Sie sind auf Seite 1von 127

IBM Systems Technical University Budapest, 3 -6 May 2010

pAD02

Upgrading from IBM 5.4 to


IBM i 6.1 or IBM i 7.1
Gary Konicek
IBM STG Lab Services
konicek@us.ibm.com

2010 IBM Corporation


4.1.01

IBM Systems Technical University Budapest, 3 -6 May 2010

Agenda
 IBM i 6.1/ IBM i 7.1 Upgrade Planning
Introduction
Planning and Preparing for the Upgrade
Major Upgrade Planning Tasks
Top 10 Keys to Success
Useful Web sites

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Migrating from V5R4 to IBM i 6.1 or


IBM i 7.1

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

How to get from here to IBM i 6.1, IBM i 7.1?

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

One step software upgrades

OS/400
V5R3

IBM i 6.1
IBM i 5.4
(i5/OS V5R4)
Note: Clustering supports only one cluster version difference. An i 5.4
cluster must have a cluster version of 5 before you install i 6.1.
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

One step software upgrades

IBM i 6.1

IBM i 7.1
IBM i 5.4
(i5/OS V5R4)
Note: Clustering supports only one cluster version difference. An i 6.1 cluster
must have a cluster version of 6 before you install i 7.1.
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

What if a much Earlier Release is Installed? .


Getting to a Supported i5/OS Release
Multiple Upgrades

IBM i 7.1
V5R4

V5R2
V4R5

IBM i 6.1
V5R1

V4R4

V5R3

* Note: these upgrade paths are no longer formally supported by IBM, so best effort support
only. Also, you need access to V5R1, V5R2 or V5R3 media.
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Family and OS/400 Release Life Cycle


http://www-947.ibm.com/systems/support/i/planning/upgrade/suptschedule.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Life Cycle


IBM i

06

07

08

09

10

11

12

13

14

15

16

IBM i
Upgrade
paths

V5R2
V5R3
5.4*
6.1*
7.1*

Service

*The projected date for the service of IBM i releases is based on current IBM planning assumptions. Note that it is IBMs
current practice to support an IBM i release until the next two releases have been made available, plus twenty four months.
This presentation contains information about IBMs plans and directions. Such plans are subject to change without notice.

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Family and OS/400 Release Support


http://www-947.ibm.com/systems/support/i/planning/software/i5osschedule.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i, i5/OS and OS/400 Release Support


http://www-947.ibm.com/systems/support/i/planning/software/i5osschedule.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i System Support


Servers

IBM i 5.4

POWER7
750, 770, 780
POWER6
JS12, 22, 23/43, 550* 560
POWER6
520, 550*, 570, 595
POWER5+
515, 525
POWER5
520, 550, 570, 595
800, 810, 825, 870, 890

270, 820, 830, 840







IBM i 6.1

IBM i 7.1














* Specific models
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

FYI: Supported Models IBM i, i5/OS & OS/400


http://www-947.ibm.com/systems/support/i/planning/upgrade/osmapping.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

FYI: Supported
Models IBM i, i5/OS & OS/400
Models supported by IBM i
http://www-947.ibm.com/systems/support/i/planning/upgrade/osmapping.html

Important: Use the IBM Hardware Pre-req Web site tool for the latest regarding minimum software levels
needed for hardware models and/or features: http://www-912.ibm.com/e_dir/eServerPrereq.nsf 2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

POWER5, POWER6 or POWER7 Servers Upgrade Planning Guideline


 In general, upgrade Firmware & software in the following order: (Work from the
outside in)
HMC Firmware --- See HMC Planning Site:
http://www14.software.ibm.com/webapp/set2/sas/f/hmc/home.html
Server Firmware Sites

Systems with an HMC


http://www-912.ibm.com/s_dir/slkbase.nsf/ibmscdirect/E58D7BBF0EAC9A2786256EAD005F54D8

Systems without an HMC (Upgrade policy set to OS)


http://www912.ibm.com/s_dir/slkbase.nsf/c32447c09fb9a1f186256a6c00504227/604992740f846a498625
6fd3006029b5?OpenDocument

Operating Systems

Plan for which OS level runs on top of which levels of firmware/hardware


IBM Prerequisite Web site: http://www-912.ibm.com/e_dir/eserverprereq.nsf
IBM i 5.4
http://publib.boulder.ibm.com/infocenter/iseries/v5r4/topic/books/sc415120.pdf

IBM i 6.1
http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzahc/sc415120.pdf

IBM i 7.1
http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/sc415120.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

POWER6 to POWER7 Upgrades


3.5 GHz

POWER7 770

 Power 570 (POWER6) can be


upgraded to Power 770 or 780
Upgrades GA on June 4, 2010

POWER6 570
3.86 GHz
4.14 GHz

 IBM i licenses move with the upgrade


 Power 520 Statement of Direction

POWER7 780

IBM plans to provide upgrade paths in 2010 from the POWER6 Power 520 2
and 4-core
servers to next generation POWER7 processor-based entry servers.

 Power 595 Statement of Direction

IBM plans to deliver a new high-end server in 2010 with up to 256 POWER7
processor cores. Designed to operate within the same physical footprint and
energy envelope of the current 64-core Power 595 server. IBM also plans to
provide an upgrade path from the current IBM Power 595 server with 12X I/O
to the new POWER7 high-end server.
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

POWER5 Upgrade Paths


POWER5
595

570

POWER6

POWER7

FHA

9117-MMA
9406-MMA
EMA

550

E8A
M50

9406-520/525

upgrades
from
POWER5
to
POWER7

E4A 2-4 core


M25

9405-520
9407-515

Expect POWER5 upgrades to


be withdrawn when POWER6
models are withdrawn.

JS12
JS22
JS23/43
E4A 1-core
M15

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Introduction IBM i
Upgrade Planning

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

First things first some terminology

Firmware??

LIC?

Resave?

SLIC?

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

First things first . Pre-POWER5

i5/OS
(OS/400)
LIC (SLIC)

Hardware

 i5/OS (V5R3 or V5R4)


 LIC: Licensed Internal Code (also was
informally referred to as SLIC (Systems LIC) in
the past
Layered architecture below the machine
interface (MI)
Provides functions including storage
management, pointers and addressing,
program management, etc.
TIMI* sub component of LIC
High-level machine instruction set and
application programming interface

*TIMI: Technology Independent Machine Interface


2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

And then came POWER5, POWER6, POWER7.

IBM i

LIC

 IBM i (previously known as i5/OS)


 LIC: Licensed Internal Code (also was informally
known as SLIC Systems LIC))
Layered architecture below the machine interface
(MI)
Provides functions including storage
management, pointers and addressing, program
management, etc.
TIMI* sub component of LIC
High-level machine instruction set and application

programming interface

Firmware

 System Firmware
Microcode stored on the service processor

Hardware

*TIMI: Technology Independent Machine Interface


2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

What is a Resave?
 Redistribution of LIC and/or IBM i (i5/OS)
Provides correct base level of install media for NEW functions (e.g.
to support new hardware features)
Reduces time to install Cumulative packages

...

3rd
1st
CUM

2nd
CUM

CUM

Size of CUM & install time

Resave

1st
CUM

...

Size of CUM & install time

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining the Required Resave Level?


 Simple example: POWER 5 570 with IBM i 6.1 installed -- considering
upgrading to 9117-MMA (5.0 GHz POWER6) system
 Utilize the IBM Prerequisite Web site:

http://www-912.ibm.com/e_dir/eserverprereq.nsf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining the Required Resave Level


 Utilize the IBM Prerequisite Web site
Enter model, machine type and (optionally) feature code
http://www-912.ibm.com/e_dir/eserverprereq.nsf/UpgradeCategories/Hardware?opendocument

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining the Required Resave Level


 Utilize the IBM Hardware Prerequisite Web tool
Click resulting feature code for more details

http://www-912.ibm.com/e_dir/eserverprereq.nsf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining the Required Resave Level

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining the Required Resave Level


https://www-912.ibm.com/e_dir/eserverprereq.nsf/HW2/Hardware~eServer~7388?OpenDocument

Question: How do I find out


what MY system has?
Answer: Via marker PTFs
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining Resave Level (via Marker PTFs) Resave Web site


http://www-947.ibm.com/systems/support/i/planning/resave/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining Resave Level Installed (via Marker PTFs)


http://www-947.ibm.com/systems/support/i/planning/resave/v6r1.html

Remember?

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining Resave Level Installed


 Use DSPPTF to check if the following required Fix Level/CUM and
Resave level are installed (for our example)
IBM i 6.1 RS610-00 OS and RS610-E LIC --- AP07348 (OS Marker PTF) and
RE08245 (LIC Marker PTF)
Fix Level (CUM) C82886610 -- Use DSPPTF LICPGM(5761SS1)

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Determining Resave Level Installed

 Use DSPPTF to check if the following required Fix Level/CUM and Resave level are
installed (for our example)
Fix Level (CUM) C88286610 and IBM i 6.1 resave marker (AP07348) -- Use
DSPPTF LICPGM(5761SS1)
IBM i 6.1 LIC marker Use DSPPTF LICPGM(5761999) RE08245 (RS610-E)
NOT installed. RE08043 is marker PTF for RS610-B.

So required Fix Level (CUM) and is installed, but we need a later resave of LIC installed.
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Planning and Preparing


for the Upgrade

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Top 3 Tools -- Upgrade Planning

1.) IBM Information Center


2.) System i Planning Web Site

3.) IBM Pre-Upgrade Verification tool

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM Information Centers


http://publib.boulder.ibm.com/iseries/
POWER7,
POWER6,
POWER5
HMC,
Virtualization
Engine, IBM
Director,

IBM i
(i5/OS)

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Information Center


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/index.jsp

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i for Power Systems. Planning Web Site


http://www.ibm.com/systems/i/

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

System i Planning
Migrations and Upgrades
http://www-947.ibm.com/systems/support/i/planning/migrationupgrade.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Migrations & Upgrades


Upgrade Planning Info.
http://www-947.ibm.com/systems/support/i/planning/upgrade/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Upgrade Planning Info.


IBM i 6.1
http://www-947.ibm.com/systems/support/i/planning/upgrade/v6r1/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Upgrade Planning Info.


 IBM i 7.1
Software
http://www-947.ibm.com/systems/support/i/planning/upgrade/v7r1/software.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Migrations & UpgradesSW Upgradesi7.1 Info. CenterWhats New


Info Center Tip: Bookmarking a favorite section in Internet Explorer 6

Tip: For Firefox, right


mouse on any topic or
bread crumb and choose
Bookmark This Link

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Needle in a haystack?

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Migrations & Upgrades


SW Upgrades
V7R1 Info.
Fastpath.
http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/fastpathrzahc.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Migrations & Upgrades


SW Upgrades
V7R1 Info.
Fastpath.
http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/requiredfixesupgrade.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Prefer a hardcopy? PDFs are available


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/rzahc1.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM Pre-Upgrade Verification Tool

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

What is the IBM Pre-Upgrade Verification Tool?


 As-is tool developed by IBM to help ensure a successful IBM i
(i5/OS) upgrade
Tool checks to see if key required pre-upgrade steps have been
successfully completed
If not, the steps that were missed or completed incorrectly are
flagged
YOU then have the opportunity to successfully complete the
missing/incorrect steps
Important the tool itself does not automatically perform any
corrective actions/missed steps

 Useful to anyone preparing for an upgrade


Source: OS/400 V5R2M0 and above
Target : up to IBM i 7.1

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

New Pre-Upgrade Verification Tool (PRUV) verifies:


 Prepare for Install steps
Prerequisite PTFs applied
Acceptance of Software Agreements
Allocation of additional LIC space
System values
ANZOBJCVN PTFs applied ( V6R1 only)
etc.
 Checks for other items that may prevent a successful upgrade
Damaged system profiles
Duplicate/extension files in system libraries
etc.
 Optionally performs other steps, including checking for the existence of useful
items prior to the upgrade including
Performance data
BRMS recovery report
etc.

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

PRUV Tool Requirements:


 Client
Windows PC

 Server:
OS/400 V5R2/V5R3 or i5/OS V5R4
and Host Servers (Option 12) installed

 Download tool from IBM site:


The URL/Web site is contained in the knowledgebase document
KB465353483 (or search for keyword PRUV)
http://www912.ibm.com/s_dir/slkbase.nsf/1ac66549a21402188625680b0002037e/5a6b33f04dcc09
3a8625736a00590072?OpenDocument&Highlight=2,pruv

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i :

Signon to desired system

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:


Select desired Target Release

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i :


Choose the kind of checks to run

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i :

Click Finish after reviewing messages

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Pre-Upgrade Verification tool for IBM i:

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Program conversion to IBM i 6.1, IBM i 7.1

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

i5/OS program conversion to IBM i 6.1, IBM i 7.1


 This is required for i 6.1 or IBM i 7.1 from release V5R4 or earlier
 This is not the same as CISC-to-RISC
Not a hardware conversion
 Simple process to review objects and estimate time to convert
 Conversion requires program's creation data (observability)
 You can use the rating of a different processor for the estimate
 Eradicate any unsupported program alterations
 Extend unique ability to remove code corruption

Every runnable MI application includes creation data, so can be converted


without source
No ongoing updates required

ITSO Redpaper: i5/OS Program Conversion: Getting Ready for i 6.1


http://www.redbooks.ibm.com/redpieces/abstracts/redp4293.html?Open

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010






IBM i Program Conversion

Ensures unprecedented system integrity


Delivers improved performance
Enables exploitation of future system and processor capabilities
Program conversion will be required to run with IBM i 6.1 or IBM i 7.1

Program conversion automatically upgrades software to exploit latest system


enhancements
Not required for POWER6, which can run IBM i 5.4
Required for POWER7, can run on IBM i 6.1 or IBM i 7.1
 Conversion requires program's creation data (observability)

Note that all programs created for V5R1 or later releases have had their
creation data automatically saved during program creation
 Tool available now to analyze program conversion for i5/OS V5R3 / V5R4

Identifies potential issues, if any, and estimates conversion time


 Program conversion is performed during install/restore of applications, at first use
or at scheduled time

ITSO Redpaper: i5/OS Program Conversion: Getting Ready for V6R1 http://www.redbooks.ibm.com/redpieces/abstracts/redp4293.html?Open
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

About Conversion
 Replace existing program object, without compile
o Most attributes retained; modification timestamp updated
o Works for all* created for V5R1 or later,
older programs unless creation data removed

 One-time process, but required either direction


o V5R4 or V5R3  i 6.1
o V5R4 or V5R3 i 6.1

 Integral to i 6.1 or i 7.1 , so no options or added fees


 Average per-program convert times, large sample
o Sub-second on fastest processors, < 4 seconds on slowest
o Programs with many modules can take a lot longer

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Programs with creation data,


on pre-i 6.1 systems

Programs created/converted
on i6.1 systems with
pre-POWER6 hardware

Programs created/converted
on i6.1 systems with
POWER6 hardware

Optional conversion during restore, mandatory before running


Mandatory conversion during restore
No conversion required
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Program conversion method choices on i 6.1, i7.1


 Choose combination of methods
o You initiate by library
STROBJCVN
o Restore/install
FRCOBJCVN(*YES *ALL) or set QFRCCVNRST >= 2
o First call (etc.)

 Consider ANZOBJCVN estimates,


Redpaper recommendations
 Must regenerate applications that wont convert
o Compile from source or acquire

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

ANZOBJCVN command
Analyze Object Conversion (ANZOBJCVN)
Type choices, press Enter.
Option . . . . . . . . . . . . . . . . >*COLLECT
Libraries to analyze . . . . . . *ALLUSR
ASP device . . . . . . . . . . . . *
Check spooled files . . . . . . *YES
Object . . . . . . . . . . . . . . . . . *NONE

*COLLECT, *REPORT
Name, generic*, *ALLUSR...
Name, *, *ALLAVL...
*YES, *NO

Directory subtree . . . . . . . *ALL


Target release . . . . . . . . . V6R1M0

*ALL, *NONE
VxRyMz

Option . . . . . . . . . . . . . > *REPORT


Type of report . . . . . . . . . *ALLAVL
+ for more values

*COLLECT, *REPORT
*ALLAVL, *CVNPRB, *LIBSUM...

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

ANZOBJCVN *report output


Display Spooled File
File . . . . . :
QPIZARPT
Page/Line
3/24
*...+....1....+....2....+....3....+....4....+....5....+....6....+....7....+...
Date collected . . . . . . . . . . . . . . . . . . . . . . . . . . . . :04/13/08
Total analyzed objects . . . . . . . . . . . . . . . . . . . . . . . . : 1.440
Objects that can be converted with no lost attributes . . . . . . . . : 1,436
Objects that can be converted with some lost attributes . . . . . . . :
0
Total objects to convert . . . . . . . . . . . . . . . . . . . . . . . : 1,436
Total estimated conversion time for library objects. . . . . . . . . . :00:06:37
Analyze Object Conversion - Library Summary Report
4/13/08
5722SS1 V5R4M0 060210 EBC570I1
Auxiliary Storage Pool (ASP) . . . . . . . . . . : 00001
ASP Resource Na
-------------Counters------------- ------------------Symptoms--Total
Need
No Lost
Some Lost
Conversion
Library
Objects
Conversion
Attributes
Attributes
Time
---------- ----------- ------------ ------------ ---------- --------APILIB
5
5
5
0
00:00:01
APILIBMOD
5
5
5
0
00:00:01
ARCLIB
13
13
13
0
00:00:14
Total spooled files to convert . . . . . . . . . .: 436
Total estimated conversion time for spooled files : 00:00:04
Install initial program load (IPL) conversions:
ASP
Total
ASP
Resource
Affected
Conversion
ID
Name
Spool files
Time
-------------- -------------- ---------1
SYSBAS
436 00:00:04
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Status of conversion activity


 For those ISVs who have gone through the conversion process, the
feedback is good
 145 ISVs participated in the beta program
831 applications listed for i 6.1 in the Global Solutions Directory as of
July 23, 2009
2,182 applications listed for IBM i 6.1 in the Global Solutions Directory as
of April 29, 2010
108 applications listed for IBM i 7.1 in the Global Solutions Directory as
of April 29, 2010

https://www-304.ibm.com/jct09002c/gsdod/homepage.do

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Prepare on i 5.4 or V5R3 before upgrade


 Read latest information
Redpaper REDP-4293
i5/OS program conversion: Getting ready for i5/OS V6R1 and beyond
ww.redbooks.ibm.com/redpieces/abstracts/redp4293.html
IBM i planning web site:
www-304.ibm.com/jct01004c/systems/support/i/planning/upgrade/index.html

 Download PTFs to run ANZOBJCVN


See Redpaper recommendations
Run Analyze Object Conversion to collect data, generate reports
Identifies potential MI program conversion issues, estimates times
If purchased application will not convert and no source to compile, ask provider
for V5R1 or later version

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Other Software Planning

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

General Resources for Software Planning


 IBM i (i5/OS)
Information Center http://publib.boulder.ibm.com/iseries/

 Memo to Users
Located in the Info Center
IBM i 6.1 http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/index.jsp
IBM i 7.1 http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/index.jsp

 Software No Longer Supported


http://www-304.ibm.com/systems/support/i/planning/upgrade/v6r1/software.html

 PSP Planning Site


http://www-912.ibm.com/s_dir/sline003.nsf/ALLPSPBYREL?OpenView&Start=1&Count=30&Collapse=2#2

 See applicable Announcement Letters


Located on the announcement site http://www-01.ibm.com/common/ssi/index.wss

 Individual Product Web sites off of the IBM i home page


http://www-03.ibm.com/systems/i/software/a2z.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Withdrawals and Changes


Function / Product

Notes

Recommended Replacement

Direct Attach Ops Console

Not supported with i 7.1

LAN Console or HMC: Read Memo to User

Java Developer Kit (Classic)

Not included with i 7.1

IBM Technology for Java

Extended Integrated Server Support

Not support on i 7.1 (5761-LSB)


Linux not supported on iSCSI attached systems
IBM i no longer support save while active and File
Level Backup for Linux partitions

IBM i in Option 29 - Integrated Server Support.


Linux supported under VMWare

IBM i Information Center Media

Physical Media no longer available

Use the online version of the Information Center

AnyNet

Still included in i 7.1, but no longer supported

Enterprise Extenders function of IBM i

System i Access for wireless

Not supported on i 7.1 (5722-XP1)

IBM Systems Director

Secure Perspectives

Not supported on i 7.1 (5733-PS1)

Lab Services offering

Rational Developer for i

Withdraw Feb 9 effective May 11 (5733-RDI)

Rational Developer for Power RPG and COBOL


Development for i

Zend Core for i & Zend Plaform for i

Withdraw 4/13 effective 7/17 (5619-ZP1, 5771-ZP1

Replaced by Zend Server Community Edition for i


Zend Server Support for i 5771-ZC1

WebSphere 6.0

Must redeploy applications

WebSphere 6.1 or 7.0

Lotus Document Manager

Auto entitled to LOTUS QUICKR, can upgrade to


Enterprise Content Manager until September 2010

IBM Lotus Quickr. IBM Content Manager


Collaboration Edition or IBM FileNet
Content Manager Collaboration Edition.

IBM i Planning Web Site


http://www-947.ibm.com/systems/support/i/planning/upgrade/v6r1/planstmts.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Information Center http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/index.jsp

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Prefer a hardcopy? PDFs are available


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/rzahc1.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

i5/OS Information Center


http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/index.jsp

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

i5/OS Information Center ->V6R1 Memorandum to Users


-- Review to understand changes in i6.1 that could affect your system April 2010 latest update

http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzaq9/rzaq9.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Software from A to Z


http://www-03.ibm.com/servers/eserver/iseries/software/a2z.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

System i Access for Windows


 Read IBM i 6.1 and IBM i 7.1 Memo to Users & for changes/enhancements:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

 Refer to Web site: http://www-03.ibm.com/systems/i/software/access/windows/

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Domino for IBM i


 Read IBM i 6.1 and IBM i 7.1 Memo to Users for changes/enhancements:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

 IBM i 6.1 currently supports Domino 8.0.1 and 7.0.3 releases


Go to Lotus software for IBM i Compatibility Guide

http://www-03.ibm.com/systems/i/software/domino/support/

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Lotus Software for IBM i Compatibility Guide


http://www-03.ibm.com/systems/i/software/domino/pdf/releasesupport.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

WebSphere Application Server


 Read IBM i 6.1 and IBM i 7.1 Memo to Users for changes/enhancements:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

Using WebSphere Application Server V5.1 or WebSphere 6.0 now?


Migration to WebSphere Application Server V6.1 or V7.1
Migration can be done before or after an upgrade to IBM i 6.1 or 7.1
 Refer to applicable product documentation/release notes (at product home pages):
http://www-03.ibm.com/servers/eserver/iseries/software/a2z.html#W

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

WebSphere Application Server for IBM i Home Page


http://www-03.ibm.com/systems/i/software/websphere/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Windows Integration
 Read IBM i 6.1 and IBM i 7.1 Memo to Users for changes/enhancements:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

 Refer to home page:


http://www-03.ibm.com/systems/i/bladecenter/

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i on IBM BladeCenter


http://www-03.ibm.com/systems/i/advantages/v6r1/blades/

Note: Additional, different skills will be required to implement this environment.


2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i on IBM BladeCenter


http://www-03.ibm.com/systems/i/advantages/v6r1/blades/pdf/i_on_blade_readme.pdf
http://ibm.com/systems/resources/systems_power_hardware_blades_supported_environments.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Linux on Integrated Servers and IBM i 6.1


 Read IBM i 6.1 and IBM i 7.1. Memo to Users for changes/enhancements:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

 Support no longer there for all Linux operating systems running on Integrated xSeries
Server (IXS) & xSeries Adapter (IXA)
IXS/IXA server may be migrated from a previous release to a new system but
functions that will NOT work with IBM i 6.1:

Installations on IXS/IXA hardware


Post-installation utility (ixssetup.sh)
Update utility (ixsupdt)
 Support no longer there for SuSE Enterprise Linux 9 (SLES9) running on an iSCSI
platform for integrated servers
An iSCSI-based integrated server running SLES9 may be migrated but support is as is;
functions that will NOT work with IBM i 6.1 are:

Installations on iSCSI hardware for *SLESe9


Post-installation utility (ixssetup.sh).
Update utility (ixsupdt).

Linux on Integrated Servers site: http://www-03.ibm.com/systems/i/advantages/integratedserver/linux/index.html


2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

DB2

 Read Memo to Users for changes/enhancements:

http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzaq9/rzaq9.pdf

 If upgrading from V5R3 -- SQL related and DB file conversions (More details)
http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzaq9/rzaq9.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

3rd Party & In House Developed Software Solutions


 In house developed applications?
Tested yet on IBM i 6.1, IBM i 7.1 ?
Has ANZOBJCVN tool been used yet?

Important!

 Contact Application Providers/Vendor(s)


Supported and tested on IBM i 6.1, IBM 7.1 ?
Any fixes/PTFs required?
Will conversion occur on client system or will 6.1 version
be shipped out?
Any licensing fee considerations?
Migration vs. upgrade (i.e. keeping same
POWER System serial number?)

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Major IBM i 6.1, IBM i7.1


Upgrade Planning Tasks

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Outline* of Major IBM i Planning or Pre-Upgrade Tasks


A.) Use key planning documents: Info Center (e.g. Install Guide), Memo to
Users and IBM ITSO Redpaper: IBM i5/OS Program Conversion: Getting
Ready for IBM i V6R1
B.) Install PTFS and use ANZOBJCVN tools to analyze your system
C.) Verify server firmware requirements and read applicable PSP (Preventive
Service Planning) documents such as
IBM i 6.1

SF98020 V6R1 Software Install Information

SF98610, MF98610

SF98169 Server upgrade & migrations corrections


IBM i 7.1 SF98030 Late breaking information, SF98710-Hiper PTFs, MF98710 i
7.1 Hardware & HMC, SF98170 Systems Upgrades and Data Migrations.

D.) Read applicable Info APARs -- e.g. II14310 (Required PTFs for i6.1)
E.) Order latest CUMe package SF98610 (dont forget about ordering Group
PTFs)

* Note: This is not an all-inclusive task list be sure to refer to the Info Center or in the pdf for
IBM i 6.1 http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzaq9/rzaq9.pdf
or

IBM i 7.1 http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/sc415120.pdf


2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Major IBM i Planning or Pre-Upgrade Tasks - Overview


F.) Prepare for Install PTFs are required for your V5R3 system before using the
Prepare for Install menu option
The Prepare for Install PTFs media included with your V6R1 software
G.) Review Software Stack (for each LPAR)
Third Party Vendors
License Program Products
Middleware
H.) Consider using virtual image catalog for upgrade (PTFs are required for V5R3)
Network Installation for i7.1 (PTFs are required for IBM 6.1)
ftp://public.dhe.ibm.com/systems/support/power/i/nfs_optical_upgrade.pdf

I.) Review/leverage Upgrade planning Template:


http://www-947.ibm.com/systems/support/planning/upgradeproj/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Major IBM i Planning or Pre-Upgrade Tasks - Overview


J.) Accept Software Agreements before upgrading( GO LICPGM and then Option
5: Prepare for Install)
K.) Verify contents of the software media that was shipped
L.) Load Source Storage Requirements, IBM i and LPP Storage Requirements
If upgrading from V5R3MO:
Ensure load source disk is at least 17GB
Allocate additional space for LIC -- suggested to use API discussed at

TIP: To make upgrade planning easier --take advantage of the IBM Pre-Upgrade Verification Tool!
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

A) Use the Key Planning Documents


 IBM i Memo to Users IBM i 6.1
http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzaq9/rzaq9.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

A) Use the Key Planning Documents


 Memo to Users IBM i 7.1
http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzaq9/rzaq9.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Information Center


http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/index.jsp

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

A) Use the Key Planning Documents


 V6R1 Installation/Upgrade guide:
http://publib.boulder.ibm.com/infocenter/iseries/v6r1m0/topic/rzahc/sc415120.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Prefer a hardcopy? PDFs are available


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/rzahc1.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

A) Use the Key Planning Documents (ITSO Redpaper)


 IBM i5/OS Program Conversion: Getting Ready for IBM i V6R1
http://www.redbooks.ibm.com/abstracts/redp4293.html?Open

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

B) Analyze existing system(s) -- ANZOBJCVN tool


 FYI - Chapter 1 in ITSO redpaper summarizes overall process (e.g. download PTFs to obtain
ANZOBJCVN tool)

http://www.redbooks.ibm.com/redpapers/pdfs/redp4293.pdf

FYI: More details on IBM 6.1 program conversion are in session iIB15
2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

B) Analyze existing system(s) -- ANZOBJCVN


 Be sure to refer to the latest information (e.g. PTFs) in the Info APAR II14306
http://www912.ibm.com/n_dir/nas4apar.nsf/c79815e083182fec862564c00079d117/3af47a966c4df94586257306003c6868
?OpenDocument&Highlight=2,ii14306

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

C) Read Applicable PSP Documents such as:


 SF98020: Contains important V6R1 software install information
 SF98029 High Impact Pervasive PTFs
 And others
http://www-912.ibm.com/s_dir/sline003.nsf/ALLPSPBYREL?OpenView&Start=1&Count=30&Expand=1#1

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

C) Read Applicable PSP Documents including:


 IBM i 6.1 SF98610 Current Cumulative package information (not shipped with software upgrade
media)
 SF98169 Server upgrade/data migrations corrections
IBM i 7.1 SF98030 Late breaking information, SF98710-Hiper PTFs, MF98710 i 7.1 Hardware & HMC,
SF98170 Systems Upgrades and Data Migrations.

 And others
http://www-912.ibm.com/s_dir/sline003.nsf/ALLPSPBYREL?OpenView&Start=1&Count=30&Expand=1#1

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

D) Read Applicable Informational APARs


 II4310 Required PTFs for upgrading to IBM i 6.1 (and others as applicable)
 ll14482 Required PTFs for upgrading to IBM i 7.1

http://www-912.ibm.com/n_dir/nas4apar.nsf/nas4aparhome

Updated
chart

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

D) Informational APAR II14310 Reqd PTFs for Upgrading


http://www912.ibm.com/n_dir/nas4apar.nsf/5c9334a60fce2c52862573db0067acef/6cf800ceaf8376c3862573e70041ec63?OpenDocument

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

D) Informational APAR II14310 Required PTFs for Upgrading


http://www912.ibm.com/n_dir/nas4apar.nsf/5c9334a60fce2c52862573db0067acef/6cf800ceaf8376c3862573e70041ec63?OpenDocument

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

E) Order latest CUM package


 Request SF99610 to order CUM
SF98610 PSP lists current CUM level and details
 Order other appropriate Group PTFs
Click Group PTFs link at http://www-912.ibm.com/s_dir/sline003.nsf/sline003home
http://www-912.ibm.com/s_dir/sline003.nsf/GroupPTFs?OpenView&Start=1&Count=30&Expand=1#1

New

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

F) Prepare for Install PTFs


 Install the Prepare for Install PTFs for V5R3 before using the Prepare for Install menu
option
Included on the Prepare for Install PTFs media shipped with V6R1 (See Informational
APAR II14310 below)
http://www912.ibm.com/n_dir/nas4apar.nsf/5c9334a60fce2c52862573db0067acef/6cf800ceaf8376c3862573e70041ec63?OpenDocument

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

G) Review Software Stack. Work with Licensed Programs

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

G) Review Software Stack . Work with Licensed Programs

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

H) Virtual Media Installation


 Automate IBM i and Licensed Programs installs through virtual media
Isolate media errors and minimize user intervention
Improves system availability

New with V5R2

 First enabled with OS/400 V5R2


Extended to support V5R1 through PTFs
SI10553, SI06069 and MF29250

QIBM.....1
QIBM.....2
QIBM.....3
..
QIBM....10

 Required PTFs Info APAR II14310

Upgrading from V5R3M0 - SI28698, MF42598, MF43199


Upgrading from V5R3M5 - SI28698, MF42599, MF43355
Upgrading from V5R4M0 - SI28697, MF42600, MF43154
Upgrading from V5R4M5 - SI28697, MF42601, MF43157

 Easy configuration steps

Before

Create a virtual image catalog device


Build image catalog to transfer IBM software
from distribution media to a user defined IFS directory
Restart system to load from virtual device
Point licensed program installation or
PWRDWNSYS command to IFS path

 Use Network install if Upgrading from IBM i 6.1 to IBM i 7.1

ftp://public.dhe.ibm.com/systems/support/power/i/nfs_optical_upgrade.pdf

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

H) Virtual Media Installation (via Image Catalog)


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/index.jsp?topic=/rzahc/prepareimagecatalog.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

I) Review/Use Upgrade (HW & SW) Planning Template (as


appropriate)
https://www-304.ibm.com/systems/support/planning/upgradeproj/index.html

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

J) Accept Software Agreements Before Upgrading


http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/rzahcrequiredtasks.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

K) Verify Contents of the Shipped Software Media

DVDs!

http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/prepareupgradeorreplace.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

K) Verify Contents of the Shipped Software Media

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

K) Verify Contents of the Shipped Software Media

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

K) Verify Contents of the Shipped Software Media

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

K) Verify Contents of the Shipped Software Media

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

IBM i Media Charges/Electronic download support


expanded
 Effective April 13, 2010
 Applies to all IBM i marketed releases
i 5.4, i 6.1, i 7.1
 $50 USD media charge for IBM i initial and upgrade orders
 No media charge if use Electronic Software Download
 Electronic Software Delivery (ESD)
A new API called QVOIFIMG (Fill Image Catalog) has been PTFd
into V5R4 and V6R1 that makes it easier to use image catalogs
when working with images that have been downloaded through
the ESD process.
Information APAR for software Installation upgrade to IBM i
7.1 (II14482) includes the specific PTF numbers for each of
these releases.

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

L) Load Source, IBM i & Licensed Programs Storage Reqts


iBM i 7.1 http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/topic/rzahc/rzahcswslpsze.htm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

L) Load Source, IBM i & Licensed Programs Storage Reqts

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

L) Load Source, IBM i & Licensed Programs Storage Reqts

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

L) Load Source, IBM i & Licensed Programs Storage Reqts

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

TOP 10 Keys to Success


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Be sure to plan for ample time to do program conversion planning


& analysis (e.g. ANZOBJCVN) use the ITSO redpaper
Contact your applications providers/software vendors
Use the IBM Information Center and Memo to Users!
(If skipping a release, read the interim releases Memo to Users)
Leverage the as is IBM Pre-Upgrade Verification tool and collect before and after
performance data
Load source unit must be 17GB or greater and ensure that enough reserved space is allocated
for LIC
Be sure to SAVE your entire system before the IBM i upgrade (and double check the save job
log) (FlashCopy the entire system works as well)
Must accept SW license agreements before upgrade
Verify the contents of your software order and consider using Virtual Media installation
Use the IBM i Planning Web site and refer to Preventive Service Planning documents at
http://www-912.ibm.com/s_dir/sline003.nsf/sline003home
Estimate upgrade/installation time (and understand impact of
conversions):
http://publib.boulder.ibm.com/infocenter/iseries/v7r1m0/index.jsp?topic=/rzahc/rzahcsoftref1.h
tm

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Useful Web Sites

 IBM i 6.1 Info Center: (i.e. (Whats New and Memo to Users)
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/index.jsp
 Information Center IBM i (i5/OS V6R1) Installation/Upgrade:
http://publib.boulder.ibm.com/infocenter/systems/scope/i5os/topic/rzahc/rzahc1.htm?tocNode=int_217885
 ITSO Redpaper IBM i5/OS Program Conversion - Getting Ready for i5/OS V6R1:
http://www.redbooks.ibm.com/abstracts/redp4293.html?Open
 IBM i Support home page (e.g. links to Info APARS, PSPs, Fix Central, Technical Databases....): http://www304.ibm.com/systems/support/supportsite.wss/brandmain?brandind=5000027
 PSP Planning Site http://www-912.ibm.com/s_dir/sline003.nsf/sline003home
 IBM Electronic Software Delivery Web site:
http://www-304.ibm.com/jct01004c/systems/support/software/delivery/en_US/downloadinfo.html
 IBM Entitled Software Support site (Entitled SW Updates, SW Keys, Proofs of Entitlement.)
https://www-5.ibm.com/servers/eserver/ess/OpenServlet.wss
 System i Planning: http://www-304.ibm.com/jct01004c/systems/support/i/planning/
 Software No Longer Supported: http://www-304.ibm.com/systems/support/i/planning/upgrade/v6r1/index.html
 IBM Prerequisite Web site: http://www-912.ibm.com/e_dir/eserverprereq.nsf
 IBM Announcement Letters Web site: http://www-306.ibm.com/common/ssi/OIX.wss
 Individual System i software product Web sites http://www-03.ibm.com/systems/i/software/a2z.html
 New IBM Pre-Upgrade Verification tool: http://www912.ibm.com/s_dir/slkbase.nsf/1ac66549a21402188625680b0002037e/5a6b33f04dcc093a8625736a00590072?Op
enDocument&Highlight=2,pruv

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Trademarks
The following are trademarks of the International Business Machines Corporation in the United States, other countries, or both.
Not all common law marks used by IBM are listed on this page. Failure of a mark to appear does not mean that IBM does not use the mark nor does it mean that the product is not
actively marketed or is not significant within its relevant market.
Those trademarks followed by are registered trademarks of IBM in the United States; all others are trademarks or common law marks of IBM in the United States.

For a complete list of IBM Trademarks, see www.ibm.com/legal/copytrade.shtml:


*, AS/400, e business(logo), DBE, ESCO, eServer, FICON, IBM, IBM (logo), iSeries, MVS, OS/390, pSeries, RS/6000, S/30, VM/ESA, VSE/ESA,
WebSphere, xSeries, z/OS, zSeries, z/VM, System i, System i5, System p, System p5, System x, System z, System z9, BladeCenter

The following are trademarks or registered trademarks of other companies.


Adobe, the Adobe logo, PostScript, and the PostScript logo are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States, and/or other countries.
Cell Broadband Engine is a trademark of Sony Computer Entertainment, Inc. in the United States, other countries, or both and is used under license therefrom.
Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both.
Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both.
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel
Corporation or its subsidiaries in the United States and other countries.
UNIX is a registered trademark of The Open Group in the United States and other countries.
Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both.
ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office.
IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency, which is now part of the Office of Government Commerce.
* All other products may be trademarks or registered trademarks of their respective companies.
Notes:
Performance is in Internal Throughput Rate (ITR) ratio based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput that any user will
experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed.
Therefore, no assurance can be given that an individual user will achieve throughput improvements equivalent to the performance ratios stated here.
IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply.
All customer examples cited or described in this presentation are presented as illustrations of the manner in which some customers have used IBM products and the results they may have achieved. Actual
environmental costs and performance characteristics will vary depending on individual customer configurations and conditions.
This publication was produced in the United States. IBM may not offer the products, services or features discussed in this document in other countries, and the information may be subject to change without
notice. Consult your local IBM business contact for information on the product or services available in your area.
All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
Information about non-IBM products is obtained from the manufacturers of those products or their published announcements. IBM has not tested those products and cannot confirm the performance,
compatibility, or any other claims related to non-IBM products. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products.
Prices subject to change without notice. Contact your IBM representative or Business Partner for the most current pricing in your geography.

126

2010 IBM Corporation

IBM Systems Technical University Budapest, 3 -6 May 2010

Trademarks
The following are trademarks of the International Business Machines Corporation in the United States, other countries, or both.
Not all common law marks used by IBM are listed on this page. Failure of a mark to appear does not mean that IBM does not use the mark nor does it mean that the product is not
actively marketed or is not significant within its relevant market.
Those trademarks followed by are registered trademarks of IBM in the United States; all others are trademarks or common law marks of IBM in the United States.

For a complete list of IBM Trademarks, see www.ibm.com/legal/copytrade.shtml:


*, AS/400, e business(logo), DBE, ESCO, eServer, FICON, IBM, IBM (logo), iSeries, MVS, OS/390, pSeries, RS/6000, S/30, VM/ESA, VSE/ESA,
WebSphere, xSeries, z/OS, zSeries, z/VM, System i, System i5, System p, System p5, System x, System z, System z9, BladeCenter

The following are trademarks or registered trademarks of other companies.


Adobe, the Adobe logo, PostScript, and the PostScript logo are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States, and/or other countries.
Cell Broadband Engine is a trademark of Sony Computer Entertainment, Inc. in the United States, other countries, or both and is used under license therefrom.
Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both.
Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both.
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel
Corporation or its subsidiaries in the United States and other countries.
UNIX is a registered trademark of The Open Group in the United States and other countries.
Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both.
ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office.
IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency, which is now part of the Office of Government Commerce.
* All other products may be trademarks or registered trademarks of their respective companies.
Notes:
Performance is in Internal Throughput Rate (ITR) ratio based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput that any user will
experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed.
Therefore, no assurance can be given that an individual user will achieve throughput improvements equivalent to the performance ratios stated here.
IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply.
All customer examples cited or described in this presentation are presented as illustrations of the manner in which some customers have used IBM products and the results they may have achieved. Actual
environmental costs and performance characteristics will vary depending on individual customer configurations and conditions.
This publication was produced in the United States. IBM may not offer the products, services or features discussed in this document in other countries, and the information may be subject to change without
notice. Consult your local IBM business contact for information on the product or services available in your area.
All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
Information about non-IBM products is obtained from the manufacturers of those products or their published announcements. IBM has not tested those products and cannot confirm the performance,
compatibility, or any other claims related to non-IBM products. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products.
Prices subject to change without notice. Contact your IBM representative or Business Partner for the most current pricing in your geography.

127

2010 IBM Corporation

Das könnte Ihnen auch gefallen