,000

300,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar

2,000,000

600,000

2,000,000 UEP, CHED

600,000 UEP, CHED

Province of Northern Samar

70

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

College of Engineering
Building

Catarman, N.
Samar

2,600,000

2,600,000 UEP, CHED

Coco Coir Building

Catarman, N.
Samar

150,000

150,000 UEP, CHED

Criminology Dept. Building

Voc-Tech Building

Industrial Arts Building

Engineering Laboratory
Building

Computer Studies Center


Electrical Dept. Building
College of Agriculture
Building
Amphitheater Stage

Nona Rehabilitation and


71
Recovery Plan

DMST Building

Bio-Physical Complex
Building

Environmental Science
Building
CS Covered Walk

2,000,000

2,000,000 UEP, CHED

Catarman, N.
Samar

1,200,000

1,200,000 UEP, CHED

Catarman, N.
Samar

150,000

150,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

600,000

700,000

600,000 UEP, CHED

850,000

700,000 UEP, CHED


850,000 UEP, CHED

Catarman, N.
Samar

1,000,000

1,000,000 UEP, CHED

Catarman, N.
Samar

50,000

50,000 UEP, CHED

Catarman, N.
Samar

550,000

550,000 UEP, CHED

Catarman, N.
Samar

1,800,000

1,800,000 UEP, CHED

Catarman, N.
Samar

1,000,000

1,000,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar

2,000,000

450,000

2,000,000 UEP, CHED

450,000 UEP, CHED

Province of Northern Samar

College of Science Lab.

Catarman, N.
Samar

Nona Rehabilitation and


Recovery Plan

Location

Diagnostic Laborartory
Building

Catarman, N.
Samar

NAL Building

Catarman, N.
Samar

College of Nursing Building

Practice House Building

Technology and Livelihood


Building
Clonal Nursery Complex

Forestry Classroom Building


Piggery Building
Poultry

NORSARC

Abaca Stripping Machine

Electrical Lines, Fixtures and


Post
Government Cottages
(Australian Village)

Old Engineering Building


Library Building

Estimated Cost (PhP)


2016

2017

2018

2019
400,000

Catarman, N.
Samar

250,000

2,500,000

Total

Implementing
Agency

400,000 UEP, CHED

2,500,000 UEP, CHED


250,000 UEP, CHED

Catarman, N.
Samar

3,000,000

3,000,000 UEP, CHED

Catarman, N.
Samar

1,200,000

1,200,000 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar

200,000

2,500,000

200,000 UEP, CHED

2,500,000 UEP, CHED

Catarman, N.
Samar

500,000

Catarman, N.
Samar

1,500,000

1,500,000 UEP, CHED

Catarman, N.
Samar

3,500,000

3,500,000 UEP, CHED

133,269

133,269 UEP, CHED

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

Laoang, N. Samar
Laoang, N. Samar

250,000

100,000

3,500,000
690,576

500,000 UEP, CHED


250,000 UEP, CHED

100,000 UEP, CHED

3,500,000 UEP, CHED


690,576 UEP, CHED

Province of Northern Samar

72

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Engineering Office

Laoang, N. Samar

751,915

751,915 UEP, CHED

Covered Walk

Laoang, N. Samar

664,909

664,909 UEP, CHED

Criminology Building
COED Building

Physical Education Building


Quadrangle Hall

Three-Unit Bleachers
Cafeteria Building
L-Shape Building

Executive Building

Function Hall (Fishpond)


Cottage (Fishpond)
New CIT Building
ULHS Building

Administration Building
Criminology Building
(Classrooms)

HRM Building (Classrooms)


Education Building
(Classrooms)

Laoang, N. Samar
Laoang, N. Samar

294,789
649,266

Laoang, N. Samar

147,251 UEP, CHED


994,080 UEP, CHED
175,854 UEP, CHED

494,485

Laoang, N. Samar

494,485 UEP, CHED

400,000

Laoang, N. Samar

120,000

Laoang, N. Samar
Laoang, N. Samar

400,000 UEP, CHED


130,000
150,000

Laoang, N. Samar

70,000

Laoang, N. Samar

100,000

Catubig, N. Samar

116,625

Catubig, N. Samar

276,105

Catubig, N. Samar

147,251
175,854

Laoang, N. Samar

Catubig, N. Samar

649,266 UEP, CHED

994,080

Laoang, N. Samar

Laoang, N. Samar

294,789 UEP, CHED

604,375
271,820

30,000

120,000 UEP, CHED


130,000 UEP, CHED
150,000 UEP, CHED
70,000 UEP, CHED

100,000 UEP, CHED


30,000 UEP, CHED

116,625 UEP, CHED


604,375 UEP, CHED
276,105 UEP, CHED
271,820 UEP, CHED

Province of Northern Samar

Nona Rehabilitation and


73
Recovery Plan

Flag Pole

Laoang, N. Samar

Nona Rehabilitation and


Recovery Plan

Location

Agriculture Building
(Classrooms)

Catubig, N. Samar

Gymnatorium

Catubig, N. Samar

Computer Room

Material Recovery Facilities


Piggery Building
Rice Granary
Grandstand

Library Building
Cottages

ULHS Building

Hostel Building

Estimated Cost (PhP)


2016

2017
271,820

Catubig, N. Samar

2018

108,735

583,026 UEP, CHED


16,310 UEP, CHED

54,000

Catubig, N. Samar

104,990

Catubig, N. Samar
Catubig, N. Samar

54,000 UEP, CHED

583,115
583,095

Catubig, N. Samar

33,115

Catubig, N. Samar

Sub Total for Repair/Reconstruction

108,735 UEP, CHED

16,310

Catubig, N. Samar

170,440
5,200,000

63,975,469

24,498,732

Implementing
Agency

271,820 UEP, CHED

583,026

Catubig, N. Samar

Catubig, N. Samar

2019

Total

27,150

16,926,915

104,990 UEP, CHED


583,115 UEP, CHED
583,095 UEP, CHED
33,115 UEP, CHED

170,440 UEP, CHED


27,150 UEP, CHED

110,601,115

Province of Northern Samar

74

Program/Project/Activity

Program/Project/Activity
2

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Construction of New Buildings


Concrete Products &
Woodworks

Catarman, N.
Samar

ULES Stage

Catarman, N.
Samar

Function Hall (White Beach,


West Side)
Kamalig

Catarman, N.
Samar

450,000

Catarman, N.
Samar

500,000

850,000

850,000 UEP, CHED

400,000

400,000 UEP, CHED

450,000 UEP, CHED

500,000 UEP, CHED

3-storey Men's Residence Hall Catarman, N.


- Phase I
Samar

40,000,000

40,000,000 UEP, CHED

3-storey Annex Admin. Bldg.


- P-I

20,000,000

20,000,000 UEP, CHED

Refurbishing/upgrading of
Acad. Lib. - P-I

Catarman, N.
Samar

Proposed Evacuation Building

Catarman, N.
Samar

Sub Total for New Construction

Total for UEP

15,000,000

Catarman, N.
Samar
450,000

5,650,000

90,000,000

165,500,000

229,475,469

15,000,000 UEP, CHED

1,250,000

25,748,732

16,926,915

90,000,000 UEP, CHED

167,200,000

277,801,115

Province of Northern Samar

Nona Rehabilitation and


75
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Government Buidlings
1

Repair/Reconstruction of Damaged Government Buildings

1.1 Barangay Halls

Repair/Rehabilitation of
Alejandro Brgy. Hall

Allen, N. Samar

102,000

102,000

DILG, PGNS,
LGU Allen

Repair/Rehabilitation of
Calarayan Brgy. Hall

Allen, N. Samar

195,000

195,000

DILG, PGNS,
LGU Allen

Repair/Rehabilitation of
Cabacungan Brgy. Hall
Repair/Rehabilitation of
Frederick Brgy. Hall

Repair/Rehabilitation of
Guin-Arawayan Brgy. Hall
Repair/Rehabilitation of
Imelda Brgy. Hall
Repair/Rehabilitation of
Kinabrahan Brgy. Hall
Repair/Rehabilitation of
Lagundi Brgy. Hall
Repair/Rehabilitation of
Lipata Brgy. Hall
Repair/Rehabilitation of
Barangay Hall

Repair/Rehabilitation of San
Juan Brgy. Hall
Repair/Rehabilitation of 24
Units of Barangay Hall

Allen, N. Samar

Allen, N. Samar
Allen, N. Samar
Allen, N. Samar
Allen, N. Samar
Allen, N. Samar
Allen, N. Samar
Biri, N. Samar
Lavezares, N.
Samar

Mondragon, N.
Samar

195,000

163,000
164,000
163,000
163,000
163,000
156,000
700,000
220,000

4,049,394

195,000

163,000
164,000
163,000
163,000
163,000
156,000
700,000
220,000

4,049,394

DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Biri

DILG, PGNS,
LGU Lavezares

DILG, PGNS,
LGU Mondragon

Province of Northern Samar

76

Program/Project/Activity

Program/Project/Activity

Location

Repair/Rehabilitation of 4
Units of Barangay Hall

San Jose, N. Samar

Repair/Rehabilitation of
Aguinaldo Brgy. Hall

Catarman, N.
Samar

Repair/Rehabilitation of 16
Units of Barangay Hall
Repair/Rehabilitation of
Bangkerohan Brgy. Hall
Repair/Rehabilitation of
Baybay Brgy. Hall
Repair/Rehabilitation of
Bocsol Brgy. Hall
Repair/Rehabilitation of
Cabayhan Brgy. Hall

Repair/Rehabilitation of Cagabaca Brgy. Hall


Repair/Rehabilitation of
Calachuci Brgy. Hall
Repair/Rehabilitation of
Casoy Brgy. Hall
Repair/Rehabilitation of
Cervantes Brgy. Hall
Repair/Rehabilitation of
Cularima Brgy. Hall

Repair/Rehabilitation of
Daganas Brgy. Hall

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

2016
461,270

2017

2018

2019

Total

DILG, PGNS,
LGU San Jose

175,526

DILG, PGNS,
LGU Catarman

4,500,000

182,557

182,557

196,600
102,396
72,000

196,600
102,396
72,000

Catarman, N.
Samar

276,538

276,538

Catarman, N.
Samar

93,619

93,619

Catarman, N.
Samar

196,600

196,600

Catarman, N.
Samar

224,686

224,686

Catarman, N.
Samar

140,429

140,429

Catarman, N.
Samar

Catarman, N.
Samar

234,049

280,000

Agency

461,270

4,500,000
175,526

Implementing

234,049

280,000

DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

DILG, PGNS,
LGU Catarman

Province of Northern Samar

Nona Rehabilitation and


77
Recovery Plan

Repair/Rehabilitation of
Cawayan Brgy. Hall

San Roque, N.
Samar

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Repair/Rehabilitation of
Dalakit Brgy. Hall

Catarman, N.
Samar

210,643

210,643

DILG, PGNS,
LGU Catarman

Repair/Rehabilitation of
Galutan Brgy. Hall

Catarman, N.
Samar

280,858

280,858

DILG, PGNS,
LGU Catarman

Repair/Rehabilitation of
Donya Polqueria Brgy. Hall
Repair/Rehabilitation of
Gebalangan Brgy. Hall
Repair/Rehabilitation of
Gebulwangan Brgy. Hall

Repair/Rehabilitation of
General Malvar Brgy. Hall

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

Repair/Rehabilitation of Guba Catarman, N.


Brgy. Hall
Samar
Repair/Rehabilitation of
Hinatad Brgy. Hall

Catarman, N.
Samar

Repair/Rehabilitation of Ipilipil Brgy. Hall

Catarman, N.
Samar

Repair/Rehabilitation of
Imelda Brgy. Hall

Repair/Rehabilitation of J.
Abad Santos Brgy. Hall

Repair/Rehabilitation of J. P.
Rizal Brgy. Hall
Repair/Rehabilitation of
Lapu-lapu Brgy. Hall

Repair/Rehabilitation of
Liberty Brgy. Hall

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

Catarman, N.
Samar

224,686

140,429
175,536
140,429
140,429
140,429
140,429
140,429
140,429
140,429
140,429

140,429

224,686

140,429
175,536
140,429
140,429
140,429
140,429
140,429
140,429
140,429
140,429

140,429

DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

DILG, PGNS,
LGU Catarman

Province of Northern Samar

78

Program/Project/Activity

Estimated Cost (PhP)

Implementing

Program/Project/Activity

Location

Repair/Rehabilitation of
Libjo Brgy. Hall

Catarman, N.
Samar

312,064

312,064

DILG, PGNS,
LGU Catarman

Repair/Rehabilitation of
Macagtas Brgy. Hall

Catarman, N.
Samar

280,858

280,858

DILG, PGNS,
LGU Catarman

Repair/Rehabilitation of
Mabini Brgy. Hall
Repair/Rehabilitation of
McKinley Brgy. Hall
Repair/Rehabilitation of
Molave Brgy. Hall
Repair/Rehabilitation of
New Rizal Brgy. Hall
Repair/Rehabilitation of
Old Rizal Brgy. Hall
Repair/Rehabilitation of
Paticua Brgy. Hall
Repair/Rehabilitation of
Polangi Brgy. Hall
Repair/Rehabilitation of
Salvacion Brgy. Hall
Repair/Rehabilitation of
San Julian Brgy. Hall
Repair/Rehabilitation of
San Pascual Brgy. Hall

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

2017

140,429

210,643
218,445
315,964
175,536
140,428
140,428
140,428
140,428
140,428
117

2018

2019

Agency

140,429

210,643
218,445
315,964
175,536
140,428
140,428
140,428
140,428
140,428
117

DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

Province of Northern Samar

Nona Rehabilitation and


79
Recovery Plan

Repair/Rehabilitation of
Quezon Brgy. Hall

Catarman, N.
Samar

2016

Total

Nona Rehabilitation and


Recovery Plan

Repair/Rehabilitation of
Somoge Brgy. Hall

Repair/Rehabilitation of
Talisay Brgy. Hall
Repair/Rehabilitation of
Tinowaran Brgy. Hall
Repair/Rehabilitation of
Trangue Brgy. Hall
Repair/Rehabilitation of
UEP-Zone 1 Brgy. Hall
Repair/Rehabilitation of
UEP-Zone 2 Brgy. Hall
Repair/Rehabilitation of
UEP-Zone 3 Brgy. Hall
Repair/Rehabilitation of
Washington Brgy. Hall

Repair/Rehabilitation of
16 Units of Barangay Hall
Sub Total Barangay Halls

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Catarman, N.
Samar

140,428

140,428

Catarman, N.
Samar

343,270

343,270

140,428

140,428

140,428

140,428

Catarman, N.
Samar

78,016

78,016

187,238

187,238

Catarman, N.
Samar

70,214

70,214

175,426

175,426

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

San Roque, N.
Samar

4,500,000
23,997,321

Implementing
Agency

DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

DILG, PGNS,
4,500,000 LGU San
Roque

23,997,321

Province of Northern Samar

80

Program/Project/Activity

Program/Project/Activity
1.2 Day Care Centers

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Repair/Rehabilitation of
Alejandro DayCare Center

Allen, N. Samar

102,000

102,000

DILG, PGNS,
LGU Allen

Repair/Rehabilitation of
Frederick Day Care Center

Allen, N. Samar

163,000

163,000

DILG, PGNS,
LGU Allen

Repair/Rehabilitation of
Cabacungan Day Care Center

Allen, N. Samar

Repair/Rehabilitation of GuinAllen, N. Samar


Arawayan Day Care Center
Repair/Rehabilitation of
Imelda Day Care center

Allen, N. Samar

Repair/Rehabilitation of Day
Care Centers

Biri, N. Samar

Repair/Rehabilitation of Day
Care Center Kinabranan 1
Repair/Rehabilitation of Day
Care Center of Brgy. Pilar

Nona Rehabilitation and


81
Recovery Plan

Repair/Rehabilitation of
Day Care Center of Brgy.
Caglanipao Alegria

Repair/Rehabilitation of
Aguinaldo Day Care Center
Repair/Rehabilitation of
Airport Day Care Center

San Antonio, N.
Samar
San Antonio, N.
Samar
San Isidro, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

163,000
163,000
163,000

1,200,000
195,000
163,000
456,300

163,000

163,000
163,000
163,000

1,200,000

DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Biri

DILG, PGNS,
195,000 LGU San
Antonio
DILG, PGNS,
163,000 LGU San
Antonio
456,300

172,800

172,800

100,000

100,000

DILG, PGNS,
LGU San Isidro
DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

Province of Northern Samar

Repair/Rehabilitation of Day
Care Center of Brgy. Dalupirit

Allen, N. Samar

163,000

Nona Rehabilitation and


Recovery Plan

Repair/Rehabilitation of

Location
Catarman, N.

Bangkerohan Day Care Center Samar


Repair/Rehabilitation of
Bocsol Day Care Center

Repair/Rehabilitation of Cagabaca Day Care Center

Repair/Rehabilitation of

Calachuchi Day Care Center

Repair/Rehabilitation of Caligang Day Care Center

Repair/Rehabilitation of

Cawayan Day Care Center


Repair/Rehabilitation of
Imelda Day Care Center

Repair/Rehabilitation of
Mabini Day Care Center

Repair/Rehabilitation of

Macagtas Day Care Center

Repair/Rehabilitation of Old
Rizal Day Care Center

Repair/Rehabilitation of
Paticua Day Care Center

Repair/Rehabilitation of
Talisay Day Care Center

Repair/Rehabilitation of UEP
Zone-1 Day Care Center

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Estimated Cost (PhP)


2016
172,800
102,396
157,500
120,000
172,800
172,800
126,000

2017

2018

2019

Total
172,800
102,396
157,500
120,000
172,800
172,800
126,000

140,429

140,429

168,000

168,000

72,000

72,000

105,000

105,000

172,800

172,800

72,000

72,000

Implementing
Agency
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman

Province of Northern Samar

82

Program/Project/Activity

Program/Project/Activity
Repair/Rehabilitation of UEP
Zone-2 Day Care Center

Repair/Rehabilitation of UEP
Zone-3 Day Care Center

Repair/Rehabilitation of 31
Units of Day Care Centers

Repair/Rehabilitation of 18
Units of Day Care Centers

Repair/Rehabilitation of 29
Units of Day Care Centers

Repair/Rehabilitation of 34
Units of Day Care Centers

Repair/Rehabilitation of 3
Units Day Care Centers

Units Day Care Centers

Repair/Rehabilitation of 2
Units Day Care Centers

Repair/Rehabilitation of
24 Units Day Care Centers

Catarman, N.
Samar

Catarman, N.
Samar

Lope de Vega, N.
Samar

San Roque, N.
Samar

Bobon, N. Samar
Mondragon, N.
Samar

Brgys. Lapinig del


Norte, Potong del
Sur, and Mabini,

Lapinig, N. Samar

Estimated Cost (PhP)


2016
172,800
172,800

2017

2018

2019

Total
172,800
172,800

Norte, Manaybanay,
E. Laodenio, Del

Sur, Jubasan, and &


Magsaysay, Gamay,
N. Samar

Catubig, N. Samar

Pambujan, N.
Samar

Agency
DILG, PGNS,

LGU Catarman
DILG, PGNS,

LGU Catarman
DILG, PGNS,

2,733,681

2,733,681 LGU Lope de

1,516,631

1,516,631

1,680,000
3,859,452

1,680,000
3,859,452

1,217,000

1,217,000

2,246,000

2,246,000

600,000

600,000

Brgys. Magtaon,

Sta. Potenciana, Del

Implementing

3,370,300

3,370,300

Vega

DILG, PGNS,

LGU San Roque


DILG, PGNS,
LGU Bobon

DILG, PGNS,

LGU Mondragon
DILG, PGNS,

LGU Lapinig

DILG, PGNS,
LGU Gamay

DILG, PGNS,

LGU Catubig

DILG, PGNS,
LGU Pambujan

Province of Northern Samar

Nona Rehabilitation and


83
Recovery Plan

Repair/Rehabilitation of 8

Location

Nona Rehabilitation and


Recovery Plan

Repair/Rehabilitation of 58
Units Day Care Centers

Sub Total Day Care Centers

Location
Laoang, N. Samar

1.3 543rd Engineering Construction Brigade Facilities

Estimated Cost (PhP)


2016
14,456,000

36,983,288

2017

2018

Total

2019

14,456,000

36,983,288

Implementing
Agency
DILG, PGNS,
LGU Laoang

Administration Building

Catarman, N.
Samar

2,172,130

2,172,130 AFP-PA

Ammo Dump

Catarman, N.
Samar

708,850

708,850 AFP-PA

Medical and Dental Office

Kalipayan Hall

82nd DRC Barracks


EP Barracks

Motorpool Shed
BDE Bleacher
BDE Cabana
Safe House

Training Barracks

Catarman, N.
Samar
Catarman, N.
Samar

822,780
962,020

822,780 AFP-PA
962,020 AFP-PA

Catarman, N.
Samar

2,453,140

2,453,140 AFP-PA

Catarman, N.
Samar

3,037,320

3,037,320 AFP-PA

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

1,044,290
3,200,000
1,012,440
1,500,000
3,504,600

1,044,290 AFP-PA
3,200,000 AFP-PA
1,012,440 AFP-PA
1,500,000 AFP-PA
3,504,600 AFP-PA

Province of Northern Samar

84

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Catarman, N.
Samar

1,420,000

1,420,000 AFP-PA
60,000 AFP-PA

Procurement of Chainsaw

Catarman, N.
Samar

60,000

Catarman, N.
Samar

70,000

70,000 AFP-PA

220,000

220,000 AFP-PA

Catarman, N.
Samar

120,000

120,000 AFP-PA

4,300,000

4,300,000 AFP-PA

Catarman, N.
Samar

2,800,000

2,800,000 AFP-PA

2,900,000

2,900,000 AFP-PA

1,000,000

1,000,000 AFP-PA

Provision of Workers Hand


Tools

Procurement of Generator Set


Procurement of Welding
Machine

Procurement of Wheeled
Back Hoe
Procurement of 2 Dump
Trucks

Procurement of Wheeled
Scoop Loader
Nona Rehabilitation and
85
Recovery Plan

Procurement of Tractor Dozer


Buildings Facilities,
Quarter Master and Signal
Equipments

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Catarman, N.
Samar

Brgy. Rawis,
Laoang, N. Samar

Sub Total for 543rd Engineering Construction


Brigade

3,000,000

36,307,570

3,000,000 AFP-PA

36,307,570

Province of Northern Samar

Provision of Workers Safety


Equipments

Nona Rehabilitation and


Recovery Plan

Location

1.4 Public Markets

Repair/Rehabilitation of Allen
Allen, N. Samar
Public Market

Market Tienda (2-storey)

Repair/Rehabilitation of San
Jose Public Market
Repair/Rehabilitation of
Mondragon Public Market
Repair/Rehabilitation of
Lapinig Public Market

Repair/Rehabilitation of
Pambujan Public Market

Pambujan Market Tienda

Total for Public Markets

2019

4,558,680

4,558,680

San Roque, N.
Samar

2,100,000

2,100,000

Catarman, N.
Samar

Market Tienda (1-storey)

2018

Catarman, N.
Samar

Catarman Market Tienda

Repair/Rehabilitation of Dry
Market

2017

13,000,000

Biri, N. Samar

Repair/Rehabilitation of Wet
Market

2016

Total

13,000,000

Repair/Rehabilitation of Biri
Public Market
Catarman Wet Market (1, 2,
and 3)

Estimated Cost (PhP)

San Roque, N.
Samar
San Roque, N.
Samar
San Roque, N.
Samar

San Jose, N. Samar


Mondragon, N.
Samar

Lapinig, N. Samar
Pambujan, N.
Samar
Pambujan, N.
Samar

200,000

200,000

3,600,000

3,600,000

900,000

900,000

800,000

800,000

900,000

900,000

489,600

489,600

2,475,000

2,475,000

315,000

315,000

819,168

562,500

30,719,948

819,168

562,500

30,719,948

Implementing
Agency

DILG, PGNS,
LGU Allen
DILG, PGNS,
LGU Biri

DILG, PGNS,
LGU Catarman
DILG, PGNS,
LGU Catarman

DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU San Jose

DILG, PGNS,
LGU Mondragon
DILG, PGNS,
LGU Lapinig

DILG, PGNS,
LGU Pambujan
DILG, PGNS,
LGU Pambujan

Province of Northern Samar

86

Program/Project/Activity

Program/Project/Activity
1.5 Municipal Buildings/Halls

Location

Relocation Mitigation of Allen


Municipal Building

Allen, N. Samar

Repair/Rehabilitation of
Capul Municipal Building

Capul, N. Samar

Repair/Rehabilitation of Biri
Municipal Building
Repair/Rehabilitation of
Rosario Municipal Building

Repair/Rehabilitation of San
Isidro Municipal Building
Repair/Rehabilitation of San
Vicente Municipal Building
Repair/Rehabilitation of San
Vicente Municipal Building

Nona Rehabilitation and


87
Recovery Plan

Repair/Rehabilitation of
Bobon Municipal Building
Repair/Rehabilitation of
Mondragon Municipal
Building

Repair/Rehabilitation of
Gamay Municipal Building

Rosario, N. Samar
San Isidro, N.
Samar

San Vicente, N.
Samar
Catarman, N.
Samar

San Roque, N.
Samar

Bobon, N. Samar
Mondragon, N.
Samar

Gamay, N. Samar

2016

2017

2018

2019

Total

Implementing
Agency

12,000,000

12,000,000

DILG, PGNS,
LGU Allen

1,100,000

1,100,000

DILG, PGNS,
LGU Capul

360,000

360,000

650,000

1,170,000

950,000

650,000

1,170,000

DILG, PGNS,
LGU Rosario

DILG, PGNS,
LGU San Isidro

DILG, PGNS,
950,000 LGU San
Vicente

2,995,814

2,995,814

230,000

230,000

234,048

DILG, PGNS,
LGU Biri

234,048

5,470,872

5,470,872

585,120

585,120

DILG, PGNS,
LGU Catarman

DILG, PGNS,
LGU San Roque
DILG, PGNS,
LGU Bobon

DILG, PGNS,
LGU Mondragon

DILG, PGNS,
LGU Gamay

Province of Northern Samar

Repair/Rehabilitation of San
Roque Municipal Building

Biri, N. Samar

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Repair/Rehabilitation of
Mapanas Municipal Building

Mapanas, N. Samar

Repair/Rehabilitation of
Pambujan Municipal Building

Repair/Rehabilitation of Las
Navas Municipal Building

Repair/Rehabilitation of
Laoang Municipal Building

Estimated Cost (PhP)


2016

2017

2018

Total

2019

2,194,200

2,194,200

Pambujan, N.
Samar

195,000

195,000

1,506,000

1,506,000

Laoang, N. Samar

2,000,000

2,000,000

Las Navas, N.
Samar

Sub Total Municipal Buildings/Halls

31,641,054

31,641,054

Implementing
Agency
DILG, PGNS,
LGU Mapanas

DILG, PGNS,
LGU Las Navas

DILG, PGNS,
LGU Pambujan
DILG, PGNS,
LGU Laoang

Province of Northern Samar

88

Program/Project/Activity

Program/Project/Activity

Location

1.6 Buildings of National Line Agencies


Renovation of DOST PSTCNothern Samar Building

UEP Village,
Catarman, N.
Samar

Repair/Rehabilitation of PNP
Station

Biri, N. Samar

Repair/Rehabilitation of
COMELEC Office

Repair/Rehabilitation of PNP
Building
Repair/Rehabilitation of Fire
Station Building
Repair/Rehabilitation of
Catarman Fire Station
Repair/Rehabilitation of
Catarman PNP Office
Repair/Rehabilitation of
Catarman Municipal Jail
Repair/Rehabilitation of
DSWD Building

Repair/Rehabilitation of Fire
Station Building

Repair/Rehabilitation of
PNP Building

Rosario, N. Samar
San Isidro, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

San Jose, N. Samar


Bobon. N. Samar
Gamay, N. Samar

Mapanas, N.
Samar

2016

1,500,000

2017

2018

2019

Total

Implementing
Agency

1,500,000 DOST

100,000

100,000 COMELEC

612,000

612,000 DILG

110,000

273,487
40,958

110,000 DILG

273,487 DILG
40,958 DILG

1,067,259

1,067,259 DILG

10,000

10,000 DILG

526,608

57,500

950,000

1,169,000

526,608 DILG

57,500 DSWD

950,000 DILG

1,169,000 DILG

Province of Northern Samar

Nona Rehabilitation and


89
Recovery Plan

Repair/Rehabilitation of San
Jose Fire Station

Biri, N. Samar

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Repair/Rehabilitation of NFA
Building

Mapanas, N. Samar

Repair/Rehabilitation of
Coast Guard Sub-Station
Office/Barracks

Brgy. Baybay,
Laoang, N. Samar

Repair/Rehabilitation of Fire
Station Building

Repair/Upgrading of DOH
Office (with Conference
Room)

Estimated Cost (PhP)

Location

2016

Sub Total for Buildings of National Line


Agencies

Biri, N. Samar

Repair/Rehabilitation of
Stage

Catarman, N.
Samar

Repair/Rehabilitation of
Rayhak Catarman Building

Repair/Rehabilitation of
Waiting Shed
Repair/Rehabilitation of
Stage

Catarman, N.
Samar

Brgy. Aguinaldo,
Catarman, N.
Samar

Brgy. Bangkerohan,
Catarman, N.
Samar

2019

Implementing
Agency

380,000 NFA

5,000,000

5,000,000 DILG

153,021

153,021 PCG

15,000,000

15,000,000 DOH

26,949,833

1.7 Parks, Civic Centers, and other Public Areas/Buildings


Repair/Rehabilitation of
Waiting Shed

2018

380,000

Brgy. Little Vinece,


Laoang, N. Samar

Catarman, N.
Samar

2017

Total

400,000

26,949,833

400,000 LGU Biri

2,000,000

2,000,000 LGU Catarman

14,400

14,400 LGU Catarman

57,600

57,600 LGU Catarman

72,000

72,000 LGU Catarman

Province of Northern Samar

90

Program/Project/Activity

Program/Project/Activity
Repair/Rehabilitation of
Covered Court
Repair/Rehabilitation of
Covered Court
Repair/Rehabilitation of
Covered Court

Repair/Rehabilitation of 2
Units of Covered Courts
Repair/Rehabilitation of
Multi-Purpose Building
Repair/Rehabilitation of
Waiting Shed
Repair/Rehabilitation of
Farmer's Center

Repair/Rehabilitation of
Municipal Covered Court
Repair/Rehabilitation of
Multi-Purpose Hall
Repair/Rehabilitation of
Gymnasium

Brgy. Baybay,
Catarman, N.
Samar

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Brgy. Cawayan,
Catarman, N.
Samar

350,000

350,000 LGU Catarman

2,880,000

2,880,000 LGU Catarman

San Roque, N.
Samar

1,620,000

1,620,000 LGU Catarman

4,162,500

4,162,500 LGU San Roque

Brgy. Dalakit,
Catarman, N.
Samar

San Roque, N.
Samar

San Jose, N. Samar


San Jose, N. Samar
Bobon, N. Samar
Bobon, N. Samar
Mondragon, N.
Samar

Brgy. Occidental I,
Gamay, N. Samar

2,340,480
20,400

2,340,480 LGU San Roque


20,400 LGU San Jose

234,048

234,048 LGU San Jose

23,000

23,000 LGU Bobon

460,000

864,000

1,760,000

460,000 LGU Bobon

864,000 LGU Mondragon

1,760,000 LGU Gamay

Province of Northern Samar

Nona Rehabilitation and


91
Recovery Plan

Repair/Rehabilitation of
Municipal Park

Location

Nona Rehabilitation and


Recovery Plan

Repair/Rehabilitation of
Municipal Gymnasium

Mapanas, N. Samar

2,070,000

2,070,000 LGU Mapanas

Mapanas, N. Samar

900,000 LGU Mapanas

Repair/Rehabilitation of
12 Units of Multi-Purpose
Building

Brgys. Magtaon,
Sta. Potenciana, Del
Norte, Manaybanay,
E. Laodenio, Del
Sur, Jubasan,
and Magsaysay,
Mapanas, N. Samar

900,000

2,340,000

2,340,000 LGU Mapanas

Brgys. Maragano
and Cabariwan,
Palapag, N. Samar

6,300,000

6,300,000 LGU Palapag

2,340,000

2,340,000 LGU Palapag

Repair/Rehabilitation of Mini
Gymnasium

Repair/Rehabilitation of 2
Brgy. Laniwan,
Units of Covered Court/MultiPalapag, N. Samar
Purpose Evacuation Center
Repair/Rehabilitation of 2
Units of Stage
Repair/Rehabilitation of 2
Units Waiting Shed
Repair/Rehabilitation of
Multi-Purpose Building

Repair/Rehabilitation of 11
Units Waiting Shed
Repari/Rehabilitation of
3 Units of Miscellaneous
Structures (P. Fence,
Basketball courts, etc.)

Las Navas, N.
Samar
Las Navas, N.
Samar

2016

45,000
36,000

2017

2018

2019

Total

Implementing

Location

Agency

45,000 LGU Las Navas


36,000 LGU Las Navas

Catubig, N. Samar

965,800

965,800 LGU Catubig

Pambujan, N.
Samar

900,000

900,000 LGU Pambujan

Province of Northern Samar

92

Estimated Cost (PhP)

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Repair/Rehabilitation of
Covered Court

Pambujan, N.
Samar

1,350,000

1,350,000 LGU Pambujan

Repair/Rehabilitation of
Stage Auditorium with
Comfort Room

Pambujan, N.
Samar

918,000

918,000 LGU Pambujan

27,000

27,000 LGU Pambujan

Repair/Rehabilitation of
17 Units Stage Auditorium
(various barangays)

Repair/Rehabilitation of
Municipal Auditorium/Stage
Repair/Rehabilitation of
Multi-Purpose Gymnasium
Repair/Rehabilitation of
Multi-Purpose Hall

Repair/Rehabilitation of
Multi-Purpose/Evacuation
Center

Nona Rehabilitation and


93
Recovery Plan

Repair/Rehabilitation of
Covered Court

Brgy. Poblacion,
Silvino Lubos, N.
Samar

Brgy. Little Vinece,


Laoang, N. Samar
Brgy. Cabulaloan,
Laoang, N. Samar
Brgy. Guilaoangi,
Laoang, N. Samar
Brgy. Simora,
Laoang, N. Samar
Brgy. Rawis,
Laoang, N. Samar

Sub Total Parks, Civic Centers, and Other Public


Areas/Buildings

270,000

270,000

LGU Silvino
Lobos

10,000,000

10,000,000 LGU Laoang

10,000,000

10,000,000 LGU Laoang

5,000,000

5,000,000 LGU Laoang

9,000,000

9,000,000 LGU Laoang

10,000,000
79,320,228

10,000,000 LGU Laoang


400,000

79,720,228

Province of Northern Samar

Repair/Rehabilitation of
Covered Court

Pambujan, N.
Samar

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

1.8 Provincial Government Buildings, Utilities, and Facilities

2017

2018

2019

Total

Implementing
Agency

PGSO Warehouse (Old)

Catarman, N.
Samar

304,262

304,262 PGNS

PGSO Warehouse (New)

Catarman, N.
Samar

294,900

294,900 PGNS

Provincial Auditor's Office

PIO

Governor's Residence

Procurement Services Bldg.


PREC Building

Nursery Shed House


Food Terminal

Equipment Shed 1 and 2


Equipment Shed 3

Materials and Laboratory


Office
Shop and Administrative
Building

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

210,643

212,204
263,304
94,789

210,643 PGNS

212,204 PGNS
263,304 PGNS
94,789 PGNS

Catarman, N.
Samar

397,882

397,882 PGNS

Catarman, N.
Samar

135,000

135,000 PGNS

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

397,882

540,000
720,000
76,800

1,740,732

397,882 PGNS

540,000 PGNS
720,000 PGNS
76,800 PGNS

1,740,732 PGNS

Province of Northern Samar

94

Program/Project/Activity

Program/Project/Activity
Terminal Building
Fire Station
Signages/Markers
Guard House ( 3-Units )
Administrative Building
Veterinary Office
Training & Extension Building
Planning & Seed Laboratory
Bldg.
Soil Department

OLD Administrative Building


Repair/Upgrading of
Provincial Health Office

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Catarman, N.
Samar

3,014,538

3,014,538 PGNS

Catarman, N.
Samar

585,120

585,120 PGNS

20,000

20,000 PGNS

Catarman, N.
Samar

75,000

75,000 PGNS

468,096

468,096 PGNS

Catarman, N.
Samar

187,238

187,238 PGNS

263,304

263,304 PGNS

643,632

643,632 PGNS

204,792

204,792 PGNS

187,238

187,238 PGNS

5,617,152

5,617,152 PGNS

10,000,000

10,000,000 PGNS

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

Province of Northern Samar

Nona Rehabilitation and


95
Recovery Plan

NSPESO Building

Location

Nona Rehabilitation and


Recovery Plan

Repair/Upgrading of
Provincial Nutrition Office

Location
Catarman, N.
Samar

Sub Total for Provincial Government Buildings,


Utilities, and Facilities
1.9 Other Buildings and Facilities

Estimated Cost (PhP)


2016

2017

2018

Total

2019

10,000,000
36,654,509

Implementing
Agency

10,000,000 PGNS

36,654,509

Old Pavillion Building

Biri, N. Samar

350,000

350,000 LGU Biri

Motorpool Building

San Isidro, N.
Samar

196,000

196,000 LGU San Isidro

New Pavillion Building


Legislative Building

Slaughter House

Senior Citizen Building


Legislative Building

Catarman Land Transport

Catarman Slaughter House


MENRO Office
DRRM Office

Biri, N. Samar
San Vicente, N.
Samar

Victoria, N. Samar

400,000
400,000

300,000

400,000 LGU Biri


400,000

LGU San
Vicente

300,000 LGU Victoria

Catarman, N.
Samar

1,228,752

1,228,752 LGU Catarman

Catarman, N.
Samar

2,025,000

2,025,000 LGU Catarman

Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar
Catarman, N.
Samar

2,681,800

1,710,000
112,343
98,300

2,681,800 LGU Catarman

1,710,000 LGU Catarman


112,343 LGU Catarman
98,300 LGU Catarman

Province of Northern Samar

96

Program/Project/Activity

Program/Project/Activity
Liga Building

MRF
MRF
MRF (8 Units)

Processing Center

MRF Municipal Campus


Municipal Garage

Municipal Guard House


Municipal Treasurer

Location

Catarman, N.
Samar
Brgy. Talisay,
Catarman, N.
Samar
UEP Zone 3,
Catarman, N.
Samar

Estimated Cost (PhP)


2016

48,000 LGU Catarman

30,000

30,000 LGU Catarman

17,250

Bobon, N. Samar

Agency

48,000

Bobon, N. Samar

Bobon, N. Samar

2019

702,144 LGU Catarman

144,000

Bobon, N. Samar

2018

Implementing

702,144

Lope de Vega, N.
Samar

Bobon, N. Samar

2017

Total

17,250

28,750
23,000
57,500

144,000

LGU Lope de
Vega

17,250 LGU Bobon


17,250 LGU Bobon
28,750 LGU Bobon
23,000 LGU Bobon
57,500 LGU Bobon

Bobon, N. Samar

115,000

MRF Building

Brgy. Lapinig del


Sur, Lapinig, N.
Samar

68,000

68,000 LGU Lapinig

468,000

468,000 LGU Gamay

Senior Citizen Building

Land Transport Terminal

Bobon, N. Samar

Brgy. Poblacion,
Gamay, N. Samar

115,000

115,000 LGU Bobon


115,000 LGU Bobon

Province of Northern Samar

Nona Rehabilitation and


97
Recovery Plan

Legislative Building

Nona Rehabilitation and


Recovery Plan

Location

Agriculture & Engineering


Building

Mapanas, N.
Samar

Municipal Garage

Brgy. Poblacion,
Palapag, N. Samar

Zuellig Halfway House

Liga Building

Legislative Building
OSCA Building
MRF Building

Wecome/Signage
Slaughter House

Tricycle Parking Shed

Various Agriculturist Office


Legislative Building
Legislative Building

Mapanas, N.
Samar

Pambujan, N.
Samar

Estimated Cost (PhP)


2016

3,218,000
1,169,000
900,000
55,690

2017

2018

2019

Total

Implementing
Agency

3,218,000 LGU Mapanas


1,169,000 LGU Mapanas
900,000 LGU Palapag

55,690 LGU Pambujan

Pambujan, N.
Samar

163,850

163,850 LGU Pambujan

Pambujan, N.
Samar

360,000

360,000 LGU Pambujan

Pambujan, N.
Samar

94,500

94,500 LGU Pambujan

Pambujan, N.
Samar
Pambujan, N.
Samar
Pambujan, N.
Samar

185,625

64,800

72,000

185,625 LGU Pambujan

64,800 LGU Pambujan

72,000 LGU Pambujan

Pambujan, N.
Samar

1,950,400

1,950,400 LGU Pambujan

Laoang, N. Samar

5,000,000

5,000,000 LGU Laoang

Silvino Lobos, N.
Samar

375,000

375,000

LGU Silvino
Lobos

Province of Northern Samar

98

Program/Project/Activity

Program/Project/Activity
Municipal Library and DAR
Office

Location

Brgy. Guilaoangi,
Laoang, N. Samar

Estimated Cost (PhP)


2016

2017

2018

Total

2019

3,000,000

Sub Total for Other Buildings and Facilities

27,944,954

Total for Repair/Rehabilitation of Damaged


Government Buildings

330,518,705

Implementing
Agency

3,000,000 LGU Laoang


-

400,000

27,944,954
330,918,705

Province of Northern Samar

Nona Rehabilitation and


99
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

New Construction

2.1 Health Center, Day Care Center


Construction of Two-Storey
Health Center & Daycare
Center

Allen, N. Samar

33,000,000

33,000,000

Construction of Two-Storey
Health Center & Daycare
Center

Biri, N. Samar

11,000,000

11,000,000 PGNS, LGU Biri

Bobon, N. Samar

22,000,000

22,000,000

Capul, N. Samar

11,000,000

11,000,000

PGNS, LGU
Capul

Catarman, N.
Samar

66,000,000

66,000,000

PGNS, LGU
Catarman

Lavezares, N.
Samar

8,800,000

8,800,000

PGNS, LGU
Lavezares

22,000,000

22,000,000

Mondragon, N.
Samar

33,000,000

33,000,000

Rosario, N. Samar

11,000,000

11,000,000

Construction of Two-Storey
Health Center & Daycare
Center

Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center

Lope De Vega, N.
Samar

PGNS, LGU
Allen

PGNS, LGU
Bobon

PGNS, LGU Lope


De Vega
PGNS, LGU
Mondragon
PGNS, LGU
Rosario

Province of Northern Samar

100

Program/Project/Activity

Program/Project/Activity

Location

Construction of Two-Storey
Health Center & Daycare
Center

San Antonio, N.
Samar

Construction of Two-Storey
Health Center & Daycare
Center

Construction of Two-Storey
Health Center & Daycare
Center

Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center

Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center

2016

2017

2018

2019

Total

Implementing
Agency
PGNS, LGU San
Antonio

11,000,000

11,000,000

San Isidro, N.
Samar

22,000,000

22,000,000

San Jose, N. Samar

17,600,000

17,600,000

San Vicente, N.
Samar

11,000,000

11,000,000

Victoria, N. Samar

15,400,000

15,400,000

Catubig, N. Samar

44,000,000

44,000,000

Gamay, N. Samar

15,400,000

15,400,000

Laoang, N. Samar

55,000,000

55,000,000

PGNS, LGU
Laoang

Lapinig, N. Samar

13,200,000

13,200,000

Las Navas, N.
Samar

PGNS, LGU
Lapinig

50,600,000

50,600,000

PGNS, LGU San


Isidro
PGNS, LGU San
Jose
PGNS, LGU San
Vicenter
PGNS, LGU
Victoria
PGNS, LGU
Catubig
PGNS, LGU
Gamay

PGNS, LGU Las


Navas

Province of Northern Samar

Nona Rehabilitation and


101
Recovery Plan

Construction of Two-Storey
Health Center & Daycare
Center

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Construction of Two-Storey
Health Center & Daycare
Center

Mapanas, N.
Samar

Construction of Two-Storey
Health Center & Daycare
Center

Pambujan, N.
Samar

Construction of Two-Storey
Health Center & Daycare
Center

Construction of Two-Storey
Health Center & Daycare
Center
Construction of Two-Storey
Health Center & Daycare
Center

Palapag, N.
Samar

San Roque, N.
Samar

Silvino Lubos,
N. Samar

Sub Total for Health Center, Day Care


Center

Estimated Cost (PhP)


2016

2017

2018

Total

2019

17,600,000

17,600,000

33,000,000

33,000,000

33,000,000

33,000,000

46,200,000

46,200,000

13,200,000

13,200,000

616,000,000

120,000,000

120,000,000

120,000,000

120,000,000

240,000,000

Total for New Construction

616,000,000

120,000,000

120,000,000

856,000,000

Total for Government Buildings

946,518,705

120,400,000

120,000,000

1,186,918,705

3,550,008,028

2,223,501,029

180,748,732

566,926,915

6,521,184,704

Construction of Multi-purpose
Venue Cum Evacuation
24 MLGUs
Center (Convention, Trade/
Exhibition Center, etc.)
Sub Total for Multi-purpose Venue Cum
Evacuation Center

GRAND TOTAL FOR INFRASTRUCTURE


SECTOR

616,000,000

Implementing
Agency
PGNS, LGU
Mapanas
PGNS, LGU
Palapag
PGNS, LGU
Pambujan

PGNS, LGU San


Roque
PGNS LGU
Silvino Lobos

240,000,000 PGNS

Province of Northern Samar

102

Program/Project/Activity

Province of Northern Samar

Productive

Sector

Nona Rehabilitation and


103
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

Total

2019

Implementing
Agency

Coconut Rehabilitation, Recovery and Development Program


Rehabilitation
Coconut Seed Dispersal
Project
Fertilization Program

Provincewide

3,000,000

3,000,000

3,000,000

3,000,000

12,000,000 PCA

Organic

Provincewide

675,000

1,000,000

1,000,000

1,000,000

3,675,000 PCA

Multinutrients

Provincewide

Office Repair and Rehabilitation

1,300,000

Office repair

1,500,000

Laboratory repair & other lab


accessories

2,600,000

Turmeric (luyang dilaw)

Biri, Mondragon,
Palapag

Laoang, San Roque,


Pambujan, Las
Navas, Palapag,
Mapanas
San Jose, Lope de
Vega, Catarman,
Bobon

11,900,000 PCA
1,500,000 PCA
500,000 PCA

Coconut Intercropping program

Cacao

4,000,000

500,000

Recovery

Pineapple

4,000,000

1,350,000
2,250,000
8,000,000

1,350,000

PCA

2,250,000

PCA

8,000,000

PCA

Province of Northern Samar

104

PRODUCTIVE SECTOR

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Intercropping Incentivization Program

Banana (incentive-based
program/cash-for-work
@ Php5.00 per stabilized
seedling)
Pineapple (incentive-based
program/cash-for-work
@ Php2.00 per stabilized
sucker)
Cacao (incentive-based
program/cash-for-work
@ Php2.00 per stabilized
seedling)

800,000

Biri, Mondragon,
Palapag

Laoang, San Roque,


Pambujan, Las
Navas, Palapag,
Mapanas

150,000
180,000

San Jose, Lope de


Vega, Catarman,
Bobon

500,000

800,000

PCA

150,000

PCA

180,000

PCA

500,000

PCA

IPM, IEC and Capacity-Building Program

Nona Rehabilitation and


105
Recovery Plan

IPM

Training and capacity


building/technology transfer
IEC production

500,000

1,000,000

1,500,000

25,000

50,000

75,000

100,000

200,000

300,000

PCA
PCA
PCA
PCA

Province of Northern Samar

Turmeric (incentive-based
program/cash-for-work @
Php5.00 per kg of stabilized
rhizome)

Palapag, Lope de
Vega, San Jose,
Capul, Catubig,
Las Navas, Allen,
Catarman, San
Antonio, Mapanas,
Laoang, Pambujan,
San Roque, Lapinig
and Lavezares

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Coconut-Livestock Integration for Coconut Farmers

Goat-raising/dispersal

Duck-raising

Native chicken/dispersal
Carabao dispersal

Total for Coconut

Capul, Catubig,
Laoang, Palapag,
Mapanas, Gamay,
Catarman, San Jose,
San Vicente, Silvino
Lobos, Bobon, San
Roque, Pambujan,
Mondragon, San
Isidro, Victoria,
Allen, Rosario, Las
Navas and Lapinig

1,400,000

1,400,000

PCA

All 24
municipalities

1,920,000
1,200,000

1,920,000

PCA

28,800,000

PCA

All 24
municipalities
All 24
municipalities

28,800,000

1,200,000

PCA

10,830,000

22,370,000

36,800,000

8,000,000

78,000,000

1,000,000

2,000,000

3,000,000

4,000,000

10,000,000

DA

15,000,000

15,000,000

15,000,000

15,000,000

60,000,000

DA

Rice Rehabilitation, Recovery and Development Program


Rehabilitation
High Quality Rice Seed
Assistance/ Dispersal Project
Production Support for
Technology Adoption

All 24
municipalities
All 24
municipalities

Province of Northern Samar

106

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Recovery
Rice Bunding Assistance
Project

Rice Farm Mechanization


Program

Conduct of Farmer Field


School for sustainable rice
production adaptable to
climate change
Assistance to farmers for
Control of Rats and other
Pests for Rice and Crops

Improvement of Provincial
Research and Extension
Center

Laoang; Catubig;
Las Navas; Palapag;
Pambujan; San
Roque

1,500,000

1,500,000

2,000,000

2,500,000

7,500,000

DA/PAO-PGNS

10,000,000

10,000,000

10,000,000

10,000,000

40,000,000

DA/PAO-PGNS

4 Municipalities

360,000

360,000

360,000

360,000

1,440,000

DA/PAO-PGNS

Provincewide

500,000

1,000,000

1,500,000

2,000,000

5,000,000

DA/PAO-PGNS

5,000,000

DA/PAO-PGNS

10 Municipalities

Bgy. Galutan,
Catarman

5,000,000

High Value Commercial Crops Rehabilitation, Recovery and Development Program


Provincewide

Repair and Improvement of


Provincial Food Terminal

Bgy. Cawayan,
Catarman

Rehabilitation of Municipal
Nurseries

Vegetable Seeds Dispersal


and Production

500,000

6 municipalities

Provincewide

1,000,000

1,000,000

2,000,000

3,000,000

6,500,000 DA/PAO-PGNS

2,000,000

2,000,000 DA/PAO-PGNS

2,000,000

2,000,000 DA/PAO-PGNS

1,000,000

1,000,000

1,000,,000

3,000,000 DA/LGU/NGAs

Province of Northern Samar

Nona Rehabilitation and


107
Recovery Plan

Distribution of HVCC Seeds


and Planting Materials

Nona Rehabilitation and


Recovery Plan

Organic Fertilizer Production


Total for Crops

Estimated Cost (PhP)

Location
Provincewide

2016
500,000

30,360,000

2017
500,000

41,360,000

2018
500,000

35,360,000

2019
500,000

37,360,000

Total

Implementing
Agency

2,000,000 DA/LGU/NGAs

144,440,000

Fishery Rehabilitation, Recovery and Development Program


Rehabilitation
Rehabilitation of fish seed
production and distribution
station (BFAR Facilities,
stocks, structure and
equipment)

UEP - Catarman,
Laoang, Lavezares
and San Roque

Repair of Fish Processing


plant

Lavezares

Repair of hatchery in UEP

Fishing Gear Paraphernalia


Distribution (Payao, Fish
Corral, Gill Nets, Crab spots,
Fish spots)

Motorized banca distribution


(fiber glass 20 footer with
complete accessories)

Allen, Mondragon,
Mapanas, Gamay,
Lapinig, Biri,
Victoria, Laoang,
Pambujan,San
Roque and Catarman
Allen, Biri, Bobon,
Mondragon,
Catarman, San Jose,
San Vicente,Gamay,
Laoang, Palapag,
Mapanas,Pambujan,
San Roque

18,525,000

18,525,000

BFAR

250,000

250,000

BFAR

3,045,400

3,045,400

BFAR

8,284,500

BFAR

100,000

4,284,500

100,000

4,000,000

BFAR

Province of Northern Samar

108

Program/Project/Activity

Program/Project/Activity

Location

Organic Fertilizer Production

Provincewide

Non-motorized banca
distribution

Victoria, Lapinig
Allen, Biri, Bobon,
Mondragon,
Catarman, San Jose,
San Vicente,Gamay,
Laoang, Palapag,
Mapanas,Pambujan,
San Roque

Total for Crops

Repair of partially damaged


boats (motorized and nonmotorized boats)

Recovery

Mapanas, Biri,
Capul, San Antonio,
Lavezares,
Laoang,Pambujan,
Lapinig

2016
500,000

2017
500,000

2018
500,000

35,360,000

2019
500,000

37,360,000

Total

Implementing
Agency

2,000,000 DA/LGU/NGAs

30,360,000

41,360,000

144,440,000

500,000

200,000

700,000 BFAR

2,796,365

2,796,365 BFAR

Province of Northern Samar

Nona Rehabilitation and


109
Recovery Plan

Seaweeds Production and


Distribution

Allen,Victoria,
Rosario, Lavezares,
San Jose, Bobon,
Biri, Cataraman,
Mondragon, San
Roque,Pambujan,
Laoang, Palapag,
Gamay, Mapanas,
Lapinig

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

Operation and Maintenance


of Mariculture Park (repair
of cages, floating house,
San Jose, N. Samar
harvesting flatform, boats and
fishpens)

5,000,000

Assistance to Aquaculture
fishponds (stocks),
freshwater fishponds and
brackishwater fishponds

2,297,486

Mangrove Reforestation
Project

Establishment of Fish
Sanctuary Guardhouse (2
units)
Bantay Dagat Program Patrol Boat

Small Scale Fishing Gear


Assistance
Mudcrub Fattening

Fish Processing:
- Bangus deboning
- Fish Fillet
- Agar-agar manufacturing

Allen, Bobon,
Catarman, Lope De
Vega, Catubig, Las
Navas, Lavezares,
San Jose, Rosario,
San Roque and
Victoria

1st and 2nd District

2,000,000

San Roque and


Mapanas

2018

2019

6,110,000

Implementing
Agency

11,110,000 BFAR

2,297,486 BFAR

2,490,000

4,490,000 BFAR

220,000

Coastal
Municipalities

Total

220,000 BFAR
3,500,000

3,500,000

7,000,000 BFAR/LGUs

San Antonio,
Bobon, Victoria,
San Isidro & San
Vicente

1,500,000

1,000,000

1,500,000

2,000,000

6,000,000

BFAR/PAO PLGU

Rosario, San Jose

1,000,000

1,500,000

1,000,000

1,500,000

5,000,000

BFAR/ PAO PLGU

Provincewide

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000 PAO - PLGU

Province of Northern Samar

110

Program/Project/Activity

Program/Project/Activity
Bangus Tilapia in Cages

Payao Project Fish Shelter


Total for Fishery

Location
Provincewide

Provincewide

Estimated Cost (PhP)


2016

2017

2018

2019

Total

2,500,000

2,500,000

2,500,000

2,500,000

10,000,000

9,000,000

47,218,751

24,600,000

13,000,000

93,818,751

2,500,000

2,500,000

2,500,000

2,500,000

10,000,000

Implementing
Agency
BFAR/ PAO PLGU
BFAR/ PAO PLGU

Trade and Industry Rehabilitation, Recovery and Development Program


Rehabilitation
" Asset Restoration for
Microenterprise
and Restoration of
Community-based
Value-adding Facilities "
Financing Forum
Recovery

Provincewide
Provincewide

Sweet Delicacies Training and


Allen
Production
Rural Microenterprise
Development Program

" New Design for Pump Boat


and Capacity Development
Training "
Rural Microenterprise
Development Program

Laoang

Pambujan
San Jose

San Isidro
Laoang

Las Navas

2,036,700

DTI

40,000

DTI

500,000

500,000

DTI

1,400,000

1,400,000

DTI

10,000

10,000

500,000

2,125,000
1,500,000
700,000
1,800,000

10,000

10,000

500,000

1,500,000

2,125,000
1,500,000
1,500,000
700,000

1,800,000

DTI
DTI
DTI
DTI
DTI
DTI

Province of Northern Samar

Nona Rehabilitation and


111
Recovery Plan

Yamang Pinoy

Biri

2,036,700

Nona Rehabilitation and


Recovery Plan

Industry Clustering and


Development
Shared Service Facility

" SSF on Food Processing and


Packaging
for Association of Northern
Samar Producers "

Location

Estimated Cost (PhP)


2016

Las Navas & San


Antonio

2017
2,886,300

Allen

2,000,000

2018

2019

Total

Implementing
Agency

2,886,300

DTI

2,000,000

DTI

Catarman

1,873,570

1,873,570

DTI

" SSF on Coconut Sugar


Packaging and
Processing Facility for
Catarman Agri
Processors Organization "

Catarman

817,913

817,913

DTI

SSF on Romblon Processing


SSF for Buko Pie and Chips
Production

San Roque

197,800

DTI

SSF for Mapanas Coco Coir


Processing Plant

Palapag

197,800

Mapanas

1,841,500

1,841,500

DTI

SSF for Business Resource


Center

Catarman

Small Medium Enterprise Roving Academy (SMERA)


" Entrepreneurship and
Business Opportunities
Seminar "

San Jose, Rosario,


Palapag

" Technology Application/


Productivity Improvement "

Lavezares

Entrerprise Development on
Agri-Preneurship
Product Development

258,441

536,118

258,441

536,118

DTI

DTI
DTI

111,000

111,000

Catarman

37,000

37,000

DTI

Catarman

37,000

37,000

DTI

37,000

37,000

DTI

DTI

Province of Northern Samar

112

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Marketing Assistance
BAHANDI Regional 2016
National Trade Fair

Provincewide

Pasalubong Centers
Market Linkages

Entrepreneurial Development
Trainings (Best Game;
Marketing; Personal Financial
Management; Costing and
Pricing; FS Preparation;
Business Planning

100,000

100,000

100,000

100,000

400,000

5,000

5,000

5,000

5,000

20,000

50,000
5,000

50,000
5,000

50,000
5,000

50,000
5,000

200,000
20,000

Lavezares; Palapag;
Pambujan; San
Jose; Catarman; San
Jose
56,000

56,000

Skills Training on Danggit


Processing

Lavezares

15,000

15,000

Mondragon

15,000

15,000

Skills training on coconut


products

Catarman

Cacao Processing

Upgrading Training for


Handicraft

San Roque

DTI
DTI
DTI
DTI
DTI

15,000
15,000
15,000

15,000
15,000
15,000

DTI
DTI
DTI
DTI
DTI
DTI

Province of Northern Samar

Nona Rehabilitation and


113
Recovery Plan

Livelihood Skills Trainings

Lavezares

San Jose

Agency

DTI

EDT-BEST Game

Skills Training for twining


and weaving

Implementing

Nona Rehabilitation and


Recovery Plan

Location

2016

2017

2019

Implementing
Agency

350,000

350,000

DTI

Catarman

350,000

350,000

DTI

Laoang
Allen

Lavezares

350,000
350,000

Mondragon

350,000

350,000

350,000
350,000

350,000
350,000

Las Navas
Catubig

350,000

350,000

San Roque
Total for Trade and Industry

2018

Total

San Isidro

Pambujan
Establishment of Negosyo
Centers

Estimated Cost (PhP)

350,000
350,000
350,000

350,000
350,000
350,000

DTI
DTI
DTI
DTI
DTI
DTI
DTI
DTI

15,973,342

9,293,000

870,000

870,000

27,006,342

Animal Production NC II

2,000,000

2,000,000

2,000,000

2,000,000

8,000,000

TESDA

Crop production NC II

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

TESDA

Technical Education and Skills Development Program

Small Engine Repair NC II


Carpentry NC II

Automotive Mechanic
Cookery NC II

Bread & Pastry Production NC II


Plumbing NC II

2,000,000
2,000,000
1,000,000
1,000,000
1,000,000
1,000,000

2,000,000
2,000,000
1,000,000
1,000,000
1,000,000
1,000,000

2,000,000
2,000,000
1,000,000
1,000,000
1,000,000
1,000,000

2,000,000
2,000,000
1,000,000
1,000,000
1,000,000
1,000,000

8,000,000
8,000,000
4,000,000
4,000,000
4,000,000
4,000,000

TESDA
TESDA
TESDA
TESDA
TESDA
TESDA

Province of Northern Samar

114

Program/Project/Activity

Estimated Cost (PhP)

Location

Automotive Servicing NC II

Provincewide

2,000,000

2,000,000

2,000,000

2,000,000

8,000,000

TESDA

Provincewide

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

TESDA

Electrical System NC II
RAC NC II

2016

Provincewide

Total for Skills Development for Vocational


Courses

2017

1,000,000
15,000,000

1,000,000
15,000,000

2018

1,000,000
30,000,000

2019

1,000,000
60,000,000

Total

Implementing

Program/Project/Activity

4,000,000
120,000,000

Agency

TESDA

Science and Technology Rehabilitation, Recovery and Development Program


Rehabilitation
Repair and Reconstuction
of Private MSME Production
Centers
Recovery

DOST Small Enterprise


Technology Upgrading
Program (DOST - SETUP)

DOST Grant-in-Aid Program


(DOST - GIA)

Catubig,
Mondragon,
Catarman, Bobon
Northern Samar
Municipalities
Northern Samar
Municipalities

Total for Science and Technology

1,200,000

3,891,583
400,000

4,291,583

1,200,000

DOST

6,681,400

10,500,000

21,481,400

DOST

400,000

400,000

400,000

1,200,000

DOST

2,000,000

FIDA

5,900,000

7,081,400

10,900,000

28,172,983

Abaca Rehabilitation, Recovery and Development Program


Nona Rehabilitation and
115
Recovery Plan

Rehabilitation
Repair of FIDA Provincial
Office

Abaca Farm Rehabilitation

UEP, Catarman,
Northern Samar
Provincewide

75,000

2,000,000
75,000

75,000

75,000

300,000

PhilFIDA

Province of Northern Samar

4,300,000

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Recovery
Open Type Abaca Nurseries

21 municipalities:

Abaca Disease Management


Program

Las Navas

Abaca Farm Expansion

Operationalization of
UEP-PLGU Tissue Culture
Laboratory

Organizational Development
Program
Capacity Development
Program

Abaca Mo Diyes Mo Program


Abaca Enterprise
Development Program

Abaca Fiber Extraction


Mechanization Program

Farm Equipment/Facilities
Fabrication Program
Total for Abaca

Provincewide

UEP, Catarman,
Northern Samar

450,000
150,000

2,000,000

Provincewide
Provincewide

690,000

810,000

1,055,000

1,055,000

1,055,000

3,165,000 PhilFIDA, PLGU

2,000,000

2,000,000

2,000,000

8,000,000

1,000,000

1,000,000

1,000,000

3,000,000 PhilFIDA, PLGU

30,000,000

30,000,000

30,000,000

90,000,000 PhilFIDA, PLGU

5,000,000

5,000,000

5,000,000

150,000

1,000,000

21 municipalities:
Pacific, Central,
Balicuatro cluster
Pacific, Central,
Balicuatro cluster

570,000

10,000,000

2,600,000

2,000,000

52,775,000

150,000

1,000,000

10,000,000

2,000,000

52,895,000

150,000

1,000,000

10,000,000

2,000,000

53,015,000

2,520,000 PhilFIDA
600,000 PhilFIDA

PLGU, UEP,
PhilFIDA

3,000,000 PhilFIDA, PLGU

30,000,000 PhilFIDA, PLGU


15,000,000
6,000,000

161,285,000

PhilFIDA, PLGU

TESDA/
PhilFIDA/PLGU

Province of Northern Samar

116

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Labor and Employment Program


Emergency Employment
Program
Livelihood Program (BUB)

Provincewide

27,189,200

DOLE

Catarman

1,800,000

DOLE

Laoang

1,514,000

Bobon

Gamay

San Jose

Total for Labor and Employment

2,500,00

DOLE

1,400,000

DOLE
DOLE

500,000

32,403,200

32,403,200

DOLE

Livestock Rehabilitation, Recovery and Development Program


Carabao Dispersal

Provincewide

2,640,000

2,640,000

2,640,000

7,920,000

DA

Cattle Dispersal

Provincewide

1,320,000

1,320,000

1,320,000

3,960,000

DA

Provincewide

500,000

500,000

500,000

1,500,000

200,000

600,000

Goat Dispersal

Swine Dispersal

Artifical Insemination for


Large Ruminants
Animal Health Mission
Bull Loan

Pasture Development
Total for Livestock

350,000

Provincewide
Provincewide
Provincewide

240,000

250,000

Provincewide
Provincewide

250,000

500,000
200,000

350,000
240,000
500,000
200,000

350,000
240,000
500,000

1,050,000
720,000

1,750,000

1,320,000

1,320,000

1,320,000

3,960,000

7,570,000

7,570,000

7,570,000

22,960,000

500,000

500,000

500,000

1,500,000

DA
DA

PCC; LGUs
DA; PGNS

PGNS; LGUs ;
UEP-CVM

PGNS; DA;PCC
LGUs

Province of Northern Samar

Nona Rehabilitation and


117
Recovery Plan

Provision of Drugs and


Biologics

Provincewide

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Non-Government Organizations Initiatives


Cash for Work (include for
tools and materials, repair/
rehab of community assets
and infrastructure)

Catarman, Catubig,
San Roque, Laoang
and Mapanas

Training on DRR/Sustainable
Agriculture Approaches

Catarman, Catubig,
San Roque, Laoang
and Mapanas

Cash Grant for most


vulnerable household

Farming and Livelihood


Assistance
Total for Plan Phil.

14,140,620

14,140,620

Plan Phils.

Catarman, Catubig,
San Roque, Laoang
and Mapanas

1,258,400

1,258,400

Plan Phils.

Catarman, Catubig,
San Roque, Laoang
and Mapanas

1,255,000

1,255,000

Plan Phils.

3,250,000

3,250,000

Plan Phils.

19,904,020

19,904,020

TOTAL FOR PRODUCTIVE SECTOR

140,612,145

201,486,751

195,176,400

190,715,000

727,990,296

Province of Northern Samar

118

Program/Project/Activity

Province of Northern Samar

Social

Sector

Nona Rehabilitation and


119
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

Housing
Land Acquisition

2019

Total

Implementing
Agency
NHA

Biri(6.25 has)

31,025,000

31,025,000 NHA

Catarman (3.25
has)

16,025,000

16,025,000 NHA

Bobon(2.0 has)

Catubig (0.25 has)


Gamay (1.50 has)

10,000,000

10,000,000 NHA

1,025,000

1,025,000 NHA

7,050,000

7,050,000 NHA

Laoang (16.50 has)

82,050,000

82,050,000 NHA

Pambujan

85,000,000

85,000,000 NHA

Lapinig (4.25 has)

Rosario (0.45 has)

21,025,000

21,025,000 NHA

2,025,000

2,025,000 NHA

San Antonio (10.70


has)

53,050,000

53,050,000 NHA

San Roque (5.35


has)

26,075,000

26,075,000 NHA

6,000,000

6,000,000 NHA

San Jose (0.35 has)

Silvino Lubos (5.35


has)
Victoria (1.20 has)

Ten (10) other


municipalities (20
has@ 2 has. / mun.

1,075,000

1,075,000 NHA

26,075,000

26,075,000 NHA

100,000,000

100,000,000 NHA

Province of Northern Samar

120

SOCIAL SECTOR

Program/Project/Activity
Land Development

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Biri

62,500,000

62,500,000 NHA

Catarman

32,500,000

32,500,000 NHA

Bobon

Catubig
Gamay

20,000,000
10,000,000
15,000,000

20,000,000 NHA
10,000,000 NHA
15,000,000 NHA

Laoang

165,000,000

165,000,000 NHA

Pambujan

170,000,000

170,000,000 NHA

San Antonio

107,000,000

107,000,000 NHA

53,050,000

53,050,000 NHA

Lapinig

Rosario

San Jose

San Roque

Silvino Lubos
Ten (10) other
municipalities (20
has@ 2 has. / mun.

10,000,000
10,000,000
53,050,000
12,000,000

200,000,000

42,050,000 NHA
10,000,000 NHA
10,000,000 NHA
53,050,000 NHA
12,000,000 NHA

200,000,000 NHA

Province of Northern Samar

Nona Rehabilitation and


121
Recovery Plan

Victoria

42,050,000

Nona Rehabilitation and


Recovery Plan

Housing Construction

Location

Estimated Cost (PhP)


2016

2017

Agency

202,050,000

202,050,000 NHA

Catarman

105,500,000

105,500,000 NHA

Gamay

49,000,000

49,000,000 NHA

Lapinig

138,075,000

138,075,000 NHA

Rosario

13,075,000

13,075,000 NHA

66,075,000

Catubig

66,075,000 NHA

8,000,000

Laoang

8,000,000 NHA

53,025,000

Pambujan

53,025,000 NHA

553,050,000

553,050,000 NHA

San Antonio

347,075,000

347,075,000 NHA

San Roque

173,000,000

173,000,000 NHA

39,000,000

39,000,000 NHA

San Jose

11,025,000

Silvino Lubos
Ten (10) other
municipalities (20
has@ 2 has. / mun.

174,500,000 NHA

NHA

PGNS-Catarman

PGNS-Pambujan

11,025,000 NHA

174,500,000

Victoria

Total for NHA

2019

Implementing

Biri

Bobon

Resettlement Assistance for


LGU's (Land Development)

2018

Total

24,000,000
-

12,000,000

3,298,100,000

24,000,000 NHA
100,000,000

12,000,000 NHA

3,398,100,000

Province of Northern Samar

122

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Education
Repair & Rehabilitation of
School Buildings

24 Towns of
Northern Samar

751,842,790

Procurement of Furnitures
(arm chairs, teachers
tables & chairs , cabinets &
blackboards)

24 Towns of
Northern Samar

11,857,350

12,037,500

12,474,000
47,040,000

Construction of Temporary
Learning Shelters

Procurement of Textbooks
and Reference Materials
Procurement of ICT
Equipments (Computers,
Internet Connection, etc.)
Total for DepEd

24 Towns of
Northern Samar

24 Towns of
Northern Samar
24 Towns of
Northern Samar

851,174,140

490,292,210

Construction of Water and


Sanitation Facilities
Total for DepED/DPWH

24 Towns of
Northern Samar

22,500,000

Demolition of Totally
Damaged Classrooms

24 Towns of
Northern Samar

Nona Rehabilitation and


123
Recovery Plan

Acquisition of Lands for


Relocation of Schools in High
Risk Areas
Total for LGU

Cabatuan ES, &


Lipata ES

16,852,500

40,747,350

DepED

18,684,000

15,102,000

46,260,000

DepED

47,040,000

47,040,000

188,895,000

DepED

490,292,210

DepED/DPWH

89,700,000

DepED/DPWH

27,960,000

77,761,500

78,994,500

47,775,000

47,775,000

180,000,000

180,000,000

180,000,000

177,600,000

692,792,210

202,500,000

202,500,000

199,800,000

22,500,000

27,825,000
2,000,000

29,825,000

2,000,000

2,000,000

22,500,000

22,200,000

1,055,705,140

717,600,000
1,297,592,210

DepED

DepED/DPWH

27,825,000

LGU

4,000,000

LGU

31,825,000

Province of Northern Samar

24 Towns of
Northern Samar
24 Towns of
Northern Samar

DepED

27,960,000

Construction of School
Buildings

Construction of E-Classrooms
with Solar Panels

751,842,790

Nona Rehabilitation and


Recovery Plan

Location

Organization and Capacity


building of school disaster
committees

Total for Education Services

Lope De Vega,
Catarman, San
Roque, Catubig and
Las Navas

Procurement of Books

Catarman

Procurement of laboratory
equipment

Campaign for book donations


Preparations of research
proposals
Provision of scholarship
program
Capability-building on
DRRM/Adaptation &
resiliency

Production of DRRM/CC info


materials
Total for SUC - UEP

Estimated Cost (PhP)


2016

2017

2018

Plan
International

5,000,000

5,000,000

10,000,000

UEP

Catarman

5,000,000

5,000,000

UEP

Catarman

30,000,000

Catarman

180,000

180,000

UEP

Catarman

750,000

750,000

UEP

3,500,000

5,000,000

44,430,000

3,500,000

3,500,000

2,385,122,350

Agency

282,261,500

Catarman

247,575,000

Implementing

1,573,791,350

Catarman

281,494,500

2019

Total

7,000,000

30,000,000

52,930,000

UEP
UEP
UEP

Province of Northern Samar

124

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Health
Repair and Rehabilitation of
Health Facilities (Hospital,
RHU and BHS)

Lapinig

210,643

Gamay

Mapanas
Palapag

Las Navas
Catubig

Pambujan
Laoang

Silvino Lubos

1,383,234

2,176,646

Biri

472,777

994,704

Capul

1,076,621

Lavezares
Rosario

1,297,016

San Isidro
Nona Rehabilitation and
125
Recovery Plan

San Jose

1,263,859

Lope de Vega
Bobon

San Roque
Victoria

2,691,552
649,483
889,382

Catarman

2,671,268

487,600 DOH RO8 / LGU

2,176,646 DOH RO8 / LGU


279,297
210,643

1,383,234 DOH RO8 / LGU


46,810 DOH RO8 / LGU

279,297 DOH RO8 / LGU


472,777 DOH RO8 / LGU

3,207,181 DOH RO8 / LGU


210,643 DOH RO8 / LGU

2,691,552 DOH RO8 / LGU


994,704 DOH RO8 / LGU

1,076,621 DOH RO8 / LGU


23,405

6,485,470

649,483 DOH RO8 / LGU

1,297,016 DOH RO8 / LGU


23,405 DOH RO8 / LGU

889,382 DOH RO8 / LGU

6,485,470 DOH RO8 / LGU


699,023
855,055

1,263,859 DOH RO8 / LGU


699,023 DOH RO8 / LGU
855,055 DOH RO8 / LGU

1,531,298

1,531,298 DOH RO8 / LGU

678,739

678,739 DOH RO8 / LGU

2,671,268 DOH RO8 / LGU

Province of Northern Samar

San Vicente

Mondragon

487,600
46,810

3,207,181

Allen

210,643 DOH RO8 / LGU

Nona Rehabilitation and


Recovery Plan

Procurement of Water Sea


Ambulance

Location
Laoang

Biri

Estimated Cost (PhP)


2016
5,000,000

Capul

San Vicente

2019

Implementing
Agency

5,000,000 DOH RO8


5,000,000 DOH RO8
5,000,000

5,000,000 DOH RO8


5,000,000

5,000,000 DOH RO8


5,000,000 DOH RO8

837,000

837,000

DOH RO8

Province

1,310,400

1,310,400

DOH RO8

Continued Provision of
much needed medical and
psycological service (Training
on Emergency Preparedness
and Response for Barangay
Health Workers)

Province

360,000

1,440,000

DOH RO8

Procurement of emergency
drugs (to be dist. to prov.
Hospital & DH, 24 RHUs)

Catarman

500,000

24 mun/province

Continued Provision of
much needed medical
and psychological service
(Training on Emergency
Preparedness and Response
for all health personnel)

Procurement of wireless
communication
equipme(two-way radios)

Laoang

2018

5,000,000
5,000,000

San Antonio
Replacement / Procurement
of Health Equipment to
ensure availability of health
sevices in all levels of
community

2017

Total

1,000,000

360,000

360,000

360,000

500,000
1,000,000

1,000,000

1,000,000

4,000,000

DOH RO8/PHO
DOH RO8

Province of Northern Samar

126

Program/Project/Activity

Program/Project/Activity
Construction of Half-way
Home for Pregnant/High Risk
Women
Total for Health Services

Location

Province-Catarman

Estimated Cost (PhP)


2016

16,269,082

2017
2,000,000

20,379,490

2018

18,036,265

2019

10,684,271

Total

Implementing
Agency

2,000,000

DOH RO8

65,369,107

Food & Nutrition


Procurement of Mobile Clinic
/ Bus

Province

10,000,000

10,000,000

PHO - PNO

Procurement of Mobile
Kitchen

Province

2,000,000

2,000,000

PHO - PNO

Procurement of Ambulance

Construction of Food Bank /


Storage

Training of Health Workers


on Nutrition in Emergencies

Training of Health / Nutrition


workers on CMAM

Supplemental Feeding Program


Pre-Schoolers (PSC)
Ante-Partum (AP)

Purchase of Measuring
Equipment (Weighing Scale
and Height Board)

Procurement of multivitamins
Total for Food & Nutrition

Province
Province
Province

Province

1,500,000
1,500,000

1,500,000
1,500,000

810,000

810,000

540,000

540,000

15,363,000

14,594,400

13,865,400

113,172,400

156,995,200

16,122,600

15,316,200

14,549,400

13,822,200

59,810,400

810,000

16,122,600

810,000

15,316,200

540,000

14,549,400

540,000

13,822,200

2,700,000
2,700,000

59,810,400

PHO - PNO
PHO - PNO
PHO - PNO
PHO - PNO
PHO - PNO

Province

1,600,000

80,000

80,000

80,000

1,840,000

PHO - PNO

Province

3,000,000

5,000,000

7,000,000

9,000,000

24,000,000

PHO - PNO

68,828,200

51,926,800

51,124,200

150,976,800

322,856,000

Province of Northern Samar

Nona Rehabilitation and


127
Recovery Plan

Post Partum (PP)

Province

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

WASH
Reconstruction of Sanitary
Toilets

Lapinig

360,000

336,000

336,000

1,032,000

DOH/LGU

8,632,000

25,896,000

DOH/LGU

3,648,000

10,944,000

Gamay

1,704,000

1,704,000

1,680,000

Palapag

13,008,000

13,008,000

13,008,000

Pambujan

17,832,000

17,808,000

17,808,000

Allen

10,536,000

10,512,000

10,512,000

Mapanas

Las Navas
Catubig
Laoang

Silvino Lubos
Biri

Capul

8,632,000
1,152,000
3,648,000

40,464,000
288,000

7,848,000
1,200,000

8,632,000
1,152,000
3,648,000

40,464,000
288,000

7,848,000
1,200,000

1,152,000

23,544,000

1,152,000

14,808,000

San Isidro

1,200,000

1,200,000

1,176,000

San Antonio
San Vicente
Victoria

Catarman
San Jose

Lope de Vega
Mondragon
Bobon

San Roque

528,000
216,000

2,400,000

528,000
192,000

2,400,000

53,448,000

7,848,000

288,000

14,808,000
3,720,000

3,456,000

121,368,000

14,832,000
3,744,000

39,024,000

40,440,000

Lavezares
Rosario

5,088,000

3,720,000
528,000
192,000

2,280,000

864,000

31,560,000
3,552,000

44,448,000
11,184,000
1,584,000
3,576,000
600,000

7,080,000

47,640,000

47,616,000

47,616,000

142,872,000

216,000

216,000

216,000

648,000

7,608,000

20,568,000
10,416,000
20,448,000

7,608,000

20,568,000
10,392,000
20,424,000

7,608,000

20,544,000
10,392,000
20,424,000

22,824,000
61,680,000
31,200,000
61,296,000

DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU
DOH/LGU

Province of Northern Samar

128

Program/Project/Activity

Program/Project/Activity
Development of Level II
Water System

Expansion or relocation of
public cemeteries

Procurement of truckmounted purifyiing machine


Procurement of rubberized
water bags (10L capacity)
Procurement of water
desalination machine
Total for WASH

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Lapinig

1,000,000

1,000,000

1,000,000

3,000,000

Silvino Lubos

1,000,000

1,000,000

1,000,000

3,000,000

Mapanas

San Antonio
Las Navas
Allen

Mondragon

San Vicente

All municipalities
except Biri, San
Antonio, San
Vicente and Capul
All municipalities
except Biri, San
Antonio, San
Vicente and Capul

San Vicente, San


Antonio, Capul, Biri

1,000,000
1,000,000
2,000,000

1,000,000
1,000,000

1,000,000
1,000,000

2,000,000

3,000,000
3,000,000
2,000,000
2,000,000

2,000,000

Implementing
Agency
LWUA

DOH/DPWH

2,000,000

2,000,000

2,000,000

6,000,000

6,000,000

DOH

2,000,000

2,000,000

DOH

8,000,000

8,000,000

DOH/LGU

264,488,000

240,272,000

240,008,000

744,768,000

Province of Northern Samar

Nona Rehabilitation and


129
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Social Welfare/Protection

CORE SHELTER Project


Construction of Warehouse

Construction OF Evacuation
Centers/ Municipality /
Barangay

Allen
Bobon
Lavezares
Catarman

Allen/Catarman

Identified/ affected
municipalities/
barangay

Identified/affected
Emergency Shelter Assistance
municipalities in
(ESA) Program
Northern Samar
Total for DSWD/LGU

TOTAL FOR SOCIAL SECTOR

2,700,000

2,700,000

2,700,000

2,700,000

30,000,000

10,800,000

DSWD/LGU

30,000,000

DSWD

1,200,000

1,200,000

1,200,000

1,200,000

4,800,000

552,135,000

552,135,000

552,135,000

552,135,000

2,208,540,000

586,035,000

556,035,000

2,249,923,632

4,517,620,790

556,035,000

556,035,000

2,254,140,000

1,250,461,965 1,205,279,071

9,223,285,457

DSWD/LGU
DSWD

Province of Northern Samar

130

Program/Project/Activity

Province of Northern Samar

Cross-sectoral
Damage, Losses and Needs

Nona Rehabilitation and


131
Recovery Plan

Nona Rehabilitation and


Recovery Plan

Program/Project/Activity

Estimated Cost (PhP)

Location

2016

2017

2018

2019

Total

Implementing
Agency

Local Governance & DRRM Practices


Full Implementation of Salient Provisions of RA 10121
Institutionalization of
LDRRMO

Province

1,000,000

LDRRM Plan

PDRRMC

500,000

18 Municipalities

Capability Building

24 MDRRMCs

Incident Command System

24 MDRRMCs/LCEs

Data Banking

Reporting System/
Mechanism

PDRRMO

24 MDRRMOs
PDRRMC

24 MDRRMCs

Institutionalization of
Disaster Operations Center

Establishment of Evacuation
Centers

PDRRMC

24 MDRRMCs
24 MDRRMCs

24 Municipalities

PDRRMC/
MDRRMCs/
500,000 LGUs

7,200,000

7,200,000

14,400,000

120,000

120,000

240,000

1,200,000

1,200,000

2,400,000

240,000

240,000

480,000

240,000

240,000

480,000

50,000

50,000

Accountability/Chcek System on Utilization of LDRRM Funds


Gender-sensitive trainings

1,000,000

50,000

240,000

240,000

126,000,000

126,000,000

50,000
50,000

50,000

126,000,000

126,000,000

PDRRMC/
MDRRMCs/
LGUs

480,000 PDRRMC/
MDRRMCs/
- LGUs

504,000,000

Province of Northern Samar

132

Cross-sectoral Damage, Losses and Needs

Program/Project/Activity

Location

Strengthening the Linkages PDRRMC


of DRRMCs with NGAs, NGOs,
24 MDRRMC
INGOs and CSOs

Local Climate Change


Adaptation Plan

Comprehensive Land Use


Plans
Peace and Order Security
Establishment of Weather
Monitoring/Early Warning
System

Training for LGUs/


MDRRMOs on the Operation
& Maintenance of Weather
Monitoring/Early Warning
Systems

24 MDRRMC
Lapinig
Allen

PDRRMC

24 MDRRMCs

Municipalities of
San Vicente, Capul,
Biri, Pambujan,
Silvino Lubos, San
Isidro and San Jose

Municipalities of
Victoria, Allen,
Lavezares, Rosario,
Bobon, Catarman,
Mondragon, Lope
De Vega, San Roque,
Laoang, Catubig,
Las Navas, Palapag,
Mapanas, Lapinig,
and Gamay.
24 MLGUs/1 PLGU

2016

300,000

60,000

500,000

2017

300,000

60,000

2018
60,000

300,000

2019
60,000

300,000

120,000

120,000

200,000

200,000

200,000

200,000

360,000

360,000

360,000

400,000
75,000

360,000

400,000
75,000

75,000

75,000

Total

Implementing
Agency

240,000 PDRRMC/
MDRRMCs/
1,200,000 LGUs
500,000 PDRRMC/
MDRRMCs/
240,000
LGUs
800,000 PDRRMC/
MDRRMCs/
800,000
LGUs

300,000 PDRRMC/
MDRRMCs/
1,440,000
LGUs

577,500

577,500

577,500

577,500

PDRRMC/
2,310,000 MDRRMCs/
LGUs

1,250,000

1,250,000

1,250,000

1,250,000

PDRRMC/
5,000,000 MDRRMCs/
LGUs

75,000

75,000

PDRRMC/
150,000 MDRRMCs/
LGUs

Province of Northern Samar

Nona Rehabilitation and


133
Recovery Plan

Upgrading of Installed
Weather Monitoring/Early
Warning Systems

PDRRMC

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Training on the Application of


24 MLGUs/1 PLGU
Updated REDAS Version

Communication Facilities/System Establishment


Strengthening IOs
Capability building for IOs

Capability Building for Local


Media and Communication
Groups

Production of Radio Program

Provincewide, 24
MLGUs

Estimated Cost (PhP)


2016
75,000

2017

2018

2019

100,000
125,000

125,000

125,000

125,000

Provincewide

125,000

125,000

125,000

125,000

240,000

240,000

240,000

Total for Local Governance & DRRM Practices

141,232,500

139,222,500

Agency

PDRRMC/
150,000 MDRRMCs/
LGUs

75,000

Provincewide, 24
MLGUs

Provincewide

Implementing

Total

129,312,500

129,312,500

PDRRMC/
100,000 MDRRMCs/
LGUs
PDRRMC/
500,000 MDRRMCs/
LGUs
PDRRMC/
500,000 MDRRMCs/
LGUs
PDRRMC/
720,000 MDRRMCs/
LGUs

539,080,000

Social Protection
Early Childhood Care and Development
Orientation on new ECCD LAW, Standards and
Guidelines, and other issues concerning ECCD

24
Municipalities

600,000

National Early Learning Framework

7 municipalities
with with Child
Development
Center

104,000

Consultation meeting with Municipal ECCD


coordinators and Provincial DCWs Federation
Officers

24
Municipalities

68,400

600,000
70,000

75,000

293,400
104,000

PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs

Province of Northern Samar

134

Program/Project/Activity

Program/Project/Activity
Educational Enhancement of
Child Development Workers

Location

24 Municipalities

11,000,000

15,000,000

24 Municipalities

157,900,000

24 Municipalities

2,500,000

2,500,000

2,500,000
800,000

24 Municipalities

Paskuhan Activities

Operation of Bahay Pag-asa


Insured Children's Protection
of Childrens Right
Balik Pamilya Bata Program
Diversion Program
Nona Rehabilitation and
135
Recovery Plan

Provision of Basic PsychoSocial Sevices to Street and


Delinquent Children

24 Municipalities

Barangay Dalakit,
Catarman Northern
Samar

Operation of Home for Trafficked Children


Provision of Temporary
SHELTER and Basic services
to Victims of Trafficking

Barangay Dalakit,
Catarman Northern
Samar

1,140,000

1,000,000

2,500,000

1,000,000

1,900,000

1,000,000

2018
1,500,000
2,000,000

1,000,000

2019
2,000,000
2,500,000

1,000,000

Implementing

Total

Agency

9,500,000

PSWDO/
DSWD/LGUs

26,000,000

PSWDO/
DSWD/LGUs

7,540,000

4,000,000

160,000,000

317,900,000

2,500,000

2,500,000

10,000,000

2,500,000

2,500,000

2,500,000

10,000,000

800,000

800,000

800,000

2,500,000

1,000,000

2,500,000

1,000,000

2,500,000

1,000,000

1,500,000

1,500,000

1,500,000

1,500,000

3,000,000

3,000,000

3,000,000

3,000,000

10,000,000

PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs

4,000,000

PSWDO/
3,200,000 DSWD/LGUs
6,000,000
-

12,000,000

PSWDO/
DSWD/LGUs

Province of Northern Samar

1,000,000

Convention of Child
Development Workers

Childrens Congress

2017

5,000,000

24 Municipalities

Resource augmentation on
the Improvement of Child
Development Facility

2016

24 Municipalities

Resource Augmentation

Training on National Early


Learning Curriculum

Estimated Cost (PhP)

Nona Rehabilitation and


Recovery Plan

Location

Counselling and Psycho-Social


Intervention
Re-integration to Family and
Community

Barangay Dalakit,
Catarman Northern
Establishment of Help Desk at
Samar
Airport and Bus Terminal
Quarterly PCAT-VAWC
Meeting

Service to Street Children/


Children in Conflict with the
Law (CICL)at Bahay Pag-asa
on Trafficked Survivors

Catarman,
Northern Samar

TOT Practical Skills


Dev. and Entrepreneurship
to IGPS

24 Municipalities

Dress Making

Biri, San Vicente


and Capul

Estimated Cost (PhP)


2016
1,000,000
300,000
150,000
80,000

3,000,000

2017
1,000,000
300,000
150,000
80,000

3,000,000

2018
1,000,000
300,000
150,000
80,000

3,000,000

2019
1,000,000
300,000
150,000
80,000

3,000,000

Persons with Disability Welfare Program

Massage Therapy

Laoang, Allen and


Catarman

Cosmetology

Catarman, Laoang

Food Processing

Computer Literacy
Small Business
Management

Catarman, Laoang

Catubig, Las Navas


24 Municipalities

Implementing

Total

Agency

4,000,000
1,200,000
600,000
320,000
12,000,000
-

500,000

500,000

500,000

150,000

150,000

150,000

100,000

100,000

100,000

150,000

100,000
50,000

100,000

150,000

100,000
50,000

100,000

500,000

150,000

150,000

100,000

100,000

50,000

100,000

100,000

50,000

100,000

PSWDO/
DSWD/LGUs

2,000,000
450,000
600,000
400,000
400,000
200,000
400,000

PSWDO/
DSWD/LGUs

PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs
PSWDO/
DSWD/LGUs

Province of Northern Samar

136

Program/Project/Activity

Program/Project/Activity
Training, Sports Training
for PWD

Location
Selected PWDs

Estimated Cost (PhP)


2016
50,000

2017
50,000

2018
50,000

2019

Total

Implementing
Agency

50,000

200,000

PSWDO/
DSWD/LGUs

Full Implementation
Denomination by RA 9442

24 Municipalities

100,000

100,000

100,000

100,000

Senior Citizens Day Center


Welfare Program

For Construction

4,250,000

4,250,000

4,250,000

4,250,000

17,000,000

PSWDO/
DSWD/LGUs

Wellness Program for SC

24 Municipalities

375,000

375,000

375,000

375,000

1,500,000

PSWDO/
DSWD/LGUs

Senior Citizens Welfare Program

Strengthening of OSCA/
FSCANS

24 Municipalities

Women and Family Welfare Program

250,000

250,000

250,000

250,000

400,000

1,000,000

PSWDO/
DSWD/LGUs

PSWDO/
DSWD/LGUs

Empowered Women, Families and Solo Parents to Become Responsible and Actively Participating in Community Development
Orientation on Magna Carta of
Women (RA 9017) and other
related Laws
Womens Congress

Psycho-social Enhancement
thru Capability Building for
Solo Parents
Capability Building to 50
Community (PES) Parents
Effectiveness Service
Volunteers Province wide

24 Municipalities

500,000

500,000

500,000

2,000,000

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

3,000,000

3,000,000

3,000,000

3,000,000

12,000,000

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

1,500,000

1,500,000

1,500,000

1,500,000

6,000,000

PSWDO/
DSWD/LGUs

Province of Northern Samar

Nona Rehabilitation and


137
Recovery Plan

Operation of Drop in
Center for Battered Women
and Women in Difficult
Circumstances

500,000

Nona Rehabilitation and


Recovery Plan

Location

Assessment Workshop and


Program Review

Monitoring/ evaluation and


Provision to Service Provider
Provision of Psycho-social
and Psychiatric intervention
Provision of counselling/
Critical Incidence Stress
Debriefing (CISD)

Provision of transportation
assistance to stranded
disadvantaged individuals/
families

2016

24 Municipalities

Provision of other basic


services (clothing) to
disadvantaged families

Total for Social Protection

2017

2018

2019

Total

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

500,000

500,000

500,000

500,000

2,000,000

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

500,000

500,000

500,000

500,000

2,000,000

1,000,000

1,000,000

1,000,000

1,000,000

4,000,000

500,000

500,000

500,000

500,000

2,000,000

100,000

Crisis Intervention Unit

Provision of food/hot meal to


walk-in clients

Estimated Cost (PhP)

216,117,400

100,000

58,275,000

100,000

100,000

43,880,000

204,735,000

400,000

Implementing
Agency
PSWDO/
DSWD/LGUs

PSWDO/
DSWD/LGUs

523,007,400

Environment
Strengthening protection of existing mangrove, beach and upland forest4 municipalities
Monthly field inspection
by composite team (DENR,
PGENRO, MLGU, BLGU, CSO)
Information-dissemination
through barangay assembly

24 Municipalities

120,000

120,000

240,000

240,000

720,000 DENR

180,000

120,000

360,000

360,000

1,020,000 DENR

Province of Northern Samar

138

Program/Project/Activity

Program/Project/Activity

Location

Distribution of knowledge
materials (posters,
brochures)

Production/ installation of
billboards/signage

Surveillance of illegal logging


activities (4x a year for 4
years)
Operation-entrapment (4x a
year)

24 Municipalities

Preparation of Manual of
Operation

Revitalization/ organization
of Anti-Illegal Logging Task
Force

Reforestation of Forestland and Denuded Areas

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

150,000

150,000

500,000

500,000

1,000,000

40,000

40,000

80,000

80,000

240,000 DENR

40,000

40,000

80,000

80,000

240,000 DENR

150,000

150,000

75,000

75,000

1,750,000

1,750,000

10,750,000

10,750,000

300,000 DENR
2,000,000 DENR

300,000 DENR
150,000 DENR

Insurance for planted CBFM


areas

25,000,000

28,500,000

21,500,000

DENR

Province of Northern Samar

Nona Rehabilitation and


139
Recovery Plan

San Isidro,
Victoria, Bobon,
Mapping of existing CBFM
Biri, Rosario,
areas
Lavezares, San Jose,
Zoning of CBFM areas (to
Bobon, Catarman,
define which forest zones will
Mondragon, San
be insured)
Roque, Pambujan,
Palapag, Laoang,
Selection of insuring entity
Catubig, Las Navas,
Processing required
Mapanas, Gamay,
documentations for insurance
Lapinig, Lope de
Release of insurance policy
Vega, Silvino Lubos
papers to awarded POs/CSOs

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Implementing

Total

Agency

Insurance for upland


farmers/fisherfolks members
of POs

San Isidro,
Victoria, Bobon,
Biri, Rosario,
Lavezares, San Jose,
Selection of insuring entity
Bobon, Catarman,
Mondragon, San
Processing required
documentations for insurance Roque, Pambujan,
Palapag, Laoang,
Catubig, Las Navas,
Mapanas, Gamay,
Release of insurance policy
papers to awarded POs/CSOs Lapinig, Lope de
Vega, Silvino Lubos

1,260,000

1,260,000

2,520,000

2,520,000

Procurement of seedlings (NGP reforestation-requirements) from established CBFM-POs in Northern Samar


Training on seed and seedling
propagation for CBFM-PO
BPI Certification of Seeds/
seedling production
Contracting POs

Total for Environment

Provincewide

7,560,000 DENR

300,000

300,000

600,000

50,000

50,000

100,000

15,365,000

15,305,000

4,280,000

28,280,000

63,230,000

DENR

Province of Northern Samar

140

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

ESWM / Wastewater
Strengthening Capability of MLGUs in ESWM Implementation
Re-orientation on ESWM

Training on WACS for SWM


Unit

Establishment of SWM Unit

24 Municipalities:
1st Year: San
Preparation of SWM Plan
Antonio, San
Vicente, Capul,
Revitalize SWM Boards
Allen, Victoria,
Training-exposure to different Lavezares, Biri, San
composting technologies
Jose; 2nd Yearand compost-production
Central Area; and
operation
3rd Year- Pacific
Cluster
Reactivation of Bgy ESWM
implementation

2,000,000

2,000,000

4,000,000

4,000,000

12,000,000 DENR

2,000,000

7,000,000 DENR

Training-exposure to different
residual waste processing
facilities and technology

Establishment of data-bank/ information system on biodiversity (flora &fauna/ wildlife, ecosystem)

Formation/creation of unit on
IS for wildlife/flora & fauna in
Provincewide
Northern Samar
Actual inventory, data
gathering and encoding/
banking of data & info

1,500,000

1,500,000

2,000,000

Province of Northern Samar

Nona Rehabilitation and


141
Recovery Plan

Procurement of software &


hardware

Nona Rehabilitation and


Recovery Plan

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Support fund for LGU re: ESWM machine/equipment (50:50 counterparting)


Preparation of MOA and
menu for release and use of
funds
Release/ procurement of
machine/equipment

24 Municipalities

6,000,000

6,000,000

12,000,000

937,500

937,500

1,000,000

1,000,000

2,000,000

3,000,000

150,000

150,000

12,000,000

12,000,000

24,000,000 DENR

Replacement/ Rehabilitation of MRF/Composting Facilities


Preparation of design
of Municipal MRF and
Composting Facility per LGU

Bobon, Catubig,
laoang, lavezares,
Lope de vega,
MOA signing/fund release
Mondragon,
Actual construction/repair
Palapag, Pambujan,
Inspection of accomplishment San Jose, San Isidro,
Actual operation/launching of Victoria
completed project

1,875,000 DENR

Support Fund for LGUs' Waste Water Treatment Program


Training program on different
waste water treatment
technologies (3 batches; 8
LGUs per batch)
Formulation of waste water
treatment plan of LGUs
Preparation of standard
MOA and accountability/
sustainability plan
Fund release/actual
implementation of waste
water treatment facility

Launching of waste water


treatment facility

24 LGUs

2,000,000

6,000,000
3,000,000
300,000

24,000,000

24,000,000

72,000,000

DENR

Province of Northern Samar

142

Program/Project/Activity

Program/Project/Activity

Location

Estimated Cost (PhP)


2016

2017

2018

2019

Total

Implementing
Agency

Establishment of Sanitary LandfillA


Land Acquisition

Purchase of shredding
machines and pelletizer

Total for ESWM/Wastewater

Cataraman

6,000,000

6,000,000

Allen

5,000,000

5,000,000

Laoang

4,000,000

Other 21 mun.

24 municipalities

TOTAL FOR CROSS-SECTORAL DAMAGE, LOSSES


AND NEEDS

4,000,000

42,000,000
31,200,000

42,000,000
31,200,000

23,587,500

111,787,500

47,000,000

32,000,000

214,375,000

396,302,400

324,590,000

224,472,500

394,327,500

1,339,692,400

Province of Northern Samar

Nona Rehabilitation and


143
Recovery Plan

Province of Northern Samar

Chapter

PLAN IMPLEMENTATION AND MONITORING & EVALUATION MECHANISM

Plan Implementation
The implementation of the plan will be steered by the Provincial Government of Northern
Samar as the executing agency through the Provincial Disaster Risk Reduction and Management
Council (PDRRMC) headed by the Provincial Governor. It will be primarily responsible of
directing, coordinating and harmonizing all programs, projects and activities necessary to
carry out the rehabilitation and recovery plan.
The rehabilitation projects shall be implemented in partnership with the stakeholders in
various development sectors. The partnership shall build on strengthened collaboration and
coordination with the national government agencies, non-government organizations (local and
international), peoples organization, civil society organizations and the private sector. These
agencies and organizations shall be tapped to provide technical and financial assistance in the
project implementation in accordance with their mandates, expertise and capabilities.

The Provincial Government of Northern Samar through the Provincial Planning and Development
Office (PPDO) shall primarily provide a coordinating and facilitating role to ensure efficient
and effective service delivery by project implementers and service providers. On the other
hands, service providers may deliver their goods and services to project beneficiaries in close
collaboration and complementation with the provincial government. The implementation
mechanism to be adopted is shown in Figure 9.

144

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

Figure 9. Implementation Mechanism of the PGNS

PDRRMC
Chai r: Gov ernor

PREVENTION
COMMI TTEE

MITIGATION
COMMI TTEE

REHABILITATION
COMMI TTEE

RESPONSE
COMMI TTEE

PPDO
Vice - Chair: PPDC
Four (4) Coordinators for
each sector from PPDO
Productive
Sector
Head: DA 8
Counterpart: PAO

Infrastructure
Sector
Head: DPWH 8
Counterpart: 1st
and 2nd DEO

Social Services
Sector
Head: DSWD 8

Counterpart:
PSWDO

Cross
Sectoral
Head: DILG 8
Counterpart: LGOO

To ensure participatory approach in resettlement project implementation, Local Inter-Agency


Committees (LIACs) will be established in each municipality. The LIAC will serve as the
policy-making and coordinating body to ensure harmonized and efficient implementation of
the various programs and activities related to the development of resettlement projects and
relocation of affected families.
The LIAC will be chaired by the Local Chief Executive and co-chaired by HUDCC/NHA. Members
of the LIAC will include representatives from NGAs, including DSWD, DENR, DPWH, and the
Presidential Commission for the Urban Poor, as well as LGUs, particularly the Municipal
Planning and Development Office (MPDO), Municipal Social Welfare and Development Office
(MSWDO), Municipal Engineering Office, and Municipal Assessors Office. Whenever applicable,
Provincial Inter-Agency Committees (Prov-IACs) may also be established at the provincial level
to oversee the resettlement efforts in the province.

Nona Rehabilitation and


145
Recovery Plan

Province of Northern Samar

Figure 10. Local Inter-Agency Committees (LIACs)


LIAC for
Permanent Shelter (PS)
Multi-Sectoral
Chai rman: M ayor
Vice-Chair: HUD CC/NHA
GOs/NGOs/POs

Beneficiary Selection
Committee

(Masterlist of HHs for PS)

Site Selection Project


Implementation

(PS Project Site with facilities)

Relocation
(Transfer of Families)

Estate Management and


Community Development
(Sustainable communities)

Monitoring and Evaluation


An effective monitoring and evaluation mechanism is a major means of keeping track of the
progress and results of project implementation and ensuring the attainment of the expected
results. This will also demonstrate the utilization of good governance, accountability and
transparency, and effective service delivery of the plan.

In views of this, a monitoring and evaluation mechanism should be established. Monitoring and
evaluation of rehabilitation projects should be carried out to determine the status of projects and
identify problems encountered in the implementation. This information will facilitate decision
makers in making adjustments to redirect project implementation according to schedules and
responsiveness to the expected outcomes of the rehabilitation plan.

The Provincial Government of Northern Samar shall create a Padayon Project Monitoring and
Evaluation Team (PPMET) that will oversee the overall implementation of the short-term
rehabilitation and recovery plan with the technical support of the PPDO as the Secretariat. The
PPMETs functions shall include the following: conduct field visits to project sites; gather issues
and problems encountered in project accomplishments against physical and financial targets;
submits reports and make recommendations to the executing agency; and make use of existing
monitoring and assessment tools.
146

Nona Rehabilitation and


Recovery Plan

Province of Northern Samar

At the program level, the cluster heads/sectoral coordinators are responsible for monitoring
the programs, projects and activities (PPAs) of their respective units. The coordinators for the
different sectors shall take responsibility of the field monitoring and validation of the PPAs
progress and status. The secretariat will consolidate the reports submitted by the sectoral
coordinators and the different departments. Copies of the consolidated reports will be provided
to the program implementers and to the Provincial Development Council (PDC) chaired by
the Provincial Governor. These reports will be submitted to the Local Chief Executives of
the component municipalities and the PDC for their review and information. The proposed
composition of the PPMEC is presented below:
Figure 11. Padayon Project Monitoring and Evaluation Team (PPMET)
Chairperson: Provincial
Planning and
Development
Coordinator

Secretariat: PPDO

Co-Chai r: Provincial
Budget Officer

Productive Sector
Head: Provincial
Agricul turist

Members:
DA,BFAR,DTI,DOST,
PCA, PhilFIDA,TESDA,
DOLE,PSRs,I/NGOs

Infrastructure Sector
Head: Provincial
Engineer
Members:
DPWH,PPA,LTO,NIA,
NTC,DOT,DOE,UEP,
NORSAMELCO,
PSRs,I/NGOs

Social Services Sector


Head: Provincial
Social Welfare and
Development Officer
Members:
DSWD,DOH,DILG,NHA,
DepEd,UEP,
PSRs,I/NGOs

Cross Sectoral
Head: Provincial
Disaster Risk
Reduction and
Management Officer
Members:
DILG,DENR,
OCD,PSRs,I/NGOs

Nona Rehabilitation and


147
Recovery Plan