Sie sind auf Seite 1von 583

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 191
210
475
: 191QL
475AT

192
212
485
192QR
485AT

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 ACCESS PLATFORM

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-10-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

001

OPT 10000-001
2

DEC14

___________
PREPARATION
NOTE: DO NOT PERFORM THE OPERATIONAL TEST WHEN
THE AIRCRAFT IS ON JACKS.
IN ORDER TO SIMPLIFY THE OPT, TEST ONE
SYSTEM AT A TIME.
WARNING: DISPLAY WARNING NOTICES PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
1. INSTALL ACCESS PLATFORM AT ENGINE.
2. OPEN ACCESS DOORS 191NL (192NR) AND 475AT
(485AT).

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

004

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

__________________________________________
OPERATIONAL
CHECK OF PACK VALVE INDICATING
REF. FIG. 211000-OPT-00100
1. TEST WITH MFC MODULE 1B (2B) DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1B (MFC/2B)
PUSHBUTTON SWITCH 6UA1 (6UA2) AND VERIFY
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-001
3

DEC14

THAT RELEVANT OFF LEGEND COMES ON.


B. ON PANEL 22VU PRESS PUSHBUTTON SWITCH ENG 1
(2) BLEED 27HA (28HA).
C. ON PANEL 22VU PRESS PUSHBUTTON SWITCH PACK
VALVE SYS 1 (2) 9HB (10HB) AND VERIFY THAT
FAULT LEGEND COMES ON.
D. RELEASE ENG 1 (2) BLEED PUSHBUTTON SWITCH
27HA (28HA) AND VERIFY THAT FAULT LEGEND
OF PACK VALVE 1 (2) PUSHBUTTON SWITCH 9HB
(10HB) GOES OFF.
E. ON PANEL 22VU RELEASE PACK VALVE PUSHBUTTON
SWITCH 9HB (10HB).
F. ON PACK VALVE DISCONNECT PLUG 19HBA (20HBA)
AND VERIFY THAT ON PACK VALVE PUSHBUTTON
SWITCH 9HB (10HB) FAULT LEGEND COMES ON.
RECONECCT PLUG 19HBA (20HBA)
G. ON PANEL 25VU PRESS MFC/1B (MFC/2B)
PUSHBUTTON SWITCH 6UA1 (6UA2) AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
2. TEST WITH MFC MODULE 1A (2A) DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1A (MFC/2A)
PUSHBUTTON SWITCH 7UA1 (7UA2) AND VERIFY
THAT RELEVANT OFF LEGEND COMES ON.
B. PERFORM STEPS 1B THROUGH 1F.
C. ON PANEL 25VU PRESS MFC/1A (MFC/2A)
PUSHBUTTON SWITCH 7UA1 (7UA2) AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
3. TEST WITH BOTH MFC MODULES ENERGIZED
A. ON PANEL 25VU VERIFY THAT OFF AND FAULT
LEGENDS ARE OFF.
B. SET PROP BRAKE SWITCH TO ON POSITION.
C. ON ENGINE BLEED 2 SHUT OFF VALVE 16HA
DISCONNECT CONNECTOR A AND BRIDGE PIN J
TO D AND K TO G.
NOTE: FAULT LEGEND ON ENGINE BLEED 2
PUSHBUTTON SWITCH WILL COME ON AND
SHOULD NOT BE CONSIDERED FOR THIS TEST.
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-001
4

DEC14

D. PRESS BOTH PACK VALVE PUSHBUTTON SWITCHES


9HB AND 10HB AND VERIFY THAT FAULT
LEGENDS REMAIN OFF.
E. PRESS ENGINE 2 BLEED PUSHBUTTON SWITCH 28HA
AND VERIFY THAT FAULT LEGENDS ON BOTH
PUSHBUTTON SWITCHES 9HB AND 10HB COME ON.
F. RELEASE ENGINE 2 BLEED PUSHBUTTON SWITCH
28HA AND PACK VALVE PUSHBUTTON SWITCHES
9HB AND 10HB.
005

OPERATIONAL TEST OF PACK VALVE ASSOCIATED


_________________________________________
CIRCUIT
_______
REF. FIG. 211000-OPT-00100
1. CHECK OF RH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 2B DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/2B P/BSW 6UA2 AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS RH PACK P/BSW 10HB.
C. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
D. ON OVERHEAT SWITCH 18HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
E. ON PACK VALVE CONNECTOR 20HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
F. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 10HB COMES ON.
G. REMOVE THE JUMPER WIRE FROM OVERHEAT
SWITCH 18HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
H. ON PANEL 22VU RELEASE P/BSW 10HB.
I. ON PANEL 25VU PRESS MFC/2B P/BSW 6UA2 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.
2. CHECK OF RH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 2A DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/2A P/BSW 7UA2 AND
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

21-10-00

OPT 10000-001
5

DEC14

VERIFY THAT RELEVANT OFF LEGEND COMES ON.


B. ON PANEL 22VU PRESS P/BSW 10HB.
C. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
D. AFTER 7 SEC, ON PACK VALVE CONNECTOR 20HBA
VERIFY THAT VOLTAGE STILL EXISTS BETWEEN
PINS 5 AND 6.
E. ON OVERHEAT SWITCH 18HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 20HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 10HB COMES ON.
H. REMOVE THE JUMPER WIRE FROM THE OVERHEAT
SWITCH 18HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
I. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 10HB GOES OFF.
J. ON PANEL 22VU RELEASE AND PRESS P/BSW 10HB.
K. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
L. SIMULATE FLIGHT STATUS (APPROACH A FALSE
TARGET TO ONE OF THE WOW PROXIMITY SWITCHES
51GB OR 52GB OR 55GB).
WARNING: ANY PRECAUTION TO AVOID INADVERTENT
LANDING GEAR RETRACTION SHALL BE
TAKEN.
M. AFTER A TIME DELAY OF 7 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
N. ON PANEL 101VU SELECT WARN SELECTOR SWITCH
17WW IN VMO POSITION.
O. ON PANEL 101VU PRESS PTT P/BSW 187WW.
P. AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
Q. ON GROUND T/F PRESSURE SWITCH 80HB
DISCONNECT CONNECTOR A AND BRIDGE PIN 2
TO 3.
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
5
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

21-10-00

OPT 10000-001
6

DEC14

R. AFTER APPROXIMATELY 7 SEC, ON PACK VALVE


CONNECTOR 20HBA VERIFY THAT NO VOLTAGE
EXISTS BETWEEN PINS 5 AND 6.
S. RELEASE PTT 187WW AND PLACE SEL SW 17WW
FROM VMO POSITION TO NORM FLT POSITION.
T. ON PANEL 22VU RELEASE P/BSW 10HB.
U. REMOVE JUMPER WIRES FROM ENGINE BLEED SHUT
OFF VALVE 16HA AND REINSTALL THE CONNECTOR.
V. REMOVE THE JUMPER WIRE FROM GROUND T/F
PRESSURE SWITCH 80HB CONNECTOR A.
W. REINSTALL CONNECTOR ON GROUND T/F PRESSURE
SWITCH 80HB.
X. REINSTALL CONNECTOR ON PACK VALVE 20HB.
Y. ON PANEL 25VU PRESS MFC/2A P/BSW 7UA2 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.
3. CHECK OF LH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 1B DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1B P/BSW AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON ENGINE BLEED SHUT OFF VALVE 15HA
DISCONNECT CONNECTOR A AND BRIDGE PINS
J TO D AND K TO G.
C. ON PANEL 22VU PRESS LH PACK P/BSW 9HB.
D. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
E. ON OVERHEAT SWITCH 17HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 9HB COMES ON.
H. REMOVE JUMPER WIRE FROM OVERHEAT SWITCH
17HB CONNECTOR AND REINSTALL THE CONNECTOR
ON OVERHEAT SWITCH.
I. ON PANEL 22VU RELEASE P/BSW 9HB.
J. ON PANEL 25VU PRESS MFC/1B P/BSW AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
4. CHECK OF LH PACK VALVE ASSOCIATED CIRCUIT
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
6
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-001
7

DEC14

WITH MFC MODULE 1A DE-ENERGIZED


A. ON PANEL 25VU RELEASE MFC/1A P/BSW 7UA1 AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS P/BSW 9HB.
C. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
D. AFTER 7 SEC, ON PACK VALVE CONNECTOR 19HBA
VERIFY THAT VOLTAGE STILL EXISTS BETWEEN
PINS 5 AND 6.
E. ON OVERHEAT SWITCH 17HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 9HB COMES ON.
H. REMOVE JUMPER WIRE FROM OVERHEAT SWITCH
17HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
I. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON P/BSW 9HB GOES OFF.
J. ON PANEL 22VU RELEASE AND PRESS P/BSW 9HB.
K. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
L. SIMULATE FLIGHT STATUS (APPROACH A FALSE
TARGET TO ONE OF THE WOW PROXIMITY SWITCHES
50GB OR 53GB OR 54GB).
M. AFTER A TIME DELAY OF 7 SEC, ON PACK VALVE
CONNECTOR 19HB VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
N. ON PANEL 101VU SELECT WARN SELECTOR SWITCH
17WW IN VMO POSITION.
O. ON PANEL 101VU PRESS PTT P/BSW 187WW.
P. AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 19HBA VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
Q. ON GROUND T/F PRESSURE SWITCH 81HB
DISCONNECT CONNECTOR A AND BRIDGE PIN 2
TO 3.
R. AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 19HBA VERIFY THAT NO VOLTAGE
*** CONTINUED ***
AH

21-10-00
OPT 10000-001
2-400 PAGE
7
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-001
8

DEC14

EXISTS BETWEEN PINS 5 AND 6.


S. RELEASE PTT 187WW AND PLACE SEL SW 17WW
FROM VMO POSITION TO NORM FLT POSITION.
T. ON PANEL 22VU RELEASE P/BSW 9HB.
U. REMOVE JUMPER WIRES FROM ENGINE BLEED SHUT
OFF VALVE 15HA AND REINSTALL THE CONNECTOR.
V. REMOVE THE JUMPER WIRE FROM GROUND T/F
PRESSURE SWITCH 81HB CONNECTOR A.
W. REINSTALL CONNECTOR ON GROUND T/F PRESSURE
SWITCH 81HB.
X. REINSTALL CONNECTOR ON PACK VALVE 19HB.
Y. ON PANEL 25VU PRESS MFC/1A P/BSW 7UA1 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.
006

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE ACCESS DOOR 191NL (192NR) AND 475AT
(485AT).
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICES.
*****

AH

E N D

O F

T E X T

*****

21-10-00
OPT 10000-001
2-400 PAGE
8
DEC 01/14

21-10-00
9

AH

CONTROLS INDICATING

OPT 10000-001
DEC14

21-10-00
OPT 10000-001

2-400

PAGE
9
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 191
210
475
: 191QL
475AT

192
212
485
192QR
485AT

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 ACCESS PLATFORM

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)

AH

24-46-00-EAD-10000
31-63-00-PRO-10000

21-10-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

001

OPT 10000-002
2

DEC14

___________
PREPARATION
NOTE: DO NOT PERFORM THE OPERATIONAL TEST WHEN
THE AIRCRAFT IS ON JACKS.
IN ORDER TO SIMPLIFY THE OPT, TEST ONE
SYSTEM AT A TIME.
WARNING: DISPLAY WARNING NOTICES PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
1. INSTALL ACCESS PLATFORM AT ENGINE.
2. OPEN ACCESS DOORS 191NL (192NR) AND 475AT
(485AT).

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

004

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

21-10-00

OPT 10000-002
3

DEC14

THIS PROCEDURE DESCRIBES LOCATION AND


MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).
005

__________________________________________
OPERATIONAL
CHECK OF PACK VALVE INDICATING
REF. FIG. 211000-OPT-00100
1. TEST WITH MFC MODULE 1B (2B) DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1B (MFC/2B)
PUSHBUTTON SWITCH AND VERIFY
THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS PUSHBUTTON SWITCH ENG 1
(2) BLEED.
C. ON PANEL 22VU PRESS PUSHBUTTON SWITCH PACK
VALVE SYS 1 (2) AND VERIFY THAT
FAULT LEGEND COMES ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER FAULT MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
D. RELEASE ENG 1 (2) BLEED PUSHBUTTON SWITCH
AND VERIFY THAT FAULT LEGEND OF PACK
VALVE 1 (2) PUSHBUTTON SWITCH GOES OFF.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD, UPPER WINDOW ON CABIN SD PAGE,
WHITE STBY MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A GREEN BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE DISAPPEARS.
E. ON PANEL 22VU RELEASE PACK VALVE PUSHBUTTON
SWITCH.
F. ON PACK VALVE DISCONNECT PLUG 19HBA (20HBA)
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-002
4

DEC14

AND VERIFY THAT ON PACK VALVE PUSHBUTTON


SWITCH FAULT LEGEND COMES ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER MESSAGE FAULT IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
RECONNECT PLUG 19HBA (20HBA)
- VERIFY THAT FAULT LEGEND OF PACK VALVE
1 (2) PUSHBUTTON SWITCH GOES OFF.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD, UPPER WINDOW ON CABIN SD PAGE,
WHITE OFF MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A WHITE BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE DISAPPEARS.
G. ON PANEL 25VU PRESS MFC/1B (MFC/2B)
PUSHBUTTON SWITCH AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
2. TEST WITH MFC MODULE 1A (2A) DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1A (MFC/2A)
PUSHBUTTON SWITCH AND VERIFY
THAT RELEVANT OFF LEGEND COMES ON.
B. PERFORM STEPS 1B THROUGH 1F.
C. ON PANEL 25VU PRESS MFC/1A (MFC/2A)
PUSHBUTTON SWITCH AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
3. TEST WITH BOTH MFC MODULES ENERGIZED
A. ON PANEL 25VU VERIFY THAT OFF AND FAULT
LEGENDS ARE OFF.
B. SET PROP BRAKE SWITCH TO ON POSITION.
C. ON ENGINE BLEED 2 SHUT OFF VALVE 16HA
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-002
5

DEC14

DISCONNECT CONNECTOR A AND BRIDGE PIN J


TO D AND K TO G.
NOTE: FAULT LEGEND AND ASSOCIATED MESSAGE ON
ENGINE BLEED 2 PUSHBUTTON SWITCH WILL
COME ON AND SHOULD NOT BE CONSIDERED FOR
THIS TEST.
D. PRESS BOTH PACK VALVE PUSHBUTTON SWITCHES
AND VERIFY THAT FAULT LEGENDS REMAIN OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
WHITE STBY MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A GREEN BOX.
E. PRESS ENGINE 2 BLEED PUSHBUTTON SWITCH,
AND VERIFY THAT FAULT LEGENDS ON BOTH
PACK VALVE PUSHBUTTON SWITCHES COME ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER FAULT MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK 1+2
MESSAGE IS DISPLAYED.
F. RELEASE ENGINE 2 BLEED PUSHBUTTON SWITCH
AND PACK VALVE PUSHBUTTON SWITCHES
AND VERIFY THAT FAULT LEGENDS ON
BOTH PACK VALVE PUSHBUTTON SWITCHES GO OFF.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
WHITE OFF MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A WHITE BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK 1+2
MESSAGE DISAPPEARS.
006

OPERATIONAL TEST OF PACK VALVE ASSOCIATED


_________________________________________
CIRCUIT (PART 1)
________________
REF. FIG. 211000-OPT-00100
1. CHECK OF RH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 2B DE-ENERGIZED
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

21-10-00

OPT 10000-002
6

DEC14

A. ON PANEL 25VU RELEASE MFC/2B P/BSW 6UA2 AND


VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS RH PACK P/BSW 10HB.
C. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
D. ON OVERHEAT SWITCH 18HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
E. ON PACK VALVE CONNECTOR 20HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
F. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON RH PACK VALVE P/BSW COMES ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER MESSAGE FAULT IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
G. REMOVE THE JUMPER WIRE FROM OVERHEAT
SWITCH 18HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
H. ON PANEL 22VU RELEASE RH PACK VALVE P/BSW.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD, UPPER WINDOW ON CABIN SD PAGE,
WHITE OFF MESSAGE IS DISPLAYED UNDER
PACK, IN A WHITE BOX.
I. ON PANEL 25VU PRESS MFC/2B P/BSW 6UA2 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.
2. CHECK OF RH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 2A DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/2A P/BSW AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS RH PACK VALVE P/BSW.
C. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

21-10-00

OPT 10000-002
7

DEC14

D. AFTER 7 SEC, ON PACK VALVE CONNECTOR 20HBA


VERIFY THAT VOLTAGE STILL EXISTS BETWEEN
PINS 5 AND 6.
E. ON OVERHEAT SWITCH 18HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 20HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON RH PACK VALVE P/BSW COMES ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER MESSAGE FAULT IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
H. REMOVE THE JUMPER WIRE FROM THE OVERHEAT
SWITCH 18HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
I. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON RH PACK VALVE P/BSW GOES OFF.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
WHITE STBY MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A GREEN BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE DISAPPEARS.
J. ON PANEL 22VU RELEASE AND PRESS RH PACK
VALVE P/BSW.
K. AFTER A TIME DELAY OF 6 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE EXISTS
BETWEEN PINS 5 AND 6.
L. SIMULATE FLIGHT STATUS (APPROACH A FALSE
TARGET TO ONE OF THE WOW PROXIMITY SWITCHES
51GB OR 52GB OR 55GB).
WARNING: ANY PRECAUTION TO AVOID INADVERTENT
LANDING GEAR RETRACTION SHALL BE
TAKEN.
M. AFTER A TIME DELAY OF 7 SEC, ON PACK VALVE
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
7
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

N.
O.
P.
Q.
R.
S.
T.
U.
V.
W.
X.
Y.

21-10-00

OPT 10000-002
8

DEC14

CONNECTOR 20HBA VERIFY THAT VOLTAGE STILL


EXISTS BETWEEN PINS 5 AND 6.
ON PANEL 101VU PLACE WARN SELECTOR SWITCH
IN VMO POSITION.
ON PANEL 101VU PRESS PTT P/BSW.
AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
ON GROUND T/F PRESSURE SWITCH 80HB
DISCONNECT CONNECTOR A AND BRIDGE
PIN 2 TO 3.
AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 20HBA VERIFY THAT NO VOLTAGE
EXISTS BETWEEN PINS 5 AND 6.
RELEASE PTT AND PLACE SEL SW
FROM VMO POSITION TO NORM FLT POSITION.
ON PANEL 22VU RELEASE RH PACK VALVE P/BSW.
REMOVE JUMPER WIRES FROM ENGINE BLEED SHUT
OFF VALVE AND REINSTALL THE CONNECTOR.
REMOVE THE JUMPER WIRE FROM GROUND T/F
PRESSURE SWITCH 80HB CONNECTOR A.
REINSTALL CONNECTOR ON GROUND T/F PRESSURE
SWITCH 80HB.
REINSTALL CONNECTOR ON PACK VALVE 20HB.
ON PANEL 25VU PRESS MFC/2A P/BSW 7UA2 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.

3. CHECK OF LH PACK VALVE ASSOCIATED CIRCUIT


WITH MFC MODULE 1B DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1B P/BSW AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON ENGINE BLEED SHUT OFF VALVE 15HA
DISCONNECT CONNECTOR A AND BRIDGE PINS
J TO D AND K TO G.
C. ON PANEL 22VU PRESS LH PACK P/BSW 9HB.
D. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
E. ON OVERHEAT SWITCH 17HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
8
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

OPT 10000-002
9

DEC14

NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.


G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON LH PACK VALVE P/BSW COMES ON.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER MESSAGE FAULT IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
H. REMOVE JUMPER WIRE FROM OVERHEAT SWITCH
17HB CONNECTOR AND REINSTALL THE CONNECTOR
ON OVERHEAT SWITCH.
I. ON PANEL 22VU RELEASE LH PACK VALVE P/BSW.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD, UPPER WINDOW ON CABIN SD PAGE,
WHITE OFF MESSAGE IS DISPLAYED UNDER
J. ON PANEL 25VU PRESS MFC/1B P/BSW AND VERIFY
THAT RELEVANT OFF LEGEND GOES OFF.
007

OPERATIONAL TEST OF PACK VALVE ASSOCIATED


_________________________________________
CIRCUIT (PART 2)
________________
4. CHECK OF LH PACK VALVE ASSOCIATED CIRCUIT
WITH MFC MODULE 1A DE-ENERGIZED
A. ON PANEL 25VU RELEASE MFC/1A P/BSW 7UA1 AND
VERIFY THAT RELEVANT OFF LEGEND COMES ON.
B. ON PANEL 22VU PRESS LH PACK VALVE P/BSW.
C. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
D. AFTER 7 SEC, ON PACK VALVE CONNECTOR 19HBA
VERIFY THAT VOLTAGE STILL EXISTS BETWEEN
PINS 5 AND 6.
E. ON OVERHEAT SWITCH 17HB DISCONNECT
CONNECTOR A AND BRIDGE PIN 1 TO 2.
F. ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
NO VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
G. ON PANEL 22VU VERIFY THAT FAULT LEGEND
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
9
DEC 01/14

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

H.
I.

J.
K.
L.
M.
N.
O.
P.
Q.
R.

21-10-00

OPT 10000-002
10

DEC14

ON LH PACK VALVE P/BSW COMES ON


- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS FLASH.
- SINGLE CHIME
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AMBER MESSAGE FAULT IS DISPLAYED UNDER
WHITE PACK, IN AN AMBER BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS DISPLAYED.
REMOVE JUMPER WIRE FROM OVERHEAT SWITCH
17HB CONNECTOR AND REINSTALL THE
CONNECTOR ON THE OVERHEAT SWITCH.
ON PANEL 22VU VERIFY THAT FAULT LEGEND
ON LH PACK VALVE P/BSW GOES OFF.
- ON 133VU(VM) AND 134VU(VM):MASTER CAUTION
LIGHTS GO OFF.
- ON MFD, UPPER WINDOW ON CABIN SD PAGE,
WHITE STBY MESSAGE IS DISPLAYED UNDER
WHITE PACK, IN A GREEN BOX.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE DISAPPEARS.
ON PANEL 22VU RELEASE AND PRESS LH PACK
VALVE P/BSW.
ON PACK VALVE CONNECTOR 19HBA VERIFY THAT
VOLTAGE EXISTS BETWEEN PINS 5 AND 6.
SIMULATE FLIGHT STATUS (APPROACH A FALSE
TARGET TO ONE OF THE WOW PROXIMITY SWITCHES
50GB OR 53GB OR 54GB).
AFTER A TIME DELAY OF 7 SEC, ON PACK VALVE
CONNECTOR 19HB VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
ON PANEL 101VU PLACE WARN SELECTOR SWITCH
IN VMO POSITION.
ON PANEL 101VU PRESS PTT P/BSW.
AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
CONNECTOR 19HBA VERIFY THAT VOLTAGE STILL
EXISTS BETWEEN PINS 5 AND 6.
ON GROUND T/F PRESSURE SWITCH 81HB
DISCONNECT CONNECTOR A AND BRIDGE PIN 2
TO 3.
AFTER APPROXIMATELY 7 SEC, ON PACK VALVE
*** CONTINUED ***
AH

21-10-00
OPT 10000-002
2-400 PAGE
10
DEC 01/14

21-10-00

PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

S.
T.
U.
V.
W.
X.
Y.
008

OPT 10000-002
11

DEC14

CONNECTOR 19HBA VERIFY THAT NO VOLTAGE


EXISTS BETWEEN PINS 5 AND 6.
RELEASE PTT AND PLACE SEL SW
FROM VMO POSITION TO NORM FLT POSITION.
ON PANEL 22VU RELEASE LH PACK VALVE P/BSW.
REMOVE JUMPER WIRES FROM ENGINE BLEED SHUT
OFF VALVE 15HA AND REINSTALL THE CONNECTOR
REMOVE THE JUMPER WIRE FROM GROUND T/F
PRESSURE SWITCH CONNECTOR A.
REINSTALL CONNECTOR ON GROUND T/F PRESSURE
SWITCH.
REINSTALL CONNECTOR ON PACK VALVE 19HB.
ON PANEL 25VU PRESS MFC/1A P/BSW 7UA1 AND
VERIFY THAT RELEVANT OFF LEGEND GOES OFF.

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

009

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE ACCESS DOOR 191NL (192NR) AND 475AT
(485AT).
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICES.
*****

AH

E N D

O F

T E X T

*****

21-10-00
OPT 10000-002
2-400 PAGE
11
DEC 01/14

21-10-00
12

AH

CONTROLS INDICATING

OPT 10000-002
DEC14

21-10-00
OPT 10000-002

2-400

PAGE
12
DEC 01/14

21-11-51

PACK VALVE FILTER CHECK

CHK 10000-001
1

APR05

ZONING DATA
___________

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 FILTER-AIR

AH

___
MEN

_________
MAN-HOURS

P/N A5856H

21-11-51
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-11-51

PACK VALVE FILTER CHECK

CHK 10000-001
2

001

APR05

__________________
PACK
VALVE REMOVAL
SEE JOB INSTRUCTION CARD
211151-RAI-10000

002

_____
CHECK
REF. FIG. 211051-CHK-00100
1. REMOVE LOCKWIRE AND DISCONNECT INLET
PRESSURE SENSING TUBE ASSEMBLY (1) AND
FILTER (2) FROM VALVE.
2. CHECK FILTER FOR PHYSICAL DAMAGES,
IF NECESSARY REPLACE IT.
3. IF THE FILTER REQUIRES CLEANING, PERFORM IT
FOLLOWING THE PROCEDURES SHOWN IN C.M.M.
21-20-43.
4. CONNECT INLET PRESSURE SENSING TUBE (1) AND
FILTER (2) TO VALVE AND SECURE IT BY
LOCKWIRE.

003

_______________________
PACK
VALVE INSTALLATION
SEE JOB INSTRUCTION CARD
211151-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-11-51
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-11-51
3

AH

INLET PRESSURE SENSING


TUBE AND FILTER
LOCATION

CHK 10000-001
APR05

21-11-51
CHK 10000-001

2-400

PAGE
3
APR 01/05

21-11-51

PACK VALVE DEACTIVATION

DNZ 10000-001
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 191
192
212
: 191ML

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

GSE

: 01 BLANKING CAP

AH

___
MEN

_________
MAN-HOURS

98S36005001200

21-11-51
DNZ 10000-001
2-400 PAGE
1
MAR 01/11

21-11-51

PACK VALVE DEACTIVATION

DNZ 10000-001
2

001

MAR11

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 3HB(4HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK & RECIRC FAN CAUTION
- 5HB(6HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
TURBOFAN
- 7HB(8HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK VALVE
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM
AND OPERATION OF AIR CONDITIONING
SYSTEM.
3. REMOVE ACCESS DOOR 191ML.

002

_______________________
PACK
VALVE DEACTIVATION
REF. FIG. 211151-DNZ-00100
1. DISCONNECT ELECTRICAL CONNECTOR (3).
2. HOLD VALVE (4) AND REMOVE COUPLINGS (1) AND
(6).
3. REMOVE PACK VALVE 19HB (20HB) (4).
4. BLANK OFF ELECTRICAL CONNECTOR (3), STOW IT
AND SECURE WITH TAPE.
5. INSTALL BLANKING CAP (7) ON BLEED DUCT (5).

*** CONTINUED ***


AH

21-11-51
DNZ 10000-001
2-400 PAGE
2
MAR 01/11

21-11-51

PACK VALVE DEACTIVATION

DNZ 10000-001
3

003

MAR11

_______________________
PACK
VALVE INSTALLATION
REF. FIG. 211151-DNZ-00100
1. POSITION PACK VALVE (4) BETWEEN DUCTS WITH
ARROW SHOWING THE AIRFLOW DIRECTION TOWARDS
THE AIR CONDITIONING UNIT.
2. HOLD VALVE AND INSTALL COUPLINGS (1) AND(6).
3. TIGHTEN COUPLINGS (1) AND (6).

004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL ACCESS DOOR 191ML.
3. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
4. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 3HB(4HB)
- 5HB(6HB)
- 7HB(8HB)
5. INSTALL PLACARD ON PUSHBUTTON RELEVANT TO
VALVE DEACTIVATED.
*****

AH

E N D

O F

T E X T

*****

21-11-51
DNZ 10000-001
2-400 PAGE
3
MAR 01/11

21-11-51
4

AH

PACK VALVE DEACTIVATION

DNZ 10000-001
MAR11

21-11-51
DNZ 10000-001

2-400

PAGE
4
MAR 01/11

21-11-51

PACK VALVE CLOSURE


OPERATIONAL TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-11-51
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-11-51

PACK VALVE CLOSURE


OPERATIONAL TEST

001

OPT 10000-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

________________
OPERATIONAL
TEST
REF. FIG. 211051-OPT-00100
1. WITH PACK VALVE PUSHBUTTON SWITCH
RELEASED (OUT), CHECK THAT FAULT LEGEND ON
SWITCH IS NOT ILLUMINATED.

003

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-11-51
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-11-51
3

AH

PACK VALVE PUSHBUTTON SW

OPT 10000-001
DEC14

21-11-51
OPT 10000-001

2-400

PAGE
3
DEC 01/14

21-11-51

PACK VALVE CLOSURE


OPERATIONAL TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: PRINCIPLE OF CDS USE
(DISPLAY UNITS
EXPLORATION)

AH

24-46-00-EAD-10000
31-63-00-PRO-10000

21-11-51
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-11-51

PACK VALVE CLOSURE


OPERATIONAL TEST

001

OPT 10000-002
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

003

________________
OPERATIONAL
TEST
REF. FIG. 211051-OPT-00100
1. WITH PACK VALVE PUSHBUTTON SWITCH
RELEASED (OUT), CHECK THAT FAULT LEGEND ON
SWITCH IS NOT ILLUMINATED.
- ON EWD, IN ALERT WINDOW, AIR PACK
MESSAGE IS NOT DISPLAYED.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
WHITE PACK OFF MESSAGE IS DISPLAYED.

004

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-11-51
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-11-51
3

AH

PACK VALVE PUSHBUTTON SW

OPT 10000-002
DEC14

21-11-51
OPT 10000-002

2-400

PAGE
3
DEC 01/14

21-11-51

PACK VALVE REMOVAL


AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
212
: 191ML

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 PACK FLOW VALVE

211150-010-010

: PACK VALVE INDICATING


AND ASSOC. CIRCUIT
OPERATIONAL TEST

21-10-00-OPT-10000

PUBLICATION
___________
JIC

AH

21-11-51
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-11-51

PACK VALVE REMOVAL


AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 3HB(4HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK & RECIRC FAN CAUTION
- 5HB(6HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
TURBOFAN
- 7HB(8HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK VALVE
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM
AND OPERATION OF AIR CONDITIONING
SYSTEM.
3. REMOVE ACCESS DOOR 191ML.

002

_______
REMOVAL
REF. FIG. 211051-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (3).
2. HOLD VALVE (4) AND REMOVE COUPLING (1) AND
(6).
3. REMOVE PACK VALVE 19HB (20HB) (4).
4. CAP OPEN ENDS OF DUCTS (2) AND (5) AND BLANK
OFF ELECTRICAL CONNECTOR (3).
5. CAP OPEN LINE ENDS AND ELECTRICAL CONNECTOR
OF THE VALVE.

*** CONTINUED ***


AH

21-11-51
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-11-51

PACK VALVE REMOVAL


AND INSTALLATION

003

RAI 10000-001
3

APR05

____________
INSTALLATION
REF. FIG. 211051-RAI-00100
1. REMOVE BLANKING CAPS FROM DUCTS (2) AND (5)
AND FROM ELECTRICAL CONNECTOR (3).
2. REMOVE CAPS FROM LINE ENDS AND CONNECTOR OF
VALVE.
3. POSITION PACK VALVE (4) BETWEEN DUCTS WITH
ITS ARROW SHOWING THE SAME FLOW DIRECTION
OF ARROW ON DUCT.
4. HOLD VALVE AND INSTALL COUPLINGS (1) AND(6).
5. TIGHTEN COUPLINGS (1) AND (6) TO 45 LBF.IN
(0.5 DAN.M).
6. CONNECT ELECTRICAL CONNECTOR (3).

004

________
CLOSE
UP
1. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
2. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 3HB(4HB)
- 5HB(6HB)
- 7HB(8HB)
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
4. INSTALL ACCESS DOOR 191ML.

*** CONTINUED ***


AH

21-11-51
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-11-51

PACK VALVE REMOVAL


AND INSTALLATION

005

RAI 10000-001
4

APR05

___________________________
PACK
VALVE OPERATIONAL TEST
SEE JOB INSTRUCTION CARD
211000-OPT-10000
*****

AH

E N D

O F

T E X T

*****

21-11-51
RAI 10000-001
2-400 PAGE
4
APR 01/05

21-11-51
5

AH

PACK VALVE REMOVAL AND


INSTALLATION

RAI 10000-001
APR05

21-11-51
RAI 10000-001

2-400

PAGE
5
APR 01/05

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 212
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

___
MEN

_________
MAN-HOURS
02

ELAPSED TIME

GSE

: 01 GENERIC PRESSURE GAUGE

PUBLICATION
___________
JIC

: ENGINE START (PROPELLER


BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

72-00-00-ERU-10030

21-11-52
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

001

OPT 10000-001
2

DEC14

___________
PREPARATION
REF. FIG. 211152-OPT-00100
1. REMOVE PANEL 191QL (192QR)
2. DISCONNECT INLET CONTROL PRESSURE PORT OF
TRIM AIR VALVE FROM DUCT AIR LINE 17HH (18HH
3. CONNECT A PRESSURE GAUGE ON THIS LINE.

002

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

003

________________
OPERATIONAL
TEST
REF. FIG. 123321-CDG-00110
REF. FIG. 211152-OPT-00100
1. ON PANEL 22VU
PRESS ENGINE1(2) BLEED P/B SWITCH 27HA(28HA)
VERIFY THAT OFF LEGEND GOES OFF.
2. CHECK THAT THERE IS 15 (+/-2) PSIG ON THE
PRESSURE GAUGE.

004

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

005

________
CLOSE-UP
REF. FIG. 211152-OPT-00100
1. DISCONNECT THE PRESSURE GAUGE FROM THE AIR
PRESSURE LINE.
2. CONNECT THE AIR LINE TO THE INLET PRESSURE
*** CONTINUED ***
AH

21-11-52
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

OPT 10000-001
3

DEC14

PORT OF TRIM AIR VALVE.


3. INSTALL PANEL 191QL (192QR).
*****

AH

E N D

O F

T E X T

*****

21-11-52
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-11-52
4

AH

CONTROLS LOCATION

OPT 10000-001
DEC14

21-11-52
OPT 10000-001

2-400

PAGE
4
DEC 01/14

21-11-52
5

AH

SERVICE PRESS. REGULATOR

OPT 10000-001
DEC14

21-11-52
OPT 10000-001

2-400

PAGE
5
DEC 01/14

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 212
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

___
MEN

_________
MAN-HOURS
02

ELAPSED TIME

GSE

: 01 GENERIC PRESSURE GAUGE

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
72-00-00-ERU-10030

21-11-52
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

001

OPT 10000-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
REF. FIG. 211152-OPT-00100
1. REMOVE PANEL 191QL (192QR)
2. DISCONNECT INLET CONTROL PRESSURE PORT OF
TRIM AIR VALVE FROM DUCT AIR LINE 17HH (18HH
3. CONNECT A PRESSURE GAUGE ON THIS LINE.

003

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

004

________________
OPERATIONAL
TEST
REF. FIG. 123321-CDG-00110
REF. FIG. 211152-OPT-00100
1. ON PANEL 22VU
PRESS ENGINE1(2) BLEED P/B SWITCH 27HA(28HA)
VERIFY THAT OFF LEGEND GOES OFF.
ON MFD UPPER WINDOW, IN CABIN SD PAGE, GREEN
PACK MESSAGE IS DISPLAYED.
*** CONTINUED ***
AH

21-11-52
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-11-52

OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR

OPT 10000-002
3

DEC14

2. CHECK THAT THERE IS 15 (+/-2) PSIG ON THE


PRESSURE GAUGE.
005

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

006

________
CLOSE-UP
REF. FIG. 211152-OPT-00100
1. DISCONNECT THE PRESSURE GAUGE FROM THE AIR
PRESSURE LINE.
2. CONNECT THE AIR LINE TO THE INLET PRESSURE
PORT OF TRIM AIR VALVE.
3. INSTALL PANEL 191QL (192QR).
*****

AH

E N D

O F

T E X T

*****

21-11-52
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-11-52
4

AH

CONTROLS LOCATION

OPT 10000-002
DEC14

21-11-52
OPT 10000-002

2-400

PAGE
4
DEC 01/14

21-11-52
5

AH

SERVICE PRESS. REGULATOR

OPT 10000-002
DEC14

21-11-52
OPT 10000-002

2-400

PAGE
5
DEC 01/14

21-11-52

SERVICE PRESSURE
REGULATOR REMOVAL AND
INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191ML

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 SERVICE PRESSURE REGULATOR

AH

___
MEN

_________
MAN-HOURS

211150-05A-120

21-11-52
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-11-52

SERVICE PRESSURE
REGULATOR REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
2. REMOVE ACCESS DOOR 191ML.

002

_______
REMOVAL
REF. FIG. 211052-RAI-00100
1. DISCONNECT OUTLET AND SUPPLY AIR DUCTS (1)
AND (2).
2. REMOVE BOLT (3) AND WASHER (4).
3. REMOVE SERVICE PRESSURE REGULATOR 6141HQ
(6142HQ) (5) FROM MOUNTING PROVISION.

003

____________
INSTALLATION
REF. FIG. 211052-RAI-00100
1. POSITION SERVICE PRESSURE REGULATOR ON
MOUNTING PROVISION AND SECURE IT WITH WASHER
(4) AND BOLT (3).
2. CONNECT OUTPUT AND SUPPLY CONNECTION AIR
DUCTS (1) AND (2). TORQUE TO 40 LBF.IN
(0.45 DAN.M).

004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS
OF EQUIPMENT.
*** CONTINUED ***
AH

21-11-52
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-11-52

SERVICE PRESSURE
REGULATOR REMOVAL AND
INSTALLATION

RAI 10000-001
3

APR05

2. REMOVE WARNING NOTICE.


3. INSTALL ACCESS DOOR 191ML.
005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-11-52
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-11-52
4

AH

SERVICE PRESSURE
REGULATOR REMOVAL AND
INSTALLATION

RAI 10000-001
APR05

21-11-52
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-22-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

001

21-22-00

OPT 10000-001
2

DEC14

___________
PREPARATION
1. ON 22VU PLACE PACK VALVE 1 (PACK VALVE 2)
PUSHBUTTON SWITCH IN OFF POSITION.
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
2. MAKE CERTAIN THAT CABIN DOORS ARE OPEN.

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

________________
OPERATIONAL
TEST
REF. FIG. 212200-OPT-00100
1. ON PANEL 22VU PRESS RECIRC FAN 1(2) P/BSW
AND VERIFY THAT OFF LEGEND GOES OFF.
2. MAKE CERTAIN THAT AIR GOES OUT FROM FLIGHT
COMPT (CABIN) AIR OUTLETS.
RECIRCULATION FAN OPERATES CORRECTLY.
3. OPEN CIRCUIT BREAKER 25HB(22HB) AND VERIFY
THAT ON RECIRC FAN 1(2) P/BSW FAULT LEGEND
COMES ON, AIR AND MASTER CAUTION LIGHTS
COME ON AND SINGLE CHIME IS ACTIVATED.
FAN DOES NOT OPERATE.
4. CLOSE CIRCUIT BREAKER 25HB(22HB) AND VERIFY
THAT FAULT LEGEND AND CCAS SIGNALS GO OFF.
FAN OPERATES.
NOTE: WITH BOTH PROPELLER CONDITION LEVERS IN
FEATHER POSITION, CCAS SIGNALS ARE
INHIBITED.
*** CONTINUED ***
AH

21-22-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-001
3

DEC14

5. RELEASE RECIRC FAN 1(2) P/BSW AND VERIFY


THAT OFF LEGEND AND CCAS SIGNALS COME ON.
FAN DOES NOT OPERATE.
004

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

005

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE.
*****

AH

E N D

O F

T E X T

*****

21-22-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-22-00
4

AH

CABIN AND FLIGHT


COMPARTMENT OPERATIONAL
TEST

OPT 10000-001
DEC14

21-22-00
OPT 10000-001

2-400

PAGE
4
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

31-63-00-PRO-10000
24-46-00-EAD-10000

21-22-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

001

OPT 10000-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
1. ON 22VU PLACE PACK VALVE 1 (PACK VALVE 2)
PUSHBUTTON SWITCH IN OFF POSITION.
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
2. MAKE CERTAIN THAT CABIN DOORS ARE OPEN.

003

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

004

________________
OPERATIONAL
TEST
REF. FIG. 212200-OPT-00100
REF. FIG. 212200-OPT-00110
1. ON PANEL 22VU PRESS RECIRC FAN 1(2) P/BSW
AND VERIFY THAT OFF LEGEND GOES OFF
2. MAKE CERTAIN THAT:
*** CONTINUED ***
AH

21-22-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-002
3

DEC14

A. AIR COMES OUT FROM FLIGHT COMPT (CABIN)


AIR OUTLETS.
B. RECIRCULATION FAN OPERATES CORRECTLY.
C. ON MFD UPPER WINDOW, IN CABIN SD PAGE,
CHECK THAT:
- ITEM 1 IS DISPLAYED FOR LEFT(RIGHT) SIDE
- ITEM 4 IS DISPLAYED
- ITEM 7(8) IS DISPLAYED
3. OPEN CIRCUIT BREAKER:
25HB(22HB)
PWR SPLY ON PRIM DC BUS 1(2)/
L(R) RECIRC FAN
A. VERIFY THAT:
- ON RECIRC FAN 1(2) P/BSW, FAULT
LEGEND COMES ON.
- MASTER CAUTION LIGHTS COME ON
- SINGLE CHIME IS ACTIVATED.
- FAN DOES NOT OPERATE.
B. ON MFD UPPER WINDOW, IN SD CABIN PAGE,
CHECK THAT:
- ITEM 3 IS DISPLAYED FOR LEFT(RIGHT)
SIDE
- ITEMS 5 AND 9 ARE DISPLAYED
- ON EWD, IN ALERT WINDOW, AIR RECIRC
FAN MESSAGE IS DISPLAYED
4. CLOSE CIRCUIT BREAKER 25HB(22HB)
A. VERIFY THAT:
- FAULT LEGEND OF RECIRC FAN 1(2)
P/BSW GOES OFF.
- ON EWD, IN ALERT WINDOW, AIR RECIRC
FAN MESSAGE DISAPPEARS.
- MASTER CAUTION LIGHTS GO OFF.
- FAN OPERATES
B. ON MFD UPPER WINDOW, IN SD CABIN PAGE:
*** CONTINUED ***
AH

21-22-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-002
4

DEC14

CHECK THAT:
- ITEM 1 IS DISPLAYED FOR LEFT(RIGHT)
SIDE
- ITEM 4 IS DISPLAYED
- ITEM 7(8) IS DISPLAYED
NOTE: WITH BOTH PROPELLER CONDITION LEVERS IN
FEATHER POSITION, CCAS SIGNALS ARE
INHIBITED.
5. RELEASE RECIRC FAN 1(2) P/BSW AND VERIFY
THAT OFF LEGEND COMES ON.
A. VERIFY THAT:
(1) ON MFD UPPER WINDOW, IN SD CABIN
PAGE:
- ITEM 2 IS DISPLAYED FOR LEFT AND
RIGHT SIDES
- ITEMS 5 AND 9 ARE DISPLAYED
(2) FAN DOES NOT OPERATE.
6. ON PANEL 22VU, PRESS RECIRC FAN 1 AND 2
P/BSW AND VERIFY THAT THE OFF LEGENDS GO
OFF ON BOTH P/B SWITCHES.
7. ON MFD UPPER WINDOW, IN SD CABIN PAGE,
CHECK THAT:
- ITEM 1 IS DISPLAYED
- ITEM 6 IS DISPLAYED
- NO RECIRC MESSAGE IS DISPLAYED
005

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

006

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*** CONTINUED ***
AH

21-22-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14

21-22-00

CABIN AND FLIGHT COMPT


AIR DISTRIBUTION
OPERATIONAL TEST

OPT 10000-002
5

DEC14

2. REMOVE WARNING NOTICE.


*****

AH

E N D

O F

T E X T

*****

21-22-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14

21-22-00
6

AH

CABIN AND FLIGHT


COMPARTMENT OPERATIONAL
TEST

OPT 10000-002
DEC14

21-22-00
OPT 10000-002

2-400

PAGE
6
DEC 01/14

21-22-00
7

AH

SYMBOLOGY

OPT 10000-002
DEC14

21-22-00
OPT 10000-002

2-400

PAGE
7
DEC 01/14

21-22-00

OPT OF CABIN AIR


VENTILATION ISOLATION IN
CNTNR CONFIG (CLASS E)

OPT 10020-001
1

DEC14

ZONING DATA
___________
ZONE

: 210

220

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-22-00
OPT 10020-001
2-400 PAGE
1
DEC 01/14

21-22-00

OPT OF CABIN AIR


VENTILATION ISOLATION IN
CNTNR CONFIG (CLASS E)

001

OPT 10020-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

___________
PREPARATION
REF. FIG. 212200-OPT-00120
WARNING: DISPLAY WARNING NOTICES PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
1. ON PANEL 34VU:
A. MAKE SURE THAT PUSHBUTTON SWITCH
CAB VENT/AIR FLOW IS RELEASED.
- OFF LEGEND IS ON.
2. IN FWD CARGO COMPARTMENT, MAKE SURE THAT
MANUAL SHUT-OFF VALVE IS IN OPEN POSITION.
3. ON PANEL 22VU:
A. MAKE SURE THAT PACK VALVE PUSHBUTTON
SWITCHES ARE IN OFF POSITION.
B. PRESS RECIRC FAN 1(2) PUSHBUTTON SWITCH
- OFF LEGEND GOES OFF.

003

____________________________________________
OPERATIONAL
TEST OF ISOLATION VALVES OPENING
REF. FIG. 212200-OPT-00120
1. ON PANEL 34VU:
A. PRESS PUSHBUTTON SWITCH CAB VENT/AIR
FLOW.
- OFF LEGEND GOES OFF.
2. VERIFY THAT AIR GOES OUT FROM CABIN MAIN
DISTRIBUTION AIR OUTLETS.
3. OPEN CABIN PSU AIR OUTLETS AND LEAVE THEM
*** CONTINUED ***
AH

21-22-00
OPT 10020-001
2-400 PAGE
2
DEC 01/14

21-22-00

OPT OF CABIN AIR


VENTILATION ISOLATION IN
CNTNR CONFIG (CLASS E)

OPT 10020-001
3

DEC14

OPEN DURING THE ENTIRE TEST.


4. VERIFY THAT AIR GOES OUT FROM CABIN PSU AIR
OUTLETS.
004

____________________________________________
OPERATIONAL
TEST OF ISOLATION VALVES CLOSING
REF. FIG. 212200-OPT-00120
1. ON PANEL 34VU:
A. RELEASE PUSHBUTTON SWITCH CAB VENT/AIR
FLOW.
2. IN FWD CARGO COMPARTMENT, PUT THE MANUAL
SHUT-OFF VALVE IN CLOSED POSITION.
3. VERIFY THAT THERE IS NO AIRFLOW COMING OUT
FROM CABIN MAIN DISTRIBUTION AIR OUTLETS.
4. VERIFY THAT THERE IS NO AIRFLOW COMING OUT
FROM CABIN PSU AIR OUTLETS.

005

________
CLOSE
UP
REF. FIG. 212200-OPT-00120
1. ON PANEL 22VU:
A. RELEASE RECIRC FAN 1(2) PUSHBUTTON
SWITCH
- OFF LEGEND GOES ON.
2. REMOVE WARNING NOTICES.
3. IN FWD CARGO COMPARTMENT, REPLACE THE MANUAL
SHUT-OFF VALVE IN INITIAL POSITION.

006

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****
AH

E N D

O F

T E X T

*****

21-22-00
OPT 10020-001
2-400 PAGE
3
DEC 01/14

21-22-00
4

AH

OPERATIONAL TEST OF CAB


AIR DISTRIB ISOLATION

OPT 10020-001
DEC14

21-22-00
OPT 10020-001

2-400

PAGE
4
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 121
122
212
: 231DF 231EF 232EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01

___
MEN

RECIRCULATION FAN

_________
MAN-HOURS

212220-33A-030

PUBLICATION
___________
JIC
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

25-21-21-RAI-10000
24-46-00-EAD-10000

21-22-21
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232EF) AND 231DF.

004

_______
REMOVAL
REF. FIG. 212221-RAI-00100
1. REMOVE SCREW (9) WITH WASHER (10).
2. REMOVE MUFFLER (11) FROM TRAY (8).
3. DISCONNECT ELECTRICAL CONNECTOR (1).
4. REMOVE CLAMP (3) AND DISCONNECT SLEEVE (4).
5. REMOVE BOLTS (5), WASHERS (6) AND DISCONNECT
BONDING STRIP (7).
6. REMOVE FAN (2).
*** CONTINUED ***
AH

21-22-21
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-001
3

DEC14

7. CAP DUCT OPEN ENDS AND ELECTRICAL


CONNECTORS.
005

____________
INSTALLATION
REF. FIG. 212221-RAI-00100
1. INSPECT AIR INLET GRID FOR OBSTRUCTION AND
CORRECT CONDITION.
2. REMOVE BLANKING CAPS.
3. POSITION FAN (2) ON ITS SUPPORT.
4. INSTALL BOLT (5) WITH WASHER (6) AND BONDING
STRIP (7).
5. CONNECT SLEEVE (4) AND INSTALL CLAMP (3).
6. CONNECT ELECTRICAL CONNECTORS (1).
7. POSITION MUFFLER (11) ON TRAY (8).
8. INSTALL SCREW (9) WITH WASHER (10).

006

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

__________________________________
RECIRCULATION
FAN OPERATIONAL TEST
REF. FIG. 212221-OPT-00100
1. REMOVE WARNING NOTICE.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
*** CONTINUED ***
AH

21-22-21
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-001
4

DEC14

3. ON PANEL 22VU PRESS THE FOLLOWING PUSHBUTTON


SWITCH:
- 27HB (26HB) COMPT TEMP/RECIRC FAN 1(2)
AND VERIFY THAT OFF LEGEND GOES OFF.
4. MAKE CERTAIN THAT FAN OPERATES.
5. ON PANEL 22VU RELEASE THE FOLLOWING
PUSHBUTTON SWITCH:
- 27HB (26HB)
AND VERIFY THAT OFF LEGEND COMES ON.
6. MAKE CERTAIN THAT FAN STOPS.
008

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

009

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232EF) AND 231DF.

010

________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

011

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-21
RAI 10000-001
2-400 PAGE
4
DEC 01/14

21-22-21
5

AH

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-001
DEC14

21-22-21
RAI 10000-001

2-400

PAGE
5
DEC 01/14

21-22-21
6

AH

RECIRCULATION FAN
PUSHBUTTON SWITCH

RAI 10000-001
DEC14

21-22-21
RAI 10000-001

2-400

PAGE
6
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 121
122
212
: 231DF 231EF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01

___
MEN

RECIRCULATION FAN

_________
MAN-HOURS

212220-33A-030

PUBLICATION
___________
JIC
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

25-21-21-RAI-10000
24-46-00-EAD-10000

21-22-21
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

001

RAI 10000-002
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232LF) AND 231DF.

004

_______
REMOVAL
REF. FIG. 212221-RAI-00100
1. REMOVE SCREW (9) WITH WASHER (10).
2. REMOVE MUFFLER (11) FROM TRAY (8).
3. DISCONNECT ELECTRICAL CONNECTOR (1).
4. REMOVE CLAMP (3) AND DISCONNECT SLEEVE (4).
5. REMOVE BOLTS (5), WASHERS (6) AND DISCONNECT
BONDING STRIP (7).
6. REMOVE FAN (2).
*** CONTINUED ***
AH

21-22-21
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-002
3

DEC14

7. CAP DUCT OPEN ENDS AND ELECTRICAL


CONNECTORS.
005

____________
INSTALLATION
REF. FIG. 212221-RAI-00100
1. INSPECT AIR INLET GRID FOR OBSTRUCTION AND
CORRECT CONDITION.
2. REMOVE BLANKING CAPS.
3. POSITION FAN (2) ON ITS SUPPORT.
4. INSTALL BOLT (5) WITH WASHER (6) AND BONDING
STRIP (7).
5. CONNECT SLEEVE (4) AND INSTALL CLAMP (3).
6. CONNECT ELECTRICAL CONNECTORS (1).
7. POSITION MUFFLER (11) ON TRAY (8).
8. INSTALL SCREW (9) WITH WASHER (10).

006

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

__________________________________
RECIRCULATION
FAN OPERATIONAL TEST
REF. FIG. 212221-OPT-00100
1. REMOVE WARNING NOTICE.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
*** CONTINUED ***
AH

21-22-21
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-22-21

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-002
4

DEC14

3. ON PANEL 22VU PRESS THE FOLLOWING PUSHBUTTON


SWITCH:
- 27HB (26HB) COMPT TEMP/RECIRC FAN 1(2)
AND VERIFY THAT OFF LEGEND GOES OFF.
4. MAKE CERTAIN THAT FAN OPERATES.
5. ON PANEL 22VU RELEASE THE FOLLOWING
PUSHBUTTON SWITCH:
- 27HB (26HB)
AND VERIFY THAT OFF LEGEND COMES ON.
6. MAKE CERTAIN THAT FAN STOPS.
008

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

009

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232LF) AND 231DF.

010

________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

011

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-21
RAI 10000-002
2-400 PAGE
4
DEC 01/14

21-22-21
5

AH

RECIRCULATION FAN
REMOVAL AND INSTALLATION

RAI 10000-002
DEC14

21-22-21
RAI 10000-002

2-400

PAGE
5
DEC 01/14

21-22-21
6

AH

RECIRCULATION FAN
PUSHBUTTON SWITCH

RAI 10000-002
DEC14

21-22-21
RAI 10000-002

2-400

PAGE
6
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

DVI 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 120

121

122

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

ELAPSED TIME

___
MEN

_________
MAN-HOURS
01

BULK MATERIAL : BALTANE

11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-22-23
DVI 10000-001
2-400 PAGE
1
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

001

DVI 10000-001
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232EF) AND 231DF.

004

DETAILED VISUAL INSPECTION OF RECIRCULATION


___________________________________________
FAN GRIDS
_________
REF. FIG. 212223-RAI-00100
1. REMOVE SCREW (6) WITH WASHER (7).
2. REMOVE MUFFLER (8) FROM TRAY (2).
3. VERIFY THAT GRIDS (5) ARE NOT OBSTRUCTED.
4. IF THERE IS STICKY DUST ON GRIDS, BLOW
COMPRESSED AIR TO REMOVE DUST AND FOREIGN
OBJECTS FROM THEM.
5. USING CLEAN COTTON RAG SOAKED IN BALTANE
*** CONTINUED ***
AH

21-22-23
DVI 10000-001
2-400 PAGE
2
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

DVI 10000-001
3

DEC14

(MAT. 11-004B), CLEAN GRIDS.


6. POSITION MUFFLER (8) ON TRAY (2).
7. INSTALL SCREW (6) WITH WASHER (7).
005

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232EF) AND 231DF.

006

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

007

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
2. REMOVE WARNING NOTICE.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-22-23
DVI 10000-001
2-400 PAGE
3
DEC 01/14

21-22-23
4

AH

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

DVI 10000-001
DEC14

21-22-23
DVI 10000-001

2-400

PAGE
4
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

DVI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
121
122
: 231DF 231EF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

ELAPSED TIME

___
MEN

_________
MAN-HOURS
01

BULK MATERIAL : BALTANE

11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-22-23
DVI 10000-002
2-400 PAGE
1
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

001

DVI 10000-002
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232LF) AND 231DF.

004

DETAILED VISUAL INSPECTION OF RECIRCULATION


___________________________________________
FAN GRIDS
_________
REF. FIG. 212223-RAI-00100
1. REMOVE SCREW (6) WITH WASHER (7).
2. REMOVE MUFFLER (8) FROM TRAY (2).
3. VERIFY THAT GRIDS (5) ARE NOT OBSTRUCTED.
4. IF THERE IS STICKY DUST ON GRIDS, BLOW
COMPRESSED AIR TO REMOVE DUST AND FOREIGN
OBJECTS FROM THEM.
5. USING CLEAN COTTON RAG SOAKED IN BALTANE
*** CONTINUED ***
AH

21-22-23
DVI 10000-002
2-400 PAGE
2
DEC 01/14

21-22-23

DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS

DVI 10000-002
3

DEC14

(MAT. 11-004B), CLEAN GRIDS.


6. POSITION MUFFLER (8) ON TRAY (2).
7. INSTALL SCREW (6) WITH WASHER (7).
005

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232LF) AND 231DF.

006

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

007

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
2. REMOVE WARNING NOTICE.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-22-23
DVI 10000-002
2-400 PAGE
3
DEC 01/14

21-22-23
4

AH

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

DVI 10000-002
DEC14

21-22-23
DVI 10000-002

2-400

PAGE
4
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 121

122

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-22-23
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232EF) AND 231DF.

004

_______
REMOVAL
REF. FIG. 212223-RAI-00100
1. REMOVE SCREW (6) WITH WASHER (7).
2. REMOVE MUFFLER (8) FROM TRAY (2).
3. REMOVE SCREW (3) WITH WASHER (4).
4. REMOVE INLET GRID (5) FROM FAN (1).

005

____________
INSTALLATION
REF. FIG. 212223-RAI-00100
*** CONTINUED ***
AH

21-22-23
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-001
3

DEC14

1. POSITION INLET GRID (5) ON FAN (1).


2. INSTALL SCREW (3) WITH WASHER (4).
3. POSITION MUFFLER (8) ON TRAY (2).
4. INSTALL SCREW (6) WITH WASHER (7).
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232EF) AND 231DF.

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
2. REMOVE WARNING NOTICE.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-23
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-22-23
4

AH

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-001
DEC14

21-22-23
RAI 10000-001

2-400

PAGE
4
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 121
122
: 231DF 231EF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-22-23
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

001

RAI 10000-002
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB) PWR SPLY ON PRIM DC BUS
1(2)/L(R) RECIRC FAN
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232LF) AND 231DF.

004

_______
REMOVAL
REF. FIG. 212223-RAI-00100
1. REMOVE SCREW (6) WITH WASHER (7).
2. REMOVE MUFFLER (8) FROM TRAY (2).
3. REMOVE SCREW (3) WITH WASHER (4).
4. REMOVE INLET GRID (5) FROM FAN (1).

005

____________
INSTALLATION
REF. FIG. 212223-RAI-00100
*** CONTINUED ***
AH

21-22-23
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-22-23

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-002
3

DEC14

1. POSITION INLET GRID (5) ON FAN (1).


2. INSTALL SCREW (3) WITH WASHER (4).
3. POSITION MUFFLER (8) ON TRAY (2).
4. INSTALL SCREW (6) WITH WASHER (7).
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232LF) AND 231DF.

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 127VU (124VU)
- 25HB (22HB)
2. REMOVE WARNING NOTICE.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-23
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-22-23
4

AH

RECIRCULATION FAN INLET


GRID REMOVAL AND
INSTALLATION

RAI 10000-002
DEC14

21-22-23
RAI 10000-002

2-400

PAGE
4
DEC 01/14

21-22-25

INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT

CHK 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
: 231DF 231EF 232EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

BULK MATERIAL : WHITE SPIRIT


COTTON RAG

_________
MAN-HOURS

11-002

PUBLICATION
___________
JIC

: CHECK VALVE REMOVAL AND


INSTALLATION

AH

21-22-25-RAI-10000

21-22-25
CHK 10000-001
2-400 PAGE
1
DEC 01/14

21-22-25

INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT

001

CHK 10000-001
2

DEC14

______________________
REMOVAL
OF CHECK VALVE
SEE JOB INSTRUCTION CARD
212225-RAI-10000

002

_____
CHECK
1. CHECK CONDITION OF CHECK VALVE, ESPECIALLY
SEMICIRCULAR FLAPS AND THEIR SEATING, HINGE
PIN AND TENSION SPRING (CHECK FOR ABSENCE OF
CRACKS, DENTS OR CORROSION).
2. HOLD CHECK VALVE SO THAT AXIS OF FLAP PIN IS
VERTICAL, MANUALLY OPERATE FLAPS AND CHECK
THAT THEY MOVE FREELY THROUGH OUT TRAVEL
RANGE AND SEAT CORRECTLY.
3. CLEAN WITH WHITE SPIRIT IF NECESSARY.

003

________________________
CHECK
VALVE INSTALLATION
SEE JOB INSTRUCTION CARD
212225-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-25
CHK 10000-001
2-400 PAGE
2
DEC 01/14

21-22-25
3

AH

CHECK VALVE REMOVAL AND


INSTALLATION

CHK 10000-001
DEC14

21-22-25
CHK 10000-001

2-400

PAGE
3
DEC 01/14

21-22-25

INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT

CHK 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
: 231DF 231EF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

BULK MATERIAL : WHITE SPIRIT


COTTON RAG

_________
MAN-HOURS

11-002

PUBLICATION
___________
JIC

: CHECK VALVE REMOVAL AND


INSTALLATION

AH

21-22-25-RAI-10000

21-22-25
CHK 10000-002
2-400 PAGE
1
DEC 01/14

21-22-25

INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT

001

CHK 10000-002
2

DEC14

______________________
REMOVAL
OF CHECK VALVE
SEE JOB INSTRUCTION CARD
212225-RAI-10000

002

_____
CHECK
1. CHECK CONDITION OF CHECK VALVE, ESPECIALLY
SEMICIRCULAR FLAPS AND THEIR SEATING, HINGE
PIN AND TENSION SPRING (CHECK FOR ABSENCE OF
CRACKS, DENTS OR CORROSION).
2. HOLD CHECK VALVE SO THAT AXIS OF FLAP PIN IS
VERTICAL, MANUALLY OPERATE FLAPS AND CHECK
THAT THEY MOVE FREELY THROUGH OUT TRAVEL
RANGE AND SEAT CORRECTLY.
3. CLEAN WITH WHITE SPIRIT IF NECESSARY.

003

________________________
CHECK
VALVE INSTALLATION
SEE JOB INSTRUCTION CARD
212225-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-25
CHK 10000-002
2-400 PAGE
2
DEC 01/14

21-22-25
3

AH

CHECK VALVE REMOVAL AND


INSTALLATION

CHK 10000-002
DEC14

21-22-25
CHK 10000-002

2-400

PAGE
3
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
: 231DF 231EF 232EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 CHECK VALVE

212220-030-050

EXPENDABLE

: 01 O-RING

212220-030-020

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-22-25
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION
OF PNEUMATIC SYSTEM AND OPERATION OF
AIR CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232EF) AND 231DF.

004

______________________
REMOVAL
OF CHECK VALVE
REF. FIG. 212251-RAI-00100
1. REMOVE THE INSULATION.
2. HOLD VALVE (4) AND REMOVE COUPLING (1),
O-RING (2) AND CLAMP (3).
3. REMOVE CHECK VALVE 6123HB(6124HB) (4).
4. DISCARD O-RING (2).
5. CAP OPEN ENDS OF DUCTS (5) AND (6).

005

___________________________
INSTALLATION
OF CHECK VALVE
REF. FIG. 212251-RAI-00100
1. REMOVE BLANKING CAPS FROM DUCTS (5) AND (6).
*** CONTINUED ***
AH

21-22-25
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
3

DEC14

2. POSITION CHECK VALVE (4) BETWEEN DUCTS WITH


ARROW SHOWING THE AIRFLOW DIRECTION TOWARDS
THE MIXING CHAMBER.
3. HOLD VALVE AND INSTALL NEW O-RING (2),
COUPLINGS (1) AND CLAMP (3).
4. TIGHTEN COUPLING (1) AND CLAMP (3).
5. INSTALL THE INSULATION.
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232EF) AND 231DF.

007

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE.

008

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-25
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-22-25
4

AH

CHECK VALVE REMOVAL AND


INSTALLATION

RAI 10000-001
DEC14

21-22-25
RAI 10000-001

2-400

PAGE
4
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
: 231DF 231EF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 CHECK VALVE

212220-030-050

EXPENDABLE

: 01 O-RING

212220-030-020

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-22-25
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-002
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION
OF PNEUMATIC SYSTEM AND OPERATION OF
AIR CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANELS 231EF (232LF) AND 231DF.

004

______________________
REMOVAL
OF CHECK VALVE
REF. FIG. 212251-RAI-00100
1. REMOVE THE INSULATION.
2. HOLD VALVE (4) AND REMOVE COUPLING (1),
O-RING (2) AND CLAMP (3).
3. REMOVE CHECK VALVE 6123HB(6124HB) (4).
4. DISCARD O-RING (2).
5. CAP OPEN ENDS OF DUCTS (5) AND (6).

005

___________________________
INSTALLATION
OF CHECK VALVE
REF. FIG. 212251-RAI-00100
1. REMOVE BLANKING CAPS FROM DUCTS (5) AND (6).
*** CONTINUED ***
AH

21-22-25
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-22-25

AIR CONDITIONED CHECK


VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
3

DEC14

2. POSITION CHECK VALVE (4) BETWEEN DUCTS WITH


ARROW SHOWING THE AIRFLOW DIRECTION TOWARDS
THE MIXING CHAMBER.
3. HOLD VALVE AND INSTALL NEW O-RING (2),
COUPLINGS (1) AND CLAMP (3).
4. TIGHTEN COUPLING (1) AND CLAMP (3).
5. INSTALL THE INSULATION.
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANELS 231EF(232LF) AND 231DF.

007

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE.

008

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-25
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-22-25
4

AH

CHECK VALVE REMOVAL AND


INSTALLATION

RAI 10000-002
DEC14

21-22-25
RAI 10000-002

2-400

PAGE
4
DEC 01/14

21-22-27

CHECK OF AIR GRND CONN


CHECK VALVE DUCT FWD U/F
COMPT

CHK 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 120

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: CHECK VALVE REMOVAL


AND INSTALLATION

AH

21-22-27-RAI-10000

21-22-27
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-22-27

CHECK OF AIR GRND CONN


CHECK VALVE DUCT FWD U/F
COMPT

001

CHK 10000-001
2

APR05

______________________
REMOVAL
OF CHECK VALVE
SEE JOB INSTRUCTION CARD
212227-RAI-10000

002

_____
CHECK
1. CHECK THAT NO WEAR EXISTS.
2. MANUALLY, OPERATE FLAPS AND CHECK THAT THEY
MOVE FREELY THROUGH OUT TRAVEL RANGE AND
SEAT CORRECTLY.

003

___________________________
INSTALLATION
OF CHECK VALVE
SEE JOB INSTRUCTION CARD
212227-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-27
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-22-27
3

AH

CHECK VALVE REMOVAL


AND INSTALLATION

CHK 10000-001
APR05

21-22-27
CHK 10000-001

2-400

PAGE
3
APR 01/05

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
: 231DF 231GF 232EF 232HF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CHECK VALVE

212220-038-100

EXPENDABLE

: 02 GASKET

212220-038-090

AH

___
MEN

_________
MAN-HOURS

21-22-27
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

001

RAI 10000-001
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
2. REMOVE FLOOR PANELS 232EF, 231DF, 231GF AND
232HF.

002

______________________
REMOVAL
OF CHECK VALVE
REF. FIG. 212227-RAI-00100
1. LOOSEN SCREWS IN CLAMPS (8) AND (10).
2. REMOVE NUTS (1), BOLTS (3) AND WASHERS (2)
AND (4).
3. REMOVE CLAMP (5).
4. REMOVE DUCT (6).
5. REMOVE GASKET (11), CHECK VALVE (12) AND
GASKET (13).
6. CHECK GASKETS (11) AND (13) FOR CORRECT
CONDITION. REPLACE IF NECESSARY.
7. CAP OPEN ENDS OF DUCTS (7), (9) AND (14).

003

___________________________
INSTALLATION
OF CHECK VALVE
REF. FIG. 212227-RAI-00100
1. REMOVE BLANKING CAPS FROM DUCTS (7), (9)
AND (14).
*** CONTINUED ***
AH

21-22-27
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

RAI 10000-001
3

DEC14

2. POSITION GASKET (13), CHECK VALVE (12),


GASKET (11) AND DUCT (6).
3. INSTALL BOLTS (3), WASHERS (2) AND (4) AND
NUTS (1).
4. POSITION CLAMPS (8) AND (10). TIGHTEN THEM.
5. POSITION AND TIGHTEN CLAMP (5).
6. INSTALL THE INSULATION.
004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL FLOOR PANELS 232EF, 231DF, 231GF
AND 232HF.
3. REMOVE WARNING NOTICE.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-27
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-22-27
4

AH

CHECK VALVE REMOVAL


AND INSTALLATION

RAI 10000-001
DEC14

21-22-27
RAI 10000-001

2-400

PAGE
4
DEC 01/14

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
: 231DF 231GF 232HF 232LF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CHECK VALVE

212220-038-100

EXPENDABLE

: 02 GASKET

212220-038-090

AH

___
MEN

_________
MAN-HOURS

21-22-27
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

001

RAI 10000-002
2

DEC14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
2. REMOVE FLOOR PANELS 232LF, 231DF, 231GF AND
232HF.

002

______________________
REMOVAL
OF CHECK VALVE
REF. FIG. 212227-RAI-00100
1. LOOSEN SCREWS IN CLAMPS (8) AND (10).
2. REMOVE NUTS (1), BOLTS (3) AND WASHERS (2)
AND (4).
3. REMOVE CLAMP (5).
4. REMOVE DUCT (6).
5. REMOVE GASKET (11), CHECK VALVE (12) AND
GASKET (13).
6. CHECK GASKETS (11) AND (13) FOR CORRECT
CONDITION. REPLACE IF NECESSARY.
7. CAP OPEN ENDS OF DUCTS (7), (9) AND (14).

003

___________________________
INSTALLATION
OF CHECK VALVE
REF. FIG. 212227-RAI-00100
1. REMOVE BLANKING CAPS FROM DUCTS (7), (9)
AND (14).
*** CONTINUED ***
AH

21-22-27
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-22-27

REMOVAL AND INSTALLATION


OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT

RAI 10000-002
3

DEC14

2. POSITION GASKET (13), CHECK VALVE (12),


GASKET (11) AND DUCT (6).
3. INSTALL BOLTS (3), WASHERS (2) AND (4) AND
NUTS (1).
4. POSITION CLAMPS (8) AND (10). TIGHTEN THEM.
5. POSITION AND TIGHTEN CLAMP (5).
6. INSTALL THE INSULATION.
004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL FLOOR PANELS 232LF, 231DF, 231GF
AND 232HF.
3. REMOVE WARNING NOTICE.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-27
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-22-27
4

AH

CHECK VALVE REMOVAL


AND INSTALLATION

RAI 10000-002
DEC14

21-22-27
RAI 10000-002

2-400

PAGE
4
DEC 01/14

21-22-51

DETAILED VISUAL
INSPECTION OF AIR GROUND
CONNECTION CHECK VALVE

DVI 10000-001
1

MAR12

ZONING DATA
___________
ZONE

: 110

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

ELAPSED TIME

___
MEN

_________
MAN-HOURS
01

PUBLICATION
___________
JIC

: ENGINE START (PROPELLER


BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

72-00-00-ERU-10030

21-22-51
DVI 10000-001
2-400 PAGE
1
MAR 01/12

21-22-51

DETAILED VISUAL
INSPECTION OF AIR GROUND
CONNECTION CHECK VALVE

001

DVI 10000-001
2

MAR12

__________________________
DETAILED
VISUAL INSPECTION
1. VERIFY THAT NO CRACKS AND/OR CORROSION
EXIST.
2. MANUALLY, OPERATE FLAPS FOR COMPLETE FREE
MOVEMENT,CORRECT SEAT AND CORRECT SPRING
OPERATION.

002

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

003

____________________________________
DETAILED
VISUAL INSPECTION FOR LEAKS
REF. FIG. 211051-OPT-00100
1. ON PANEL 22VU PRESS THE FOLLOWING PUSHBUTTON
SWITCHES:
28HA
ENG 2 BLEED
9HB
PACK VALVE SYS 1
10HB
PACK VALVE SYS 2
2. VERIFY THAT THE OFF LEGENDS ON PUSHBUTTON
SWITCHES GO OFF.
3. VERIFY THAT THERE ARE NO LEAKS BETWEEN THE
GROUND CONNECTION CHECK VALVE HOUSING AND
THE BUTTERFLY PLATES.
4. RELEASE PUSHBUTTON SWITCHES 9HB, 10HB AND
28HA.

004

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*****

AH

E N D

O F

T E X T

*****

21-22-51
DVI 10000-001
2-400 PAGE
2
MAR 01/12

21-22-51
3

AH

AIR GROUND CONNECTION


CHECK VALVE REMOVAL AND
INSTALLATION

DVI 10000-001
MAR12

21-22-51
DVI 10000-001

2-400

PAGE
3
MAR 01/12

21-22-51
4

AH

PACK VALVE PUSHBUTTON SW

DVI 10000-001
MAR12

21-22-51
DVI 10000-001

2-400

PAGE
4
MAR 01/12

21-22-51

AIR GROUND CONNECTION


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 192
210
: 192KR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

MECHANIC

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 CHECK VALVE
01 GASKET

BULK MATERIAL : SEALANT PR-1436-GB-2


MEK

01

AH

212220-42-150
212220-42-160
09-016
11-003

21-22-51
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-22-51

AIR GROUND CONNECTION


CHECK VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT THE PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: DISPLAY WARNING NOTICE IN FLIGHT
COMPARTMENT PROHIBITING OPERATION OF
AIR CONDITIONING SYSTEM.
2. OPEN ACCESS DOOR 192KR.

002

_______
REMOVAL
REF. FIG. 212051-RAI-00100
1. REMOVE SEALANT COMPOUND BETWEEN HOUSING (1)
AND FUSELAGE SKIN USING AN APPROPRIATE
SPATULA.
2. REMOVE BOLTS (6), WASHERS (7) AND
HOUSING (1).
3. REMOVE SEALANT COMPOUND FROM HEADS OF
BOLTS (4).
4. REMOVE BOLTS (4), WASHERS (5), CHECK
VALVE (2) AND GASKET (3).
5. CHECK GASKET (3) FOR CORRECT CONDITION.
REPLACE IF NECESSARY.

003

____________
INSTALLATION
REF. FIG. 212051-RAI-00100
1. CLEAN HOUSING (1), FUSELAGE SKIN AND, OTHER
ITEMS TO REMOVE ALL SEALANT COMPOUND, USING
COTTON RAG SOAKED IN MEK (MAT.11-003).
2. HOLD CHECK VALVE (2) AND GASKET (3) IN
THEIR POSITION.
*** CONTINUED ***
AH

21-22-51
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-22-51

AIR GROUND CONNECTION


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
3

APR05

3. INSTALL BOLTS (4) AND WASHERS (5).


4. HOLD HOUSING (1) IN ITS POSITION.
5. INSTALL BOLTS (6) AND WASHERS (7).
5. APPLY FILLET OF SEALANT COMPOUND (MAT.
09-016) AROUND HOUSING (1) AND FUSELAGE
SKIN.
6. INCAPSULATE NUTS (4) WITH SEALANT COMPOUND
(MAT.09-016).
004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE ACCESS DOOR 192KR.
3. REMOVE WARNING NOTICE.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-51
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-22-51
4

AH

AIR GROUND CONNECTION


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
APR05

21-22-51
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-22-91

CHECK OF FLIGHT DECK


DISTRIBUTION CHECK VALVE

CHK 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 120

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-22-91
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-22-91

CHECK OF FLIGHT DECK


DISTRIBUTION CHECK VALVE

001

CHK 10000-001
2

APR05

REMOVAL OF FLIGHT DECK DISTRIBUTION


___________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
212291-RAI-10000

002

_____
CHECK
1. CHECK THAT NO WEAR EXISTS.
2. MANUALLY, OPERATE FLAPS AND CHECK THAT THEY
MOVE FREELY THROUGH OUT TRAVEL RANGE AND
SEAT CORRECTLY.

003

INSTALLATION OF FLIGHT DECK DISTRIBUTION


________________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
212291-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-22-91
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-22-91
3

AH

FLIGHT DECK DISTRIBUTION


CHECK VALVE REMOVAL AND
INSTALLATION

CHK 10000-001
APR05

21-22-91
CHK 10000-001

2-400

PAGE
3
APR 01/05

21-22-91

FLIGHT DECK DISTRIBUTION


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 120
210

230

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CHECK VALVE

AH

___
MEN

_________
MAN-HOURS

212220-015-150

21-22-91
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-22-91

FLIGHT DECK DISTRIBUTION


CHECK VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
2. REMOVE FLOOR PANEL 231DF.

002

_______
REMOVAL
REF. FIG. 212291-RAI-00100
1. REMOVE CLAMP (1).
2. UNSCREW NUTS (3) AND REMOVE BOLTS (5) AND
WASHERS (4).
3. REMOVE DUCT (10) FROM SLEEVE (2).
4. REMOVE GASKETS (7) AND (9) AND CHECK VALVE
(8) FROM DUCT (6).

003

____________
INSTALLATION
REF. FIG. 212291-RAI-00100
1. INSTALL DUCT (10) IN SLEEVE (2).
2. INSTALL CHECK VALVE (8) WITH GASKETS (7) AND
(9) BETWEEN DUCTS (6) AND (10).
3. INSTALL BOLTS (5) AND WASHERS (4) AND SCREW
NUTS (3).
4. INSTALL CLAMP (1).

*** CONTINUED ***


AH

21-22-91
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-22-91

FLIGHT DECK DISTRIBUTION


CHECK VALVE REMOVAL AND
INSTALLATION

004

RAI 10000-001
3

APR05

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL FLOOR PANEL 231DF.
3. IN FLIGHT COMPARTMENT REMOVE WARNING NOTICE.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-22-91
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-22-91
4

AH

FLIGHT DECK DISTRIBUTION


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-001
APR05

21-22-91
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
221
260
: 211CC 221FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-23-00
OPT 10010-002
2-400 PAGE
1
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

001

OPT 10010-002
2

DEC14

___________
PREPARATION
REF. FIG. 212300-OPT-00110
1. ON PANEL 902VU, MOVE ONE OF THE CONDITION
LEVERS ABOVE FTR POSITION.
2. REMOVE ACCESS PANELS 211CC AND 221FF.
REFER TO AMM 20-41-13 IF NECESSARY

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

004

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

______________________________________
OPERATIONAL
TEST OF AIR EXTRACTION FAN
REF. FIG. 212300-OPT-00110
NOTE : DURING THIS TEST, ONLY FAN OPERATION
AND ASSOCIATED ALERTS ARE CHECKED.
THE POSITIONS OF THE VALVES ARE NOT
DESCRIBED.
1. CHECK OF NORMAL OPERATIONS
A. CHECK THAT FAN OPERATES.
NOTE : FAN ROTATES 120 SECONDS APPROX.
*** CONTINUED ***
AH

21-23-00
OPT 10010-002
2-400 PAGE
2
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
3

DEC14

AFTER ENERGIZATION.
B. ON OVERHEAD PANEL 22VU :
(1) RELEASE AVIONICS VENT/EXHAUST MODE/
NORM PUSHBUTTON SWITCH AND CHECK
THAT :
- OVBD LEGEND OF PUSHBUTTON SWITCH
COMES ON
- THE FOLLOWING ALERT APPEAR :
. AIR LIGHT COMES ON ON CREW ALERTING PANEL.
- MECHANIC CALL SOUNDS.
- FAN STOPS OPERATING.
(2) PRESS AVIONICS VENT/EXHAUST MODE/
NORM PUSHBUTTON SWITCH AND CHECK
THAT :
- OVBD LEGEND OF PUSHBUTTON SWITCH
GOES OFF.
- MECHANICS CALL DISAPPEARS
- FAN OPERATES
- ALERTS DISAPPEAR
2. CHECK OF SAFETY DEVICES AND ALERTS ASSOCIATED WITH FAN OPERATION :
A. ON CIRCUIT BREAKER PANEL 124VU,
OPEN CIRCUIT BREAKER 8PN AND CHECK
THAT :
- FAN STILL OPERATES.
B. ON CIRCUIT BREAKER PANEL 127VU,
OPEN CIRCUIT BREAKER 15PA AND CHECK
THAT :
- FAULT LEGEND OF AVIONICS VENT/
EXHAUST MODE/NORM PUSHBUTTON SWITCH
COMES ON.
- THE FOLLOWING ALERTS APPEAR :
. MASTER CAUTION LIGHTS FLASH ON
PANELS 3VU AND 5VU.
*** CONTINUED ***
AH

21-23-00
OPT 10010-002
2-400 PAGE
3
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
4

DEC14

. AMBER AIR LIGHT COMES ON ON CREW


ALERTING PANEL.
. SINGLE CHIME SOUNDS.
- FAN STOPS OPERATING.
C. ON CIRCUIT BREAKER PANEL 124VU,
CLOSE CIRCUIT BREAKER 8PN AND CHECK THAT:
- FAULT LEGEND OF AVIONICS VENT/
EXHAUST MODE/NORM PUSHBUTTON SWITCH
GOES OFF.
- ALERTS DISAPPEAR.
- FAN ROTATES.
D. ON CIRCUIT BREAKER PANEL 127VU,
CLOSE CIRCUIT BREAKER 15PA.
3. CHECK OF FAN HIGH SPEED OPERATION WHEN THERE
IS OVERHEAT OF EXTRACTION DUCTS, ON GROUND.
A. ON CIRCUIT BREAKER PANEL 121VU, OPEN
CIRCUIT BREAKER 24HR.
B. DISCONNECT CONNECTOR 36HRA.
C. SHUNT TERMINALS A AND B ON CONNECTOR
36HRA.
D. ON CIRCUIT BREAKER PANEL 121VU :
(1) CLOSE CIRCUIT BREAKER 24HR AND CHECK
THAT FAN ROTATES AT HIGHER SPEED THAN
NORMAL (AURAL CHECK)
(2) OPEN CIRCUIT BREAKER 24HR.
E. ON CONNECTOR 36HRA, REMOVE SHUNT BETWEEN
TERMINALS A AND B.
F. CONNECT CONNECTOR 36HRA TO THERMAL SWITCH
36HR.
*** CONTINUED ***
AH

21-23-00
OPT 10010-002
2-400 PAGE
4
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
5

DEC14

G. ON CIRCUIT BREAKER PANEL 121VU,


CLOSE CIRCUIT BREAKER 24HR AND CHECK THAT
FAN ROTATES (NORMAL SPEED).
4. CHECK OF INHIBITION IN FLIGHT OF ALERTS
CAUSED BY FAN SHUT-OFF AFTER SMOKE DETECTION
IN AFT CARGO COMPARTMENT.
A. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH IN FLT
POSITION.
B. ON PANEL 122VU, OPEN CIRCUIT BREAKER
186WA.
C. DISCONNECT CONNECTOR 150WA-A FROM SMOKE
DETECTOR.
D. SHUNT TERMINALS B AND C ON CONNECTOR
150WA-A.
E. CLOSE CIRCUIT BREAKER 186WA AND CHECK
THAT FAN STOPS AND NO AIR ALERT IS
TRIGGERED
F. OPEN CIRCUIT BREAKER 186WA.
G. REMOVE SHUNTS ON TERMINALS B AND C OF
CONNECTOR 150WA-A.
H. CONNECT CONNECTOR 150WA-A TO SMOKE DETECTOR.
J. CLOSE CIRCUIT BREAKER 186WA.
K. ON OVERHEAD PANEL 22VU, RELEASE AND PRESS
AGAIN AVIONICS VENT/EXHAUST MODE/NORM
PUSHBUTTON SWITCH.
NOTE : DO NOT TAKE INTO ACCOUNT ALERTS
APPEARING DURING THIS OPERATION.
*** CONTINUED ***
AH

21-23-00
OPT 10010-002
2-400 PAGE
5
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
6

DEC14

L. CHECK THAT FAN ROTATES.


005

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

006

________
CLOSE-UP
REF. FIG. 212300-OPT-00110
1. INSTALL ACCESS PANELS 211CC AND 221FF.
REFER TO AMM 20-41-13 IF NECESSARY
2. ON PANEL 902VU, PLACE CONDITION LEVER ON
FUEL S.O POSITION.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-00
OPT 10010-002
2-400 PAGE
6
DEC 01/14

21-23-00
7

AH

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-002
DEC14

21-23-00
OPT 10010-002

2-400

PAGE
7
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-003
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
221
260
: 211CC 221FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

31-63-00-PRO-10000
24-46-00-EAD-10000

21-23-00
OPT 10010-003
2-400 PAGE
1
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

001

OPT 10010-003
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
REF. FIG. 212300-OPT-00110
1. ON PANEL 902VU, MOVE ONE OF THE CONDITION
LEVERS ABOVE FTR POSITION.
2. REMOVE ACCESS PANELS 211CC AND 221FF.
REFER TO AMM 20-41-13 IF NECESSARY

003

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

004

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
*** CONTINUED ***

AH

21-23-00
OPT 10010-003
2-400 PAGE
2
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

005

OPT 10010-003
3

DEC14

______________________________________
OPERATIONAL
TEST OF AIR EXTRACTION FAN
REF. FIG. 212300-OPT-00110
REF. FIG. 212300-OPT-00100
NOTE : DURING THIS TEST, ONLY FAN OPERATION
AND ASSOCIATED ALERTS ARE CHECKED.
THE POSITIONS OF THE VALVES ARE NOT
DESCRIBED.
1. CHECK OF NORMAL OPERATIONS
A. CHECK THAT FAN OPERATES.
B. ON MFD UPPER WINDOW, IN CABIN SD PAGE,
CHECK THAT ITEM 1 IS DISPLAYED.
NOTE : FAN ROTATES AFTER APPROX. 120
SECONDS AFTER ENERGIZATION.
B. ON OVERHEAD PANEL 22VU :
(1) RELEASE AVIONICS VENT/EXHAUST MODE/
NORM PUSHBUTTON SWITCH AND CHECK
THAT :
- OVBD LEGEND OF PUSHBUTTON SWITCH
COMES ON
- THE FOLLOWING ALERT APPEAR :
. ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 2 IS
DISPLAYED.
- MECHANIC CALL SOUNDS.
- AURALLY CHECK THAT FAN STOPS
OPERATING.
(2) PRESS AVIONICS VENT/EXHAUST MODE/
NORM PUSHBUTTON SWITCH AND CHECK
THAT :
- OVBD LEGEND OF PUSHBUTTON SWITCH
GOES OFF.
- MECHANICS CALL DISAPPEARS
*** CONTINUED ***
AH

21-23-00
OPT 10010-003
2-400 PAGE
3
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-003
4

DEC14

- AURALLY CHECK THAT FAN OPERATES


- ALERT DISAPPEAR:
. ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 1 IS
DISPLAYED.
2. CHECK OF SAFETY DEVICES AND ALERTS
ASSOCIATED WITH FAN OPERATION :
A. ON CIRCUIT BREAKER PANEL 124VU,
OPEN CIRCUIT BREAKER
8PN DC BUS 2 V SNSG/BUS CAUTION
CHECK THAT :
- AURALLY FAN STILL OPERATES.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
CHECK THAT ITEM 1 REMAINS DISPLAYED.
- PRESS CLR ON EFCP TO CLEAR WARNINGS.
B. ON CIRCUIT BREAKER PANEL 127VU,
OPEN CIRCUIT BREAKER 15PA AND CHECK
15PA DC EMER/ESS/STBY BUS ON
PRIM DC BUS 1/CTL
AND CHECK THAT :
- FAULT LEGEND OF AVIONICS VENT/
EXHAUST MODE/NORM PUSHBUTTON SWITCH
COMES ON.
- THE FOLLOWING ALERTS APPEAR :
. MASTER CAUTION LIGHTS FLASH
. ON MFD UPPER WINDOW, IN CABIN SD
PAGE, ITEM 3 IS DISPLAYED
. ON EWD, IN ALERT WINDOW, AIR VENT
EXH MESSAGE IS DISPLAYED
. SINGLE CHIME SOUNDS
- AURALLY CHECK THAT FAN STOPS OPERATING.
C. ON CIRCUIT BREAKER PANEL 124VU,
CLOSE CIRCUIT BREAKER 8PN AND CHECK THAT:
- FAULT LEGEND OF AVIONICS VENT/
EXHAUST MODE/NORM PUSHBUTTON SWITCH
GOES OFF.
- ALERTS DISAPPEAR.
*** CONTINUED ***
AH

21-23-00
OPT 10010-003
2-400 PAGE
4
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-003
5

DEC14

. ON MFD UPPER WINDOW, IN CABIN SD


PAGE, CHECK THAT ITEM 1 IS DISPLAYED
. ON EWD, IN ALERT WINDOW, AIR VENT
EXH MESSAGE DISAPPEARS.
. MASTER CAUTION LIGHTS GO OFF.
- AURALLY CHECK THAT FAN ROTATES.
D. ON CIRCUIT BREAKER PANEL 127VU,
CLOSE CIRCUIT BREAKER 15PA.
3. CHECK OF FAN HIGH SPEED OPERATION BY
SIMULATING A HIGH FLIGHT DECK AMBIENT
TEMPERATURE, ON GROUND.
A. ON CIRCUIT BREAKER PANEL 121VU, OPEN
CIRCUIT BREAKER
24HR AVIONICS VENT/ EXTRACT FAN CTL
B. DISCONNECT CONNECTOR 36HRA.
C. SHUNT TERMINALS A AND B ON CONNECTOR
36HRA.
D. ON CIRCUIT BREAKER PANEL 121VU :
(1) CLOSE CIRCUIT BREAKER 24HR AND CHECK
THAT FAN ROTATES AT HIGHER SPEED THAN
NORMAL (AURAL CHECK)
(2) OPEN CIRCUIT BREAKER 24HR.
E. ON CONNECTOR 36HRA, REMOVE SHUNT BETWEEN
TERMINALS A AND B.
F. CONNECT CONNECTOR 36HRA TO THERMAL SWITCH
36HR.
G. ON CIRCUIT BREAKER PANEL 121VU,
CLOSE CIRCUIT BREAKER 24HR AND CHECK THAT
FAN ROTATES (NORMAL SPEED).
*** CONTINUED ***
AH

21-23-00
OPT 10010-003
2-400 PAGE
5
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-003
6

DEC14

4. CHECK OF INHIBITION IN FLIGHT OF ALERTS


CAUSED BY FAN SHUT-OFF AFTER SMOKE DETECTION
IN AFT CARGO COMPARTMENT.
A. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH IN FLT
POSITION.
B. ON PANEL 122VU, OPEN CIRCUIT BREAKER
186WA.
C. DISCONNECT CONNECTOR 150WA-A FROM SMOKE
DETECTOR.
D. SHUNT TERMINALS B AND C ON CONNECTOR
150WA-A.
E. CLOSE CIRCUIT BREAKER 186WA AND CHECK
THAT FAN STOPS AND NO AIR ALERT IS
TRIGGERED
F. OPEN CIRCUIT BREAKER 186WA.
G. REMOVE SHUNTS ON TERMINALS B AND C OF
CONNECTOR 150WA-A.
H. CONNECT CONNECTOR 150WA-A TO SMOKE DETECTOR.
J. CLOSE CIRCUIT BREAKER 186WA.
K. ON OVERHEAD PANEL 22VU, RELEASE AND PRESS
AGAIN AVIONICS VENT/EXHAUST MODE/NORM
PUSHBUTTON SWITCH.
NOTE : DO NOT TAKE INTO ACCOUNT ALERTS
APPEARING DURING THIS OPERATION.
L. AURALLY CHECK THAT FAN ROTATES.

*** CONTINUED ***


AH

21-23-00
OPT 10010-003
2-400 PAGE
6
DEC 01/14

21-23-00

OPERATIONAL TEST OF AIR


EXTRACTION FAN

006

OPT 10010-003
7

DEC14

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

________
CLOSE-UP
REF. FIG. 212300-OPT-00110
1. INSTALL ACCESS PANELS 211CC AND 221FF.
REFER TO AMM 20-41-13 IF NECESSARY
2. ON PANEL 902VU, PLACE CONDITION LEVER ON
FUEL S.O POSITION.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-00
OPT 10010-003
2-400 PAGE
7
DEC 01/14

21-23-00
8

AH

OPERATIONAL TEST OF AIR


EXTRACTION FAN

OPT 10010-003
DEC14

21-23-00
OPT 10010-003

2-400

PAGE
8
DEC 01/14

21-23-00
9

AH

AIR EXTRACTION FAN/


OVERBOARD VALVE LEGENDS

OPT 10010-003
DEC14

21-23-00
OPT 10010-003

2-400

PAGE
9
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 122
210
: 122AR
221FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-23-00
OPT 10020-002
2-400 PAGE
1
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

001

OPT 10020-002
2

DEC14

___________
PREPARATION
REF. FIG. 212300-OPT-00120
1. ON OVERHEAD PANEL 22VU, CHECK THAT
A. AVIONICS VENT/EXHAUST MODE PUSHBUTTON
SWITCH IS PRESSED.
B. AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH IS IN AUTO POSITION.
2. ON RIGHT MAINTENANCE PANEL 702VU,
CHECK THAT:
WEIGHT ON WHEELS SWITCH IS IN NORM
POSITION.

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

004

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

OPERATIONAL TEST OF OVERBOARD VALVE AND


_______________________________________
ASSOCIATED ALERTS - GROUND CONFIGURATION
________________________________________
REF. FIG. 212300-OPT-00120
NOTE: DURING FOLLOWING TEST, FAN WILL BE
AURALLY CHECKED.
*** CONTINUED ***
AH

21-23-00
OPT 10020-002
2-400 PAGE
2
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-002
3

DEC14

VALVE (1) CHECK WILL BE PERFORMED FROM


OUTSIDE THE AIRCRAFT, UNDER FORWARD
FUSELAGE.
1. NORMAL CONFIGURATION
A. CHECK THAT FAN OPERATES
NOTE: FAN OPERATES 120 SECONDS AFTER
ENERGIZATION.
B. CHECK THAT VALVE (1) IS FULLY OPEN.
2. PASSENGER COMPARTMENT HEATING
A. ON OVERHEAD PANEL 22VU, LIFT SAFETY GUARD
AND PLACE AVIONICS VENT/OVBD VALVE
SELECTOR SWITCH ON FULL CLOSE POSITION.
B. CHECK THAT:
(1) FAN OPERATES
(2) VALVE (1) CLOSES
(3) ON PANEL 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT COMES ON.
(4) WHEN VALVE (1) IS FULLY CLOSED, CAUTION
LIGHT GOES OFF.
3. RETURN TO NORMAL CONFIGURATION
A. ON OVERHEAD PANEL 22VU, PLACE SELECTOR
SWITCH ON AUTO POSITION:
B. CHECK THAT:
(1) FAN OPERATES
(2) VALVE (1) OPENS
*** CONTINUED ***
AH

21-23-00
OPT 10020-002
2-400 PAGE
3
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-002
4

DEC14

(3) ON PANEL 22VU, CAUTION LIGHT COMES ON.


(4) WHEN VALVE (1) IS FULLY OPEN, CAUTION
LIGHT GOES OFF.
005

OPERATIONAL TEST OF OVERBOARD VALVE AND


_______________________________________
ASSOCIATED ALERTS - FLIGHT CONFIGURATION
________________________________________
REF. FIG. 212300-OPT-00120
1. NORMAL CONFIGURATION
A. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH ON FLT POSITION.
B. CHECK THAT :
(1) FAN OPERATES
(2) VALVE (1) CLOSES
(3) ON PANEL 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT COMES ON.
4) WHEN VALVE (1) IS FULLY CLOSED,
CAUTION LIGHT GOES OFF.
2. NORMAL PROCEDURE FURTHER TO FAN FAILURE
A. ON OVERHEAD PANEL 22VU, RELEASE AVIONICS
VENT/EXHAUST MODE/NORM PUSHBUTTON SWITCH
AND CHECK THAT:
(1) OVBD LEGEND OF PUSHBUTTON SWITCH
COMES ON.
(2) MECHANIC CALL SOUNDS.
(3) FAN STOPS OPERATING.
*** CONTINUED ***
AH

21-23-00
OPT 10020-002
2-400 PAGE
4
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-002
5

DEC14

(4) AIR LEGEND COMES ON ON CREW ALERTING


PANEL.
(5) VALVE (1) OPENS.
(6) CAUTION LIGHT COMES ON.
(7) VALVE (1) STOPS IN INTERMEDIARY POSITION AND CAUTION LIGHT GOES OFF.
B. ON OVERHEAD PANEL 22VU, LIFT SAFETY GUARD,
PLACE AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH ON FULL OPEN POSITION AND
CHECK THAT:
(1) VALVE (1) OPENS
(2) CAUTION LIGHT COMES ON.
(3) WHEN VALVE (1) IS FULLY OPEN, CAUTION
LIGHT GOES OFF.
C. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH ON NORM POSITION.
3. RETURN TO NORMAL CONFIGURATION
A. ON OVERHEAD PANEL 22VU,
(1) PRESS PUSHBUTTON SWITCH AND CHECK THAT:
- OVBD LEGEND OF PUSHBUTTON SWITCH
GOES OFF
- FAN OPERATES
- AIR LEGEND GOES OFF ON CREW ALERTING PANEL
(2) PLACE SELECTOR SWITCH ON AUTO
POSITION.
*** CONTINUED ***
AH

21-23-00
OPT 10020-002
2-400 PAGE
5
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

006

OPT 10020-002
6

DEC14

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

________
CLOSE-UP
MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-00
OPT 10020-002
2-400 PAGE
6
DEC 01/14

21-23-00
7

AH

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-002
DEC14

21-23-00
OPT 10020-002

2-400

PAGE
7
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 122
210
: 122AR
221FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

31-63-00-PRO-10000
24-46-00-EAD-10000

21-23-00
OPT 10020-003
2-400 PAGE
1
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

001

OPT 10020-003
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
REF. FIG. 212300-OPT-00120
1. ON OVERHEAD PANEL 22VU, CHECK THAT
A. AVIONICS VENT/EXHAUST MODE PUSHBUTTON
SWITCH IS PRESSED.
B. AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH IS IN AUTO POSITION.
2. ON RIGHT MAINTENANCE PANEL 702VU,
CHECK THAT:
WEIGHT ON WHEELS SWITCH IS IN NORM
POSITION.

003

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

004

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
*** CONTINUED ***
AH

21-23-00
OPT 10020-003
2-400 PAGE
2
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
3

DEC14

(OFF LEGENDS ARE OFF):


6UA1
6UA2
7UA1
7UA2
005

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

OPERATIONAL TEST OF OVERBOARD VALVE AND


_______________________________________
ASSOCIATED ALERTS - GROUND CONFIGURATION
________________________________________
REF. FIG. 212300-OPT-00100
REF. FIG. 212300-OPT-00120
NOTE : DURING FOLLOWING TEST, FAN WILL BE
AURALLY CHECKED.
VALVE (1) CHECK WILL BE PERFORMED FROM
OUTSIDE THE AIRCRAFT, UNDER FORWARD
FUSELAGE.
1. NORMAL CONFIGURATION
A. - AURALLY CHECK THAT FAN OPERATES
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
CHECK THAT ITEM 1 IS DISPLAYED.
NOTE: FAN OPERATES 120 SECONDS AFTER
ENERGIZATION.
B. - VISUALLY CHECK THAT VALVE (1) IS FULLY
OPEN.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
CHECK THAT ITEM 6 IS DISPLAYED.
2. PASSENGER COMPARTMENT HEATING
A. ON OVERHEAD PANEL 22VU, LIFT SAFETY GUARD
AND PLACE AVIONICS VENT/OVBD VALVE
SELECTOR SWITCH ON FULL CLOSE POSITION.
B. CHECK THAT:
*** CONTINUED ***
AH

21-23-00
OPT 10020-003
2-400 PAGE
3
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
4

DEC14

(1) - AURALLY CHECK THAT FAN OPERATES


- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 1 IS DISPLAYED.
(2) VISUALLY CHECK THAT VALVE (1) CLOSES.
(3) - ON PANEL 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT COMES ON.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 10 IS DISPLAYED
(4) WHEN VALVE (1) IS FULLY CLOSED:
- VISUALLY CHECK THAT VALVE (1) IS
FULLY CLOSED.
- ON PANEL 22VU, CAUTION LIGHT GOES OFF
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 5 IS DISPLAYED.
3. RETURN TO NORMAL CONFIGURATION
A. ON OVERHEAD PANEL 22VU, PLACE
AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH ON AUTO POSITION.
B. CHECK THAT:
(1) - AURALLY CHECK THAT FAN OPERATES
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 1 IS DISPLAYED.
(2) WHEN VALVE (1) IS FULLY OPEN:
- VISUALLY CHECK THAT VALVE (1) IS
FULLY OPENED.
- ON PANEL 22VU, CAUTION LIGHT
AVIONICS VENT/OVBD VALVE FAULT
GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 6 IS DISPLAYED

*** CONTINUED ***


AH

21-23-00
OPT 10020-003
2-400 PAGE
4
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

006

OPT 10020-003
5

DEC14

OPERATIONAL TEST OF OVERBOARD VALVE AND


_______________________________________
ASSOCIATED ALERTS - FLIGHT CONFIGURATION
________________________________________
REF. FIG. 212300-OPT-00100
REF. FIG. 212300-OPT-00120
1. NORMAL CONFIGURATION
A. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH ON FLT
POSITION.
B. CHECK THAT:
(1) - AURALLY CHECK THAT FAN OPERATES
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 1 IS DISPLAYED
(2) VISUALLY CHECK THAT VALVE (1) CLOSES
(3) - ON PANEL 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT COMES ON.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 10 IS DISPLAYED
(4) WHEN VALVE (1) IS FULLY CLOSED:
- VISUALLY CHECK THAT VALVE (1) IS
FULLY CLOSED.
- ON 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 7 IS DISPLAYED
2. NORMAL PROCEDURE FURTHER TO FAN FAILURE
A. ON OVERHEAD PANEL 22VU, RELEASE AVIONICS
VENT/EXHAUST MODE/NORM PUSHBUTTON SWITCH
AND CHECK THAT:
(1) - OVBD LEGEND OF PUSHBUTTON SWITCH
COMES ON.
*** CONTINUED ***
AH

21-23-00
OPT 10020-003
2-400 PAGE
5
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
6

DEC14

- ON MFD UPPER WINDOW, IN CABIN SD PAGE


CHECK THAT ITEM 2 IS DISPLAYED.
(2) AURALLY CHECK THAT FAN STOPS OPERATING.
(3) VISUALLY CHECK THAT VALVE (1) OPENS.
(4) ON 22VU, AVIONICS VENT/OVBD VALVE/
FAULT CAUTION LIGHT COMES ON.
(5) - VISUALLY CHECK THAT VALVE (1) STOPS
INTERMEDIARY POSITION.
- ON 22VU, AVIONICS VENT/OVBD
VALVE/FAULT CAUTION LIGHT GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 8 IS DISPLAYED.
B. ON OVERHEAD PANEL 22VU, LIFT SAFETY GUARD,
PLACE AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH ON FULL OPEN POSITION AND
CHECK THAT:
(1) - VISUALLY CHECK THAT VALVE (1) OPENS
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 4 IS DISPLAYED.
- SINGLE CHIME SOUNDS.
(2) WHEN VALVE (1) IS FULLY OPEN:
- VISUALLY CHECK THAT VALVE (1) IS
FULLY OPENED.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, CHECK THAT ITEM 4 IS DISPLAYED
C. ON RIGHT MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS SWITCH ON NORM
POSITION.
3. RETURN TO NORMAL CONFIGURATION
A. ON OVERHEAD PANEL 22VU,
*** CONTINUED ***
AH

21-23-00
OPT 10020-003
2-400 PAGE
6
DEC 01/14

21-23-00

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
7

DEC14

(1) PRESS AVIONICS/EXHAUST MODE/NORM


PUSHBUTTON SWITCH AND CHECK THAT:
- OVBD LEGEND OF PUSHBUTTON SWITCH
GOES OFF
(2) PLACE SEL SW-AVIONICS VENT/OVBD VALVE
SELECTOR SWITCH ON AUTO POSITION.
- AURALLY CHECK THAT FAN OPERATES.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE
CHECK THAT ITEMS 1 AND 6 ARE
DISPLAYED.
007

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

008

________
CLOSE-UP
MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-00
OPT 10020-003
2-400 PAGE
7
DEC 01/14

21-23-00
8

AH

OPERATIONAL TEST OF
OVERBOARD VALVE

OPT 10020-003
DEC14

21-23-00
OPT 10020-003

2-400

PAGE
8
DEC 01/14

21-23-00
9

AH

AIR EXTRACTION FAN/


OVERBOARD VALVE LEGENDS

OPT 10020-003
DEC14

21-23-00
OPT 10020-003

2-400

PAGE
9
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 210
214
: 212KF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-23-16
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

001

OPT 10000-001
2

DEC14

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
1. CUT LOCKWIRE OF GUARD.
2. REMOVE ACCESS PANEL 212KF.

003

____________________________________
OPERATIONAL
TEST OF ANTI-SMOKE VALVE
REF. FIG. 212316-OPT-00100
NOTE : VALVE IS IN FULLY OPEN POSITION WHEN
VALVE LEVER (1) IS PARALLEL WITH DUCT
AXIS.
1. PUT THE FLAP IN CLOSED POSITION BY MEANS OF
THE CONTROL LEVER (2) BEING CAREFUL TO AVOID
OVERTRAVEL OF LEVER WHEN THE FLAP IS ALREADY
IN CLOSED POSITION.
*** CONTINUED ***
AH

21-23-16
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

OPT 10000-001
3

DEC14

2. MOVE THE CONTROL LEVER (2) TO OPEN POSITION


AND VISUALLY CHECK THAT THE VALVE LEVER (1)
IS IN FULLY OPEN POSITION.
004

________
CLOSE
UP
1. INSTALL ACCESS PANELS PREVIOUSLY REMOVED.
2. PUT LOCKWIRE ON GUARD.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
*****

AH

E N D

O F

T E X T

*****

21-23-16
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-23-16
4

AH

OPERATIONAL TEST OF
ANTI-SMOKE VALVE

OPT 10000-001
DEC14

21-23-16
OPT 10000-001

2-400

PAGE
4
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 210
214
: 212AZ 212KF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-23-16
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

001

OPT 10000-002
2

DEC14

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
1. CUT LOCKWIRE OF GUARD.
2. REMOVE ACCESS PANEL 212KF AND 212AZ.

003

_____________________________________
OPERATIONAL
TEST OF ANTI-SMOKE VALVES
REF. FIG. 212316-OPT-00100
NOTE : VALVES ARE IN FULLY OPEN POSITION WHEN
VALVE LEVER (1) IS PARALLEL WITH DUCT
AXIS.
1. PUT THE FLAPS IN CLOSED POSITION BY MEANS OF
THE CONTROL LEVER (2) BEING CAREFUL TO AVOID
OVERTRAVEL OF LEVER WHEN THE FLAPS ARE
ALREADY IN CLOSED POSITION.
*** CONTINUED ***
AH

21-23-16
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-23-16

OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)

OPT 10000-002
3

DEC14

2. MOVE THE CONTROL LEVER (2) TO OPEN POSITION


AND VISUALLY CHECK THAT THE VALVE LEVERS (1)
ARE IN FULLY OPEN POSITION.
004

________
CLOSE
UP
1. INSTALL ACCESS PANELS PREVIOUSLY REMOVED.
2. PUT LOCKWIRE ON GUARD.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
*****

AH

E N D

O F

T E X T

*****

21-23-16
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-23-16
4

AH

OPERATIONAL TEST OF
ANTI-SMOKE VALVES

OPT 10000-002
DEC14

21-23-16
OPT 10000-002

2-400

PAGE
4
DEC 01/14

21-23-16

REMOVAL AND INSTALLATION


OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

RAI 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 210
212
214
: 212HF 212JF 212KF 212MZ 212NZ

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: OPERATIONAL TEST OF
ANTI-SMOKE VALVE

AH

21-23-16-OPT-10000

21-23-16
RAI 10000-001
2-400 PAGE
1
MAR 01/12

21-23-16

REMOVAL AND INSTALLATION


OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

001

RAI 10000-001
2

MAR12

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
1. CUT LOCKWIRE OF GUARD.
2. REMOVE ACCESS PANELS 212MZ, 212NZ, 212JF
212KF AND 212HF.

003

REMOVAL OF ANTI-SMOKE VALVE,


____________________________
CONTROL LEVER AND CABLE
_______________________
REF. FIG. 212316-RAI-00100
1. REMOVAL OF CABLE/SLEEVE ASSY
A. RELEASE SCREWS (1).
B. MOVE CABLE IN ITS SLEEVE IN ORDER TO FREE
*** CONTINUED ***
AH

21-23-16
RAI 10000-001
2-400 PAGE
2
MAR 01/12

21-23-16

REMOVAL AND INSTALLATION


OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

RAI 10000-001
3

MAR12

BOLTS (2).
C. CUT CABLE TIES.
D. REMOVE NUT (3).
E. REMOVE SCREWS (5).
F. COLLECT SCREWS (5), WASHERS (6), NUTS
(7) AND CLAMPS (8).
G. REMOVE SLEEVE (9) EQUIPPED WITH THEIR
SETTING SYSTEMS (4).
2. REMOVAL OF CONTROL LEVER
A. REMOVE BOLT (10).
B. COLLECT BOLT (10), WASHERS (11) AND NUT
(12).
C. REMOVE SCREWS (13).
D. REMOVE LEVER (14) AND ITS PLATE (15).
3. REMOVAL OF ANTI-SMOKE VALVE
A. REMOVE CLAMPS (16).
B. SLIDE FLEXIBLE SLEEVE (17) AND CLAMPS
(16) ALONG AIR EXTRACTION PIPE IN ORDER
TO DISENGAGE THE VALVE.
C. CAREFULLY UNSTICK VALVE (18) AND REMOVE
IT.
004

INSTALLATION OF ANTI-SMOKE VALVE,


_________________________________
CONTROL LEVER AND CABLE
_______________________
REF. FIG. 212316-RAI-00100
*** CONTINUED ***
AH

21-23-16
RAI 10000-001
2-400 PAGE
3
MAR 01/12

21-23-16

REMOVAL AND INSTALLATION


OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

RAI 10000-001
4

MAR12

1. INSTALLATION OF ANTI-SMOKE VALVE


A. BEFORE INSTALLATION OF VALVE, CHECK THAT
(1) IT OPERATES CORRECTLY
(2) THERE IS NO HARD POINT.
B. PLACE VALVE IN FULL OPEN POSIITION.
C. APPLY MATERIAL 08-001 ON OUTER SIDE OF
VALVE (18) AND ON INNER SIDE OF DUCT (19)
AND INSTALL VALVE ON DUCT.
D. INSTALL FLEXIBLE SLEEVE (17), CLAMPS (16)
AND TIGHTEN.
2. INSTALLATION OF CONTROL LEVER
A. INSTALL PLATE (15) EQUIPPED WITH ITS
LEVER (14).
B. TIGHTEN SCREWS (13).
C. INSTALL LEVER (14), BOLT (10), WASHERS
(11), AND SCREW NUT (12).
D. MOVE CONTROL LEVER (14) FORWARD WHICH
CORRESPONDS TO THE FULL OPEN POSITION OF
THE VALVE.
3. INSTALLATION OF CABLE/SLEEVE ASSY
A. CHECK THAT CABLE MOVES WITHOUT HARD POINT
IN ITS SLEEVE.
B. INSTALL CLAMPS (8), SCREWS (5), WASHERS
(6) AND NUTS (7).
C. INSTALL ASSEMBLY (9) EQUIPPED WITH THEIR
SETTING SYSTEMS (4).
D. SCREW NUT (3).
*** CONTINUED ***
AH

21-23-16
RAI 10000-001
2-400 PAGE
4
MAR 01/12

21-23-16

REMOVAL AND INSTALLATION


OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

RAI 10000-001
5

MAR12

E. BY MOVING CABLE IN ITS SLEEVE, INSTALL


BOLTS (2) AND LOCK CABLE BY TIGHTENING
SCREWS (1).
F. INSTALL CABLE TIES.
4. ADJUSTMENT AND CHECK
A. CHECK FOR HARD POINT AT VALVE HINGE AND
THAT VALVE FLAP OPENS AND CLOSES
CORRECTLY.
B. CHECK THAT IN OPEN POSITION, THE BELLCRANK ASSY (20) IS CORRECTLY INSTALLED.
IF NECESSARY, RECTIFY SETTING SYSTEMS (4)
C. SAME CHECK FOR CLOSED POSITION (IF NECES-SARY,MOVE STOP (21) LOCATED ON PLATE).
005

____________________________________
OPERATIONAL
TEST OF ANTI-SMOKE VALVE
SEE JOB INSTRUCTION CARD
212316-OPT-10000.

006

________
CLOSE
UP
1. INSTALL ACCESS PANELS PREVIOUSLY REMOVED.
2. PUT LOCKWIRE ON GUARD.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

007

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
*****

AH

E N D

O F

T E X T

*****

21-23-16
RAI 10000-001
2-400 PAGE
5
MAR 01/12

21-23-16
6

AH

REMOVAL/INSTALLATION OF
ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE

RAI 10000-001
MAR12

21-23-16
RAI 10000-001

2-400

PAGE
6
MAR 01/12

21-23-21

REMOVAL AND INSTALLATION


OF AIR EXTRACTION FAN

RAI 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 121
214
: 221BF 221FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
ELECTRIC

___
MEN

_________
MAN-HOURS
01

ELAPSED TIME

SPARE

: 01 AIR EXTRACTION FAN 7HR

212320

: OPERATIONAL TEST OF AIR


EXTRACTION FAN

21-23-00-OPT-10010

PUBLICATION
___________
JIC

AH

21-23-21
RAI 10000-001
2-400 PAGE
1
MAR 01/12

21-23-21

REMOVAL AND INSTALLATION


OF AIR EXTRACTION FAN

001

RAI 10000-001
2

MAR12

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
REMOVE THE FLOOR PANELS 221BF AND 221FF.

003

_____________________________
REMOVAL
OF AIR EXTRACTION FAN
REF. FIG. 212321-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1), IDENTIFY AND DISCONNECT WIRES (10), (11) AND
(12).
2. DISCONNECT CLAMPS (2)(3) FROM FLEXIBLE
HOSES (4) (5).
3. DISCONNECT COUPLINGS (6)(7).
4. REMOVE AIR EXTRACTION FAN (8) FROM SUPPORT
*** CONTINUED ***
AH

21-23-21
RAI 10000-001
2-400 PAGE
2
MAR 01/12

21-23-21

REMOVAL AND INSTALLATION


OF AIR EXTRACTION FAN

RAI 10000-001
3

MAR12

BRACKET (9).
5. BLANK ELECTRICAL CONNECTOR WITH PROTECTIVE
CAP.
004

__________________________________
INSTALLATION
OF AIR EXTRACTION FAN
REF. FIG. 212321-RAI-00100
1. CLEAN AND INSPECT EQUIPMENT INSTALLATION
AREA, REMOVE BLANKING CAP.
2. INSTALL AIR EXTRACTION FAN (8) ON FAN
SUPPORT BRACKET (9) BY COUPLINGS (6) (7).
NOTE : THE ARROW LOCATED ON FAN SHOWS THE
AIRFLOW DIRECTION TOWARDS THE OVBD AND
UNDERFLOOR VENTILATION VALVES (REAR
PART OF A/C).
3. CONNECT FLEXIBLE HOSES (4) AND (5) TO AIR
EXTRACTION FAN (8) WITH CLAMPS (2) AND (3).
4. REMOVE BLANKING CAP FROM ELECTRICAL
CONNECTOR.
5. CONNECT ELECTRICAL CONNECTOR (1), AND WIRES
(10), (11) AND (12) IDENTIFIED AT REMOVAL.

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.

006

OPERATIONAL TEST OF AIR


_______________________
EXTRACTION FAN
______________
SEE JOB INSTRUCTION CARD
212300-OPT-10010

*** CONTINUED ***


AH

21-23-21
RAI 10000-001
2-400 PAGE
3
MAR 01/12

21-23-21

REMOVAL AND INSTALLATION


OF AIR EXTRACTION FAN

007

RAI 10000-001
4

MAR12

________
CLOSE-UP
MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
INSTALL FLOOR PANELS 221BF AND 221FF.
*****

AH

E N D

O F

T E X T

*****

21-23-21
RAI 10000-001
2-400 PAGE
4
MAR 01/12

21-23-21
5

AH

AIR EXTRACTION FAN

RAI 10000-001
MAR12

21-23-21
RAI 10000-001

2-400

PAGE
5
MAR 01/12

21-23-22

MANUAL CHECK OF
OVERBOARD VENT VALVE

CHK 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 122
214
: 122AR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-23-22
CHK 10000-001
2-400 PAGE
1
MAR 01/12

21-23-22

MANUAL CHECK OF
OVERBOARD VENT VALVE

001

CHK 10000-001
2

MAR12

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

____________________________________
MANUAL
CHECK OF OVERBOARD VENT VALVE
REF. FIG. 212322-CHK-00100
OUTSIDE THE AIRCRAFT, UNDER FORWARD FUSELAGE :
1. CHECK THAT OVERBOARD VALVE IS IN OPEN POSITION.
2. PUSH THE BUTTON OF THE MANUAL CONTROL HANDLE
3. A. TURN HANDLE CLOCKWISE TO CLOSE THE VALVE
AND CHECK CORRECT MOVEMENT OF VALVE :
. INTERMEDIATE POSITION : 22.5 TURNS
. CLOSED POSITION
: 24.5 TURNS
B. TURN HANDLE ANTI-CLOCKWISE TO OPEN THE
VALVE AND CHECK THE CORRECT MOVEMENT OF
*** CONTINUED ***
AH

21-23-22
CHK 10000-001
2-400 PAGE
2
MAR 01/12

21-23-22

MANUAL CHECK OF
OVERBOARD VENT VALVE

CHK 10000-001
3

MAR12

VALVE.
4. SHUT THE MANUAL CONTROL HANDLE.
003

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.
*****

AH

E N D

O F

T E X T

*****

21-23-22
CHK 10000-001
2-400 PAGE
3
MAR 01/12

21-23-22
4

AH

MANUAL CHECK OF OVBD


VENT VALVE

CHK 10000-001
MAR12

21-23-22
CHK 10000-001

2-400

PAGE
4
MAR 01/12

21-23-22

REMOVAL AND INSTALLATION


OF OVERBOARD VENTILATION
VALVE

RAI 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 122
214
: 122AR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 OVERBOARD VENT VALVE

212320-10-100

: OPERATIONAL TEST OF
OVERBOARD VALVE

21-23-00-OPT-10020

PUBLICATION
___________
JIC

AH

21-23-22
RAI 10000-001
2-400 PAGE
1
MAR 01/12

21-23-22

REMOVAL AND INSTALLATION


OF OVERBOARD VENTILATION
VALVE

001

RAI 10000-001
2

MAR12

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

______________________________________
REMOVAL
OF OVERBOARD VENTILATION VALVE
REF. FIG. 212322-RAI-00100
NOTE: THE REMOVAL AND INSTALLATION OPERATIONS
ARE PERFORMED FROM THE OUTSIDE OF THE
AIRCRAFT.
1. REMOVE SCREWS (4) WHILE MAINTENING VALVE (3)
2. ALLOW VALVE (3) TO MOVE DOWNWARDS IN ORDER
TO DISCONNECT ELECTRICAL CONNECTOR (2).
3. DISCONNECT SNAP (5) FROM SUPPORT (6).
4. REMOVE VALVE (3).
5. BLANK ELECTRICAL CONNECTORS WITH PROTECTIVE
*** CONTINUED ***
AH

21-23-22
RAI 10000-001
2-400 PAGE
2
MAR 01/12

21-23-22

REMOVAL AND INSTALLATION


OF OVERBOARD VENTILATION
VALVE

RAI 10000-001
3

MAR12

CAPS.
003

___________________________________________
INSTALLATION
OF OVERBOARD VENTILATION VALVE
REF. FIG. 212322-RAI-00100
1. CLEAN AND INSPECT VALVE INTERFACE AND/OR
AREA ADJACENT.
2. REMOVE BLANKING CAPS.
3. CONNECT SNAP (5) TO SUPPORT (6).
4. CONNECT ELECTRICAL CONNECTOR (2)
5. INSTALL VALVE (3) IN CORRECT POSITION
AND SECURE IT WITH SCREWS (4).

004

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.

005

___________________________________
OPERATIONAL
TEST OF OVERBOARD VALVE
SEE JOB INSTRUCTION CARD
212300-OPT-10020

006

________
CLOSE-UP
1. REMOVE WARNING NOTICE.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-22
RAI 10000-001
2-400 PAGE
3
MAR 01/12

21-23-22
4

AH

OVERBOARD VENTILATION
VALVE

RAI 10000-001
MAR12

21-23-22
RAI 10000-001

2-400

PAGE
4
MAR 01/12

21-23-23

OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 122
210
: 231BF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-23-23
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-23-23

OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE

001

OPT 10000-002
2

DEC14

___________
PREPARATION
REF. FIG. 212323-OPT-00100
1. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKERS ARE CLOSED :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR
AVIONICS VENT/IND
5HR
AVIONICS VENT/VALVES
24HR
AVIONICS VENT/EXTRACT FAN CTL
B. ON CIRCUIT BREAKER PANEL 124VU :
8PN DC BUS 2 V SNSG/BUS CAUTION
4HR
PWR SUPLY ON PRIM DC BUS2/EXTRACT
FAN
C. ON CIRCUIT BREAKER PANEL 127VU :
3HR
PWR SUPLY ON PRIM DC BUS1/EXTRACT
FAN
15PA
DC EMER/ESS/STBY BUS ON PRIM DC
BUS 1/CTL
D. ON CIRCUIT BREAKER PANEL 21VU
2WC
COM/CALL/MECH.
2. ON OVERHEAD PANEL 22VU, CHECK THAT :
A. AVIONICS VENT/EXHAUST MODE/NORM PUSHBUTTON SWITCH 12HR IS PRESSED.
B. AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH 21HR IS IN AUTO POSITION.
3. ON RIGHT MAINTENANCE PANEL 702VU,
CHECK THAT :
WEIGHT ON WHEELS SWITCH IS IN NORM
POSITION.
4. REMOVE FLOOR PANEL 231BF.
*** CONTINUED ***
AH

21-23-23
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-23-23

OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE

002

OPT 10000-002
3

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

004

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

_____________________________________
OPERATIONAL
TEST OF UNDER FLOOR VALVE
REF. FIG. 212323-OPT-00100
NOTE : DURING FOLLOWING TEST:
-FAN WILL BE AURALLY CHECKED.
-VALVE 15HR CHECK WILL BE PERFORMED BY
CHECKING INDEX (1) POSITION.
-OVERBOARD VALVE POSITION AND ASSOCIATED
ALERTS NOT BE DESCRIBED.
1. NORMAL CONFIGURATION
A. CHECK THAT FAN OPERATES
NOTE : FAN OPERATES 120 SECONDS AFTER
ENERGIZATION.
B. CHECK THAT VALVE 15HR IS CLOSED.
2. PASSENGER COMPARTMENT HEATING
A. ON OVERHEAD PANEL 22VU, LIGHT SAFETY GUARD
AND PLACE AVIONICS VENT/OVBD VALVE
*** CONTINUED ***
AH

21-23-23
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-23-23

OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE

OPT 10000-002
4

DEC14

SELECTOR SWITCH 21HR ON FULL CLOSE


POSITION.
B. CHECK THAT :
(1) FAN OPERATES
(2) VALVE 15HR OPENS
3. RETURN TO NORMAL CONFIGURATION
A. ON OVERHEAD PANEL 22VU, PLACE SELECTOR
SWITCH 21HR ON AUTO POSITION :
B. CHECK THAT :
(1) FAN OPERATES
(2) VALVE 15HR CLOSES.
005

________
CLOSE-UP
REF. FIG. 212323-OPT-00100
1. INSTALL FLOOR PANELS 231BF.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-23-23
OPT 10000-002
2-400 PAGE
4
DEC 01/14

21-23-23
5

AH

OPERATIONAL TEST OF
UNDER FLOOR VALVE

OPT 10000-002
DEC14

21-23-23
OPT 10000-002

2-400

PAGE
5
DEC 01/14

21-23-23

REMOVAL AND INSTALLATION


OF UNDERFLOOR
VENTILATION VALVE

RAI 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 121
214
: 231BF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
ELECTRIC

___
MEN

_________
MAN-HOURS
01

ELAPSED TIME

SPARE

: 01 UNDERFLOOR VENT VALVE

212320

EXPENDABLE

: 02 SEAL

212320

: OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE

21-23-23-OPT-10000

PUBLICATION
___________
JIC

AH

21-23-23
RAI 10000-001
2-400 PAGE
1
MAR 01/12

21-23-23

REMOVAL AND INSTALLATION


OF UNDERFLOOR
VENTILATION VALVE

001

RAI 10000-001
2

MAR12

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
REMOVE FLOOR PANEL 231BF.

003

_______________________________________
REMOVAL
OF UNDERFLOOR VENTILATION VALVE
REF. FIG. 212323-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1).
2. REMOVE CLAMPS (2) FROM DUCTS (5) AND (6).
3. REMOVE UNDERFLOOR VENTILATION VALVE (3).
4. REMOVE AND DISCARD O-RING (4).
5. BLANK ELECTRICAL CONNECTOR WITH PROTECTIVE
CAP.
*** CONTINUED ***
AH

21-23-23
RAI 10000-001
2-400 PAGE
2
MAR 01/12

21-23-23

REMOVAL AND INSTALLATION


OF UNDERFLOOR
VENTILATION VALVE

004

RAI 10000-001
3

MAR12

____________________________________________
INSTALLATION
OF UNDERFLOOR VENTILATION VALVE
REF. FIG. 212323-RAI-00100
1. CLEAN AND INSPECT EQUIPMENT INSTALLATION
AREA, REMOVE BLANKING CAP.
2. INSTALL O RING (4) ON UNDERFLOOR VENT
VALVE (3).
3. POSITION CLAMPS (2) ON DUCTINGS (5) AND
(6).
4. INSTALL UNDERFLOOR VENT VALVE (3) AND SECURE
IT WITH COUPLINGS (2) USING A MAXIMUM TORQUE
OF 65 LBF.IN (0,73 M.DAN).
CAUTION: OVER-TORQUING THE COUPLING MAY CAUSE
AN MFC FAILURE.
5. CONNECT ELECTRICAL CONNECTOR (1).

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.

006

OPERATIONAL TEST OF UNDERFLOOR VENTILATION


__________________________________________
VALVE
_____
SEE JOB INSTRUCTION CARD
212323-OPT-10000

007

________
CLOSE-UP
MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
INSTALL FLOOR PANEL 231BF.
*****

AH

E N D

O F

T E X T

*****

21-23-23
RAI 10000-001
2-400 PAGE
3
MAR 01/12

21-23-23
4

AH

UNDERFLOOR VENTILATION
VALVE

RAI 10000-001
MAR12

21-23-23
RAI 10000-001

2-400

PAGE
4
MAR 01/12

21-23-25

REMOVAL AND INSTALLATION


OF AIR EXTRACTION DUCT
CHECK VALVE

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 120
121
131
210
214
220
: 231EF 241EF

240

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
ELECTRIC

___
MEN

_________
MAN-HOURS
01

ELAPSED TIME

SPARE

: 01 AIR EXTRACTION CHECK VALVE

212320-08

EXPENDABLE

: 02 GASKET

212320-08

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

24-46-00-EAD-10000

PUBLICATION
___________
JIC

AH

21-23-25
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-23-25

REMOVAL AND INSTALLATION


OF AIR EXTRACTION DUCT
CHECK VALVE

001

RAI 10000-002
2

DEC14

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
REMOVE FLOOR PANELS 231EF AND 241EF.

003

______________________
REMOVAL
OF CHECK VALVE
REF. FIG. 212325-RAI-00100
1. REMOVE THE CLAMP (2) FROM DUCT (1).
2. REMOVE BOLTS (7) WASHERS (8) AND NUTS (9).
3. DISCONNECT DUCT (1) FROM DUCT (6).
4. REMOVE CHECK VALVE (4) AND GASKETS (3)
AND (5).

*** CONTINUED ***


AH

21-23-25
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-23-25

REMOVAL AND INSTALLATION


OF AIR EXTRACTION DUCT
CHECK VALVE

004

RAI 10000-002
3

DEC14

_______________________________________________
INSTALLATION
OF AIR EXTRACTION DUCT CHECK VALVE
REF. FIG. 212325-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/
OR ADJACENT AREA.
2. INSTALL GASKETS (3) AND (5).
3. INSTALL CHECK VALVE (4) BETWEEN DUCT (1) AND
DUCT (6) AND SECURE THEM WITH BOLTS (7)
WASHERS (8) AND NUTS (9).
4. SECURE DUCT (1) WITH CLAMP (2).

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.

006

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

008

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF

OPERATIONAL TEST OF AIR EXTRACTION DUCT


_______________________________________
CHECK VALVE
___________
REF. FIG. 212325-OPT-00100
*** CONTINUED ***
AH

21-23-25
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-23-25

REMOVAL AND INSTALLATION


OF AIR EXTRACTION DUCT
CHECK VALVE

RAI 10000-002
4

DEC14

1. ON PANEL 22VU, MAKE CERTAIN THAT AVIONICS


VENT/EXHAUST MODE/NORM PUSHBUTTON SWITCH
12HR IS PRESSED (OVBD LEGEND OFF), AND
THAT AVIONICS VENT/OVBD VALVE SWITCH 21HR
IS IN AUTO POSITION.
NOTA: EXTRACTION FAN STARTS OPERATING 120
SECONDS APPROX. AFTER ENERGIZATION
2. ON PANEL 702VU, PLACE WEIGHT ON WHELL
SWITCH IN FLT POSITION .
3. MAKE CERTAIN THAT AIR IS EVACUATED :
- UNDER CABIN FLOOR.
- IN ENTRANCE AREA AT FLOOR LEVEL.
009

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

010

________
CLOSE-UP
MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
INSTALL FLOOR PANELS ALREADY REMOVED, FLOOR
COVERING AND SEATS CORRESPONDINGS.
*****

AH

E N D

O F

T E X T

*****

21-23-25
RAI 10000-002
2-400 PAGE
4
DEC 01/14

21-23-25
5

AH

AIR EXTRACTION DUCT


CHECK-VALVE

RAI 10000-002
DEC14

21-23-25
RAI 10000-002

2-400

PAGE
5
DEC 01/14

21-23-25
6

AH

OPERATIONAL TEST OF AIR


EXTRACTION DUCT CHECK
VALVE

RAI 10000-002
DEC14

21-23-25
RAI 10000-002

2-400

PAGE
6
DEC 01/14

21-24-11

CHECK OF BATTERIES
VENTILATION CHECK VALVE

CHK 10000-001
1

APR05

ZONING DATA
___________

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

BULK MATERIAL : CLEANING AGENT

_________
MAN-HOURS

11-002

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF BATTERIES VENTILATION
CHECK VALVE

AH

21-24-11-RAI-10000

21-24-11
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-24-11

CHECK OF BATTERIES
VENTILATION CHECK VALVE

001

CHK 10000-001
2

APR05

____________________________________________
REMOVAL
OF BATTERIES VENTILATION CHECK VALVE
SEE JOB INSTRUCTION CARD
212411-RAI-10000.

002

____________________
CHECK
OF CHECK VALVE
1. CLEAN CHECK VALVE USING WHITE SPIRIT AND
LEAVE TO DRY.
2. CAREFULLY CHECK INSIDE CHECK VALVE TO DETECT
ANY TRACE OF CORROSION.
NOTE : IF CORROSION IS FOUND, DISCARD CHECK
VALVE.
3. CHECK OPERATING STATE OF CHECK VALVE :
- MOVEMENT OF INTERNAL COMPONENTS
- DIRECTION OF FLOW
- SIGNS OF LEAKAGE.
MOVE CORRECTLY IN THE OPENING DIRECTION IN
ACCORDANCE WITH DIRECTION OF FLOW.
NOTE : CHECK VALVE RELATIVE OPENING PRESSURE :
- UPSTREAM/DOWNSTREAM DIFFERENTIAL
PRESSURE LESS THAN A OR EQUAL TO
0.5 MILLIBAR (0.00725 PSI).

003

INSTALLATION OF BATTERIES VENTILATION CHECK


___________________________________________
VALVE
_____
SEE JOB INSTRUCTION CARD
212411-RAI-10000.
*****

AH

E N D

O F

T E X T

*****

21-24-11
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-24-11
3

AH

BATTERIES VENT CHECK


VALVE

CHK 10000-001
APR05

21-24-11
CHK 10000-001

2-400

PAGE
3
APR 01/05

21-24-11

REMOVAL AND INSTALLATION


OF BATTERIES VENTILATION
CHECK VALVE

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 210
212
: 221AZ

213

214

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
ELECTRIC

___
MEN

_________
MAN-HOURS
01

ELAPSED TIME

SPARE

: 01 MAIN BATTERY CHECK VALVE

212410-01

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

24-46-00-EAD-10000

PUBLICATION
___________
JIC

AH

21-24-11
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-24-11

REMOVAL AND INSTALLATION


OF BATTERIES VENTILATION
CHECK VALVE

001

RAI 10000-002
2

DEC14

________________________________________
DE-ENERGIZATION
OF AIR EXTRACTION SYSTEM
CAUTION : DISPLAY WARNING NOTICE INDICATING
THAT :
DURING MAINTENANCE OPERATIONS ON AIR
EXTRACTION SYSTEM, INSTRUMENT PANELS
AND ELECTRONICS RACKS ARE NOT
VENTILATED.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
A. ON CIRCUIT BREAKER PANEL 121VU :
1HR AVIONICS VENT/IND
5HR AVIONICS VENT/VALVES
24HR AVIONICS VENT/EXTRACT FAN CTL
B. ON PANEL 124VU :
4HR PWR SUPLY ON PRIM DC BUS 2/EXTRACT FAN
C. ON PANEL 127VU :
3HR PWR SUPLY ON PRIM DC BUS 1/EXTRACT FAN

002

___________
PREPARATION
REF. FIG. 212411-RAI-00100
1. MAKE CERTAIN THAT SUCTION AND EVACUATIONS
ZONES OF THE SYSTEM INSIDE AND OUTSIDE
AIRCRAFT ARE NOT OBSTRUCTED, IN PARTICULAR,
CHECK BATTERY VENTILATION OUTLET (2).
2. REMOVE LOWER REAR PANEL 221AZ OF ELECTRONICS
RACK 80VU.

003

_____________________________________
REMOVAL
OF BATTERIES VENT CHECK VALVE
REF. FIG. 212411-RAI-00100
1. REMOVE THE BAND CLAMP (4).
*** CONTINUED ***
AH

21-24-11
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-24-11

REMOVAL AND INSTALLATION


OF BATTERIES VENTILATION
CHECK VALVE

RAI 10000-002
3

DEC14

2. UNSCREW THE NUT (6).


3. REMOVE THE BATTERY VENT CHECK VALVE (5) AND
CAP THE FLEX HOSE (3) AND THE ELBOW (7).
004

__________________________________________
INSTALLATION
OF BATTERIES VENT CHECK VALVE
REF. FIG. 212411-RAI-00100
1. CLEAN AND INSPECT EQUIPMENT INSTALLATION
AREA.
2. REMOVE CAPS FROM FLEX HOSE (3) AND FROM
ELBOW (7).
3. INSTALL CHECK VALVE (5) AND SCREW NUT (6) TO
ELBOW (7).
4. SECURE BAND CLAMP (4) TO FLEX HOSE (3).

005

_____________________________________
ENERGIZATION
OF AIR EXTRACTION SYSTEM
REMOVE SAFETY CLIPS AND TAGS AND CLOSE CIRCUIT
BREAKERS PREVIOUSLY OPENED.

006

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2

MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
*** CONTINUED ***

AH

21-24-11
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-24-11

REMOVAL AND INSTALLATION


OF BATTERIES VENTILATION
CHECK VALVE

008

RAI 10000-002
4

DEC14

_______________________________________
OPERATIONAL
TEST OF BATTERY VENTILATION
REF. FIG. 212411-RAI-00100
1. ON PANEL 22VU, MAKE CERTAIN THAT AVIONICS
VENT/EXHAUST MODE/NORM PUSHBUTTON SWITCH
12HR IS PRESSED (OVBD LEGEND OFF), AND
THAT AVIONICS VENT/OVBD VALVE SWITCH 21HR
IS IN AUTO POSITION.
NOTA: EXTRACTION FAN STARTS OPERATING 120
SECONDS APPROX. AFTER ENERGIZATION
2. ON PANEL 702VU, MAKE CERTAIN THAT WEIGHT
ON WHEEL SWITCH IS IN NORM POSITION .
3. OUTSIDE THE AIRCRAFT, MAKE CERTAIN THAT THE
AIR IS EVACUATED :
- BY THE OVERBOARD VENT VALVE (1),
- BY THE BATTERY VENTILATION OUTLET (2) .

009

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

010

________
CLOSE-UP
1. INSTALL PANEL 221AZ.
2. REMOVE WARNING NOTICE.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-24-11
RAI 10000-002
2-400 PAGE
4
DEC 01/14

21-24-11
5

AH

BATTERIES VENT CHECK


VALVE

RAI 10000-002
DEC14

21-24-11
RAI 10000-002

2-400

PAGE
5
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 200

210

212

214

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-26-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

001

OPT 10000-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

___________
PREPARATION
1. WARNING: DISPLAY WARNING NOTICES PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND OPERA
TION OF AIR CONDITIONING SYSTEM.
2. ENSURE THAT CABIN DOORS ARE OPEN.
3. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKERS ARE CLOSED:
ON PANEL 121VU
3HB AIR BLEED/COMPT TEMP/SYS 1/PACK &
RECIRC FAN CAUTION
4HB AIR BLEED/COMPT TEMP/SYS 2/PACK &
RECIRC FAN CAUTION
23HB COMPT TEMP/RECIRC FAN/CTL1
24HB COMPT TEMP/RECIRC FAN/CTL2
ON PANEL 124VU
22HB PWR SPLY ON PRIM DC BUS 2/R RECIRC
FAN
ON PANEL 127VU
25HB PWR SPLY ON PRIM DC BUS 1/L RECIRC
FAN
4. ON 22VU PLACE PACK VALVE PUSHBUTTON SWITCHES
IN OFF POSITION (RELEASED).

003

_______________________________________________
OPERATIONAL
TEST OF INDIVIDUAL AIR DISTRIBUTION
REF. FIG. 212600-OPT-00100
1. ON PANEL 22VU, MAKE SURE THAT COMPT TEMP/
RECIRC FAN 1 AND COMPT TEMP/RECIRC FAN 2
PUSHBUTTON SWITCHES ARE PRESSED (OFF LEGENDS
OFF).
*** CONTINUED ***
AH

21-26-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-001
3

DEC14

2. CHEK THAT AIRFLOW CAN BE ADJUSTED AND ORIENTATED ON EACH AIR SUPPLY MODULE (1).
004

________
CLOSE
UP
1. ON PANEL 22VU, PRESS PACK VALVE PUSHBUTTON SWITCHES.
2. REMOVE WARNING NOTICES.

005

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-26-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-26-00
4

AH

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-001
DEC14

21-26-00
OPT 10000-001

2-400

PAGE
4
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 200

210

212

214

222

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-26-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

001

OPT 10000-002
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

___________
PREPARATION
1. WARNING: DISPLAY WARNING NOTICES PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND OPERA
TION OF AIR CONDITIONING SYSTEM.
2. ENSURE THAT CABIN DOORS ARE OPEN.
3. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKERS ARE CLOSED:
ON PANEL 121VU
3HB AIR BLEED/COMPT TEMP/SYS 1/PACK &
RECIRC FAN CAUTION
4HB AIR BLEED/COMPT TEMP/SYS 2/PACK &
RECIRC FAN CAUTION
23HB COMPT TEMP/RECIRC FAN/CTL1
24HB COMPT TEMP/RECIRC FAN/CTL2
ON PANEL 124VU
22HB PWR SPLY ON PRIM DC BUS 2/R RECIRC
FAN
ON PANEL 127VU
25HB PWR SPLY ON PRIM DC BUS 1/L RECIRC
FAN
4. ON 22VU PLACE PACK VALVE PUSHBUTTON SWITCHES
IN OFF POSITION (RELEASED).
5. IN FWD CARGO COMPARTMENT, ENSURE THAT MANUAL
SHUT-OFF VALVE IS IN OPEN POSITION.

003

_______________________________________________
OPERATIONAL
TEST OF INDIVIDUAL AIR DISTRIBUTION
REF. FIG. 212600-OPT-00100
1. ON PANEL 22VU, MAKE SURE THAT COMPT TEMP/
*** CONTINUED ***
AH

21-26-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-26-00

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-002
3

DEC14

RECIRC FAN 1 AND COMPT TEMP/RECIRC FAN 2


PUSHBUTTON SWITCHES ARE PRESSED (OFF LEGENDS
OFF).
2. CHEK THAT AIRFLOW CAN BE ADJUSTED AND ORIENTATED ON EACH AIR SUPPLY MODULE (1).
004

________
CLOSE
UP
1. ON PANEL 22VU, PRESS PACK VALVE PUSHBUTTON SWITCHES.
2. REMOVE WARNING NOTICES.
3. REPLACE MANUAL SHUT-OFF VALVE IN INITIAL
CONFIGURATION.

005

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-26-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-26-00
4

AH

OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION

OPT 10000-002
DEC14

21-26-00
OPT 10000-002

2-400

PAGE
4
DEC 01/14

21-27-00

CHECK OF LAVATORY
COMPARTMENT VENTILATION

CHK 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 141
261

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELECTRIC

_________
MAN-HOURS
01

ELAPSED TIME

GSE

: 01 AIR LOW PRESSURE GENERATOR

PUBLICATION
___________
JIC

: SERVICING OF TOILET
SYSTEM

AH

12-16-38-SRV-10000

21-27-00
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-27-00

CHECK OF LAVATORY
COMPARTMENT VENTILATION

001

CHK 10000-001
2

APR05

__________________________
SERVICING
OF TOILET SYSTEM
SEE JOB INSTRUCTION CARD
121638-SRV-10000

002

___________
PREPARATION
1. PREPARE LAVATORY INSIDE AREA (BOWL) FOR
PRESSURIZATION OPERATION.
2. OUTSIDE THE AIRCRAFT (ZONE 141), CHECK THAT
AIR EVACUATION VENTURI IS NOT BLOCKED.
3. INSTALL AIR PRESSURE GENERATOR NEXT TO AFT
LH DOOR (MAX. AIR PRESSURE = 14.5 PSI OR
1 BAR).

003

_____________________________
CHECK
OF LAVATORY VENTILATION
REF. FIG. 212700-CHK-00100
1. CHECK OF TOILET BOWL VENTILATION SYSTEM
A. PRESSURIZE AIR PRESSURE GENERATOR (7) TO
MAX. PRESSURE = 14.5 PSI (1 BAR).
B. CONNECT PRESSURIZATION LINE END (6) TO
AIR EXTRACTION OUTLET (5) OUTSIDE THE
AIRCRAFT (ZONE 141).
C. CHECK AIRFLOW INSIDE BOWL (3).
D. STOP AIR PRESSURE GENERATOR (7).
2. CHECK OF AIR OUTLET
A. CHECK OUTLET (1) LOCATED ABOVE WASHBASIN
FOR CLEANLINESS, MECHANICAL CONDITION
AND SETTING.
B. CHECK OUTLET (2) LOCATED IN THE VICINITY
*** CONTINUED ***
AH

21-27-00
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-27-00

CHECK OF LAVATORY
COMPARTMENT VENTILATION

CHK 10000-001
3

APR05

OF THE WASHBASIN, FOR CLEANLINESS.


004

________
CLOSE-UP
1. REMOVE AIR PRESSURE GENERATOR.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
3. RESTORE LAVATORIES TO NORMAL OPERATING
CONDITION.
*****

AH

E N D

O F

T E X T

*****

21-27-00
CHK 10000-001
2-400 PAGE
3
APR 01/05

21-27-00
4

AH

LAVATORY VENTILATION

CHK 10000-001
APR05

21-27-00
CHK 10000-001

2-400

PAGE
4
APR 01/05

21-31-00

OUTFLOW VALVES
OVERPRESSURE RELIEF
FUNCTIONAL TEST

FUT 10000-001
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 140
212
: 255FF 255GF 256FF 256GF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

ELAPSED TIME

GSE

: 01 VACUUM PUMP

AH

___
MEN

_________
MAN-HOURS
02

21-31-00
FUT 10000-001
2-400 PAGE
1
MAR 01/11

21-31-00

OUTFLOW VALVES
OVERPRESSURE RELIEF
FUNCTIONAL TEST

001

FUT 10000-001
2

MAR11

_______
WARNING
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.

002

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS
2. ON PANEL 4VU VERIFY THAT PRESSURIZATION
MANUAL CONTROL KNOB IS SELECTED IN NORMAL
POSITION.
3. ON PANEL 402VU VERIFY THAT THE DITCH P/B
SWITCH IS IN OFF POSITION.

003

___________
PREPARATION
1.REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF (256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

004

_______________
FUNCTIONAL
TEST
REF. FIG. 213100-FUT-00100
1. ELECTROPNEUMATIC VALVE 14HM
NOTE: BEFORE STARTING TEST MAKE CERTAIN THAT
VALVE IS COMPLETELY CLOSED
A. DISCONNECT VACUUM LINE (5), FILTER LINE
(6) AND INTERCONNECTING PIPE (2) FROM
VALVE, CAP OPEN ENDS OF PIPES AND PORTS
ON VALVE
B. BLANK OFF NEGATIVE PRESSURE PORT (3)
*** CONTINUED ***
AH

21-31-00
FUT 10000-001
2-400 PAGE
2
MAR 01/11

OUTFLOW VALVES
OVERPRESSURE RELIEF
FUNCTIONAL TEST

21-31-00

FUT 10000-001
3

MAR11

C. DISCONNECT OUTSIDE STATIC PRESSURE LINE


(1) AND CAP OPEN END OF PIPE
D. CONNECT VACUUM PUMP TO OUTSIDE STATIC
PRESSURE PORT (1)
E. MAKE CERTAIN THAT CABIN PRESSURE PORT
(4) IS NOT OBSTRUCTED
F. START VACUUM PUMP AND APPLY 6.35 PSI
NEGATIVE PRESSURE
G. CHECK THAT WHEN VACUUM PRESSURE REACHES
THE ABOVE MENTIONED VALUE MAIN POPPET
VALVE STARTS OPENING
H. STOP VACUUM PUMP AND DISCONNECT VACUUM
LINE
I. REMOVE ALL BLANKING CAPS AND RESTORE
ORIGINAL LINES (1, 2, 5, 6)
2. PNEUMATIC VALVE 13HM
NOTE: BEFORE STARTING TEST MAKE CERTAIN THAT
VALVE IS COMPLETELY CLOSED
A. DISCONNECT REFERENCE LINE (10), VACUUM
LINE (11) AND INTERCONNECTING LINE (8),
CAP OPEN ENDS OF PIPES AND PORTS ON VALVE
B. CAP VACUUM PORT (11), REFERENCE PRESSURE
PORT (10) AND CABIN PRESSURE PORT (9)
C. DISCONNECT OUTSIDE STATIC PRESSURE LINE
(7) AND CAP OPEN END OF PIPE
D. CONNECT VACUUM PUMP TO STATIC PRESSURE
PORT (7)
E. MAKE CERTAIN THAT CABIN PRESSURE PORT
(12) IS NOT OBSTRUCTED
F. START VACUUM PUMP AND APPLY 6.35 PSI
G. CHECK THAT WHEN VACUUM PRESSURE REACHES
THE ABOVE MENTIONED VALUE MAIN POPPET
VALVE STARTS OPENING
H. STOP VACUUM PUMP AND DISCONNECT VACUUM
LINE
I. REMOVE ALL BLANKING CAPS AND RESTORE
ORIGINAL LINES (7, 8, 10, 11)
*** CONTINUED ***
AH

21-31-00
FUT 10000-001
2-400 PAGE
3
MAR 01/11

21-31-00

OUTFLOW VALVES
OVERPRESSURE RELIEF
FUNCTIONAL TEST

005

FUT 10000-001
4

MAR11

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255GF(256GF).
2. INSTALL ATTACHING SCREWS.

006

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HM
2. REMOVE WARNING NOTICE.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10000-001
2-400 PAGE
4
MAR 01/11

21-31-00
5

AH

ELECTROPNEUMATIC AND
PNEUMATIC OUTFLOW VALVES
FUNCTIONAL TEST

FUT 10000-001
MAR11

21-31-00
FUT 10000-001

2-400

PAGE
5
MAR 01/11

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

FUT 10010-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-31-00
FUT 10010-001
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

001

FUT 10010-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

_______
WARNING
DO NOT PERFORM THE FUNCTIONAL TEST WITH ALL
DOORS CLOSED.

003

___________
PREPARATION
1. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKER IS CLOSED:
ON PANEL 121VU
- 11HM CAB PRESS/DITCH

004

__________________________________
FUNCTIONAL
TEST OF DITCHING SYSTEM
REF. FIG. 213100-FUT-00110
1. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE CLOSED BUT FREE TO OPEN.
2. ON PANEL 402VU LIFT SAFETY GUARD, PRESS CAB
PRESS DITCH P/BSW AND VERIFY THAT ON
LEGEND COMES ON.
3. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE MECHANICALLY CLOSED AND
MANUALLY IT IS IMPOSSIBLE TO OPEN THEM.
4. ON PANEL 402VU RELEASE P/BSW AND
POSITION SAFETY GUARD.
5. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE CLOSED BUT FREE TO OPEN.

*** CONTINUED ***


AH

21-31-00
FUT 10010-001
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

005

FUT 10010-001
3

DEC14

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10010-001
2-400 PAGE
3
DEC 01/14

21-31-00
4

AH

CONTROLS AND INDICATING

FUT 10010-001
DEC14

21-31-00
FUT 10010-001

2-400

PAGE
4
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

FUT 10010-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-31-00
FUT 10010-002
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

001

FUT 10010-002
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

_______
WARNING
DO NOT PERFORM THE FUNCTIONAL TEST WITH ALL
DOORS CLOSED.

003

___________
PREPARATION
1. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKER IS CLOSED:
ON PANEL 121VU
- 11HM CAB PRESS/DITCH

004

__________________________________
FUNCTIONAL
TEST OF DITCHING SYSTEM
REF. FIG. 213100-FUT-00110
1. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE CLOSED BUT FREE TO OPEN.
2. ON PANEL 402VU(VM) LIFT SAFETY GUARD, PRESS
CAB PRESS DITCH P/BSW AND VERIFY THAT ON
LEGEND COMES ON.
3. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE MECHANICALLY CLOSED AND
MANUALLY IT IS IMPOSSIBLE TO OPEN THEM.
4. ON PANEL 402VU(VM) RELEASE P/BSW AND
POSITION SAFETY GUARD.
5. FROM EXTERNAL OF A/C MAKE CERTAIN THAT THE
OUTFLOW VALVES ARE CLOSED BUT FREE TO OPEN.

*** CONTINUED ***


AH

21-31-00
FUT 10010-002
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
DITCHING SYSTEM

005

FUT 10010-002
3

DEC14

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10010-002
2-400 PAGE
3
DEC 01/14

21-31-00
4

AH

CONTROLS AND INDICATING

FUT 10010-002
DEC14

21-31-00
FUT 10010-002

2-400

PAGE
4
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

FUT 10020-004
1

DEC14

ZONING DATA
___________
ZONE

: 210
710

730

740

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC
ELECTRIC

___
MEN

_________
MAN-HOURS
01
01

ELAPSED TIME

GSE

: 01 VACUUM PUMP
01 KIT-ACCESSORIES, AIR DATA

ATR42-612

PUBLICATION
___________
JIC
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

24-46-00-EAD-10000
72-00-00-ERU-10030

21-31-00
FUT 10020-004
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

001

FUT 10020-004
2

DEC14

ADDITIONAL TOOL IF ROSEMOUNT PITOT STATIC


_________________________________________
PROBES
______
IN CASE OF ROSEMOUNT PITOT STATIC PROBES
INSTALLATION, ADAPTOR P/N P74418-4 MUST BE
USED.

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________
WARNING
NOTICE
1. PERSONNEL REMAINING ABOARD DURING THE TEST
MUST BE FREE FROM PHISICAL DISEASE OR PAIN
TO AVOID PROBLEMS DUE TO PRESSURIZATION.
2. OPENING A PRESSURE SEALED DOOR WHEN THE
AIRCRAFT IS FULLY OR PARTIALLY PRESSURIZED
WILL CAUSE EXPLOSIVE DECOMPRESSION, DEATH
OR INJURY TO PERSONNEL AND DAMAGE TO THE
AIRCRAFT.

004

___________
PREPARATION
1. CONNECT VACUUM PUMP BY MEANS OF APPROPRIATE
EQUIPMENT:
- EITHER TO ONE OF BOTH CAPTAIN STATIC
PROBES (IN THIS CASE BLANK THE CAPTAIN
STATIC PROBE ON OPPOSITE SIDE).
- OR DIRECTLY ONTO THE ADC1 STATIC PORT,0N
83VU.
2. CONNECT VACUUM PUMP BY MEANS OF APPROPRIATE
EQUIPMENT :
- EITHER TO CAPTAIN PITOT PROBE.
- OR DIRECTLY ONTO THE ADC1 PITOT PORT,0N
83VU.
*** CONTINUED ***
AH

21-31-00
FUT 10020-004
2-400 PAGE
2
DEC 01/14

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

21-31-00

FUT 10020-004
3

DEC14

3. ON NOSE LANDING GEAR PLACE WOW TARGETS ON


PROXIMITY SWITCHES 52GB AND 53GB.
4. ON MAIN LANDING GEAR PLACE WOW TARGETS ON
PROXIMITY SWITCHES 50GB, 51GB, 54GB, 55GB.
5. ON RH MAINTENANCE PANEL 702VU, AFTER HAVING
MADE CERTAIN THAT CONDITIONS FOR OPERATING
WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH
ARE FULLFILLED, OPEN SAFETY GUARD AND PLACE
SWITCH IN FLT POSITION.
NOTE:
WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH
PLACED ON FLT POSITION ALLOWS TO AVOID
LOSS OF EXTERNAL POWER SUPPLY CAUSED BY
TARGETS INSTALLED ON THE LDG PROXIMITY
SWITCHES, WHEN A GROUND POWER UNIT IS USED.
005

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

006

FUNCTIONAL TEST ON GROUND OF AUTO MODE PRESSURE


_______________________________________________
CONTROL SYSTEM DURING FLIGHT OPERATION
______________________________________
1. ON PANEL 4VU, MAKE CERTAIN THAT MANUAL
CONTROLLER CAB PRESS (1) IS IN NORM
POSITION.
2. ON PANEL 402VU, MAKE CERTAIN THAT
CAB PRESS/MODE SEL P/BSW FAULT AND MAN
LEGENDS ARE OFF.
3. ON CAPTAIN ALTIMETER,SET THE BARO CORRECTION
WITH KNOB (2) TO THE LOCAL QNH (MBAR) AND
NOTE AIRPORT ALTITUDE DISPLAYED:
-AIRPORT ALT = .....
4. ON PANEL 4VU, ON CABIN PRESSURE DIGITAL
*** CONTINUED ***
AH

21-31-00
FUT 10020-004
2-400 PAGE
3
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

FUT 10020-004
4

DEC14

CONTROLLER (3),SET THE LANDING ELEVATION TO


THE LOCAL LANDING ALTITUDE (GEOMETRIC HEIGHT
OF THE AIRPORT IN FT) :
-LANDING ALT = .....
5. CLOSE ALL DOORS.
6. ON PANEL 22VU, PRESS THE FOLLOWING P/BSW AND
CHECK THAT FAULT AND OFF LEGENDS ARE OFF
- AIR BLEED/ENG 1 BLEED
- AIR BLEED/ENG 2 BLEED
- AIR BLEED/PACK VALVE, SYS 1
- AIR BLEED/PACK VALVE, SYS 2
7. ON PANEL 22VU,PRESS COMPT TEMP/FLOW P/BSW:
- CHECK THAT HIGH LEGEND IS ON.
8. POSITION POWER LEVERS IN FI POSITION.
9. ON PANEL 22VU,SET AVIONICS VENT/OVBD VALVE
SWITCH ON FULL CLOSE POSITION.
CAUTION: GROUND AIR PRESSURIZATION UNIT MAY
DAMAGE INSTRUMENTS AND ADC SENSITIVE
COMPONENTS IF IT IS NOT USED CORRECTLY
WHEN ADJUSTING BENCH, REMAIN WITHIN
THE FOLLOWING LIMITS:
- H BETWEEN -1000FT AND +35000FT.
- VI LOWER THAN 400KTS ALTITUDE.
- ALTITUDE VARIATION LOWER THAN
6000FT/MN.
DO NOT SUDDENLY OPEN A LINE TO
AMBIENT AIR WHEN GROUND AIR
PRESSURIZATION UNIT IS CONNECTED.
FURTHERMORE,}VI}SHALL REMAIN LOWER
THAN 125KTS TO PREVENT ANY PACK
COMPRESSOR OVERTEMPERATURE.
10.BY MEANS OF VACUUM PUMP, INCREASE THE
ALTITUDE UNTIL VALUE READED ON ALTIMETER
IS UP TO 4000FT ABOVE THE AIRPORT ALT
*** CONTINUED ***
AH

21-31-00
FUT 10020-004
2-400 PAGE
4
DEC 01/14

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

21-31-00

FUT 10020-004
5

DEC14

PREVIOUSLY NOTED.
11.AFTER 3 MINUTES, BY MEANS OF VACUUM PUMP,
DECREASE THE ALTITUDE READED ON ALTIMETER
BACK TO THE AIRPORT ALT PREVIOUSLY NOTED.
A. READ ALT ON INDICATOR CAB PRESS (4):
-ALT1(READ)=.....
B. CALCULATE CORRECTED ALT:
-ALT1(CORR)=ALT1(READ)+(27.615 X QNH-27990)
-ALT1(CORR)=.....
C. CHECK THAT ALT1(CORR) VALUE IS 300FT
(+/-450FT) BELOW THE AIRPORT ALT VALUE.
12.ON CABIN PRESSURE DIGITAL CONTROLLER (3)
REDUCE THE LANDING ELEVATION BY 500FT.
A. AFTER 2 MINUTES, READ ALT ON INDICATOR
CAB PRESS (4):
-ALT2(READ)=.....
B. CALCULATE CORRECTED ALT:
-ALT2(CORR)=ALT2(READ)+(27.615 X QNH-27990)
-ALT2(CORR)=.....
C. CHECK THAT ALT2(CORR) VALUE STABILIZES AT
800FT (+/-450FT) BELOW THE AIRPORT ALT
VALUE.
13.ON CABIN PRESSURE DIGITAL CONTROLLER (3)
INCREASE THE LANDING ELEVATION BY 500FT BACK
TO THE PREVIOUS ELEVATION.
A .AFTER 3 MINUTES, READ ALT ON INDICATOR
CAB PRESS (4):
-ALT3(READ)=.....
B .CALCULATE CORRECTED ALT:
-ALT3(CORR)=ALT3(READ)+(27.615 X QNH-27990)
-ALT3(CORR)=.....
C. CHECK THAT ALT3(CORR) VALUE IS REGULATED
TO 300FT (+/-450FT) BELOW THE AIRPORT ALT
VALUE.
14.ON PANEL 22VU, RELEASE THE FOLLOWING P/BSW
AND CHECK THAT OFF LEGENDS ARE ON.
*** CONTINUED ***
AH

21-31-00
FUT 10020-004
2-400 PAGE
5
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

AIR
AIR
AIR
AIR

BLEED/ ENG
BLEED/ ENG
BLEED/PACK
BLEED/PACK

FUT 10020-004
6

DEC14

1 BLEED
2 BLEED
VALVE, SYS 1
VALVE, SYS 2

15.ON PANEL 22VU,PRESS COMPT TEMP/FLOW P/BSW:


- CHECK THAT HIGH LEGEND IS OFF (PACK FLOW
SET TO NORM).
16.POSITION POWER LEVERS IN GI POSITION.
17.ON PANEL 22VU, SET AVIONICS VENT/OVBD
VALVE SWITCH ON AUTO POSITION.
007

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

008

________
CLOSE
UP
1. REMOVE ALL TOOLS FROM STATIC AND PITOT PORTS
2. ON RH MAINTENANCE PANEL 702VU, PLACE
WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH
BACK TO NORM POSITION.
3. REMOVE ALL WOW TARGETS FROM NOSE AND MAIN
LANDING GEAR.

009

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10020-004
2-400 PAGE
6
DEC 01/14

21-31-00
7

AH

CONTROLS LOCATION

FUT 10020-004
DEC14

21-31-00
FUT 10020-004

2-400

PAGE
7
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

FUT 10020-005
1

DEC14

ZONING DATA
___________
ZONE

: 210
710

730

740

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC
ELECTRIC

___
MEN

_________
MAN-HOURS
01
01

ELAPSED TIME

GSE

: 01 VACUUM PUMP
01 KIT-ACCESSORIES, AIR DATA

ATR42-612

PUBLICATION
___________
JIC
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
24-46-00-EAD-10000
72-00-00-ERU-10030

21-31-00
FUT 10020-005
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

001

FUT 10020-005
2

DEC14

ADDITIONAL TOOL IF ROSEMOUNT PITOT STATIC


_________________________________________
PROBES
______
IN CASE OF ROSEMOUNT PITOT STATIC PROBES
INSTALLATION, ADAPTOR P/N P74418-4 MUST BE
USED.

002

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

003

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

004

______________
WARNING
NOTICE
1. PERSONNEL REMAINING ABOARD DURING THE TEST
MUST BE FREE FROM PHISICAL DISEASE OR PAIN
TO AVOID PROBLEMS DUE TO PRESSURIZATION.
2. OPENING A PRESSURE SEALED DOOR WHEN THE
AIRCRAFT IS FULLY OR PARTIALLY PRESSURIZED
WILL CAUSE EXPLOSIVE DECOMPRESSION, DEATH
OR INJURY TO PERSONNEL AND DAMAGE TO THE
AIRCRAFT.

*** CONTINUED ***


AH

21-31-00
FUT 10020-005
2-400 PAGE
2
DEC 01/14

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

005

21-31-00

FUT 10020-005
3

DEC14

___________
PREPARATION
1. CONNECT VACUUM PUMP BY MEANS OF APPROPRIATE
EQUIPMENT:
- EITHER TO ONE OF BOTH CAPTAIN STATIC
PROBES (IN THIS CASE BLANK THE CAPTAIN
STATIC PROBE ON OPPOSITE SIDE).
- OR DIRECTLY ONTO THE ADC1 STATIC PORT,0N
83VU.
2. CONNECT VACUUM PUMP BY MEANS OF APPROPRIATE
EQUIPMENT :
- EITHER TO CAPTAIN PITOT PROBE.
- OR DIRECTLY ONTO THE ADC1 PITOT PORT,0N
83VU.
3. ON NOSE LANDING GEAR PLACE WOW TARGETS ON
PROXIMITY SWITCHES 52GB AND 53GB.
4. ON MAIN LANDING GEAR PLACE WOW TARGETS ON
PROXIMITY SWITCHES 50GB, 51GB, 54GB, 55GB.
5. ON RH MAINTENANCE PANEL 702VU, AFTER HAVING
MADE CERTAIN THAT CONDITIONS FOR OPERATING
WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH
ARE FULLFILLED, OPEN SAFETY GUARD AND PLACE
SWITCH IN FLT POSITION.
NOTE:
WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH
PLACED ON FLT POSITION ALLOWS TO AVOID
LOSS OF EXTERNAL POWER SUPPLY CAUSED BY
TARGETS INSTALLED ON THE LDG PROXIMITY
SWITCHES, WHEN A GROUND POWER UNIT IS USED.

006

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

*** CONTINUED ***


AH

21-31-00
FUT 10020-005
2-400 PAGE
3
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

007

FUT 10020-005
4

DEC14

FUNCTIONAL TEST ON GROUND OF AUTO MODE PRESSURE


_______________________________________________
CONTROL SYSTEM DURING FLIGHT OPERATION
______________________________________
1. ON PANEL 402VM, MAKE CERTAIN THAT MANUAL
CONTROLLER CAB PRESS (1) IS IN NORM
POSITION.
2. ON PANEL 402VM, MAKE CERTAIN THAT
CAB PRESS/MODE SEL P/BSW FAULT AND MAN
LEGENDS ARE OFF.
3. ON ICP1 (ON PANEL 3VU), SET THE BARO
CORRECTION WITH KNOB (2) TO THE LOCAL QNH
(MBAR) AND NOTE AIRPORT ALTITUDE DISPLAYED:
-AIRPORT ALT = .....
4. ON PANEL 4VU, ON CABIN PRESSURE DIGITAL
CONTROLLER (3),SET THE LANDING ELEVATION TO
THE LOCAL LANDING ALTITUDE (GEOMETRIC HEIGHT
OF THE AIRPORT IN FT) :
-LANDING ALT = .....
5. CLOSE ALL DOORS.
6. ON PANEL 22VU, PRESS THE FOLLOWING P/BSW AND
CHECK THAT FAULT AND OFF LEGENDS ARE OFF
- AIR BLEED/ENG 1 BLEED
- AIR BLEED/ENG 2 BLEED
- AIR BLEED/PACK VALVE, SYS 1
- AIR BLEED/PACK VALVE, SYS 2
7. ON PANEL 22VU,PRESS COMPT TEMP/FLOW P/BSW:
- CHECK THAT HIGH LEGEND IS ON.
8. POSITION POWER LEVERS IN FI POSITION.
9. ON PANEL 22VU,SET AVIONICS VENT/OVBD VALVE
SWITCH ON FULL CLOSE POSITION.
CAUTION: GROUND AIR PRESSURIZATION UNIT MAY
DAMAGE INSTRUMENTS AND ADC SENSITIVE
*** CONTINUED ***
AH

21-31-00
FUT 10020-005
2-400 PAGE
4
DEC 01/14

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

21-31-00

FUT 10020-005
5

DEC14

COMPONENTS IF IT IS NOT USED CORRECTLY


WHEN ADJUSTING BENCH, REMAIN WITHIN
THE FOLLOWING LIMITS:
- H BETWEEN -1000FT AND +35000FT.
- VI LOWER THAN 400KTS ALTITUDE.
- ALTITUDE VARIATION LOWER THAN
6000FT/MN.
DO NOT SUDDENLY OPEN A LINE TO
AMBIENT AIR WHEN GROUND AIR
PRESSURIZATION UNIT IS CONNECTED.
FURTHERMORE,}VI}SHALL REMAIN LOWER
THAN 125KTS TO PREVENT ANY PACK
COMPRESSOR OVERTEMPERATURE.
10.BY MEANS OF VACUUM PUMP INCREASE THE
ALTITUDE UNTIL VALUE READED ON PFD (IN
ALTITUDE INFORMATION AREA) IS UP TO 4000FT
ABOVE THE AIRPORT ALT PREVIOUSLY NOTED.
11.AFTER 3 MINUTES, BY MEANS OF VACUUM PUMP,
DECREASE THE ALTITUDE READED ON PFD
BACK TO THE AIRPORT ALT PREVIOUSLY NOTED.
A. READ ALT ON INDICATOR CAB PRESS (4):
-ALT1(READ)=.....
B. CALCULATE CORRECTED ALT:
-ALT1(CORR)=ALT1(READ)+(27.615 X QNH-27990)
-ALT1(CORR)=.....
C. CHECK THAT ALT1(CORR) VALUE IS 300FT
(+/-450FT) BELOW THE AIRPORT ALT VALUE.
12.ON CABIN PRESSURE DIGITAL CONTROLLER (3)
REDUCE THE LANDING ELEVATION BY 500FT.
A. AFTER 2 MINUTES, READ ALT ON INDICATOR
CAB PRESS (4):
-ALT2(READ)=.....
B. CALCULATE CORRECTED ALT:
-ALT2(CORR)=ALT2(READ)+(27.615 X QNH-27990)
-ALT2(CORR)=.....
C. CHECK THAT ALT2(CORR) VALUE STABILIZES AT
800FT (+/-450FT) BELOW THE AIRPORT ALT
*** CONTINUED ***
AH

21-31-00
FUT 10020-005
2-400 PAGE
5
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

FUT 10020-005
6

DEC14

VALUE.
13.ON CABIN PRESSURE DIGITAL CONTROLLER (3)
INCREASE THE LANDING ELEVATION BY 500FT BACK
TO THE PREVIOUS ELEVATION.
A .AFTER 3 MINUTES, READ ALT ON INDICATOR
CAB PRESS (4):
-ALT3(READ)=.....
B .CALCULATE CORRECTED ALT:
-ALT3(CORR)=ALT3(READ)+(27.615 X QNH-27990)
-ALT3(CORR)=.....
C. CHECK THAT ALT3(CORR) VALUE IS REGULATED
TO 300FT (+/-450FT) BELOW THE AIRPORT ALT
VALUE.
14.ON PANEL 22VU, RELEASE THE FOLLOWING P/BSW
AND CHECK THAT OFF LEGENDS ARE ON.
- AIR BLEED/ ENG 1 BLEED
- AIR BLEED/ ENG 2 BLEED
- AIR BLEED/PACK VALVE, SYS 1
- AIR BLEED/PACK VALVE, SYS 2
15.ON PANEL 22VU,PRESS COMPT TEMP/FLOW P/BSW:
- CHECK THAT HIGH LEGEND IS OFF (PACK FLOW
SET TO NORM).
16.POSITION POWER LEVERS IN GI POSITION.
17.ON PANEL 22VU, SET AVIONICS VENT/OVBD
VALVE SWITCH ON AUTO POSITION.
008

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

009

________
CLOSE
UP
1. REMOVE ALL TOOLS FROM STATIC AND PITOT PORTS
2. ON RH MAINTENANCE PANEL 702VU, PLACE
*** CONTINUED ***
AH

21-31-00
FUT 10020-005
2-400 PAGE
6
DEC 01/14

21-31-00

FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

FUT 10020-005
7

DEC14

WEIGHT ON WHEELS/MODE/NORM/FLT SWITCH


BACK TO NORM POSITION.
3. REMOVE ALL WOW TARGETS FROM NOSE AND MAIN
LANDING GEAR.
010

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10020-005
2-400 PAGE
7
DEC 01/14

21-31-00
8

AH

CONTROLS LOCATION

FUT 10020-005
DEC14

21-31-00
FUT 10020-005

2-400

PAGE
8
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

FUT 10030-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

GSE

: 01 VACUUM PUMP
01 PNEUMATIC UNION 1/2 INCH

SPARE

: 01 O-RING

P/N MS 28778-5

: DC AND AC EXTERNAL POWER


SUPPLY

24-40-00-EAD-10000

PUBLICATION
___________
JIC

AH

21-31-00
FUT 10030-002
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

001

FUT 10030-002
2

DEC14

___________
PREPARATION
REF. FIG. 213183-FUT-00100
1. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKER IS CLOSED:
ON PANEL 121VU
- 6HM CAB PRESS/IND & WARN
2. ON PANEL 4VU PULL OUT THE IND-CAB PRESS 10HM
LEAVING ITS ELECTRICAL CONNECTOR.
3. ON PRESSURIZATION INDICATOR REMOVE FILTER
ASSEMBLY PLUG AND ITS O-RING FROM THE CABIN
PRESSURE UNION, DISCARD O-RING.
4. CONNECT THE VACUUM PUMP TO THE CABIN
PRESSURE SENSING PORT.

002

___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000

003

FUNCTIONAL TEST OF EXCESSIVE CABIN ALTITUDE


___________________________________________
WARNING
_______
REF. FIG. 213183-FUT-00100
1. START THE VACUUM PUMP OF THE TEST RIG AND
ESTABLISH A ABSOLUTE PRESSURE OF ABOUT 11PSI
2. DECREASE PRESSURE UNTIL CABIN ALTITUDE
DISPLAYED ON THE CABIN PRESSURIZATION
INDICATOR REACHES THE VALUE OF 10000FT
AND CHECK THAT :
- WARNING(MASTER WARN) ANNUNCIATORS
COME ON.
- CONTINUOUS REPETITIVE CHIME SOUNDS.
- EXCESS CAB ALT ANNUNCIATOR COME ON
(ON CAP).
*** CONTINUED ***
AH

21-31-00
FUT 10030-002
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

FUT 10030-002
3

DEC14

3. STOP THE VACUUM PUMP OF THE TEST RIG.


004

______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000

005

________
CLOSE-UP
REF. FIG. 213183-FUT-00100
1. ON PRESSURIZATION INDICATOR DISCONNECT THE
VACUUM PUMP FROM THE CABIN PRESSURE SENSING
PORT.
2. CLEAN FILTER WITH COMPRESSED AIR.
3. INSTALL O-RING AND FILTER ASSEMBLY ON UNION.
4. FASTEN THE PRESSURIZATION INDICATOR 10HM TO
PANEL 4VU.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10030-002
2-400 PAGE
3
DEC 01/14

21-31-00
4

AH

CONTROLS LOCATION

FUT 10030-002
DEC14

21-31-00
FUT 10030-002

2-400

PAGE
4
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

FUT 10030-003
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

GSE

: 01 VACUUM PUMP

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC EXTERNAL POWER
SUPPLY

AH

31-63-00-PRO-10000
24-40-00-EAD-10000

21-31-00
FUT 10030-003
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

001

FUT 10030-003
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
REF. FIG. 213185-RAI-00100
1. ON L ELECTRONICS RACK 80VU, REMOVE ACCESS
PANEL 221FZ TO GAIN ACCESS TO AMBIENT
PRESSURE SENSOR ON SHELF 83VU.
2. REMOVE SCREWS (2) WITH WASHERS (3).
3. DISMOUNT AMBIENT PRESSURE SENSOR (1) IN
ORDER TO GAIN ACCESS TO THE BOTTOM SIDE
OF THE UNIT.

003

___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000

004

_______________________________________________
CABIN
ALTITUDE OVERLIMIT SWITCH FUNCTIONAL TEST
1. BLOCK ONE OF THE TWO PRESSURE SENSOR PORTS
ON THE AMBIENT PRESSURE SENSOR.
2. PLACE THE VACUUM PUMP OVER THE SECOND
PRESSURE SENSOR PORT.
*** CONTINUED ***
AH

21-31-00
FUT 10030-003
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING

FUT 10030-003
3

DEC14

3. START THE VACUUM PUMP OF THE TEST RIG AND


ESTABLISH A ABSOLUTE PRESSURE OF ABOUT 11PSI
4. DECREASE PRESSURE UNTIL CABIN ALTITUDE
DISPLAYED ON CABIN SD PAGE OF MFD
REACHES THE VALUE OF 10100FT AND CHECK THAT
- WARNING(MASTER WARN) ANNUNCIATORS
COME ON.
- CONTINUOUS REPETITIVE CHIME SOUNDS.
- EXCESS CAB ALT MESSAGE IS DISPLAYED
(ON EWD ALERT WINDOW).
5. STOP THE VACUUM PUMP.
005

______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000

006

________
CLOSE-UP
REF. FIG. 213185-RAI-00100
1. INSTALL AMBIENT PRESSURE SENSOR (1).
2. INSTALL SCREWS (2) WITH WASHERS (3).
TIGHTEN SCREWS (2).
3. INSTALL ACCESS PANEL PREVIOUSLY REMOVED.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10030-003
2-400 PAGE
3
DEC 01/14

21-31-00
4

AH

REMOVAL AND INSTALLATION


OF AMBIENT PRESSURE
SENSOR

FUT 10030-003
DEC14

21-31-00
FUT 10030-003

2-400

PAGE
4
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

FUT 10040-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

GSE

: 01 VACUUM PUMP
01 KIT-ACCESSORIES, AIR DATA

ATR42-612

SPARE

: 01 O-RING

P/N MS 28778-5

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

24-46-00-EAD-10000

PUBLICATION
___________
JIC

AH

21-31-00
FUT 10040-001
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

001

FUT 10040-001
2

DEC14

ADDITIONAL TOOL IF ROSEMOUNT PITOT STATIC


_________________________________________
PROBES
______
IN CASE OF ROSEMOUNT PITOT STATIC PROBES
INSTALLATION, ADAPTOR P/N P74418-4 MUST BE
USED.

002

___________
PREPARATION
NOTE: THE TEST MUST BE PERFORMED ON CAPT SIDE
ONLY (ADC 1).
1. CONNECT VACUUM PUMP BY MEANS OF AN
APPROPRIATE EQUIPMENT TO CAPT STATIC PROBE
AND CAPT PITOT PROBE.
2. BY MEANS OF APPROPRIATE TOOL, BLANK THE
CORRESPONDING PROBES ON OPPOSITE SIDE.

003

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

004

FUNCTIONAL TEST OF EXCESSIVE CABIN DIFFERENTIAL


_______________________________________________
PRESSURE WARNING
________________
REF. FIG. 213183-FUT-00110
1. RECORD PRESSURE EXISTING ON GROUND (P).
2. THE ALARM EXCESS CABIN DIFF P IS GIVEN BY
MEANS OF TRIPLE INDICATOR AT A VALUE OF
6.6 +0.3/-0 PSI WITH RESPECT TO THE EXTERNAL
PRESSURE. THUS BETWEEN 6.6 AND 6.9 PSI.
IN ORDER TO CALCULATE THE TWO VALUES,
PROCEED IN THE FOLLOWING WAY
A. CALCULATE THE PRESSURE RELEVANT TO THE
UPPER LIMIT OF ALARM P(UPPER):
P-475 MB
OR
P-6.9 PSI
*** CONTINUED ***
AH

21-31-00
FUT 10040-001
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

FUT 10040-001
3

DEC14

B. CALCULATE THE PRESSURE RELEVANT TO THE


LOWER LIMIT OF ALARM P(LOWER):
P-455 MB
OR
P-6.6 PSI
3. USING THE FORMULAS AND TABLE IN FIGURE,
CALCULATE THE ALTITUDE Z(UPPER) AND
Z(LOWER), CORRESPONDING TO THE TWO PRESSURE
VALUES.
CAUTION: GROUND AIR PRESSURIZATION UNIT MAY
DAMAGE INSTRUMENT AND ADC SENSITIVE
COMPONENTS IF IT IS NOT USED CORRECTLY. WHEN ADJUSTING BENCH, REMAIN
WITHIN THE FOLLOWING LIMITS:
H BETWEEN -1000 FT AND +35000 FT,
VI LOWER THAN 400 KTS, ALTITUDE
VARIATION LOWER THAN 6000 FT/MN.
DO NOT SUDDENLY OPEN A LINE TO AMBIENT
AIR WHEN GROUND AIR PRESSURIZATION
UNIT IS CONNECTED.
4. BY MEANS OF VACUUM PUMP INCREASE THE
ALTITUDE TO OBTAIN THE ALARM.
5. VERIFY THAT
A. RED WARNING LIGHT EXCESS CABIN DIF P ON
CAP AND MASTER WARNING LIGHT ILLUMINATE
AND SIMULTANEOUSLY THE REPETITIVE CHIME
IS AUDIBLE.
B. THE VALUE READ ON THE ANEMOMETRIC BENCH
IS BETWEEN THE TWO CALCULATED VALUES.
C. THE TRIPLE INDICATOR SHOWS A VALUE HIGHER
THAN 6.6 PSI
IF POINTS B AND C DO NOT HAPPEN, REPLACE THE
TRIPLE INDICATOR.
6. BY MEANS OF VACUUM PUMP DECREASE THE
ALTITUDE TO OBTAIN THE ALARM OFF.

*** CONTINUED ***


AH

21-31-00
FUT 10040-001
2-400 PAGE
3
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

005

FUT 10040-001
4

DEC14

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

006

________
CLOSE-UP
1. DISCONNECT THE VACUUM PUMP FROM THE PROBES.
2. REMOVE BLANKING TOOL FROM THE PROBES.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10040-001
2-400 PAGE
4
DEC 01/14

21-31-00
5

AH

TABLE OF VALUES
ALTITUDE/PRESSURE

FUT 10040-001
DEC14

21-31-00
FUT 10040-001

2-400

PAGE
5
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

FUT 10040-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

GSE

: 01 VACUUM PUMP
01 KIT-ACCESSORIES, AIR DATA

ATR42-612

SPARE

: 01 O-RING

P/N MS 28778-5

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

31-63-00-PRO-10000

PUBLICATION
___________
JIC
JIC

AH

24-46-00-EAD-10000

21-31-00
FUT 10040-002
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

001

FUT 10040-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

ADDITIONAL TOOL IF ROSEMOUNT PITOT STATIC


_________________________________________
PROBES
______
IN CASE OF ROSEMOUNT PITOT STATIC PROBES
INSTALLATION, ADAPTOR P/N P74418-4 MUST BE
USED.

003

___________
PREPARATION
NOTE: THE TEST MUST BE PERFORMED ON CAPT SIDE
ONLY (ADC 1).
1. CONNECT VACUUM PUMP BY MEANS OF AN
APPROPRIATE EQUIPMENT TO CAPT STATIC PROBE
AND CAPT PITOT PROBE.
2. BY MEANS OF APPROPRIATE TOOL, BLANK THE
CORRESPONDING PROBES ON OPPOSITE SIDE.

004

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

*** CONTINUED ***


AH

21-31-00
FUT 10040-002
2-400 PAGE
2
DEC 01/14

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

005

21-31-00

FUT 10040-002
3

DEC14

FUNCTIONAL TEST OF EXCESSIVE CABIN DIFFERENTIAL


_______________________________________________
PRESSURE WARNING
________________
REF. FIG. 213183-FUT-00110
1. RECORD PRESSURE EXISTING ON GROUND (P).
2. THE ALARM EXCESS CAB DP IS TRIGGERED
AT A CABIN DIFFERENTIAL PRESSURE VALUE OF
6.6 PSI.
IN ORDER TO CALCULATE THE VALUE,
PROCEED IN THE FOLLOWING WAY
A. CALCULATE THE PRESSURE RELEVANT TO THE
LIMIT OF ALARM P(ALARM):
P-455 MB
OR
P-6.6 PSI
B. CALCULATE THE PRESSURE RELEVANT TO THE
TARGET P(TARGET):
P-475 MB
OR
P-6.9 PSI
3. USING THE FORMULAS AND TABLE IN FIGURE,
CALCULATE THE ALTITUDE Z(TARGET)
CORRESPONDING TO THE PRESSURE TARGET
VALUES.
CAUTION: GROUND AIR PRESSURIZATION UNIT MAY
DAMAGE INSTRUMENT AND ADC SENSITIVE
COMPONENTS IF IT IS NOT USED CORRECTLY. WHEN ADJUSTING BENCH, REMAIN
WITHIN THE FOLLOWING LIMITS:
H BETWEEN -1000 FT AND +35000 FT,
VI LOWER THAN 400 KTS, ALTITUDE
VARIATION LOWER THAN 6000 FT/MN.
DO NOT SUDDENLY OPEN A LINE TO AMBIENT
AIR WHEN GROUND AIR PRESSURIZATION
UNIT IS CONNECTED.
4. BY MEANS OF VACUUM PUMP INCREASE THE
ALTITUDE TO Z(TARGET) TO OBTAIN THE ALARM.
5. VERIFY THAT FOR A DP VALUE ABOVE 6.6 PSI:
A. ON EWD, IN ALERT WINDOW, EXCESS CAB DP
*** CONTINUED ***
AH

21-31-00
FUT 10040-002
2-400 PAGE
3
DEC 01/14

21-31-00

FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG

FUT 10040-002
4

DEC14

IS DISPLAYED.
B. MASTER WARNING LIGHTS ILLUMINATE
C. SIMULTANEOUSLY THE REPETITIVE CHIME IS
AUDIBLE
6. BY MEANS OF VACUUM PUMP DECREASE THE
ALTITUDE TO OBTAIN THE ALARM OFF.
006

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

________
CLOSE-UP
1. DISCONNECT THE VACUUM PUMP FROM THE PROBES.
2. REMOVE BLANKING TOOL FROM THE PROBES.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10040-002
2-400 PAGE
4
DEC 01/14

21-31-00
5

AH

TABLE OF VALUES
ALTITUDE/PRESSURE

FUT 10040-002
DEC14

21-31-00
FUT 10040-002

2-400

PAGE
5
DEC 01/14

21-31-00

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

FUT 10050-001
1

DEC14

ZONING DATA
___________
ZONE

: 210
310

212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 SAFETY BARRIERS
01 ABSOLUTE PRESSURE SENSOR

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT
ENGINE IDLE RUN-UP USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
24-40-00-EAD-10000
72-00-00-ERU-10030

21-31-00
FUT 10050-001
2-400 PAGE
1
DEC 01/14

21-31-00

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

001

FUT 10050-001
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000

003

______________________
CHECK
DU CONFIGURATION
REF. FIG. 316300-PRO-00130
REF. FIG. 316300-PRO-00110
REF. FIG. 316300-PRO-00100
1. CHECK THAT THE DUS ARE IN NORMAL
CONFIGURATION.
REF. FIG. 316300-PRO-00130
2. CONFIGURE SD CABIN ON MFD (DU2 OR DU4) BY
PRESSING SYS PUSHBUTTON ON EFCP (LH OR RH)
SEVERAL TIMES UNTIL THE REQUIRED PAGE IS
DISPLAYED.
SEE JOB INSTRUCTION CARD
316300-PRO-10000

004

______________________________
CABIN
ALTITUDE CHECK ON GROUND
REF. FIG. 316300-PRO-00130
REF. FIG. 316300-PRO-00110
*** CONTINUED ***
AH

21-31-00
FUT 10050-001
2-400 PAGE
2
DEC 01/14

21-31-00

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

FUT 10050-001
3

DEC14

REF. FIG. 213100-OPT-00100


THE AIRCRAFT MUST BE ON GROUND, ENERGIZED, BOTH
ECS PACKS OFF.
1. ON PANEL 22VU MAKE CERTAIN THAT THE
FOLLOWING PUSHBUTTONS ARE NOT ENGAGED:
- 27HA ENG1 BLEED
- 28HA ENG2 BLEED
- 9HB PACK VALVE, SYS1
- 10HB PACK VALVE, SYS2
REF. FIG. 316300-PRO-00110
2. WRITE DOWN THE AIRCRAFT ALTITUDE GIVEN ON
THE ALTITUDE WINDOW ON PFD (DU1 AND DU5).
REF. FIG. 316300-PRO-00130
3. WRITE DOWN THE CABIN ALTITUDE GIVEN ON THE
MFD (DU2 OR DU4).
4. CHECK THAT THE AIRCRAFT ALTITUDE IS EQUAL
TO THE CABIN ALTITUDE +/-750FT.
NOTE: APS ACCURACY IS +/-200FT AND ALTITUDE
DISPLAY ACCURACY IS +/-550FT.
005

___________
PREPARATION
1. POSITION SAFETY BARRIERS AND WARNING NOTICE
PROHIBITING ACCESS TO THE WORK AREA.
WARNING: PERMIT NO PERSONNEL IN THE AREA
SURROUNDING THE AIRPLANE WHILE IT IS
PRESSURIZED. MAINTAIN INTERPHONE
COMMUNICATIONS THROUGH-OUT THE
PRESSURIZATION CHECK.
WARNING: ONE QUALIFIED MAN WILL REMAIN IN THE
AIRPLANE TO START ENGINE AND BE ABLE
TO OPERATE RAPID DEPRESSURIZATION IN
THE EVENT THAT AIRPLANE INTERNAL
*** CONTINUED ***
AH

21-31-00
FUT 10050-001
2-400 PAGE
3
DEC 01/14

21-31-00

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

FUT 10050-001
4

DEC14

PRESSURE EXCEEDS DESIRED TEST LIMIT.


PERMIT NO OTHER PERSONNEL TO REMAIN
IN THE AIRPLANE DURING PRESSURIZATION.
2. ENSURE THAT ALL DOORS AND HATCHES ARE CLOSED
AND CORRECTLY LOCKED (THROUGH VISUAL
INDICATOR).
006

______________
START
ENGINE 2
SEE JOB INSTRUCTION CARD
720000-ERU-10030

007

CABIN ALTITUDE CHECK ON GROUND


______________________________
CABIN PRESSURIZED
_________________
1. ON PANEL 22VU PLACE OVBD VALVE SELECTOR
SWITCH IN FULLY CLOSED POSITION.
2.-ON PANEL 22VU PRESS ENG 2 BLEED PUSHBUTTON
SWITCH AND VERIFY THAT OFF LEGEND GOES OFF
AND XVALVE OPEN LEGEND COMES ON.
-ON MFD UPPER WINDOW, IN CABIN SD PAGE, BLEED
VALVE OF ENGINE 2 AND XFEED VALVE ARE OPENED
AND GREEN.
3. ON PANEL 4VU PUSH THE TEST BUTTON ON DIGITAL
CONTROLLER AND VERIFY THAT LANDING ELEVATION
ALTERNATIVELY SHOWS 18800/-8800.
4.- ON PANEL 22VU PRESS L AND R PACK VALVE
PUSHBUTTON SWITCHES AND VERIFY THAT OFF
LEGENDS GO OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
PACK LABELS ARE DISPLAYED IN GREEN
RECTANGLE.
5. ON PANEL 402VU(VM) THE MANUAL
PRESSURIZATION CONTROL KNOB TO MANUAL
POSITION.
*** CONTINUED ***
AH

21-31-00
FUT 10050-001
2-400 PAGE
4
DEC 01/14

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

21-31-00

FUT 10050-001
5

DEC14

6. ON PANEL 402VU(VM) RELEASE THE MODE SELECTOR


P/B SWITCH AND VERIFY THAT THE MAN LEGEND
ON P/B IS ILLUMINATED AND ON DIGITAL
CONTROLLER NO DATA ARE SHOWN ON THE
DISPLAY.
7. ON THE ABSOLUTE PRESSURE SENSOR NOTE THE
PRESSURE (PTOOL PSI).
IN CABIN SD PAGE NOTE THE DIFFERENTIAL
PRESSURE (DP PSI).
8. ON PANEL 402VU(VM) POSITION THE MANUAL
CONTROL KNOB ON MAX DECREASE. AFTER SOME
MINUTES, ON MFD UPPER WINDOW, IN CABIN SD
PAGE, RATE OF CHANGE (VS FT/MIN) SHOWS A
VALUE BETWEEN -800 AND -1300 FT/MN.
9. ROTATE THE MANUAL CONTROL KNOB TO OBTAIN
VZ CAB.=-500 FT/MN AND, ON MFD UPPER WINDOW,
IN CABIN SD PAGE, VERIFY THAT:
- DIFFERENTIAL PRESSURE INCREASES.
- CABIN ALTITUDE DECREASES.
WHEN THE ABSOLUTE PRESSURE SENSOR IS EQUAL
TO (PTOOL + 1.10 PSI), ROTATE THE MANUAL
CONTROL KNOB TO OBTAIN VZ CAB =0.
10. CHECK THAT THE CABIN DIFFERENTIAL PRESSURE
IS EQUAL TO DP + 1.10 +/-0.2 PSI.
11. RELEASE LH AND RH PACK VALVE P/B SWITCHES
AND VERIFY THAT OFF LEGEND COMES ON.
12. WHEN DIFFERENTIAL PRESSURE REACHES 0 PSI
PERFORM THE FOLLOWING STEPS:
A.SELECT MANUAL CONTROL KNOB TO MAN
POSITION
B.PRESS MODE SELECTOR P/B SWITCH
AND VERIFY THAT THE MAN LEGEND ON P/B
GOES OFF AND LANDING ELEVATION SHOWS
PREVIOUS SETTING
*** CONTINUED ***
AH

21-31-00
FUT 10050-001
2-400 PAGE
5
DEC 01/14

21-31-00

FUNCTIONAL TEST OF CABIN


ALTITUDE INDICATION

FUT 10050-001
6

DEC14

C.POSITION MANUAL CONTROL KNOB ON GREEN


BAND STOP
D.ON PANEL 22VU PLACE OVBD VALVE SELECTOR
SWITCH IN AUTO POSITION.
13.- RELEASE ENG 2 BLEED P/B SWITCH AND VERIFY
THAT OFF LEGEND GOES ON, FAULT LEGEND
IS OFF AND XVALVE OPEN LEGEND GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
BLEED VALVE OF ENGINE 2 AND XFEED VALVE
ARE CLOSED AND WHITE, WHITE BLEED OFF
LABEL IS DISPLAYED.
008

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

009

________
CLOSE-UP
1. REMOVE WARNING NOTICE AND SAFETY BARRIERS
FROM WORK AREA.
*****

AH

E N D

O F

T E X T

*****

21-31-00
FUT 10050-001
2-400 PAGE
6
DEC 01/14

21-31-00
7

AH

PFD/MFD/EWD
LOCALISATION AND
CONFIGURATION

FUT 10050-001
DEC14

21-31-00
FUT 10050-001

2-400

PAGE
7
DEC 01/14

21-31-00
8

AH

PFD
(PRIMARY FLIGHT
DISPLAY)

FUT 10050-001
DEC14

21-31-00
FUT 10050-001

2-400

PAGE
8
DEC 01/14

21-31-00
9

AH

MFD
(MULTI FUNCTIONAL
DISPLAY)

FUT 10050-001
DEC14

21-31-00
FUT 10050-001

2-400

PAGE
9
DEC 01/14

21-31-00
10

AH

CONTROLS LOCATION

FUT 10050-001
DEC14

21-31-00
FUT 10050-001

2-400

PAGE
10
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

24-46-00-EAD-10000
72-00-00-ERU-10030

21-31-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

001

OPT 10000-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

______________
WARNING
NOTICE
1. PERSONNEL REMAINING ABOARD DURING THE TEST
MUST BE FREE FROM PHISICAL DISEASE OR PAIN
TO AVOID PROBLEMS DUE TO PRESSURIZATION.
2. OPENING A PRESSURE SEALED DOOR WHEN THE
AIRCRAFT IS FULLY OR PARTIALLY PRESSURIZED
WILL CAUSE EXPLOSIVE DECOMPRESSION, DEATH
OR INJURY TO PERSONNEL AND DAMAGE TO THE
AIRCRAFT.

003

___________
PREPARATION
REF. FIG. 213100-OPT-00100
1. CLOSE ALL DOORS.
2. ON PANEL 22VU:
- VERIFY THAT PACK VALVE, SYS 1 AND 2 P/B
SWITCHES ARE PRESSED
- VERIFY THAT ENG 1 AND 2 BLEED P/B
SWITCHES ARE PRESSED
- PLACE AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH IN FULLY CLOSE POSITION.
3. ON PANEL 402VU:
RELEASE CAB PRESS/MODE SEL P/BSW 3HM AND
VERIFY THAT MAN LEGEND COMES ON.
4. ON PANEL 4VU:
SELECT MANUAL CONTROL KNOB IN NORM
POSITION.

*** CONTINUED ***


AH

21-31-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

004

OPT 10000-001
3

DEC14

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

005

________________
OPERATIONAL
TEST
REF. FIG. 213100-OPT-00100
1. SELECT MANUAL CONTROL KNOB IN FULLY CAB ALT
DECREASE.
2. ON CABIN PRESSURE INDICATOR VERIFY THAT
ALT DECREASES WHILE RATE AND DIFF
MOVE ACCORDINGLY.
NOTE: WHEN THE DP OF 2.5 PSI IS REACHED DURING
THE DECREASE PHASE, THE NEEDLES OF CABIN
ALTITUDE AND CLIMB RATE GO TO ZERO IN
ORDER TO PROTECT THE INSTRUMENTS.
WHEN THE DP OF 2.5 PSI IS REACHED DURING
THE INCREASE PHASE, THE CABIN ALTITUDE
AND CLIMB RATE GAUGES RESTART TO INDICATE
THE REAL RELEVANT VALUES.
3. MOVE MANUAL CONTROL KNOB TOWARDS CAB ALT
INCREASE.
4. ON CABIN PRESSURE INDICATOR VERIFY THAT
ALT MOVES ACCORDINGLY.
5. ON PANEL 402VU, SELECT MANUAL CONTROL KNOB
IN FULLY CAB ALT DECREASE.

006

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

*** CONTINUED ***


AH

21-31-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

007

OPT 10000-001
4

DEC14

________
CLOSE
UP
REF. FIG. 213100-OPT-00100
1. ON PANEL 4VU:
- SELECT MANUAL CONTROL KNOB IN NORM
POSITION.
2. ON PANEL 402VU:
- PRESS P/BSW CAB PRESS/ MODE SEL AND VERIFY
THAT MAN LEGEND GOES OFF
3. ON PANEL 22VU:
- PLACE SELECTOR SWITCH VENT/OVBD VALVE
IN AUTO POSITION
4. OPEN DOORS AS REQUIRED.

008

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14

21-31-00
5

AH

CONTROLS LOCATION

OPT 10000-001
DEC14

21-31-00
OPT 10000-001

2-400

PAGE
5
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
24-46-00-EAD-10000
72-00-00-ERU-10030

21-31-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

001

OPT 10000-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

______________
WARNING
NOTICE
1. PERSONNEL REMAINING ABOARD DURING THE TEST
MUST BE FREE FROM PHISICAL DISEASE OR PAIN
TO AVOID PROBLEMS DUE TO PRESSURIZATION.
2. OPENING A PRESSURE SEALED DOOR WHEN THE
AIRCRAFT IS FULLY OR PARTIALLY PRESSURIZED
WILL CAUSE EXPLOSIVE DECOMPRESSION, DEATH
OR INJURY TO PERSONNEL AND DAMAGE TO THE
AIRCRAFT.

004

___________
PREPARATION
REF. FIG. 213100-OPT-00100
1. CLOSE ALL DOORS.
2. ON PANEL 22VU:
- VERIFY THAT PACK VALVE, SYS 1 AND 2 P/B
SWITCHES ARE PRESSED
*** CONTINUED ***
AH

21-31-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

OPT 10000-002
3

DEC14

- VERIFY THAT ENG 1 AND 2 BLEED P/B


SWITCHES ARE PRESSED
- PLACE AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH IN FULLY CLOSE POSITION.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE
CYAN MAN PRESS MESSAGE IS DISPLAYED.
3. ON PANEL 402VU:
- RELEASE CAB PRESS/MODE SEL P/BSW AND
VERIFY THAT MAN LEGEND COMES ON.
- SELECT MANUAL CONTROL KNOB IN NORM
POSITION.
4. ON MFD UPPER WINDOW, IN CABIN SD PAGE,
(WHITE) TARGET + (MAGENTA) LDG ELEV
MESSAGE IS DISPLAYED.
005

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

006

________________
OPERATIONAL
TEST
REF. FIG. 213100-OPT-00100
1. ON PANEL 402VU, SELECT MANUAL CONTROL KNOB
IN FULLY CAB ALT DECREASE.
2. ON MFD UPPER WINDOW, IN CABIN SD PAGE,
VERIFY THAT CAB ALT DECREASES WHILE
DP AND VS MOVE ACCORDINGLY.
3. ON PANEL 402VU, MOVE MANUAL CONTROL KNOB
TOWARDS CAB ALT INCREASE.
4. ON MFD UPPER WINDOW, IN CABIN SD PAGE,
VERIFY THAT CAB ALT INCREASES WHILE
DP AND VS MOVE ACCORDINLY.
5. ON PANEL 402VU, SELECT MANUAL CONTROL KNOB
*** CONTINUED ***
AH

21-31-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14

21-31-00

MANUAL PRESSURE CONTROL


SYSTEM OPERATIONAL TEST

OPT 10000-002
4

DEC14

IN FULLY CAB ALT DECREASE.


007

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

008

________
CLOSE
UP
REF. FIG. 213100-OPT-00100
1. ON PANEL 402VU:
- SELECT MANUAL CONTROL KNOB IN NORM
POSITION.
- PRESS P/BSW CAB PRESS/MODE SEL
AND VERIFY THAT MAN LEGEND GOES OFF.
2. ON PANEL 22VU:
- PLACE AVIONICS VENT/OVBD VALVE SELECTOR
SWITCH IN AUTO POSITION.
3. OPEN DOORS AS REQUIRED.

009

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14

21-31-00
5

AH

CONTROLS LOCATION

OPT 10000-002
DEC14

21-31-00
OPT 10000-002

2-400

PAGE
5
DEC 01/14

21-31-20

ELECTROPNEUMATIC AND
PNEUMATIC OUTFLOW VALVES
BLOCKAGE IN OPEN POS

DNZ 10000-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 140
210
: 255FF 255GF 256FF 256GF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

GSE

: 02 FORK

AH

___
MEN

_________
MAN-HOURS

OS22959

21-31-20
DNZ 10000-001
2-400 PAGE
1
MAR 01/12

21-31-20

ELECTROPNEUMATIC AND
PNEUMATIC OUTFLOW VALVES
BLOCKAGE IN OPEN POS

001

DNZ 10000-001
2

MAR12

___________
PREPARATION
NOTE: THIS TASK IS PERFORMED TO BLOCK IN OPEN
POSITION THE OUTFLOW VALVES TO ALLOW AN
UNPRESSURIZED FLIGHT.
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS
2. DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM

002

___________
PREPARATION
1.REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF (256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

003

___________________________________________
BLOCKAGE
OF OUTFLOW VALVES IN OPEN POSITION
REF. FIG. 213120-DNZ-00100
1. DISCONNECT AND CAP ELECTRICAL CONNECTOR
FROM ELECTROPNEUMATIC OUTFLOW VALVE.
2. STOWS ELECTRICAL CABLE AND CONNECTOR AND
SECURE THEM WITH TAPE.
3. OPEN BY HAND THE ELECTROPNEUMATIC OUTFLOW
VALVE DEFLECTOR AND INSTALL ON CENTRAL
GUIDE THE FORK TO KEEP THE VALVE OPEN.
4. OPEN BY HAND THE PNEUMATIC OUTFLOW VALVE
DEFLECTOR AND INSTALL ON CENTRAL GUIDE THE
FORK TO KEEP THE VALVE OPEN.

*** CONTINUED ***


AH

21-31-20
DNZ 10000-001
2-400 PAGE
2
MAR 01/12

21-31-20

ELECTROPNEUMATIC AND
PNEUMATIC OUTFLOW VALVES
BLOCKAGE IN OPEN POS

004

DNZ 10000-001
3

MAR12

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255GF(256GF).
2. INSTALL ATTACHING SCREWS.

005

________
CLOSE
UP
1. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HM
3. INSTALL WARNING NOTICE ON DIGITAL CONTROLLER
AND ON MANUAL CONTROLLER PROHIBITING
ACTIVATION OF PRESSURIZATION SYSTEM.
*****

AH

E N D

O F

T E X T

*****

21-31-20
DNZ 10000-001
2-400 PAGE
3
MAR 01/12

21-31-20
4

AH

OUTFLOW VALVES BLOCKAGE


IN OPEN POSITION

DNZ 10000-001
MAR12

21-31-20
DNZ 10000-001

2-400

PAGE
4
MAR 01/12

21-31-21

JET PUMP REMOVAL AND


INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 121
210
: 231EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 JET PUMP

213120-15-060

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-31-21
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-31-21

JET PUMP REMOVAL AND


INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITHING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 231EF.

004

________________
JET
PUMP REMOVAL
REF. FIG. 213121-RAI-00100
1. DISCONNECT PIPE ENDS (1) AND (2) FROM JET
PUMP (3).
2. CAP PIPE OPEN ENDS.
3. UNSCREW BOLTS (5) AND REMOVE WASHERS (6).
4. REMOVE JET PUMP (3).
5. CHECK FOR CORRECT CONDITION GASKET (4),
IF NECESSARY REPLACE IT.

005

_____________________
JET
PUMP INSTALLATION
REF. FIG. 213121-RAI-00100
1. POSITION GASKET (4) AND INSTALL JET PUMP (3)
*** CONTINUED ***
AH

21-31-21
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-31-21

JET PUMP REMOVAL AND


INSTALLATION

RAI 10000-001
3

MAR14

ON IT.
2. INSTALL WASHERS (6) AND SCREW BOLTS (5).
3. REMOVE PROTECTIVE CAPS.
4. CONNECT PIPE ENDS (1) AND (2) TO JET PUMP
(3).
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 231EF.

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-31-21
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-31-21
4

AH

JET PUMP LOCATION

RAI 10000-001
MAR14

21-31-21
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-31-22

CLEANING OF
ELECTROPNEUMATIC
OUTFLOW VALVE SEAT

CLN 10000-001
1

MAR15

ZONING DATA
___________
R

ACCESS

: 255FF 256FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

BULK MATERIAL : STAIN REMOVER


COTTON RAG

AH

___
MEN

_________
MAN-HOURS

11-001

21-31-22
CLN 10000-001
2-400 PAGE
1
MAR 01/15

21-31-22

CLEANING OF
ELECTROPNEUMATIC
OUTFLOW VALVE SEAT

001

MAR15

___________
PREPARATION

R
R

WARNING: MAKE CERTAIN THAT AIRCRAFT ELECTRICAL


NETWORK IS NOT POWERED.

R
R

1. REMOVE FLOOR PANEL 255FF(256FF) TO GAIN


ACCESS TO VALVE.
002

CLN 10000-001

______________________
CLEANING
OF VALVE SEAT
1. PUSH MAIN POPPET TOWARDS FULLY OPEN POSITION
AND KEEP IT OPEN.
2. USING A CLEAN COTTON RAG SOAKED IN STAIN
REMOVER, CLEAN THE SEAT AND THE EDGE OF THE
POPPET VALVE.
3. BLOW AIR ON SEAT AND EDGES OF POPPET VALVE
TO REMOVE ALL TRACES OF HUMIDITY.
4. RELEASE THE MAIN POPPET AND MAKE CERTAIN
THAT IT COMES TO FULLY CLOSED POSITION.
5. MAKE CERTAIN THAT THE VALVE POPPET IS FREE
OF MOVEMENT.

003

________
CLOSE
UP

R
R

1. MAKE CERTAIN THAT VALVE ADJACENT AREA IS IN


CORRECT CONDITION.

R
R

2. CHECK THAT THERE IS NO FOREIGN MATERIAL IN


VALVE AREA.

3. CLOSE ACCESS DOOR 835.

4. REMOVE ACCESS PLATFORM.


*****

AH

E N D

O F

T E X T

*****

21-31-22
CLN 10000-001
2-400 PAGE
2
MAR 01/15

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE DEACTIVATION

DNZ 10000-001
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 140
210
: 255FF 256FF 256GF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

GSE

: 01
01
01
02

AH

BLANKING
BLANKING
BLANKING
BLANKING

___
MEN

CAP
PLUG
PLUG
PLUG

_________
MAN-HOURS

98S21003000200
AN929-4
AN929-5
AN929-6

21-31-22
DNZ 10000-001
2-400 PAGE
1
MAR 01/11

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE DEACTIVATION

001

DNZ 10000-001
2

MAR11

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS
- 11HM CAB PRESS/DITCH
2. DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.

002

___________
PREPARATION
1.REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF (256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

003

__________________________
0UTFLOW
VALVE DEACTIVATION
REF. FIG. 213122-DNZ-00100
1. VALVE FAILED CLOSE
A. DISCONNECT AND CAP ELECTRICAL CONNECTORS
(2) AND (7)
B. STOW ELECTRICAL CABLE AND CONNECTORS AND
SECURE THEM WITH TAPE
C. DISCONNECT BONDING STRIP (8)
D. REMOVE VACUUM PIPE (9) AND OUTSIDE STATIC
PRESSURE PIPE (3)
E. CAP THE VACUUM PIPE JUNCTION (6)
F. CAP THE RELEVANT HOLES ON VALVE BODY
2. VALVE FAILED OPEN
A. USE THE SAME PROCEDURE DESCRIBED IN POINT
1 STEPS A THROUGH F
B. REMOVE THE FILTER PIPE (1) AND THE
INTERCONNECTING PIPE (4)
C. REMOVE THE ELECTROPNEUMATIC OUTFLOW VALVE
D. INSTALL BLANKING PLATE P/N 98S21003000200
*** CONTINUED ***
AH

21-31-22
DNZ 10000-001
2-400 PAGE
2
MAR 01/11

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE DEACTIVATION

DNZ 10000-001
3

MAR11

INSTEAD OF ELECTROPNEUMATIC OUTFLOW VALVE


USING THE SAME CLAMP
E. CAP THE RELEVANT HOLE ON PNEUMATIC VALVE
BODY
004

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255GF(256GF).
2. INSTALL ATTACHING SCREWS.

005

________
CLOSE
UP
1. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HM
- 11HM
NOTE: INSTALL WARNING NOTICE ON DIGITAL
CONTROLLER PROHIBITING AUTOMATIC
PRESSURIZATION.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-31-22
DNZ 10000-001
2-400 PAGE
3
MAR 01/11

21-31-22
4

AH

ELECTROPNEUMATIC OUTFLOW
VALVE DEACTIVATION

DNZ 10000-001
MAR11

21-31-22
DNZ 10000-001

2-400

PAGE
4
MAR 01/11

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
1

MAR15

ZONING DATA
___________
ZONE
ACCESS

: 140
210
: 256FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 VALVE ELECTROPNEUMATIC

213120

EXPENDABLE

: 01 SEAL

213120

: FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

21-31-00-FUT-10020

PUBLICATION
___________
JIC

AH

21-31-22
RAI 10000-002
2-400 PAGE
1
MAR 01/15

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-002
2

MAR15

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS
- 11HM CAB PRESS/DITCH
2. DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.

002

___________
PREPARATION
1. REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF(256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

003

________________
REMOVAL
OF VALVE
REF. FIG. 213122-RAI-00100
1. DISCONNECT PIPES (1), (3), (4) AND (7) FROM
VALVE.
2. DISCONNECT ELECTRICAL CONNECTORS (2) AND (5)
3. DISCONNECT BONDING STRIP (6).
4. CAP OPEN PIPES ENDS AND ELECTRICAL
CONNECTORS (2) AND (5).
5. HOLD VALVE (8) AND REMOVE CLAMP (10).
6. REMOVE ELECTROPNEUMATIC OUTFLOW VALVE (8)
FROM SUPPORT (11).
7. REMOVE AND DISCARD SEAL (9).
8. CAP OPEN LINE ENDS AND ELECTRICAL CONNECTORS
*** CONTINUED ***
AH

21-31-22
RAI 10000-002
2-400 PAGE
2
MAR 01/15

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
3

MAR15

ON VALVE (8).
004

_____________________
INSTALLATION
OF VALVE
REF. FIG. 213122-RAI-00100
1. INSTALL SEAL (9) ON VALVE (8).
2. POSITION VALVE (8) ON ITS SUPPORT (11) AND
FIX IT BY CLAMP (10).
3. REMOVE CAPS FROM LINE ENDS AND ELECTRICAL
CONNECTORS ON VALVE (8).
4. REMOVE CAPS FROM PIPES ENDS AND ELECTRICAL
CONNECTORS (2) AND (5).
5. CONNECT PIPES (1),(3),(4) AND (7) TO VALVE.
6. CONNECT ELECTRICAL CONNECTORS (2) AND (5).
7. CONNECT BONDING STRIP (6).

005

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255FF(256FF).
2. INSTALL ATTACHING SCREWS.

006

________
CLOSE
UP
1. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
2. ON PANEL 121VU REMOVE SAFETY CLIP AND TAG
AND CLOSE THE FOLLOWING CIRCUIT BREAKERS:
- 1HM
- 11HM
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*** CONTINUED ***
AH

21-31-22
RAI 10000-002
2-400 PAGE
3
MAR 01/15

21-31-22

ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
4

MAR15

4. MAKE CERTAIN THAT ELECTROPNEUMATIC OUTFLOW


VALVE ADJACENT AREA IS IN CORRECT CONDITION.
007

FUNCTIONAL TEST ON GROUND OF CABIN PRESSURE


___________________________________________
CONTROL IN AUTO MODE
____________________
SEE JOB INSTRUCTION CARD
213100-FUT-10020
*****

AH

E N D

O F

T E X T

*****

21-31-22
RAI 10000-002
2-400 PAGE
4
MAR 01/15

21-31-22
5

AH

ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
MAR15

21-31-22
RAI 10000-002

2-400

PAGE
5
MAR 01/15

21-31-23

CLEANING OF PNEUMATIC
OUTFLOW VALVE SEAT

CLN 10000-001
1

MAR15

ZONING DATA
___________
R

ACCESS

: 255FF 256FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

BULK MATERIAL : STAIN REMOVER

AH

___
MEN

_________
MAN-HOURS

11-001

21-31-23
CLN 10000-001
2-400 PAGE
1
MAR 01/15

21-31-23

CLEANING OF PNEUMATIC
OUTFLOW VALVE SEAT

001

MAR15

___________
PREPARATION

R
R

WARNING: MAKE CERTAIN THAT AIRCRAFT ELECTRICAL


NETWORK IS NOT POWERED.

R
R

1. REMOVE FLOOR PANEL 255FF(256FF) TO GAIN


ACCESS TO VALVE.
002

CLN 10000-001

________
CLEANING
1. PUSH THE MAIN POPPET TOWARDS FULLY OPEN
POSITION AND KEEP IT OPEN.
2. USING A CLEAN COTTON RAG SOAKED IN STAIN
REMOVER CLEAN THE SEAT AND THE EDGE OF
POPPET VALVE.
3. BLOW AIR ON POPPET VALVE SEAT AND EDGES TO
REMOVE ALL TRACES OF HUMIDITY.
4. RELEASE MAIN POPPET AND MAKE CERTAIN THAT
IT COMES TO FULLY CLOSED POSITION.
5. MAKE CERTAIN THAT VALVE POPPET IS FREE OF
MOVEMENT.

003

________
CLOSE
UP

R
R

1. MAKE CERTAIN THAT VALVE ADJACENT AREA IS IN


CORRECT CONDITION.

R
R

2. CHECK THAT THERE IS NO FOREIGN MATERIAL IN


VALVE AREA.

3. CLOSE ACCESS DOOR 835.

4. REMOVE ACCESS PLATFORM.


*****

AH

E N D

O F

T E X T

*****

21-31-23
CLN 10000-001
2-400 PAGE
2
MAR 01/15

21-31-23

PNEUMATIC OUTFLOW VALVE


REMOVAL AND INSTALLATION

RAI 10000-003
1

MAR15

ZONING DATA
___________
ZONE
ACCESS

: 140
212
: 255FF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 VALVE PNEUMATIC

213120-04-260

EXPENDABLE

: 01 SEAL

213120-04-270

AH

___
MEN

_________
MAN-HOURS

21-31-23
RAI 10000-003
2-400 PAGE
1
MAR 01/15

21-31-23

PNEUMATIC OUTFLOW VALVE


REMOVAL AND INSTALLATION

001

RAI 10000-003
2

MAR15

_______
WARNING
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

___________
PREPARATION
1. REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF(256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

003

__________________________________
REMOVAL
OF PNEUMATIC OUTFLOW VALVE
REF. FIG. 213123-RAI-00100
1. DISCONNECT PIPES (2),(3),(4) AND (6) FROM
VALVE (7).
2. REMOVE ELECTRICAL CONNECTOR (1) AND BONDING
STRIP (5).
3. CAP OPEN PIPES ENDS AND ELECTRICAL
CONNECTOR (1).
4. HOLD VALVE (7) AND REMOVE CLAMP (9).
5. REMOVE PNEUMATIC OUTFLOW VALVE (7) FROM
SUPPORT (10).
6. REMOVE AND DISCARD SEAL (8).
7. CAP OPEN LINE ENDS AND ELECTRICAL
CONNECTOR ON VALVE (7).

*** CONTINUED ***


AH

21-31-23
RAI 10000-003
2-400 PAGE
2
MAR 01/15

21-31-23

PNEUMATIC OUTFLOW VALVE


REMOVAL AND INSTALLATION

004

RAI 10000-003
3

MAR15

_______________________________________
INSTALLATION
OF PNEUMATIC OUTFLOW VALVE
REF. FIG. 213123-RAI-00100
1. INSTALL SEAL (8) ON VALVE (7).
2. POSITION VALVE (7) ON ITS SUPPORT (10) AND
FIX IT BY CLAMP (9).
3. REMOVE CAPS FROM LINE ENDS AND ELECTRICAL
CONNECTOR ON VALVE (7).
4. REMOVE CAPS FROM PIPES ENDS AND ELECTRICAL
CONNECTOR (1).
5. CONNECT PIPES (2), (3), (4) AND (6) TO
VALVE (7).
6. CONNECT ELECTRICAL CONNECTOR (1) AND BONDING
STRIP (5).

005

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255FF(256FF).
2. INSTALL ATTACHING SCREWS.

006

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. MAKE CERTAIN THAT PNEUMATIC OUTFLOW VALVE
ADJACENT AREA IS IN CORRECT CONDITION.
3. REMOVE WARNING NOTICE.

*** CONTINUED ***


AH

21-31-23
RAI 10000-003
2-400 PAGE
3
MAR 01/15

21-31-23

PNEUMATIC OUTFLOW VALVE


REMOVAL AND INSTALLATION

007

RAI 10000-003
4

MAR15

OPERATIONAL TEST OF MANUAL PRESSURE CONTROL


___________________________________________
SYSTEM
______
SEE JOB INSTRUCTION CARD:
213100-OPT-10000
*****

AH

E N D

O F

T E X T

*****

21-31-23
RAI 10000-003
2-400 PAGE
4
MAR 01/15

21-31-23
5

AH

PNEUMATIC OUTFLOW VALVE


REMOVAL AND INSTALLATION

RAI 10000-003
MAR15

21-31-23
RAI 10000-003

2-400

PAGE
5
MAR 01/15

21-31-24

ELECTROPNEUMATIC OUTFLOW
VALVE FILTER REMOVAL AND
INSTALLATION

RAI 10000-001
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 140
212
: 255FF 256FF 256GF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 FILTER

213120-30-260

EXPENDABLE

: 01 PACKING

213120-30-250

AH

___
MEN

_________
MAN-HOURS

21-31-24
RAI 10000-001
2-400 PAGE
1
MAR 01/11

21-31-24

ELECTROPNEUMATIC OUTFLOW
VALVE FILTER REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

MAR11

_______
WARNING
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

___________
PREPARATION
1.REMOVE ATTACHING SCREWS.
2. REMOVE FLOOR PANEL 255FF (256FF) FOR ACCESS
TO PRESSURIZATION SYSTEM.

003

_________________
REMOVAL
OF FILTER
REF. FIG. 213124-RAI-00100
1. DISCONNECT PIPE (6) FROM REDUCER (5).
2. REMOVE REDUCER (5).
3. REMOVE END DISCARD PACKING (4).
4. UNSCREW NUT (3) AND REMOVE FILTER ASSY
FROM SUPPORT.
5. CAP OPEN END OF PIPE (6).
6. REMOVE PROTECTIVE RUBBER (2) FROM FILTER
(1).

004

______________________
INSTALLATION
OF FILTER
REF. FIG. 213124-RAI-00100
1. INSTALL PROTECTIVE RUBBER (2) ON FILTER (1).
2. POSITION FILTER ASSY ON ITS SUPPORT AND
SCREW NUT (3).
*** CONTINUED ***
AH

21-31-24
RAI 10000-001
2-400 PAGE
2
MAR 01/11

21-31-24

ELECTROPNEUMATIC OUTFLOW
VALVE FILTER REMOVAL AND
INSTALLATION

RAI 10000-001
3

MAR11

3. REMOVE CAP FROM END OF PIPE (6).


4. INSTALL PACKING (4) AND REDUCER (5).
5. CONNECT PIPE (6) TO REDUCER (5).
005

________
CLOSE
UP
1. INSTALL FLOOR PANEL 255GF(256GF).
2. INSTALL ATTACHING SCREWS.

006

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. MAKE CERTAIN THAT PNEUMATIC OUTFLOW VALVE
ADJACENT AREA IS IN CORRECT CONDITION.
3. REMOVE WARNING NOTICE.

007

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-31-24
RAI 10000-001
2-400 PAGE
3
MAR 01/11

21-31-24
4

AH

ELECTROPNEUMATIC OUTFLOW
VALVE FILTER REMOVAL
AND INSTALLATION

RAI 10000-001
MAR11

21-31-24
RAI 10000-001

2-400

PAGE
4
MAR 01/11

21-31-25

INSPECTION OF CHECK
VALVE FOR CORRECT
OPERATION

CHK 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 121
: 231DF 231EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-31-25
CHK 10000-001
2-400 PAGE
1
MAR 01/14

21-31-25

INSPECTION OF CHECK
VALVE FOR CORRECT
OPERATION

001

CHK 10000-001
2

MAR14

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

002

____________________
FLOOR
PANELS REMOVAL
1. REMOVE FLOOR PANELS 231EF AND 231DF.

003

____________________________
CHECK
OF NON RETURN FUNCTION
REF. FIG. 213125-CHK-00100
1. DISCONNECT DUCT (1) FROM JET PUMP (2).
2. TO REMOVED DUCT CONNECT A TOOL (AS SHOWN IN
FIGURE) COMPOSED BY:
- A 10-LITERS RESERVOIR
- A MANOMETER (0-70 PSI)
- A PRESSURE REGULATING VALVE
- A SHUT OFF VALVE
3. PRESSURIZE THE SYSTEM AT 60 PSI BY MEANS OF
AN EXTERNAL PNEUMATIC SOURCE.
4. CLOSE SHUT OFF VALVE AND VERIFY THAT
PRESSURE DROPS TO 5 PSI IN A TIME HIGHER
THAN 25 SEC.

004

________________________
CHECK
OF NORMAL FUNCTION
1. DISCONNECT TOOL FROM DUCT (1).
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 33HA AIR BLEED/COMPT TEMP/X FEED
3. RUN ENGINE 1(2)
(SEE JIC 720000-ERU-10030)
*** CONTINUED ***
AH

21-31-25
CHK 10000-001
2-400 PAGE
2
MAR 01/14

21-31-25

INSPECTION OF CHECK
VALVE FOR CORRECT
OPERATION

CHK 10000-001
3

MAR14

4. POSITION POWER LEVER ON GROUND IDLE.


5. ON PANEL 22VU:
- PRESS ENG1(2) BLEED P/BSW 27HA(28HA) AND
VERIFY THAT OFF LEGEND GOES OFF.
6. VERIFY THAT DUCT (1) BLOWS AIR.
7. SHUT DOWN ENGINE 1(2).
8. CONNECT DUCT (1) TO JET PUMP (2).
005

_________________________
FLOOR
PANELS INSTALLATION
1. INSTALL FLOOR PANELS 231EF AND 231DF.

006

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-31-25
CHK 10000-001
2-400 PAGE
3
MAR 01/14

21-31-25
4

AH

CHECK VALVES AND JET


PUMP LOCATION

CHK 10000-001
MAR14

21-31-25
CHK 10000-001

2-400

PAGE
4
MAR 01/14

21-31-25

CHECK VALVE REMOVAL AND


INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 121
210
: 231DF 231EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 CHECK VALVE

213120-15-140

EXPENDABLE

: 01 PACKING

213120-15-150

BULK MATERIAL : LUBRICANT KRYTOX (SEE TEXT)


PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-31-25
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-31-25

CHECK VALVE REMOVAL AND


INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

____________________
FLOOR
PANELS REMOVAL
1. REMOVE FLOOR PANELS 231EF AND 231DF.

004

___________________
CHECK
VALVE REMOVAL
REF. FIG. 213125-RAI-00100
NOTE: DIFFICULTIES CAN BE ENCOUNTERED DURING
REMOVAL OF FLEXIBLE DUCT FROM CHECK
VALVE DUE TO SEIZURE OF THE TWO ITEMS.
IN THIS CASE DISCARD BOTH FLEXIBLE DUCT
AND CHECK VALVE.
1. DISCONNECT FLEXIBLE DUCT (1) FROM VALVE (3).
2. CAP OPEN END OF DUCT.
3. REMOVE CHECK VALVE 6201HM (6202HM) (3) FROM
DUCT (4).
4. REMOVE AND DISCARD PACKING (2) FROM VALVE.

*** CONTINUED ***


AH

21-31-25
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-31-25

CHECK VALVE REMOVAL AND


INSTALLATION

005

RAI 10000-001
3

MAR14

________________________
CHECK
VALVE INSTALLATION
REF. FIG. 213125-RAI-00100
1. POSITION PACKING (2) ON CHECK VALVE (3).
2. INSTALL CHECK VALVE (3) ON DUCT (4).
3. REMOVE CAP FROM FLEXIBLE DUCT (1).
4. CONNECT FLEXIBLE DUCT (1) ON CHECK VALVE (3)
NOTE: IN ORDER TO PREVENT SEIZURE BETWEEN
FLEXIBLE DUCT (1) AND CHECK VALVE (3)
APPLY LUBRICANT NO. 05-003B

006

_________________________
FLOOR
PANELS INSTALLATION
1. INSTALL FLOOR PANELS 231EF AND 231DF.

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-31-25
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-31-25
4

AH

CHECK VALVE LOCATION

RAI 10000-001
MAR14

21-31-25
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-31-81

DIGITAL CONTROLLER
BITE TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-31-81
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-31-81

DIGITAL CONTROLLER
BITE TEST

001

OPT 10000-001
2

DEC14

___________
PREPARATION
1. ON PANEL 22VU RELEASE THE FOLLOWING
PUSHBUTTON SWITCHES:
- AIR BLEED/PACK VALVE, SYS1
- AIR BLEED/PACK VALVE, SYS2

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

____________________________
DIGITAL
CONTROLLER BITE TEST
REF. FIG. 213181-OPT-00100
1. ON CABIN PRESSURE DIGITAL CONTROLLER
PUSH THE TEST BUTTON AND VERIFY THAT THE
DIGITAL CONTROLLER WINDOWS DISPLAY
ALTERNATIVELY THE VALUES 18800 AND -8800.

004

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

005

________
CLOSE
UP
1. ON PANEL 22VU PRESS PACK VALVE PUSHBUTTON
SWITCHES
- AIR BLEED/PACK VALVE, SYS1
- AIR BLEED/PACK VALVE, SYS2
*****

AH

E N D

O F

T E X T

*****

21-31-81
OPT 10000-001
2-400 PAGE
2
DEC 01/14

21-31-81
3

AH

CONTROLS LOCATION

OPT 10000-001
DEC14

21-31-81
OPT 10000-001

2-400

PAGE
3
DEC 01/14

21-31-81

DIGITAL CONTROLLER
BITE TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 212

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

24-46-00-EAD-10000

21-31-81
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-31-81

DIGITAL CONTROLLER
BITE TEST

001

OPT 10000-002
2

DEC14

___________
PREPARATION
1. ON PANEL 22VU RELEASE THE FOLLOWING
PUSHBUTTON SWITCHES:
- AIR BLEED/PACK VALVE, SYS1
- AIR BLEED/PACK VALVE, SYS2

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

____________________________
DIGITAL
CONTROLLER BITE TEST
REF. FIG. 213181-OPT-00100
1. ON CABIN PRESSURE DIGITAL CONTROLLER
PUSH THE TEST BUTTON AND VERIFY THAT THE
DIGITAL CONTROLLER WINDOWS DISPLAY
ALTERNATIVELY THE VALUES 18800 AND -8800.

004

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

005

________
CLOSE
UP
1. ON PANEL 22VU PRESS PACK VALVE PUSHBUTTON
SWITCHES
- AIR BLEED/PACK VALVE, SYS1
- AIR BLEED/PACK VALVE, SYS2
*****

AH

E N D

O F

T E X T

*****

21-31-81
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-31-81
3

AH

CONTROLS LOCATION

OPT 10000-002
DEC14

21-31-81
OPT 10000-002

2-400

PAGE
3
DEC 01/14

21-31-81

DIGITAL CONTROLLER
REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 DIGITAL CONTROLLER

213180-01-060

: FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE

21-31-00-FUT-10020

PUBLICATION
___________
JIC

AH

21-31-81
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-31-81

DIGITAL CONTROLLER
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS

002

_______
REMOVAL
REF. FIG. 213181-RAI-00100
1. UNTIGHTEN SCREW (1) AND (2) WITHOUT REMOVING
THEM.
2. PULL CONTROLLER.
3. DISCONNECT ELECTRICAL CONNECTOR 8HM.
4. BLANK ELECTRICAL CONNECTOR.

003

____________
INSTALLATION
REF. FIG. 213181-RAI-00100
1. REMOVE BLANK FROM ELECTRICAL CONNECTOR.
2. CLEAN AND INSPECT CONTROLLER INSTALLATION
AREA.
3. CONNECT ELECTRICAL CONNECTOR 8HM.
4. POSITION CONTROLLER INSIDE INSTRUMENT PANEL.
5. TIGHTEN CONTROLLER ATTACHMENT SCREWS (1) AND
(2).

004

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
*** CONTINUED ***
AH

21-31-81
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-31-81

DIGITAL CONTROLLER
REMOVAL AND INSTALLATION

005

RAI 10000-001
3

APR05

1HM

FUNCTIONAL TEST ON GROUND OF CABIN PRESSURE


___________________________________________
CONTROL IN AUTO MODE
____________________
SEE JOB INSTRUCTION CARD
213100-FUT-10020
*****

AH

E N D

O F

T E X T

*****

21-31-81
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-31-81
4

AH

CABIN PRESSURE DIGITAL


CONTROLLER REMOVAL AND
INSTALLATION

RAI 10000-001
APR05

21-31-81
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-31-82

MANUAL CONTROLLER
REMOVAL AND INSTALLATION

RAI 10000-002
1

MAR15

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 MANUAL CONTROLLER

AH

___
MEN

_________
MAN-HOURS

213180-01-130

21-31-82
RAI 10000-002
2-400 PAGE
1
MAR 01/15

21-31-82

MANUAL CONTROLLER
REMOVAL AND INSTALLATION

001

RAI 10000-002
2

MAR15

___________
PREPARATION
WARNING: MAKE CERTAIN THAT AIR CONDITIONING
COMPRESSION AND DISTRIBUTION ARE NOT
OPERATING AND THAT AIRCRAFT IS NOT
PRESSURIZED.
1. OPEN SAFETY CLIPS AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HM CAB PRESS/AUTO PRESS
- 6HM CAB PRESS/IND & WARN
CAUTION: TAKE ALL NECESSARY CARE WHEN WORKING
IN ELECTRICAL ENVIROMENT OF INSTRUMENT
PANELS LOCATED IN FWD SECTION OF
AIRCRAFT.

002

_______
REMOVAL
REF. FIG. 213182-RAI-00100
1. UNTIGHTEN

SCREW (1) AND PULL CONTROLLER.

2. REMOVE LINES (2) AND (3).


3. INSTALL PLUGS ON LINE END FITTINGS AND
REGULATOR COUPLINGS.
003

____________
INSTALLATION
REF. FIG. 213182-RAI-00100
1. CLEAN AND INSPECT CONTROLLER INSTALLATION
AREA, REMOVE PLUGS FROM LINE END FITTINGS
AND CONTROLLER COUPLINGS.
2. CONNECT LINES (2) AND (3).
3. POSITION CONTROLLER INSIDE INSTRUMENT PANEL.
*** CONTINUED ***
AH

21-31-82
RAI 10000-002
2-400 PAGE
2
MAR 01/15

21-31-82

MANUAL CONTROLLER
REMOVAL AND INSTALLATION

RAI 10000-002
3

MAR15

4. TIGHTEN SCREW (1).


004

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HM
- 6HM
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

005

OPERATIONAL TEST OF MANUAL PRESSURE CONTROL


___________________________________________
SYSTEM
______
SEE JOB INSTRUCTION CARD:
213100-OPT-10000
*****

AH

E N D

O F

T E X T

*****

21-31-82
RAI 10000-002
2-400 PAGE
3
MAR 01/15

21-31-82
4

AH

CABIN PRESSURE MANUAL


CONTROLLER REMOVAL AND
INSTALLATION

RAI 10000-002
MAR15

21-31-82
RAI 10000-002

2-400

PAGE
4
MAR 01/15

21-31-83

CABIN PRESSURE INDICATOR


REMOVAL AND INSTALLATION

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 INDICATOR-CAB PRESS

AH

___
MEN

_________
MAN-HOURS

213180-01-090

21-31-83
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-31-83

CABIN PRESSURE INDICATOR


REMOVAL AND INSTALLATION

001

RAI 10000-002
2

DEC14

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 6HM CAB PRESS/IND & WARN

002

STANDARD REMOVAL OF FLIGHT COMPARTMENT


______________________________________
EQUIPMENT
_________
NOTE: THE SHAPE AND QUANTITY OF AFT BACKSHELLS
AS WELL AS THE QUANTITY OF FASTENERS MAY
BE DIFFERENT ACCORDING TO THE EQUIPMENT.
NEVERTHELESS, REMOVAL AND INSTALLATION
PROCEDURE IS IDENTICAL.
REF. FIG. 310000-RAI-00103
1. RELEASE QUICK DISCONNECT SCREWS (1) HOLDING
THE EQUIPMENT (2) ON CABIN PANEL VU (5)
2. PULL EQUIPMENT (2).
3. DISCONNECT CONNECTORS (4) FROM RECEPTACLE
(3).
4. REMOVE EQUIPMENT (2).
5. INSTALL PROTECTIVE CAP ON EACH CONNECTOR (4)
AND ON EACH RECEPTACLE (3).

003

STANDARD INSTALLATION OF FLIGHT COMPARTMENT


___________________________________________
EQUIPMENT
_________
REF. FIG. 310000-RAI-00103
1. CLEAN AND INSPECT CABIN PANEL VU (5) AND
EQUIPMENT (2) INTERFACE AREA.
2. REMOVE PROTECTIVE CAPS INSTALLED ON
RECEPTACLES (3) AND CONNECTORS (4).
*** CONTINUED ***
AH

21-31-83
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-31-83

CABIN PRESSURE INDICATOR


REMOVAL AND INSTALLATION

RAI 10000-002
3

DEC14

3. MAKE CERTAIN THAT PINS ARE IN CORRECT


CONDITION AND CONNECT CONNECTORS (4) WITH
RECEPTACLES (3).
4. INSTALL EQUIPMENT (2) ON CABIN PANEL VU (5).
5. ATTACH EQUIPMENT (2) BY MEANS OF QUICK
DISCONNECT SCREWS (1).
004

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 6HM

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-31-83
RAI 10000-002
2-400 PAGE
3
DEC 01/14

21-31-83
4

AH

STANDARD EQUIPMENT FOR


FLIGHT COMPARTMENT

RAI 10000-002
DEC14

21-31-83
RAI 10000-002

2-400

PAGE
4
DEC 01/14

21-31-85

REMOVAL AND INSTALLATION


OF AMBIENT PRESSURE
SENSOR

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 221
: 221FZ

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 AMBIENT PRESSURE SENSOR

213180-02

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

31-63-00-PRO-10000

PUBLICATION
___________
JIC
JIC

AH

24-46-00-EAD-10000

21-31-85
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-31-85

REMOVAL AND INSTALLATION


OF AMBIENT PRESSURE
SENSOR

001

RAI 10000-001
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
6HM CAB PRESS/IND & WARN
2. ON L ELECTRONICS RACK 80 VU, REMOVE ACCESS
PANEL 221FZ TO GAIN ACCESS TO AMBIENT
PRESSURE SENSOR ON SHELF 81VU.

003

_______
REMOVAL
REF. FIG. 213185-RAI-00100
1. DISCONNECT AND CAP ELECTRICAL CONNECTOR
(4).
2. REMOVE SCREWS (2) WITH WASHERS (3).
3. REMOVE AMBIENT PRESSURE SENSOR (1).

004

____________
INSTALLATION
REF. FIG. 213185-RAI-00100
1. INSTALL AMBIENT PRESSURE SENSOR (1).
2. INSTALL SCREWS (2) WITH WASHERS (3).
TIGHTEN SCREWS (2).
*** CONTINUED ***
AH

21-31-85
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-31-85

REMOVAL AND INSTALLATION


OF AMBIENT PRESSURE
SENSOR

RAI 10000-001
3

DEC14

3. UNCAP AND RECONNECT ELECTRICAL CONNECTOR


(4).
005

________
CLOSE-UP
1. INSTALL PANEL PREVIOUSLY REMOVED.
2. CLOSE CIRCUIT BREAKER PREVIOUSLY OPENED.

006

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

007

________________
OPERATIONAL
TEST
ON MFD UPPER WINDOW, IN CABIN SD PAGE, CHECK
THAT CABIN VS AND CABIN ALTITUDE INDICATORS
DON}T DISPLAY DASHES.

008

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-31-85
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-31-85
4

AH

REMOVAL AND INSTALLATION


OF AMBIENT PRESSURE
SENSOR

RAI 10000-001
DEC14

21-31-85
RAI 10000-001

2-400

PAGE
4
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

CHK 10010-001
1

DEC14

ZONING DATA
___________
ZONE

: 191
210

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 PRESS GAUGE (0 TO 60 PSI)

_________
MAN-HOURS

PUBLICATION
___________
JIC

: MLG FAIRING REMOVAL AND


INSTALLATION

AH

53-95-00-RAI-10000

21-51-00
CHK 10010-001
2-400 PAGE
1
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

001

CHK 10010-001
2

DEC14

_________________________
MLG
FAIRING PANEL REMOVAL
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: REMOVE ONLY PANEL 191ML.

002

________________________
CHECK
OF PACK VALVE 1(2)
REF. FIG. 215100-CHK-00110
215100-CHK-00112
1. REMOVE INSULATION (4).
2. CUT LOCKWIRE (1).
3. REMOVE NUT (3).
4. ON PORT (2) INSTALL THE MANOMETER.
CAUTION: CONNECT MANOMETER TO A PIPING 5M LONG
AT LEAST IN ORDER TO AVOID PERSONNEL
INJURY FROM PROPELLER RUNNING.
5. RUN ENGINE 1(2).
(SEE JIC 720000-ERU-10030)
6. POSITION POWER LEVER BETWEEN F.I. AND 35,
AND CONDITION LEVER ON MAX RPM.
7. ON PANEL 22VU:
- PRESS ENG1(2) BLEED P/BSW 27HA(28HA)
(11) (10) AND VERIFY THAT OFF LEGEND
GOES OFF.
- PRESS SYS1(2) AIR BLEED/PACK VALVE P/BSW
9HB(10HB) (12) (9) AND VERIFY THAT OFF
LEGEND GOES OFF.
- VERIFY THAT OFF LEGEND ON P/BSW 10HB
(9HB) (9) (12) IS ON.
*** CONTINUED ***
AH

21-51-00
CHK 10010-001
2-400 PAGE
2
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

CHK 10010-001
3

DEC14

- VERIFY THAT HIGH LEGEND ON TEMP/FLOW


COMPT P/BSW 36HB (8) IS OFF.
- SELECT MAX FULL COLD ON FLT COMPT
(CABIN) TEMPERATURE SELECTOR 5HH(6HH)
(13) (7).
8. CHECK THAT DELIVERED PRESSURE IS 22+/-2 PSI.
9. ON PANEL 22VU:
- PRESS P/BSW 36HB (8) AND VERIFY THAT
HIGH LEGEND COMES ON.
10. CHECK THAT DELIVERED PRESSURE IS 30+/-2
PSI.
11. ON PANEL 22VU:
- RELEASE P/BSW 36HB (8) AND VERIFY THAT
HIGH LEGEND GOES OFF.
- RELEASE PUSHBUTTON SWITCHES 9HB(10HB)
(12) (9) AND 27HA(28HA) (11) (10) AND
VERIFY THAT OFF LEGENDS COME ON.
12. SHUT DOWN ENGINE 1(2).
(SEE JIC 720000-ERU-10030)
13. REMOVE MANOMETER FROM PORT (2).
14. INSTALL NUT (3) AND LOCKWIRE (1).
15. INSTALL INSULATION (4).
003

______________________________
MLG
FAIRING PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: INSTALL ONLY PANEL 191ML.
*****

AH

E N D

O F

T E X T

*****

21-51-00
CHK 10010-001
2-400 PAGE
3
DEC 01/14

21-51-00
4

AH

PORT LOCATION

CHK 10010-001
DEC14

21-51-00
CHK 10010-001

2-400

PAGE
4
DEC 01/14

21-51-00
5

AH

CONTROLS AND INDICATING

CHK 10010-001
DEC14

21-51-00
CHK 10010-001

2-400

PAGE
5
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

CHK 10010-002
1

DEC14

ZONING DATA
___________
ZONE

: 191
210

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 PRESS GAUGE (0 TO 60 PSI)

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: MLG FAIRING REMOVAL AND
INSTALLATION

AH

31-63-00-PRO-10000
53-95-00-RAI-10000

21-51-00
CHK 10010-002
2-400 PAGE
1
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

001

CHK 10010-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

_________________________
MLG
FAIRING PANEL REMOVAL
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: REMOVE ONLY PANEL 191ML.

003

________________________
CHECK
OF PACK VALVE 1(2)
REF. FIG. 215100-CHK-00110
215100-CHK-00112
361100-OPT-00130
1. REMOVE INSULATION (4).
2. CUT LOCKWIRE (1).
3. REMOVE NUT (3).
4. ON PORT (2) INSTALL THE MANOMETER.
CAUTION: CONNECT MANOMETER TO A PIPING 5M LONG
AT LEAST IN ORDER TO AVOID PERSONNEL
INJURY FROM PROPELLER RUNNING.
5. RUN ENGINE 1(2).
(SEE JIC 720000-ERU-10030)
*** CONTINUED ***
AH

21-51-00
CHK 10010-002
2-400 PAGE
2
DEC 01/14

CHECK OF PACK VALVE


DELIVERED PRESSURE

21-51-00

CHK 10010-002
3

DEC14

6. POSITION POWER LEVER BETWEEN F.I. AND 35DEG,


AND CONDITION LEVER ON MAX RPM.
7. - ON PANEL 22VU, PRESS ENG1(2) BLEED P/BSW
11 (10) AND VERIFY THAT OFF LEGEND
GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 3 IS DISPLAYED.
- ON PANEL 22VU, PRESS SYS1(2) AIR BLEED/
PACK VALVE P/BSW 12 (9) AND VERIFY THAT
OFF LEGEND GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 11 IS DISPLAYED.
- ON PANEL 22VU, VERIFY THAT OFF LEGEND ON
P/BSW 12 (9) IS ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 9 IS DISPLAYED.
- ON PANEL 22VU, VERIFY THAT HIGH LEGEND
ON TEMP/FLOW COMPT P/BSW 8 IS OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
BLUE AIR HIGH FLOW MESSAGE IS NOT
DISPLAYED.
- ON PANEL 22VU, SELECT MAX FULL COLD ON
FLT COMPT (CABIN) TEMPERATURE SELECTOR
13 (7).
8. CHECK THAT DELIVERED PRESSURE IS 22+/-2 PSI.
9. - ON PANEL 22VU, PRESS P/BSW 8 AND VERIFY
THAT HIGH LEGEND COMES ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
BLUE AIR HIGH FLOW MESSAGE IS DISPLAYED.
*** CONTINUED ***
AH

21-51-00
CHK 10010-002
2-400 PAGE
3
DEC 01/14

21-51-00

CHECK OF PACK VALVE


DELIVERED PRESSURE

CHK 10010-002
4

DEC14

10. CHECK THAT DELIVERED PRESSURE IS 30+/-2


PSI.
11. - ON PANEL 22VU, RELEASE P/BSW 8 AND VERIFY
THAT HIGH LEGEND GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AIR HIGH FLOW MESSAGE DISAPPEARS.
- ON PANEL 22VU, RELEASE PUSHBUTTON
SWITCHES 12 (9) AND 11 (10) AND
VERIFY THAT OFF LEGENDS COME ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEMS 1, 7 AND 9 ARE DISPLAYED.
12. SHUT DOWN ENGINE 1(2).
(SEE JIC 720000-ERU-10030)
13. REMOVE MANOMETER FROM PORT (2).
14. INSTALL NUT (3) AND LOCKWIRE (1).
15. INSTALL INSULATION (4).
004

______________________________
MLG
FAIRING PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: INSTALL ONLY PANEL 191ML.
*****

AH

E N D

O F

T E X T

*****

21-51-00
CHK 10010-002
2-400 PAGE
4
DEC 01/14

21-51-00
5

AH

PORT LOCATION

CHK 10010-002
DEC14

21-51-00
CHK 10010-002

2-400

PAGE
5
DEC 01/14

21-51-00
6

AH

CONTROLS AND INDICATING

CHK 10010-002
DEC14

21-51-00
CHK 10010-002

2-400

PAGE
6
DEC 01/14

21-51-00
7

AH

BLEED AND PACK LEGEND

CHK 10010-002
DEC14

21-51-00
CHK 10010-002

2-400

PAGE
7
DEC 01/14

21-51-00

CHECK OF PACK LEAKAGE

CHK 10020-001
1

DEC14

ZONING DATA
___________
ZONE

: 191

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: MLG FAIRING REMOVAL AND


INSTALLATION

AH

53-95-00-RAI-10000

21-51-00
CHK 10020-001
2-400 PAGE
1
DEC 01/14

CHECK OF PACK LEAKAGE

21-51-00

CHK 10020-001
2

001

DEC14

_________________________
MLG
FAIRING PANEL REMOVAL
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: REMOVE ONLY PANELS 191ML AND 191QL(192QR)

002

_____
CHECK
REF FIG. 215100-CHK-00120
215100-CHK-00112
1. RUN ENGINE 1(2)
(SEE JIC 720000-ERU-10030)
NOTE: FOR SECURITY REASON, CHECK LEFT PACKAGE
LEAKAGE WITH RIGHT ENGINE RUNNING ONLY. CHECK
RIGHT PACK LEAKAGE WITH LEFT ENGINE RUNNING
ONLY.
2. POSITION POWER LEVER BETWEEN F.I. AND 35,
AND CONDITION LEVER ON MAX RPM OR AUTO
FOLLOWING THE A/C CONFIGURATION.
3. ON PANEL 22VU:
- PRESS ENG1(2) BLEED P/BSW 27HA(28HA) (11)
(10) AND VERIFY THAT OFF LEGEND GOES
OFF.
- PRESS SYS2(1) AIR BLEED/PACK VALVE P/BSW
10HB(9HB) (9) (12) AND VERIFY THAT OFF
LEGEND GOES OFF.
- VERIFY THAT OFF LEGEND ON P/BSW 9HB
(10HB) (12) (9) IS ON.
- PRESS TEMP/FLOW COMPT P/BSW 36HB (8) AND
VERIFY THAT HIGH LEGEND COMES ON.
- SELECT MAX FULL COLD ON FLT COMPT
(CABIN) TEMPERATURE SELECTOR 7HH(6HH) (13)
(7).
4. CHECK THAT THERE ARE NO LEAKS AT EACH BELLOW
(2) AND CLAMP (1) POSITION.
*** CONTINUED ***
AH

21-51-00
CHK 10020-001
2-400 PAGE
2
DEC 01/14

21-51-00

CHECK OF PACK LEAKAGE

CHK 10020-001
3

DEC14

5. IN CASE OF DETECTED LEAKAGE REPLACE BELLOW


(2) AND/OR CLAMP(S) (1).
- POSITION CLAMP COLLAR HEADS (3) AS SHOWN
IN SECTION C-C
- TIGHTEN CLAMPS WITH A TORQUE VALUE BETWEEN
0.18 AND 0.2 MDAN (16 AND 17.7 IN.LBF)
- REPEAT THE CHECK AFTER THE REPLACEMENT.
6. ON PANEL 22VU:
- RELEASE P/BSW COMPT SEL FLOW 36HB (8)
AND VERIFY THAT:
HIGH LEGEND GOES OFF.
- RELEASE PUSHBUTTON SWITCHES AIR BLEED
PACK VALVE 9HB(10HB) (12) (9)
AND AIR BLEED ENG1 (2) 27HA(28HA) (11)
(10) AND VERIFY THAT OFF LEGENDS COME ON
7. SHUT DOWN ENGINE (2).
(SEE JIC 720000-ERU-10030)
003

______________________________
MLG
FAIRING PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: INSTALL ONLY PANELS 191ML AND 191QL
(192QR).
*****

AH

E N D

O F

T E X T

*****

21-51-00
CHK 10020-001
2-400 PAGE
3
DEC 01/14

21-51-00
4

AH

CLAMPS AND BELLOWS CHECK

CHK 10020-001
DEC14

21-51-00
CHK 10020-001

2-400

PAGE
4
DEC 01/14

21-51-00
5

AH

CONTROLS AND INDICATING

CHK 10020-001
DEC14

21-51-00
CHK 10020-001

2-400

PAGE
5
DEC 01/14

21-51-00

CHECK OF PACK LEAKAGE

CHK 10020-002
1

DEC14

ZONING DATA
___________
ZONE

: 191

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: MLG FAIRING REMOVAL AND
INSTALLATION

AH

31-63-00-PRO-10000
53-95-00-RAI-10000

21-51-00
CHK 10020-002
2-400 PAGE
1
DEC 01/14

21-51-00

CHECK OF PACK LEAKAGE

CHK 10020-002
2

001

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

_________________________
MLG
FAIRING PANEL REMOVAL
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: REMOVE ONLY PANELS 191ML AND 191QL(192QR)

003

_____
CHECK
REF FIG. 215100-CHK-00120
215100-CHK-00112
361100-OPT-00130
1. RUN ENGINE 2.
(SEE JIC 720000-ERU-10030)
NOTE: FOR SECURITY REASON, CHECK LEFT PACKAGE
LEAKAGE WITH RIGHT ENGINE RUNNING ONLY.
CHECK RIGHT PACK LEAKAGE WITH LEFT
ENGINE RUNNING ONLY.
2. POSITION POWER LEVER BETWEEN F.I. AND 35DEG,
AND CONDITION LEVER ON MAX RPM OR AUTO
FOLLOWING THE A/C CONFIGURATION.
3. - ON PANEL 22VU, PRESS ENG1(2) BLEED P/BSW
11 (10) AND VERIFY THAT OFF LEGEND GOES
OFF.
*** CONTINUED ***
AH

21-51-00
CHK 10020-002
2-400 PAGE
2
DEC 01/14

CHECK OF PACK LEAKAGE

21-51-00

CHK 10020-002
3

DEC14

- ON MFD UPPER WINDOW, IN CABIN SD PAGE,


ITEM 3 IS DISPLAYED.
- ON PANEL 22VU, PRESS SYS2(1) AIR BLEED/
PACK VALVE P/BSW 9 (12) AND VERIFY THAT
OFF LEGEND GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 11 IS DISPLAYED.
- ON PANEL 22VU, VERIFY THAT OFF LEGEND
ON P/BSW 9 (12) IS ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 9 IS DISPLAYED.
- ON PANEL 22VU, PRESS TEMP/FLOWOMPT P/BSW
8 AND VERIFY THAT HIGH LEGEND COMES ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
BLUE AIR HIGH FLOW MESSAGE IS DISPLAYED.
- ON PANEL 22VU, SELECT MAX FULL COLD ON
FLT COMPT (CABIN) TEMPERATURE SELECTOR 13
(7).
4. CHECK THAT THERE ARE NO LEAKS AT EACH BELLOW
(2) AND CLAMP (1) POSITION.
5. IN CASE OF DETECTED LEAKAGE REPLACE BELLOW
(2) AND/OR CLAMP(S) (1).
- POSITION CLAMP COLLAR HEADS (3) AS SHOWN
IN SECTION C-C
- TIGHTEN CLAMPS WITH A TORQUE VALUE BETWEEN
0.18 AND 0.2 MDAN (16 AND 17.7 IN.LBF)
- REPEAT THE CHECK AFTER THE REPLACEMENT.
6. - ON PANEL 22VU, RELEASE P/BSW (8) AND
VERIFY THAT HIGH LEGEND GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
AIR HIGH FLOW MESSAGE DISAPPEARS.
- ON PANEL 22VU, RELEASE PUSHBUTTON
SWITCHES 9 (12) AND 11 (10) AND VERIFY
THAT OFF LEGENDS COME ON.
- ON MFD UPPER WINDOW, IN CABIN SD PAGE,
ITEM 1, ITEM 7 AND ITEM 9 ARE DISPLAYED.
7. SHUT DOWN ENGINE (2).
*** CONTINUED ***
AH

21-51-00
CHK 10020-002
2-400 PAGE
3
DEC 01/14

21-51-00

CHECK OF PACK LEAKAGE

CHK 10020-002
4

004

DEC14

______________________________
MLG
FAIRING PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
539500-RAI-10000
NOTE: INSTALL ONLY PANELS 191ML AND 191QL
(192QR).
*****

AH

E N D

O F

T E X T

*****

21-51-00
CHK 10020-002
2-400 PAGE
4
DEC 01/14

21-51-00
5

AH

CLAMPS AND BELLOWS CHECK

CHK 10020-002
DEC14

21-51-00
CHK 10020-002

2-400

PAGE
5
DEC 01/14

21-51-00
6

AH

CONTROLS AND INDICATING

CHK 10020-002
DEC14

21-51-00
CHK 10020-002

2-400

PAGE
6
DEC 01/14

21-51-00
7

AH

BLEED AND PACK LEGEND

CHK 10020-002
DEC14

21-51-00
CHK 10020-002

2-400

PAGE
7
DEC 01/14

21-51-51

INSPECTION AND CLEANING


OF HEAT EXCHANGER

CHK 10000-001
1

MAR13

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 191RL 191TL 191UL 192QR 192RR 192TR 192UR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-51-51
CHK 10000-001
2-400 PAGE
1
MAR 01/13

21-51-51

INSPECTION AND CLEANING


OF HEAT EXCHANGER

001

CHK 10000-001
2

MAR13

___________
PREPARATION
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING PACK.
1. REMOVE ACCESS DOOR 191RL(192RR);191QL(192QR)
191TL(192TR); 191UL(192UR)

002

_________________________________________
INSPECTION
AND CLEANING OF HEAT EXCHANGER
REF. FIG. 215151-CHK-00100
1. PLACE A PORTABLE TORCH LIGHT IN RAM AIR
OUTLET (2).
2. OPEN THE FLAPS OF RAM AIR CHECK VALVE (1)
AND LOOKING THROUGH RAM AIR INLET (4), MAKE
CERTAIN THAT NO FOREIGN OBJECT OR TRASH IS
PRESENT IN THE VANES OF HEAT EXCHANGER (3).
3. PERFORM CLEANING. FOR THIS REMOVE HEAT
EXCHANGER AS PER JIC 215151-RAI-10000
AND REFER TO ALLIED SIGNAL CMM 215102

003

________
CLOSE
UP
1. INSTALL ACCESS DOOR PREVIOUSLY REMOVED.
2. REMOVE WARNING NOTICE.
*****

AH

E N D

O F

T E X T

*****

21-51-51
CHK 10000-001
2-400 PAGE
2
MAR 01/13

21-51-51
3

AH

INSPECTION OF HEAT
EXCHANGER

CHK 10000-001
MAR13

21-51-51
CHK 10000-001

2-400

PAGE
3
MAR 01/13

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

RAI 10000-001
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 191RL 191TL 191UL 192QR 192RR 192TR 192UR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 HEAT EXCHANGER

215150-70A-320

: THERMAL SWITCH REMOVAL


AND INSTALLATION
: RAM AIR CHECK VALVE
REMOVAL AND INSTALLATION
: GROUND COOLING TURBOFAN
CHECK VALVE REMOVAL
AND INSTALLATION
GROUND COOLING TURBOFAN
CHECK VALVE REMOVAL AND
INSTALLATION
: CHECK OF PACK LEAKAGE

21-51-53-RAI-10000

PUBLICATION
___________
JIC
JIC
JIC

JIC

AH

21-51-59-RAI-10000
21-51-93-RAI-10000

21-51-00-CHK-10020

21-51-51
RAI 10000-001
2-400 PAGE
1
MAR 01/11

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

001

RAI 10000-001
2

MAR11

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 3HB(4HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK & RECIRC FAN CAUTION
2. REMOVE ACCESS PANELS 191RL(192RR); 191QL
(192QR); 191TL(192TR); 191UL(192UR).

002

______________________
THERMAL
SWITCH REMOVAL
SEE JOB INSTRUCTION CARD
215153-RAI-10000

003

___________________________
RAM
AIR CHECK VALVE REMOVAL
SEE JOB INSTRUCTION CARD
215159-RAI-10000

004

REMOVAL OF GROUND COOLING TURBOFAN


__________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
215193-RAI-10000

005

REMOVAL OF HEAT EXCHANGERS INLET AND OUTLET


___________________________________________
DUCT ASSY
_________
REF. FIG. 215151-RAI-00100
1. HEAT EXCHANGERS INLET DUCT REMOVAL.
A. DISCONNECT FLEXIBLE PIPE END (11) FROM
WATER SPRAY NOZZLE ON INLET DUCT.
*** CONTINUED ***
AH

21-51-51
RAI 10000-001
2-400 PAGE
2
MAR 01/11

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

RAI 10000-001
3

MAR11

B. REMOVE BOLTS (1), WASHERS (2) AND NUTS


(3).
C. REMOVE PLATE SUPPORTS (4), (5) AND (6).
D. REMOVE INLET DUCT (7).
E. REMOVE GASKET (8), REPLACE IF NECESSARY.
2. HEAT EXCHANGERS OUTLET DUCT REMOVAL.
A. REMOVE BOLTS (1), WASHERS (2) AND NUTS
(3).
B. REMOVE PLATE SUPPORTS (4), (5) AND (6).
C. REMOVE OUTLET DUCT ASSY (9).
D. REMOVE GASKET (10), REPLACE IF NECESSARY.
006

______________________
HEAT
EXCHANGER REMOVAL
REF. FIG. 215151-RAI-00110
1. REMOVE CLAMPS (7) AND (9) AND REMOVE SLEEVE
(8).
2. REMOVE CLAMP (18) (DETAIL B).
3. REMOVE CLAMP (19) AND DISCONNECT FLEXIBLE
PIPE (20) (DETAIL C).
4. REMOVE CLAMPS (15) AND (17) AND SLEEVE (16).
5. REMOVE CLAMPS (1) AND (3) AND SLEEVE (2).
6. REMOVE CLAMP (13).
7. UNSCREW NUTS (4) AND (10), REMOVE BOLTS (5).

*** CONTINUED ***


AH

21-51-51
RAI 10000-001
2-400 PAGE
3
MAR 01/11

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

007

RAI 10000-001
4

MAR11

___________________________
HEAT
EXCHANGER INSTALLATION
REF. FIG. 215151-RAI-00110
WARNING: DO NOT USE ANY TYPE OF GREASE DURING
INSTALLATION OF SLEEVES.
NOTE: INSTALLATION OF SLEEVES CAN BE IMPROVED
BY MEANS OF DISTILLED WATER.
1. POSITION HEAT EXCHANGER (14) BETWEEN ITS
SUPPORT AND INSTALL BOLTS (5) AND (11),
WASHERS (6) AND (12); SCREW NUTS (4) AND
(10).
2. INSTALL CLAMP (13).
3. INSTALL SLEEVE (2), CLAMPS (1) AND (3).
4. INSTALL SLEEVE (16), CLAMPS (15) AND (17).
5. INSTALL CLAMP (18) (DETAIL B).
6. INSTALL SLEEVE (8), CLAMPS (7) AND (9).
7. CONNECT FLEXIBLE PIPE (20), INSTALL AND
TIGHTEN CLAMP (19) (DETAIL C).
8. TIGHTEN CLAMPS (1),(3),(7),(9),(13),(15),
(17) TO 0.18-0.20 M.DAN (16-18 LBF.IN).

008

INSTALLATION OF HEAT EXCHANGERS INLET AND


_________________________________________
OUTLET DUCT ASSY
________________
REF. FIG. 215151-RAI-00100
1. HEAT EXCHANGERS OUTLET DUCT INSTALLATION.
A. INSTALL GASKET (10) ON HEAT EXCHANGERS
REAR FACE.
*** CONTINUED ***
AH

21-51-51
RAI 10000-001
2-400 PAGE
4
MAR 01/11

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

RAI 10000-001
5

MAR11

B. PLACE OUTLET DUCT (9) IN CONTACT WITH


HEAT EXCHANGERS REAR FACE AND CHECK
GASKET FOR PROPER ALIGNMENT.
C. FIT BOLTS (1), WASHERS (2) AND NUTS (3)
WITH PLATE SUPPORTS (4), (5) AND (6).
2. HEAT EXCHANGERS INLET DUCT INSTALLATION.
A. INSTALL GASKET (8) ON HEAT EXCHANGERS
FRONT FACE.
B. PLACE INLET DUCT (7) IN CONTACT WITH
HEAT EXCHANGERS FRONT FACE AND CHECK
GASKET FOR PROPER ALIGNMENT.
C. POSITION FLEXIBLE PIPE (12) AND RELEVANT
CLAMP (13).
D. FIT BOLTS (1), WASHERS (2) AND NUTS (3)
WITH PLATE SUPPORTS (4), (5) AND (6).
E. CONNECT FLEXIBLE PIPE END (11) TO WATER
SPRAY NOZZLE ON INLET DUCT.
009

INSTALLATION OF GROUND COOLING TURBOFAN


_______________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
215193-RAI-10000

010

________________________________
RAM
AIR CHECK VALVE INSTALLATION
SEE JOB INSTRUCTION CARD
215159-RAI-10000

011

___________________________
THERMAL
SWITCH INSTALLATION
SEE JOB INSTRUCTION CARD
215153-RAI-10000
*** CONTINUED ***
AH

21-51-51
RAI 10000-001
2-400 PAGE
5
MAR 01/11

21-51-51

HEAT EXCHANGER REMOVAL


AND INSTALLATION

012

RAI 10000-001
6

MAR11

________
CLOSE
UP
1. INSTALL THE PREVIOUSLY REMOVED ACCESS PANELS
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 3HB(4HB)
3. REMOVE WARNING NOTICE.

013

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*****

AH

E N D

O F

T E X T

*****

21-51-51
RAI 10000-001
2-400 PAGE
6
MAR 01/11

21-51-51
7

AH

HEAT EXCHANGER INLET AND


OUTLET DUCTS
REMOVAL AND INSTALLATION

RAI 10000-001
MAR11

21-51-51
RAI 10000-001

2-400

PAGE
7
MAR 01/11

21-51-51
8

AH

HEAT EXCHANGER REMOVAL


AND INSTALLATION

RAI 10000-001
MAR11

21-51-51
RAI 10000-001

2-400

PAGE
8
MAR 01/11

21-51-52

AIR CYCLE MACHINE


REMOVAL AND INSTALLATION

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191RL 192RR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 AIR CYCLE MACHINE

215150

: CHECK FOR FREE AIR FLOW


THROUGH THE WATER SPRAY
NOZZLE
: OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE
: CHECK OF PACK LEAKAGE

21-51-91-CHK-10000

PUBLICATION
___________
JIC
JIC
JIC

AH

21-51-98-OPT-10000
21-51-00-CHK-10020

21-51-52
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-51-52

AIR CYCLE MACHINE


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

DEC14

___________
PREPARATION
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM
AND OPERATION OF AIR CONDITIONING
PACK.
1. REMOVE ACCESS PANEL 191RL(192RR).

002

_______
REMOVAL
REF. FIG. 215152-RAI-00100
1. REMOVE CLAMPS (1) AND (3) AND SLEEVE (2).
2. REMOVE CLAMPS (4) AND (6) AND SLEEVE (5).
3. REMOVE CLAMPS (7) AND (8) AND SLEEVE (9).
4. REMOVE CLAMP (24) AND DISCONNECT FLEXIBLE
PIPE (25).
5. UNSCREW NUTS (18), REMOVE WASHERS (17) AND
BOLTS (16).
6. UNSCREW NUTS (21), REMOVE WASHERS (20) AND
BOLTS (19).
7. REMOVE AIR CYCLE MACHINE (22).
8. REMOVE GASKET (23) AND DISCARD IT IF
NECESSARY.
9. CAP OPEN ENDS OF AIR CYCLE MACHINE.

003

_________________________________
INSTALLATION
OF AIR CYCLE MACHINE
REF. FIG. 215152-RAI-00100
WARNING: DO NOT USE ANY TYPE OF GREASE DURING
INSTALLATION OF SLEEVES.
*** CONTINUED ***
AH

21-51-52
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-51-52

AIR CYCLE MACHINE


REMOVAL AND INSTALLATION

RAI 10000-001
3

DEC14

NOTE: INSTALLATION OF SLEEVES CAN BE IMPROVED


BY MEANS OF DISTILLED WATER.
1. REMOVE CUP OPEN ENDS FROM AIR CYCLE MACHINE.
2. POSITION AIR CYCLE MACHINE (22) BETWEEN HEAT
EXCHANGER AND CONDENSER. INSTALL GASKET(23).
3. INSTALL BOLTS (19), WASHERS (20) AND NUTS
(21) TO FIX THE UNIT TO ITS SUPPORT.
4. INSTALL BOLTS (16), WASHERS (17) AND NUTS
(18).
5. CONNECT FLEXIBLE PIPE (25), INSTALL AND
TIGHTEN CLAMP (24).
6. INSTALL SLEEVE (9) AND CLAMPS (7) AND (8).
7. INSTALL SLEEVE (5) AND CLAMPS (4) AND (6).
8. INSTALL SLEEVE (2) AND CLAMPS (1) AND (3).
9. TIGHTEN CLAMPS (1), (3), (4), (6), (7), (8).
REFER TO SUPPLIER CMM FOR TORQUE VALUE.
004

CHECK FOR FREE AIR FLOW THROUGH THE WATER


_________________________________________
SPRAY NOZZLE
____________
SEE JOB INSTRUCTION CARD
215191-CHK-10000

005

_______________________________________________
OPERATIONAL
TEST OF TURBINE INLET CONTROL VALVE
SEE JOB INSTRUCTION CARD
215198-OPT-10000

006

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*** CONTINUED ***
AH

21-51-52
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-51-52

AIR CYCLE MACHINE


REMOVAL AND INSTALLATION

007

RAI 10000-001
4

DEC14

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191RL(192RR).
2. REMOVE WARNING NOTICE.
*****

AH

E N D

O F

T E X T

*****

21-51-52
RAI 10000-001
2-400 PAGE
4
DEC 01/14

21-51-52
5

AH

AIR CYCLE MACHINE


REMOVAL AND INSTALLATION

RAI 10000-001
DEC14

21-51-52
RAI 10000-001

2-400

PAGE
5
DEC 01/14

21-51-53

PACK OVERTEMPERATURE
SWITCH FUNCTIONAL TEST

FUT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 191
210

192

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

GSE

: 01 HOT OIL BATH


01 HOT AIR STREAM
01 ELECTRICAL EXTENSION

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: THERMAL SWITCH REMOVAL


AND INSTALLATION
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY

AH

21-51-53-RAI-10000
24-46-00-EAD-10000

21-51-53
FUT 10000-001
2-400 PAGE
1
DEC 01/14

21-51-53

PACK OVERTEMPERATURE
SWITCH FUNCTIONAL TEST

001

FUT 10000-001
2

DEC14

______________________
THERMAL
SWITCH REMOVAL
SEE JOB INSTRUCTION CARD
215153-RAI-10000

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

_______________
FUNCTIONAL
TEST
REF. FIG. 215153-FUT-00100
1. CONNECT ELECTRICAL EXTENTION BETWEEN
CONNECTOR AND THERMAL SWITCH.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 3HB(4HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK & RECIRC FAN CAUTION
3. ON PANEL 22VU PRESS PACK VALVE 1(2) P/BSW
9HB(10HB) AND VERIFY THAT OFF LEGEND GOES
OFF.
4. USE A HOT OIL BATH OR A HOT AIR STREAM,
PROVIDED WITH THERMOMETER, TO INCREASE THE
TEMPERATURE OF THERMAL SWITCH UNTIL 204C.
5. AFTER 2 SEC VERIFY THAT:
- ON PANEL 702VU
MFC/BITE LOADED MAGNETIC INDICATOR 10UA IS
ENERGIZED
6. REMOVE HOT SOURCE.
7. REMOVE ELECTRICAL EXTENTION BETWEEN
CONNECTOR AND THERMAL SWITCH.
*** CONTINUED ***
AH

21-51-53
FUT 10000-001
2-400 PAGE
2
DEC 01/14

21-51-53

PACK OVERTEMPERATURE
SWITCH FUNCTIONAL TEST

FUT 10000-001
3

DEC14

8. OPEN SAFETY CLIP AND TAG THE FOLLOWING


CIRCUIT BREAKER:
ON PANEL 121VU
- 3HB(4HB)
NOTE: AFTER THERMAL SWITCH INSTALLATION CLEAR
MFC BITE MEMORY.
004

___________________________
THERMAL
SWITCH INSTALLATION
SEE JOB INSTRUCTION CARD
215153-RAI-10000

005

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-51-53
FUT 10000-001
2-400 PAGE
3
DEC 01/14

21-51-53
4

AH

PACK OVERTEMPERATURE
SWITCH FUNCTIONAL TEST

FUT 10000-001
DEC14

21-51-53
FUT 10000-001

2-400

PAGE
4
DEC 01/14

21-51-53

THERMAL SWITCH
REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191UL 192UR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 THERMAL SWITCH

AH

___
MEN

_________
MAN-HOURS

215150

21-51-53
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-51-53

THERMAL SWITCH
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 3HB(4HB) AIR BLEED/COMPT TEMP/SYS 1(2)/
PACK & RECIRC FAN CAUTION.
2. REMOVE ACCESS PANEL 191UL (192UR).

002

_______
REMOVAL
REF. FIG. 215153-RAI-00100
1. REMOVE LOCKWIRE.
2. DISCONNECT ELECTRICAL CONNECTOR (1).
3. REMOVE THERMAL SWITCH (2) FROM DUCT (3).

003

____________
INSTALLATION
REF. FIG. 215153-RAI-00100
1. INSTALL THERMAL SWITCH (2) ON DUCT (3),
USING SUPPLIER CMMV INSTRUCTIONS.
2. INSTALL LOCKWIRE.
3. CONNECT ELECTRICAL CONNECTOR (1).

004

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191UL (192UR).
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
*** CONTINUED ***
AH

21-51-53
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-51-53

THERMAL SWITCH
REMOVAL AND INSTALLATION

RAI 10000-001
3

MAR14

FOLLOWING CIRCUIT BREAKER:


ON PANEL 121VU
- 3HB(4HB)
3. REMOVE WARNING NOTICE FROM FLIGHT
COMPARTMENT.
4. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-51-53
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-51-53
4

AH

THERMAL SWITCH REMOVAL


AND INSTALLATION

RAI 10000-001
MAR14

21-51-53
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-51-55

CONDENSER REMOVAL AND


INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191RL 192RR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 CONDENSER

215150-70-230

: CHECK OF PACK LEAKAGE

21-51-00-CHK-10020

PUBLICATION
___________
JIC

AH

21-51-55
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-51-55

CONDENSER REMOVAL AND


INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
1. REMOVE ACCESS PANEL 191RL(192RR).

002

_______
REMOVAL
REF. FIG. 215155-RAI-00100
1. REMOVE CLAMPS (1) AND (3) AND SLEEVE (2).
2. REMOVE CLAMPS (8) AND (10) AND SLEEVE (9).
3. REMOVE CLAMPS (15) AND (17) AND SLEEVE (16).
4. REMOVE CLAMPS (19) FROM SLEEVE (18).
5. UNSCREW NUTS (4) AND REMOVE WASHERS (5) AND
BOLTS (6).
6. HOLD CONDENSER (11), UNSCREW NUTS (12) AND
REMOVE WASHERS (13) AND BOLTS (14).
7. REMOVE CONDENSER (11) AND GASKET (7).
REPLACE GASKET IF NECESSARY.

003

____________
INSTALLATION
REF. FIG. 215155-RAI-00100
WARNING: DO NOT USE ANY TYPE OF GREASE DURING
INSTALLATION OF SLEEVES.
NOTE: INSTALLATION OF SLEEVES CAN BE IMPROVED
BY MEANS OF DISTILLED WATER.
1. POSITION GASKET (7) AND CONNECT CONDENSER
*** CONTINUED ***
AH

21-51-55
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-51-55

CONDENSER REMOVAL AND


INSTALLATION

RAI 10000-001
3

APR05

(11) TO ITS SUPPORT BY MEANS OF BOLTS (14),


WASHERS (13) AND SCREW NUTS (12).
2. CONNECT CONDENSER (11) TO AIR CYCLE MACHINE
BY MEANS OF BOLTS (6), WASHERS (5) AND NUTS
(4).
3. POSITION SLEEVE (18) AND INSTALL CLAMP (19).
4. INSTALL SLEEVE (16) AND CLAMPS (15) AND (17)
5. INSTALL SLEEVE (9) AND CLAMPS (8) AND (10).
6. INSTALL SLEEVE (2) AND CLAMPS (1) AND (3).
7. TIGHTEN CLAMPS (1), (3), (8), (10),(15),(17)
AND (19) TO 0.18-0.20 DAN.M (16-18 LBF.IN).
004

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191RL(192RR).
2. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.

005

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*****

AH

E N D

O F

T E X T

*****

21-51-55
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-51-55
4

AH

CONDENSER REMOVAL AND


INSTALLATION

RAI 10000-001
APR05

21-51-55
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-51-56

WATER EXTRACTOR REMOVAL


AND INSTALLATION

RAI 10000-001
1

MAR09

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 WATER EXTRACTOR

215150-70-130

: CHECK OF PACK LEAKAGE

21-51-00-CHK-10020

PUBLICATION
___________
JIC

AH

21-51-56
RAI 10000-001
2-400 PAGE
1
MAR 01/09

21-51-56

WATER EXTRACTOR REMOVAL


AND INSTALLATION

001

RAI 10000-001
2

MAR09

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. REMOVE ACCESS PANEL 191QL (192QR).

002

_______
REMOVAL
REF. FIG. 215156-RAI-00100
1. REMOVE CLAMP (6) AND DISCONNECT FLEXIBLE
PIPE (5).
2. REMOVE CLAMPS (1) AND (3).
3. DISCONNECT WATER EXTRACTOR (7) FROM SLEEVES
(2) AND (4) AND REMOVE IT.

003

____________
INSTALLATION
REF. FIG. 215156-RAI-00100
WARNING: DO NOT USE ANY TYPE OF GREASE DURING
INSTALLATION OF SLEEVES.
NOTE: INSTALLATION OF SLEEVES CAN BE IMPROVED
BY MEANS OF DISTILLED WATER.
1. CONNECT WATER EXTRACTOR (7) TO SLEEVES (2)
AND (4).
2. INSTALL CLAMPS (1) AND (3).
3. CONNECT FLEXIBLE PIPE (5) TO WATER
EXTRACTOR, AND INSTALL CLAMP (6).
4. TIGHTEN CLAMPS (1) AND (3) TO 0.18-0.20
DAN.M (16-18 LBF.IN).
*** CONTINUED ***
AH

21-51-56
RAI 10000-001
2-400 PAGE
2
MAR 01/09

21-51-56

WATER EXTRACTOR REMOVAL


AND INSTALLATION

004

RAI 10000-001
3

MAR09

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL ACCESS PANELS PREVIOUSLY REMOVED.
3. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.

005

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*****

AH

E N D

O F

T E X T

*****

21-51-56
RAI 10000-001
2-400 PAGE
3
MAR 01/09

21-51-56
4

AH

WATER EXTRACTOR
REMOVAL AND INSTALLATION

RAI 10000-001
MAR09

21-51-56
RAI 10000-001

2-400

PAGE
4
MAR 01/09

21-51-58

GROUND COOLING TURBOFAN


REMOVAL AND INSTALLATION

RAI 10010-001
1

APR08

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TURBOFAN

215150-010A-160

EXPENDABLE

: 01 O-RING LH
01 O-RING RH

215150-060-090
215150-065-100

: CHECK OF PACK LEAKAGE

21-51-00-CHK-10020

PUBLICATION
___________
JIC

AH

21-51-58
RAI 10010-001
2-400 PAGE
1
APR 01/08

21-51-58

GROUND COOLING TURBOFAN


REMOVAL AND INSTALLATION

001

RAI 10010-001
2

APR08

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 5HB(6HB) AIR BLEED/COMPT TEMP/SYS1(2)/
TURBOFAN
2. DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
3. REMOVE ACCESS PANEL 191QL(192QR).

002

_______
REMOVAL
REF. FIG. 215158-RAI-00110
1. REMOVE CLAMPS (2) (7) AND DISCONNECT DUCTS
(1) (6).
2. REMOVE CLAMPS (9) AND DISCONNECT HOSE (8).
NOTE: STEPS 3 AND 4 CONCERN LH SIDE TURBOFAN;
STEP 5 CONCERNS RH SIDE TURBOFAN
(DETAIL C).
3. REMOVE CLAMPS (13) AND DISCONNECT BELLOWS
(14).
4. UNSCREW STRAIGHT CONNECTOR (12) AND DISCARD
O-RING (11).
5. UNSCREW NUT (16), RECOVER RETAINER (17),
DISCARD O-RING (18) AND DISCONNECT ELBOW
CONNECTOR (15).
6. UNSCREW BOLTS (3) AND RECOVER WASHERS (4).
7. REMOVE TURBOFAN (10).
*** CONTINUED ***
AH

21-51-58
RAI 10010-001
2-400 PAGE
2
APR 01/08

21-51-58

GROUND COOLING TURBOFAN


REMOVAL AND INSTALLATION

003

RAI 10010-001
3

APR08

____________
INSTALLATION
REF. FIG. 215158-RAI-00110
1. POSITION TURBOFAN (10) BETWEEN ITS SUPPORTS
(5).
2. INSTALL BOLTS (3) WITH WASHERS (4).
NOTE: STEPS 3, 4 AND 5 CONCERN LH SIDE TURBOFAN
STEPS 6 AND 7 CONCERN RH SIDE TURBOFAN
(DETAIL C).
APPLY ON THE THREAD CONNECTOR (12) A
SLIGHT LAYER OF ANTISIZE GREASE.
(SEE 20-31-00 MAT. 04-003)
3. INSTALL STRAIGHT CONNECTOR (12) WITH NEW
O-RING (11).
4. CONNECT BELLOWS (14) TO CONNECTOR (12).
5. INSTALL CLAMPS (13).
6. POSITION ELBOW CONNECTOR (15), O-RING (18)
AND RETAINER (17).
7. SCREW NUT (16).
8. CONNECT HOSE (8) AND INSTALL CLAMPS (9).
9. CONNECT DUCTS (6) (1) AND INSTALL CLAMP (7)
(2).

004

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191QL(192QR).
2. IN FLIGHT COMPARTMENT REMOVE WARNING NOTICE.
3. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
*** CONTINUED ***
AH

21-51-58
RAI 10010-001
2-400 PAGE
3
APR 01/08

21-51-58

GROUND COOLING TURBOFAN


REMOVAL AND INSTALLATION

RAI 10010-001
4

APR08

ON PANEL 121VU
- 5HB(6HB)
005

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*****

AH

E N D

O F

T E X T

*****

21-51-58
RAI 10010-001
2-400 PAGE
4
APR 01/08

21-51-58
5

AH

GROUND COOLING TURBOFAN


REMOVAL AND INSTALLATION

RAI 10010-001
APR08

21-51-58
RAI 10010-001

2-400

PAGE
5
APR 01/08

21-51-59

RAM AIR CHECK VALVE


OPERATIONAL CHECK

CHK 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191JL

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

BULK MATERIAL : CLEANING PRODUCT WD 40

AH

21-51-59
CHK 10000-001
2-400 PAGE
1
APR 01/05

21-51-59

RAM AIR CHECK VALVE


OPERATIONAL CHECK

001

CHK 10000-001
2

APR05

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. REMOVE ACCESS PANEL 191JL.

002

_____
CHECK
REF. FIG. 215159-CHK-00100
1. OPERATE MANUALLY VALVE FLAPS AND CHECK THAT
THEY MOVE FREELY AND CORRECTLY THROUGH
TRAVEL RANGE AND SEAT.
2. CHECK VALVE FLAPS AND THEIR SEATS FOR
GENERAL CONDITION.
3. HOLDING EACH FLAP OPEN, CHECK TENSION SPRING
AND HINGE PIN FOR ABSENCE OF CORROSION.
4. IF THE VALVE DOES NOT OPERATE CORRECTLY DUE
TO DUST AND DIRT, REMOVE (REF. JIC 215159RAI-10000) AND CLEAN IT WITH WD40 PRODUCT.

003

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191JL.
2. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****

AH

E N D

O F

T E X T

*****

21-51-59
CHK 10000-001
2-400 PAGE
2
APR 01/05

21-51-59
3

AH

RAM AIR CHECK VALVE


LOCATION

CHK 10000-001
APR05

21-51-59
CHK 10000-001

2-400

PAGE
3
APR 01/05

21-51-59

RAM AIR CHECK VALVE


REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CHECK VALVE

AH

___
MEN

_________
MAN-HOURS

215150-015B-150

21-51-59
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-51-59

RAM AIR CHECK VALVE


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. REMOVE ACCESS PANEL 191QL (192QR).

002

_______
REMOVAL
REF. FIG. 215159-RAI-00100
1. REMOVE CLAMPS (5) AND (3).
2. REMOVE DUCT (4).
3. REMOVE CHECK VALVE (1).
4. CAP OPEN END OF RAM AIR INLET (2).

003

____________
INSTALLATION
REF. FIG. 215159-RAI-00100
1. REMOVE PROTECTIVE CAP FROM RAM AIR INLET (2)
2. INSTALL CHECK VALVE (1) ON RAM AIR INLET (2)
WITH CHECK VALVE HINGE PIN IN VERTICAL
POSITION.
3. POSITION DUCT (4).
4. INSTALL CLAMP (3) AT TORQUE VALUE BETWEEN
77 AND 94 LBF.IN (0.8 AND 1 DAN.M).
5. INSTALL CLAMP (5).

*** CONTINUED ***


AH

21-51-59
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-51-59

RAM AIR CHECK VALVE


REMOVAL AND INSTALLATION

004

RAI 10000-001
3

MAR14

________
CLOSE
UP
1. INSTALL ACCESS PANEL 191QL (192QR).
2. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-51-59
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-51-59
4

AH

RAM AIR CHECK VALVE


REMOVAL AND INSTALLATION

RAI 10000-001
MAR14

21-51-59
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-51-91

CHECK FOR FREE AIR FLOW


THROUGH THE WATER SPRAY
NOZZLE

CHK 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

GSE

: 01 NITROGEN BOTTLE

AH

___
MEN

_________
MAN-HOURS

21-51-91
CHK 10000-001
2-400 PAGE
1
MAR 01/14

21-51-91

CHECK FOR FREE AIR FLOW


THROUGH THE WATER SPRAY
NOZZLE

001

CHK 10000-001
2

MAR14

_______
WARNING
IN FLIGHT COMPARTMENT DISPLAY WARNING NOTICES
PROHIBITING PRESSURIZATION OF PNEUMATIC SYSTEM
AND OPERATION OF AIR CONDITIONING SYSTEM.

002

___________
PREPARATION
1. OPEN ACCESS DOOR 191QL (192QR).

003

_________________________
CHECK
OF WATER SPRAY DUCT
REF. FIG. 215100-CHK-00100
1. DISCONNECT WATER SPRAY DUCT FROM WATER
SEPARATOR (1) AND SPRAY NOZZLE.
2. BLOW COMPRESSED AIR IN THE DUCT TO ENSURE
FREE AIR FLOW THROUGH DUCT.
3. VERIFY, WITH THE HELP OF A NEEDLE HAVING
DIA 1 MM, THAT THE SPRAY NOZZLE IS FREE TO
OPERATE.
4. CONNECT DUCT TO SPRAY NOZZLE AND VERIFY FREE
AIR FLOW.
5. RECONNECT WATER SPRAY DUCT TO WATER
EXTRACTOR.

004

________
CLOSE
UP
1. CLOSE ACCESS DOOR 191QL (192QR).
2. REMOVE WARNING NOTICES.
*****

AH

E N D

O F

T E X T

*****

21-51-91
CHK 10000-001
2-400 PAGE
2
MAR 01/14

21-51-91
3

AH

WATER SPRAY DUCT


LOCATION

CHK 10000-001
MAR14

21-51-91
CHK 10000-001

2-400

PAGE
3
MAR 01/14

21-51-91

WATER SPRAY NOZZLE


REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 WATER SPRAY NOZZLE

215150-15B-140

EXPENDABLE

: 01 WASHER
01 PACKING

215150-15B-130
215150-020-020

AH

___
MEN

_________
MAN-HOURS

21-51-91
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-51-91

WATER SPRAY NOZZLE


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. REMOVE ACCESS DOOR 191QL (192QR).

002

_______
REMOVAL
REF. FIG. 215191-RAI-00100
1. DISCONNECT FLEXIBLE PIPE (1) FROM WATER
SPRAY NOZZLE (4).
2. DISCARD PACKING (2).
3. REMOVE WATER SPRAY NOZZLE (4) AND WASHER
(5).
4. DISCARD WASHER (5).

003

____________
INSTALLATION
REF. FIG. 215191-RAI-00100
WARNING: DO NOT USE ANY TYPE OF GREASE DURING
INSTALLATION OF FLEXIBLE PIPES.
NOTE: INSTALLATION OF FLEXIBLE PIPES CAN BE
IMPROVED BY MEANS OF DISTILLED WATER.
1. INSTALL WATER SPRAY NOZZLE (4), WASHER (5)
ON AIR INTAKE (3).
2. INSTALL PACKING (2).
3. CONNECT FLEXIBLE PIPE (1) TO WATER SPRAY
NOZZLE (4).
*** CONTINUED ***
AH

21-51-91
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-51-91

WATER SPRAY NOZZLE


REMOVAL AND INSTALLATION

004

RAI 10000-001
3

APR05

________
CLOSE
UP
1. INSTALL ACCESS DOOR 191QL (192QR).
2. REMOVE WARNING NOTICE FROM FLIGHT
COMPARTMENT.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-51-91
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-51-91
4

AH

WATER SPRAY NOZZLE


REMOVAL AND INSTALLATION

RAI 10000-001
APR05

21-51-91
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-51-93

CHECK OF GROUND COOLING


TURBOFAN CHECK VALVE

CHK 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: GROUND COOLING TURBOFAN


CHECK VALVE REMOVAL
AND INSTALLATION
GROUND COOLING TURBOFAN
CHECK VALVE REMOVAL AND
INSTALLATION

AH

21-51-93-RAI-10000

21-51-93
CHK 10000-001
2-400 PAGE
1
DEC 01/14

21-51-93

CHECK OF GROUND COOLING


TURBOFAN CHECK VALVE

001

CHK 10000-001
2

DEC14

REMOVAL OF GROUND COOLING TURBOFAN


__________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
215193-RAI-10000

002

_____
CHECK
1. OPERATE MANUALLY VALVE FLAPS AND CHECK THAT
THEY MOVE FREELY AND CORRECTLY THROUGH
TRAVEL RANGE AND SEAT.
2. CHECK VALVE FLAPS AND THEIR SEATS FOR
GENERAL CONDITION.
3. HOLDING EACH FLAP OPEN, CHECK TENSION SPRING
AND HINGE PIN FOR ABSENCE OF CORROSION.

003

INSTALLATION OF GROUND COOLING TURBOFAN


_______________________________________
CHECK VALVE
___________
SEE JOB INSTRUCTION CARD
215193-RAI-10000
*****

AH

E N D

O F

T E X T

*****

21-51-93
CHK 10000-001
2-400 PAGE
2
DEC 01/14

21-51-93
3

AH

GROUND COOLING TURBOFAN


CHECK VALVE REMOVAL AND
INSTALLATION

CHK 10000-001
DEC14

21-51-93
CHK 10000-001

2-400

PAGE
3
DEC 01/14

21-51-93

GROUND COOLING TURBOFAN


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 191
192
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CHECK VALVE

AH

___
MEN

_________
MAN-HOURS

215150-010-200

21-51-93
RAI 10000-002
2-400 PAGE
1
DEC 01/14

21-51-93

GROUND COOLING TURBOFAN


CHECK VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-002
2

DEC14

_______
REMOVAL
REF. FIG. 215193-RAI-00100
1. REMOVE CLAMP (4).
2. REMOVE DUCT (5), CLAMP (6) AND BELLOW (7)
(DISASSEMBLY IF NECESSARY).
3. REMOVE SCREWS (3) AND CHECK VALVE (1) FROM
RAM AIR INLET (2).
4. CAP OPEN END OF RAM AIR INLET.

002

____________
INSTALLATION
REF. FIG. 215193-RAI-00100
1. REMOVE PROTECTIVE CAP FROM RAM AIR INLET (2)
2. POSITION CHECK VALVE (1) ON RAM AIR INLET
(2) WITH CHECK VALVE HINGE PIN IN VERTICAL
POSITION AND INSTALL SCREWS (3).
3. INSTALL DUCT (5), CLAMP (6) AND BELLOW (7).
4. INSTALL CLAMP (4).

003

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-51-93
RAI 10000-002
2-400 PAGE
2
DEC 01/14

21-51-93
3

AH

GROUND COOLING TURBOFAN


CHECK VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
DEC14

21-51-93
RAI 10000-002

2-400

PAGE
3
DEC 01/14

21-51-94

FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE

FUT 10000-001
1

MAR12

ZONING DATA
___________

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: ENGINE START (PROPELLER


BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

72-00-00-ERU-10030

21-51-94
FUT 10000-001
2-400 PAGE
1
MAR 01/12

21-51-94

FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE

001

FUT 10000-001
2

MAR12

___________
PREPARATION
1. PROVIDE TO PARK THE A/C IN A FREE PARKING
AREA TO START THE ENGINE 2 IN HOTEL MODE
2. INSTALL AN EXTERNAL BOOM-SET TO ASSURE A
GOOD COMMUNICATION BETWEEN THE COCKPIT AND
THE EXTERNAL OF AIRCRAFT.
3. START THE ENGINE 2 IN HOTEL MODEFOLLOWING
THE JIC :

002

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

003

FUNCTIONAL TEST OF TURBOFAN AND


_______________________________
SHUT-OFF VALVE
______________
REF.FIG.211051-OPT-00100
1. IN THE COCKPIT, ON PANEL 22VU:
-CHECK THAT CROSS-FEED VALVE 36HA OPENS:
INDICATION LIGHT XVALVE OPENIS ILLUMINATED
2. -PRESS ENG1(2) BLEEDPUSHBUTTON SWITCH
27HA (28HA) AND VERIFY OFFLEGEND GOES OFF
-PRESS SYS1(2)AIR BLEED/PACK VALVE
PUSHBUTTON SWITCH 9HB (10HB) AND VERIFY
THAT OFF LEGEND GOES OFF.
-VERIFY THAT OFF LEGEND ON PUSHBUTTON
SWITCH 10HB (9HB) IS ON.
3. IN ZONE 192 AT EXHAUST SHROUD CHECK FOR
AIR FLOW COMING FROM AIR CYCLE MACHINE

004

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*** CONTINUED ***
AH

21-51-94
FUT 10000-001
2-400 PAGE
2
MAR 01/12

21-51-94

FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE

005

FUT 10000-001
3

MAR12

________
CLOSE-UP
1. MAKE SURE THE AIR CONDITIONNING BAY AND
THE AREA SURROUNDING THE A/C IS CLEAR OF
TOOL AND MISCELLANEUS EQUIPMENTS.
*****

AH

E N D

O F

T E X T

*****

21-51-94
FUT 10000-001
2-400 PAGE
3
MAR 01/12

21-51-94
4

AH

PACK VALVE PUSHBUTTON SW

FUT 10000-001
MAR12

21-51-94
FUT 10000-001

2-400

PAGE
4
MAR 01/12

21-51-94
5

AH

FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE

FUT 10000-001
MAR12

21-51-94
FUT 10000-001

2-400

PAGE
5
MAR 01/12

21-51-94

REMOVAL AND INSTALLATION


OF TURBO FAN
SHUT-OFF VALVE

RAI 10000-001
1

APR07

ZONING DATA
___________

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE

AH

21-51-94-FUT-10000

21-51-94
RAI 10000-001
2-400 PAGE
1
APR 01/07

21-51-94

REMOVAL AND INSTALLATION


OF TURBO FAN
SHUT-OFF VALVE

001

RAI 10000-001
2

APR07

___________
PREPARATION
REF.FIG.:215194-RAI-00100
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121 VU
- 1HH (2HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/MAN.
- 3HH (4HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/AUTO.
WARNING:DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
3. REMOVE ACCESS DOOR 191ML (192ML)

002

_______
REMOVAL
REF.FIG.:215194-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
VALVE (4).
2. DISCONNECT PIPES (2) AND (3) FROM THE
VALVE (4). CAP OPEN ENDS OF PIPES AND
ELECTRICAL CONNECTOR.
3. NOTE DIRECTION OF AIR FLOW ARROW ON BODY
VALVE,THEN REMOVE THE VALVE (4).
4. CAP OPENED END LINES OF THE VALVE.

003

____________
INSTALLATION
REF.FIG.:215194-RAI-00100
1. REMOVE PROTECTIVE CAPS FROM PIPES (2)
AND (3) AND FROM ELECTRICAL CONNECTOR (1).
*** CONTINUED ***
AH

21-51-94
RAI 10000-001
2-400 PAGE
2
APR 01/07

21-51-94

REMOVAL AND INSTALLATION


OF TURBO FAN
SHUT-OFF VALVE

RAI 10000-001
3

APR07

2. REMOVE PROTECTIVE CAPS FROM THE NEW VALVE(4)


3. INSTALL VALVE (4) BETWEEN PIPES IN THE SAME
POSITION AS RECORDED DURING THE REMOVAL.
4. CONNECT PIPES (2)/(3) AND ELECTRICAL CONNECTOR (1) TO THE VALVE (4).
004

________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
3. REMOVE SAFETY CLIPS/TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
-1HH (2HH)
-3HH (4HH)

005

_______________
FUNCTIONAL
TEST
SEE JOB INSTRUCTION CARD
215194-FUT-10000
*****

AH

E N D

O F

T E X T

*****

21-51-94
RAI 10000-001
2-400 PAGE
3
APR 01/07

21-51-94
4

AH

REMOVAL/INSTALLATION OF
SHUT-OFF VALVE

RAI 10000-001
APR07

21-51-94
RAI 10000-001

2-400

PAGE
4
APR 01/07

21-51-96

OPERATIONAL TEST OF
ADDITIONAL DE-ICING
PRESSURE SWITCH

OPT 10010-001
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 190
: 191RL 192RR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-51-96
OPT 10010-001
2-400 PAGE
1
MAR 01/12

21-51-96

OPERATIONAL TEST OF
ADDITIONAL DE-ICING
PRESSURE SWITCH

001

OPT 10010-001
2

MAR12

___________
PREPARATION
1. REMOVE ACCESS PANEL 191RL(192RR).

002

________________
OPERATIONAL
TEST
REF. FIG. 215196-RAI-00100
1. DISCONNECT PIPES (1).
IN ORDER TO PRESSURIZE THE EQUIPMENT, A PRESSURIZATION DEVICE SHALL BE USED (E.G.: HAND
PUMP WITH PRESSURE GAUGE; NITROGEN BOTTLE WITH
PRESSURE REGULATOR, PRESSURE GAUGE AND FLEXIBLE
PIPE;...)
2. CONNECT THE FLEXIBLE PIPE TO HI PORT AND
APPLY A PRESSURE SLIGHTLY HIGHER THAN 9 PSI.
3. START THE ENGINE FOLLOWING JIC:
720000-ERU-10030.
4. ON PANEL 22VU PRESS THE FOLLOWING PUSHBUTTON
SWITCHES:
- AIR BLEED/ENG 2 BLEED
- AIR BLEED/PACK VALVE SYS 1(2)
5. ON PANEL 22VU PRESS P/B SWITCH
FLT COMPT(CABIN)/TEMP SEL TO SELECT MAN-MODE
6. ON PANEL 22VU SELECT SELECTORTEMPERATURE, FLT COMPT (CABIN) ON FULL
COLD POSITION.
REF. FIG. 216151-RAI-00100
7. VERIFY THAT THE POINTER ON MODULATING VALVE
(3) SHOWS OPEN POSITION.
8. DECREASE PRESSURE LOWER THAN 6 PSI, AFTER
15 SEC, THE MODULATING VALVE POINTER MUST
SHOW CLOSED POSITION.
*** CONTINUED ***
AH

21-51-96
OPT 10010-001
2-400 PAGE
2
MAR 01/12

21-51-96

OPERATIONAL TEST OF
ADDITIONAL DE-ICING
PRESSURE SWITCH

OPT 10010-001
3

MAR12

9. ON PANEL 22VU PRESS P/B SWITCH


TO SELECT AUTO-MODE.
10.ON PANEL 22VU RELEASE THE PUSHBUTTON
SWITCHES.
- AIR BLEED/ENG 2 BLEED
- AIR BLEED/PACK VALVE SYS 1(2)
11.SHUT DOWN THE ENGINE FOLLOWING JIC:
720000-ERU-10030.
REF. FIG. 215196-RAI-00100
12.DISCONNECT HAND PUMP.
13.CONNECT PIPES (1).
003

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEM OF
EQUIPMENT.
2. INSTALL ACCESS PANEL 191RL(192RR).
*****

AH

E N D

O F

T E X T

*****

21-51-96
OPT 10010-001
2-400 PAGE
3
MAR 01/12

21-51-96
4

AH

ADDITIONAL DE-ICING
PRESSURE SWITCH LOCATION

OPT 10010-001
MAR12

21-51-96
OPT 10010-001

2-400

PAGE
4
MAR 01/12

21-51-96
5

AH

TRIM AIR VALVE


LOCATION

OPT 10010-001
MAR12

21-51-96
OPT 10010-001

2-400

PAGE
5
MAR 01/12

21-51-96

ADDITIONAL DE-ICING
PRESSURE SWITCH
REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191RL 192RR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 PRESSURE SWITCH

215150-073-130

EXPENDABLE

: 02 O RING

215150-073-100

AH

___
MEN

_________
MAN-HOURS

21-51-96
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-51-96

ADDITIONAL DE-ICING
PRESSURE SWITCH
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 7HB(8HB) AIR BLEED/COMPT TEMP/SYS1(2)/
PACK VALVE
2. REMOVE ACCESS PANEL 191RL(192RR).

002

_______
REMOVAL
REF. FIG. 215196-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (6).
2. DISCONNECT PIPES (1).
3. REMOVE UNIONS (2) AND DISCARD O RINGS (3).
4. UNSCREW BOLTS (4) AND RECOVER WASHERS (5).
5. REMOVE PRESSURE SWITCH (7).
6. CAP PIPES ENDS AND ELECTRICAL CONNECTORS.

003

____________
INSTALLATION
REF. FIG. 215196-RAI-00100
1. REMOVE CAPS FROM PIPES ENDS AND ELECTRICAL
CONNECTORS.
NOTE: MAKE CERTAIN THAT PRESSURE SWITCH HI PORT
IS CONNECTED TO LEFT DUCTING AND LO PORT
TO RIGHT DUCTING.
*** CONTINUED ***
AH

21-51-96
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-51-96

ADDITIONAL DE-ICING
PRESSURE SWITCH
REMOVAL AND INSTALLATION

RAI 10000-001
3

APR05

2. POSITION PRESSURE SWITCH (7) ON ITS SUPPORT.


3. INSTALL WASHERS (5) AND BOLTS (4) AND SCREW
THEM.
4. INSTALL O RINGS (3) AND UNIONS (2).
5. CONNECT PIPES (1).
6. CONNECT ELECTRICAL CONNECTOR (6).
004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEM OF
EQUIPMENT.
2. INSTALL ACCESS PANEL 191RL(192RR).
3. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 7HB(8HB)
4. IN FLIGHT COMPARTMENT REMOVE WARNING
NOTICE.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-51-96
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-51-96
4

AH

ADDITIONAL DE-ICING
PRESSURE SWITCH LOCATION

RAI 10000-001
APR05

21-51-96
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-51-98

OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE

OPT 10000-002
1

MAR12

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191PL 191QL 192PR 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: ENGINE START (PROPELLER


BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

72-00-00-ERU-10030

21-51-98
OPT 10000-002
2-400 PAGE
1
MAR 01/12

21-51-98

OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE

001

OPT 10000-002
2

MAR12

_______
CAUTION
THIS PROCEDURE IS NOT APPLICABLE FOR AN AMBIENT
TEMPERATURE HIGHER THAN 10 C (50 F).
IN THIS CASE, TIC VALVE MUST BE REMOVED AS PER
JIC 215198-RAI-10000 AND TESTED FOLLOWING THE
HONEYWELL SIL GP22 (OFF WING PROCEDURE).
THIS LAST PROCEDURE IS APPLICABLE WHATEVER
AMBIENT TEMPERATURE MAY BE.

002

___________
PREPARATION
REF. FIG. 215198-OPT-00100
1. REMOVE PANEL 191QL (192QR);191PL(192PR)
2. INSTALL THERMOCOUPLES 1 AND 2 BY MEANS OF
ADHESIVE TAPE.
3. CONNECT THERMOCOUPLES TO A TEMPERATURE
METER.

003

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

004

________________
OPERATIONAL
TEST
REF. FIG. 123321-CDG-00110
1. ON PANEL 22VU
A. PRESS ENGINE 2 BLEED P/BSW AND PACK
VALVE, SYS 1(2) P/BSW AND
VERIFY THAT OFF LEGENDS GO OFF
B. PRESS COMPT TEMP/FLOW P/BSW AND
VERIFY THAT HIGH LEGEND COMES ON.
C. VERIFY THAT MAN LEGEND ON FLT COMPT/
TEMP SEL (CABIN/TEMP SEL) P/BSW
IS OFF.
D. POSITION TEMPERATURE FLT COMPT(CABIN)
*** CONTINUED ***
AH

21-51-98
OPT 10000-002
2-400 PAGE
2
MAR 01/12

21-51-98

OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE

OPT 10000-002
3

MAR12

SELECTOR ON FULL COLD.


2. WAIT THAT SYSTEM STABILIZES.
3. DIFFERENTIAL TEMPERATURE MEASURED BETWEEN
THE WATER EXTRACTOR OUTLET PORT
(THERMOCOUPLE 1) AND TIC VALVE MIXED AIR
OUTLET PORT (THERMOCOUPLE 2) SHOULD BE
APPROXIMATELY 10 TO 35 DEG F (5 TO 19 DEG C)
THIS INDICATES THAT TIC VALVE IS MODULATING
TO CONTROL THE COOLING TURBINE INLET
TEMPERATURE AT 75 +/- 12 DEG F
(23 +/- 6 DEG C).
4. IF DIFFERENTIAL TEMPERATURE IS LESS THAN
10 DEG F (5 DEG C) AND THERMOCOUPLE1
MEASURES LESS THAN 55 DEG F (13 DEG C), TIC
VALVE POPPET IS CLOSED AND TIC VALVE HAS
TO BE REPLACED.
5. IF DIFFERENTIAL TEMPERATURE IS MORE THAN
35 DEG F (20 DEG C), TIC VALVE POPPET IS
OPEN AND TIC VALVE HAS TO BE REPLACED.
6. IF DIFFERENTIAL TEMPERATURE IS MORE THAN
10 DEG F (5 DEG C) AND THE WATER EXTRACTOR
OUTLET PORT (TERMOCOUPLE 1) IS MORE THAN
104 DEG F (40 DEG C) THE TIC VALVE IS JAMMED
OPEN AND HAS TO BE REPLACED.
7. ON PANEL 22VU
A. RELEASE COMPT TEMP/FLOW P/BSW AND VERIFY
THAT HIGH LEGEND GOES OFF
B. RELEASE PACK VALVE, SYS 1(2) P/BSWAND
VERIFY THAT OFF LEGEND COMES ON.
005

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*** CONTINUED ***
AH

21-51-98
OPT 10000-002
2-400 PAGE
3
MAR 01/12

21-51-98

OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE

006

OPT 10000-002
4

MAR12

________
CLOSE
UP
REF. FIG. 215198-OPT-00100
1. DISCONNECT TEMPERATURE METER FROM
THERMOCOUPLES.
2. REMOVE THERMOCOUPLES.
3. INSTALL PANELS PREVIOUSLY REMOVED.
*****

AH

E N D

O F

T E X T

*****

21-51-98
OPT 10000-002
2-400 PAGE
4
MAR 01/12

21-51-98
5

AH

TURBINE INLET CONTROL


VALVE LOCATION

OPT 10000-002
MAR12

21-51-98
OPT 10000-002

2-400

PAGE
5
MAR 01/12

21-51-98
6

AH

CONTROLS LOCATION

OPT 10000-002
MAR12

21-51-98
OPT 10000-002

2-400

PAGE
6
MAR 01/12

21-51-98

TURBINE INLET CONTROL


VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
1

MAR11

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191QL 192QR

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 INLET CONTROL VALVE

215150-070A-130

: CHECK OF DUCT
TEMPERATURE

21-61-00-CHK-10000

PUBLICATION
___________
JIC

AH

21-51-98
RAI 10000-002
2-400 PAGE
1
MAR 01/11

21-51-98

TURBINE INLET CONTROL


VALVE REMOVAL AND
INSTALLATION

001

RAI 10000-002
2

MAR11

___________
PREPARATION
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
1. REMOVE ACCESS PANEL 191QL (192QR).

002

______________________________________
REMOVAL
OF TURBINE INLET CONTROL VALVE
REF. FIG. 215198-RAI-00100
1. UNSCREW NUT (10) AND DISCONNECT PIPE (9).
2. REMOVE UNION (8) AND DISCARD O-RING (11).
3. REMOVE CLAMPS (2), (3) AND (7).
4. DISCONNECT TURBINE INLET CONTROL VALVE (1)
FROM SLEEVES (4), (5) AND (6) AND REMOVE IT.
5. CUP OPEN ENDS OF PIPE (9) AND SLEEVES (4),
(5) AND (6).

003

___________________________________________
INSTALLATION
OF TURBINE INLET CONTROL VALVE
REF. FIG. 215198-RAI-00100
1. REMOVE PROTECTIVE CUPS.
2. CONNECT TURBINE INLET CONTROL VALVE (1) TO
SLEEVES (4), (5) AND (6).
3. INSTALL CLAMPS (2), (3) AND (7) AND TIGHTEN
THEM TO 0.18-0.20 DAN.M (16-18 LBF.IN).
4. INSTALL UNION (8) WITH RELEVANT O-RING (11).
5. CONNECT PIPE (9) AND SCREW NUT (10).
*** CONTINUED ***
AH

21-51-98
RAI 10000-002
2-400 PAGE
2
MAR 01/11

21-51-98

TURBINE INLET CONTROL


VALVE REMOVAL AND
INSTALLATION

004

RAI 10000-002
3

MAR11

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL ACCESS PANELS PREVIOUSLY REMOVED.
3. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.

005

_____________________________
CHECK
OF ECS DUCT TEMPERATURE
SEE JOB INSTRUCTION CARD
216100-CHK-10000
*****

AH

E N D

O F

T E X T

*****

21-51-98
RAI 10000-002
2-400 PAGE
3
MAR 01/11

21-51-98
4

AH

TURBINE INLET CONTROL


VALVE REMOVAL AND
INSTALLATION

RAI 10000-002
MAR11

21-51-98
RAI 10000-002

2-400

PAGE
4
MAR 01/11

21-61-00

CHECK OF DUCT
TEMPERATURE

CHK 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC

: ENGINE START (PROPELLER


BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

72-00-00-ERU-10030

21-61-00
CHK 10000-002
2-400 PAGE
1
DEC 01/14

CHECK OF DUCT
TEMPERATURE

001

21-61-00

CHK 10000-002
2

DEC14

ENGINE GROUND IDLE RUN-UP WITH GROUND POWER


___________________________________________
UNIT
____
SEE JOB INSTRUCTION CARD
720000-ERU-10030
NOTE: ONLY START THE ENGINE WHEN REQUESTED
DURING THE FOLLOWING PROCEDURE.

002

_____
CHECK
REF. FIG. 216100-CHK-00100
CAUTION: BEFORE ENGINE RUNNING, MAKE CERTAIN
THAT EITHER THE CARGO VENTING DOOR OR
CAPT COMMUNICATION DOOR IS OPEN AND
REMAINS OPEN DURING THE SERVICING.
1. RUN ENGINES 1 AND 2.
2. POSITION POWER LEVERS BETWEEN F.I. AND
35 PERCENT.
CONDITION LEVERS ON MAX RPM OR ON }AUTO}
POSITION, DEPENDING ON A/C CONFIGURATION.
NOTE: THE CHECK MUST BE PERFORMED WITH COMPT
SEL/FLT COMPT/CABIN SW (2) SELECTED
BOTH ON FLT COMPT AND CABIN.
3. ON PANEL 22VU:
- PRESS ENG 1 AND 2 BLEED P/BSW
(7) (6) AND VERIFY THAT OFF
LEGENDS GO OFF.
- PRESS SYS 1 AND 2 AIR BLEED/PACK VALVE
P/BSW (8) (5) AND VERIFY THAT
OFF LEGENDS GO OFF.
- SELECT MAX FULL COLD ON FLT COMPT AND
CABIN TEMPERATURE SELECTOR
(9) AND (3).
- PRESS TEMP/FLOW COMPT P/BSW (4) AND
VERIFY THAT HIGH LEGEND COMES ON.
*** CONTINUED ***
AH

21-61-00
CHK 10000-002
2-400 PAGE
2
DEC 01/14

21-61-00

CHECK OF DUCT
TEMPERATURE

CHK 10000-002
3

DEC14

4. WAIT FOR 10 MIN TO LET THE TEMPERATURES


STABILIZE.
5. CHECK THAT TEMPERATURE ON COMPT TEMP/COMPT
DUCT INDICATOR (1) IS < OR =8 DEG C.
6. ON PANEL 22VU:
- PRESS P/BSW (4) AND VERIFY THAT
HIGH LEGEND GOES OFF.
7. CHECK THAT DUCT TEMPERATURE ON INDICATOR
(1) IS < OR =10 DEG C.
8. ON PANEL 22VU:
- PRESS PUSHBUTTON SWITCHES
(7) (6) (8) (5) AND VERIFY THAT
OFF LEGENDS COME ON.
9. SHUT DOWN ENGINES 1 AND 2.
*****

AH

E N D

O F

T E X T

*****

21-61-00
CHK 10000-002
2-400 PAGE
3
DEC 01/14

21-61-00
4

AH

CONTROLS AND INDICATING

CHK 10000-002
DEC14

21-61-00
CHK 10000-002

2-400

PAGE
4
DEC 01/14

21-61-00

CHECK OF DUCT
TEMPERATURE

CHK 10000-003
1

DEC14

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
72-00-00-ERU-10030

21-61-00
CHK 10000-003
2-400 PAGE
1
DEC 01/14

21-61-00

CHECK OF DUCT
TEMPERATURE

001

CHK 10000-003
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

ENGINE GROUND IDLE RUN-UP WITH GROUND POWER


___________________________________________
UNIT
____
SEE JOB INSTRUCTION CARD
720000-ERU-10030
NOTE: ONLY START THE ENGINE WHEN REQUESTED
DURING THE FOLLOWING PROCEDURE.

003

_____
CHECK
REF. FIG. 216100-CHK-00100
REF. FIG. 361100-OPT-00130
CAUTION: BEFORE RUNNING ENGINES, MAKE SURE THAT
EITHER THE CARGO VENTING DOOR OR CAPT
COMMUNICATION DOOR IS OPEN AND REMAINS
OPEN DURING THE SERVICING.
1. RUN ENGINES 1 AND 2.
2. POSITION LEVERS AS FOLLOWS:
- POWER LEVERS BETWEEN F.I. AND 35 PERCENT
- CONDITION LEVERS ON MAX RPM (OR AUTO,
DEPENDING ON A/C CONFIGURATION)
REF. FIG. 216100-CHK-00100
*** CONTINUED ***
AH

21-61-00
CHK 10000-003
2-400 PAGE
2
DEC 01/14

21-61-00

CHECK OF DUCT
TEMPERATURE

CHK 10000-003
3

DEC14

NOTE: THIS CHECK MUST BE PERFORMED WITH


SWITCH (2) SELECTED FOR BOTH FLT COMPT
AND CABIN (CENTER POSITION).
3. ON MFD UPPER WINDOW, SD CABIN PAGE:
- WHITE BLEED OFF MESSAGE IS DISPLAYED
- WHITE PACK OFF MESSAGE IS DISPLAYED
4. ON PANEL 22VU:
- PRESS ENG 1 AND 2 BLEED P/B SWITCHES
(6) AND (7) AND VERIFY THAT OFF
LEGENDS GO OFF.
REF. FIG. 361100-OPT-00130
5. ON MFD, SD CABIN PAGE:
ENG 1 AND 2 BLEED ON SYMBOLS (3) APPEAR.
REF. FIG. 216100-CHK-00100
6. PRESS SYS 1 AND 2 AIR BLEED/PACK VALVE P/B
SWITCHES (5) AND (8) AND VERIFY THAT OFF
LEGENDS GO OFF.
7. ON MFD, SD CABIN PAGE: MAKE SURE THAT THE
GREEN PACK MESSAGE IS DISPLAYED.
8. SELECT MAX FULL COLD ON FLT COMPT AND
CABIN TEMPERATURE SELECTORS (3) AND (9).
- PRESS TEMP/FLOW COMPT P/BSW (4) AND
VERIFY THAT THE HIGH LEGEND COMES ON.
- ON MFD, SD CABIN PAGE: MAKE SURE THAT THE
MESSAGE AIR HIGH FLOW IS DISPLAYED IN
CYAN.
9. WAIT 10 MINUTES TO LET THE TEMPERATURE
STABILIZE.
CHECK THAT TEMPERATURE ON THE COMPT TEMP/
COMPT DUCT INDICATOR (1) IS < OR = 8 DEG C.
10. MAKE SURE THAT THE TEMPERATURE READING
DISPLAYED ON THE SD CABIN PAGE (MFD)
*** CONTINUED ***
AH

21-61-00
CHK 10000-003
2-400 PAGE
3
DEC 01/14

21-61-00

CHECK OF DUCT
TEMPERATURE

CHK 10000-003
4

DEC14

CORRESTPONDS WITH THE COMPT TEMP INDICATOR


ON PANEL 22VU.
11. ON PANEL 22VU:
- PRESS P/BSW (4) AND VERIFY THAT THE HIGH
LEGEND GOES OFF.
- ON MFD, SD CABIN PAGE: AIR HIGH FLOW IS
NO LONGER DISPLAYED.
12. WAIT 10 MINUTES TO LET THE TEMPERATURE
STABILIZE.
CHECK THAT DUCT TEMPERATURE ON INDICATOR
(1) IS < OR = 10 DEG C.
13. ON PANEL 22VU:
- PRESS P/B SWITCHES (5) (6) (7) (8) AND
VERIFY THAT OFF LEGENDS COME ON.
14. ON MFD UPPER WINDOW, SD CABIN PAGE:
- WHITE BLEED OFF MESSAGE IS DISPLAYED
- WHITE PACK OFF MESSAGE IS DISPLAYED
15. SHUT DOWN ENGINES 1 AND 2.
*****

AH

E N D

O F

T E X T

*****

21-61-00
CHK 10000-003
2-400 PAGE
4
DEC 01/14

21-61-00
5

AH

CONTROLS AND INDICATING

CHK 10000-003
DEC14

21-61-00
CHK 10000-003

2-400

PAGE
5
DEC 01/14

21-61-00
6

AH

BLEED AND PACK LEGEND

CHK 10000-003
DEC14

21-61-00
CHK 10000-003

2-400

PAGE
6
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

OPT 10000-001
1

DEC14

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC

: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

24-46-00-EAD-10000
72-00-00-ERU-10030

21-61-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

001

OPT 10000-001
2

DEC14

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

002

___________
PREPARATION
1. ON PANEL 22VU MAKE CERTAIN THAT ENG 1(2)
BLEED, PACK VALVE 1(2) PUSHBUTTON SWITCHES
ARE PRESSED (OFF LEGENDS ARE OFF).
2. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKERS ARE CLOSED:
- 3HH(4HH) AIR BLEED/COMPT TEMP/FLT
COMPT (CABIN) TEMP CTL/AUTO

003

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

004

____________________________________
TEMPERATURE
CONTROL OPERATIONAL TEST
REF. FIG. 216100-OPT-00100
1. FLIGHT COMPARTMENT TEMPERATURE CONTROL
A. ON PANEL 22VU RELEASE PACK VALVE 2 P/BSW.
OFF LEGEND ON P/BSW COMES ON AND
RH PACK STOPS.
B. MAKE CERTAIN THAT THROUGH FLIGHT
COMPARTMENT OUTLETS THE AIR COMES OUT.
C. MAKE CERTAIN THAT MAN P/BSW IS PRESSED
AND MAN LEGEND IS OFF.
D. SELECT ALTERNATIVELY, THROUGH FLT COMPT
TEMPERATURE SELECTOR, FULL COLD AND
FULL HOT POSITION AND VERIFY THAT
*** CONTINUED ***
AH

21-61-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

21-61-00

OPT 10000-001
3

DEC14

RELEVANT DUCT/COMPT INDICATOR, WITH COMPT


SEL IN FLT COMPT POSITION, CHANGES THE
TEMPERATURE IN ACCORDANCE WITH THE
SELECTED POSITION AND WITH THE
TEMPERATURE FELT IN THE COMPARTMENT.
E. RELEASE MAN P/BSW, MAN LEGEND ON P/BSW
COMES ON.
OPEN CIRCUIT BREAKER 3HH.
F. REPEAT STEP 1D.
G. PRESS PACK VALVE 2 P/BSW. OFF LEGEND
ON P/BSW GOES OFF, RH PACK OPERATES.
2. CABIN TEMPERATURE CONTROL
A. ON PANEL 22VU RELEASE PACK VALVE 1 P/BSW.
OFF LEGEND ON P/BSW COMES ON AND
LH PACK STOPS.
B. MAKE CERTAIN THAT THROUGH CABIN OUTLETS
THE AIR COMES OUT.
C. MAKE CERTAIN THAT MAN P/BSW IS PRESSED
AND MAN LEGEND IS OFF.
D. SELECT ALTERNATIVELY, THROUGH CABIN
SELECTOR, FULL COLD AND FULL HOT
POSITION AND VERIFY THAT RELEVANT
DUCT/COMPT INDICATOR, WITH COMPT SEL IN
CABIN POSITION, CHANGES THE TEMPERATURE
IN ACCORDANCE WITH THE SELECTED POSITION
AND WITH THE TEMPERATURE FELT IN THE
COMPARTMENT.
E. RELEASE MAN P/BSW, MAN LEGEND ON P/BSW
COMES ON. OPEN CIRCUIT BREAKER 4HH.
F. REPEAT STEP 2D.
*** CONTINUED ***
AH

21-61-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

OPT 10000-001
4

DEC14

G. PRESS MAN P/BSW, MAN LEGEND ON P/BSW


GOES OFF.
H. PRESS PACK VALVE 1 P/BSW. OFF LEGEND ON
P/BSW GOES OFF, LH PACK OPERATES.
3. CLOSE CIRCUIT BREAKERS PREVIOUSLY OPENED.
005

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

006

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-61-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14

21-61-00
5

AH

CONTROL PANEL

OPT 10000-001
DEC14

21-61-00
OPT 10000-001

2-400

PAGE
5
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

OPT 10000-002
1

DEC14

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

___
MEN

_________
MAN-HOURS

PUBLICATION
___________
JIC
JIC
JIC

: PRINCIPLE OF CDS USE


(DISPLAY UNITS
EXPLORATION)
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

AH

31-63-00-PRO-10000
24-46-00-EAD-10000
72-00-00-ERU-10030

21-61-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

001

OPT 10000-002
2

DEC14

PRINCIPLE OF CDS USE (DISPLAY UNITS


___________________________________
EXPLORATION)
____________
(TO USE ONLY IF NEEDED)
_______________________
SEE JOB INSTRUCTION CARD
316300-PRO-10000
NOTE: PROCEDURE TO USE ONLY IF NEEDED.
THIS PROCEDURE DESCRIBES LOCATION AND
MANAGEMENT OF THE DIFFERENT DISPLAY
WINDOWS PROVIDED BY THE THREE FORMATS
(PFD, EWD, MFD) PROPOSED ON THE FIVE
DISPLAY UNITS (DU).

002

ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


___________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000

003

___________
PREPARATION
1. ON PANEL 22VU MAKE CERTAIN THAT ENG 1(2)
BLEED, PACK VALVE 1(2) PUSHBUTTON SWITCHES
ARE PRESSED (OFF LEGENDS ARE OFF).
2. MAKE CERTAIN THAT THE FOLLOWING CIRCUIT
BREAKERS ARE CLOSED:
- 3HH(4HH) AIR BLEED/COMPT TEMP/FLT
COMPT (CABIN) TEMP CTL/AUTO

004

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

005

____________________________________
TEMPERATURE
CONTROL OPERATIONAL TEST
REF. FIG. 216100-OPT-00100
1. FLIGHT COMPARTMENT TEMPERATURE CONTROL
*** CONTINUED ***
AH

21-61-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

OPT 10000-002
3

DEC14

A. ON PANEL 22VU RELEASE PACK VALVE 2 P/BSW.


- OFF LEGEND ON P/BSW COMES ON,
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, PACK OFF IS DISPLAYED ON RH
PACK INDICATOR,
- RH PACK STOPS
B. MAKE CERTAIN THAT THROUGH FLIGHT
COMPARTMENT OUTLETS THE AIR COMES OUT.
C. ON PANEL 22VU, MAKE CERTAIN THAT
FLT COMPT TEMP SEL P/BSW IS PRESSED
- MAN LEGEND IS OFF ON P/BSW,
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, TEMP AUTO IS DISPLAYED ON LH
SIDE.
D. ON PANEL 22VU, SELECT ALTERNATIVELY,
THROUGH FLT COMPT TEMPERATURE SELECTOR,
FULL COLD AND FULL HOT POSITION AND
VERIFY THAT RELEVANT DUCT/COMPT
INDICATOR (WITH COMPT
SEL IN FLT COMPT POSITION),
CHANGES THE TEMPERATURE IN ACCORDANCE
WITH THE SELECTED POSITION AND WITH THE
TEMPERATURE FELT IN THE COMPARTMENT.
E. ON PANEL 22VU, RELEASE FLT COMPT TEMP SEL
P/BSW,
- MAN LEGEND ON P/BSW COMES ON,
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, TEMP MAN IS DISPLAYED ON LH
SIDE.
F

OPEN CIRCUIT BREAKER:


3HH AIR BLEED/COMPT TEMP/FLT COMPT
TEMP CTL/AUTO.

G. REPEAT STEP 1D.


H. ON PANEL 22VU, PRESS PACK VALVE 2 P/BSW.
*** CONTINUED ***
AH

21-61-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

21-61-00

OPT 10000-002
4

DEC14

- OFF LEGEND ON P/BSW GOES OFF,


- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, THE RH PACK INDICATOR IS ON
(PACK IN WHITE CHARACTERS INSIDE A
GREEN RECTANGLE),
- RH PACK OPERATES
2. CABIN TEMPERATURE CONTROL
A. ON PANEL 22VU RELEASE PACK VALVE 1 P/BSW.
- OFF LEGEND ON P/BSW COMES ON
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, PACK OFF IS DISPLAYED ON LH
PACK INDICATOR,
- LH PACK STOPS
B. MAKE CERTAIN THAT THROUGH CABIN OUTLETS
THE AIR COMES OUT.
C. ON PANEL 22VU, MAKE CERTAIN THAT
CABIN TEMP SEL P/BSW IS PRESSED
- MAN LEGEND IS OFF ON P/BSW,
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, TEMP AUTO IS DISPLAYED ON RH
SIDE.
D. SELECT ALTERNATIVELY, THROUGH CABIN
SELECTOR, FULL COLD AND FULL HOT
POSITION AND VERIFY THAT RELEVANT
DUCT/COMPT INDICATOR (WITH COMPT SEL IN
CABIN POSITION) AND CABIN TEMPERATURE
INDICATION (ON MFD UPPER WINDOW, IN
CABIN SD PAGE), CHANGE THE TEMPERATURE
IN ACCORDANCE WITH THE SELECTED POSITION
AND WITH THE TEMPERATURE FELT IN THE
COMPARTMENT.
E. ON PANEL 22VU, RELEASE CABIN TEMP SEL
P/BSW,
- MAN LEGEND ON P/BSW COMES ON,
- ON MFD UPPER WINDOW, IN CABIN SD
*** CONTINUED ***
AH

21-61-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14

21-61-00

FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST

OPT 10000-002
5

DEC14

PAGE, TEMP MAN IS DISPLAYED ON RH


SIDE.
F. OPEN CIRCUIT BREAKER
4HH AIR BLEED/COMPT TEMP/FLT CABIN TEMP
CTL/AUTO.
G. REPEAT STEP 2D.
H. ON PANEL 22VU, PRESS CABIN TEMP SEL
P/BSW,
- MAN LEGEND ON P/BSW GOES OFF.
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, TEMP AUTO IS DISPLAYED ON RH
SIDE.
J. ON PANEL 22VU, PRESS PACK VALVE 1 P/BSW.
- OFF LEGEND ON P/BSW GOES OFF,
- ON MFD UPPER WINDOW, IN CABIN SD
PAGE, THE LH PACK INDICATOR IS ON
(PACK IN WHITE CHARACTERS INSIDE A
GREEN RECTANGLE),
- LH PACK OPERATES.
3. CLOSE CIRCUIT BREAKERS PREVIOUSLY OPENED.
006

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

007

DE-ENERGIZATION OF AIRCRAFT DC AND AC CONSTANT


______________________________________________
FREQUENCY NETWORK
_________________
SEE JOB INSTRUCTION CARD
244600-EAD-10000
*****

AH

E N D

O F

T E X T

*****

21-61-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14

21-61-00
6

AH

CONTROL PANEL

OPT 10000-002
DEC14

21-61-00
OPT 10000-002

2-400

PAGE
6
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

CLN 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 213
: 211DC

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

BULK MATERIAL : ISOPAR-H

_________
MAN-HOURS

216110-05-040
11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF FLIGHT COMPARTMENT
LININGS AND FURNISHINGS

AH

25-13-10-RAI-10000

21-61-11
CLN 10000-001
2-400 PAGE
1
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

001

CLN 10000-001
2

DEC14

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
AIR BLEED/COMPT TEMP/FLT COMPT TEMP
CTL/MAN
- 3HH
AIR BLEED/COMPT TEMP/FLT COMPT TEMP
CTL/AUTO

002

___________________
PANEL
REMOVAL 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

003

_______
REMOVAL
REF. FIG. 216111-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1).
2. REMOVE BOLT (2) AND WASHER (3).
3. REMOVE SENSOR (4) AND GASKET (5).
4. REPLACE GASKET (5) IF NECESSARY.

004

________
CLEANING
WARNING: ISOPAR-H IS TOXIC AND FLAMMABLE. TAKE
THE FOLLOWING PRECAUTIONS:
- AVOID ANY CONTACT WITH FLAMES. DO
NOT SMOKE
- AVOID INHALATION OF GAS/VAPOURS/
FUMES.
- AVOID SKIN CONTACT AND EYES
CONTAMINATION.
- WEAR PROTECTIVE GLOVES DURING USE.
1. CLEAN ALL THE SENSORS WITH ISOPAR-H SOLVENT.
*** CONTINUED ***
AH

21-61-11
CLN 10000-001
2-400 PAGE
2
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

CLN 10000-001
3

DEC14

2. DRY ALL THE SENSORS WITH DRY COMPRESSED AIR.


005

____________
INSTALLATION
REF. FIG. 216111-RAI-00100
1. POSITION GASKET (5) AND SENSOR (4) ON THEIR
PIPE.
2. INSTALL BOLT (2) AND WASHER (3).
3. CONNECT ELECTRICAL CONNECTOR (1).

006

________________________
PANEL
INSTALLATION 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

007

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE
THE FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
- 3HH
*****

AH

E N D

O F

T E X T

*****

21-61-11
CLN 10000-001
2-400 PAGE
3
DEC 01/14

21-61-11
4

AH

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

CLN 10000-001
DEC14

21-61-11
CLN 10000-001

2-400

PAGE
4
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

RAI 10000-001
1

DEC14

ZONING DATA
___________
ZONE
ACCESS

: 213
: 211DC

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216110-05-040

: REMOVAL AND INSTALLATION


OF FLIGHT COMPARTMENT
LININGS AND FURNISHINGS

25-13-10-RAI-10000

PUBLICATION
___________
JIC

AH

21-61-11
RAI 10000-001
2-400 PAGE
1
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

DEC14

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
AIR BLEED/COMPT TEMP/FLT COMPT TEMP
CTL/MAN
- 3HH
AIR BLEED/COMPT TEMP/FLT COMPT TEMP
CTL/AUTO

002

___________________
PANEL
REMOVAL 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

003

_______
REMOVAL
REF. FIG. 216111-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1).
2. REMOVE BOLT (2) AND WASHER (3).
3. REMOVE SENSOR (4) AND GASKET (5).
4. REPLACE GASKET (5) IF NECESSARY.

004

____________
INSTALLATION
REF. FIG. 216111-RAI-00100
1. POSITION GASKET (5) AND SENSOR (4) ON THEIR
PIPE.
2. INSTALL BOLT (2) AND WASHER (3).
3. CONNECT ELECTRICAL CONNECTOR (1).

*** CONTINUED ***


AH

21-61-11
RAI 10000-001
2-400 PAGE
2
DEC 01/14

21-61-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

005

RAI 10000-001
3

DEC14

________________________
PANEL
INSTALLATION 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

006

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE
THE FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
- 3HH

007

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-11
RAI 10000-001
2-400 PAGE
3
DEC 01/14

21-61-11
4

AH

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

RAI 10000-001
DEC14

21-61-11
RAI 10000-001

2-400

PAGE
4
DEC 01/14

21-61-13

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 114
212
: 212KF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 SENSOR

BULK MATERIAL : WHITE SPIRIT


COTTON RAG

AH

___
MEN

_________
MAN-HOURS

216110-50-030
11-002

21-61-13
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-61-13

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
MAN/CAB/CARGO/TEMP CTL COMPT TEMP
- 2HH
AUTO/CAB/CARGO/TEMP CTL COMPT TEMP

002

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 212KF.

003

_______
REMOVAL
REF. FIG. 216113-RAI-00100
1. REMOVE THERMAL BLANKET.
2. DISCONNECT ELECTRICAL CONNECTOR (1).
3. REMOVE NUT (2), WASHER (3) AND BOLT (4).
4. REMOVE TEMPERATURE SENSOR (5).

004

____________
INSTALLATION
REF. FIG. 216113-RAI-00100
1. CLEAN, WITH COTTON RAG SOAKED IN WHITE
SPIRIT, THE SKIN SURFACE ON WHICH THE
TEMPERATURE SENSOR MUST BE INSTALLED.
2. REMOVE ADHESIVE PROTECTION FROM SENSOR AND
POSITION IT EXERTING A UNIFORM AND FIRM HAND
PRESSURE TO ENSURE COMPLETE CONTACT.
3. INSTALL NUT (2), WASHER (3) AND BOLT (4).
4. CONNECT ELECTRICAL CONNECTOR (1).
5. INSTALL THERMAL BLANKET.
*** CONTINUED ***
AH

21-61-13
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-61-13

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

005

RAI 10000-001
3

APR05

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 212KF.

006

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
- 2HH

007

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-13
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-61-13
4

AH

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
APR05

21-61-13
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


CLEANING

CLN 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 210
242
: 242BW

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

BULK MATERIAL : ISOPAR-H

_________
MAN-HOURS

216120-046B-030
11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF CABIN LATERAL PANELS

AH

25-23-23-RAI-10000

21-61-21
CLN 10000-001
2-400 PAGE
1
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


CLEANING

001

CLN 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
MAN
- 4HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
AUTO

002

___________________________
CABIN
LATERAL PANEL REMOVAL
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: REMOVE ONLY PANEL 242BW.

003

_______
REMOVAL
REF. FIG. 216121-RAI-00100
1. REMOVE SCREW (1) AND WASHER (2).
2. REMOVE COVER ASSY (3).
3. DISCONNECT ELECTRICAL CONNECTOR (4) FROM
SENSOR.
4. REMOVE BOLT (5) AND WASHER (6).
5. REMOVE SENSOR (7) AND GASKET (8).
6. REPLACE GASKET IF NECESSARY.

004

________
CLEANING
WARNING: ISOPAR-H IS TOXIC AND FLAMMABLE. TAKE
THE FOLLOWING PRECAUTIONS:
- AVOID ANY CONTACT WITH FLAMES. DO
NOT SMOKE
- AVOID INHALATION OF GAS/VAPOURS/
*** CONTINUED ***
AH

21-61-21
CLN 10000-001
2-400 PAGE
2
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


CLEANING

CLN 10000-001
3

APR05

FUMES.
- AVOID SKIN CONTACT AND EYES
CONTAMINATION.
- WEAR PROTECTIVE GLOVES DURING USE.
1. CLEAN ALL THE SENSORS WITH ISOPAR-H SOLVENT.
2. DRY ALL THE SENSORS WITH DRY COMPRESSED AIR.
005

____________
INSTALLATION
REF. FIG. 216121-RAI-00100
1. POSITION GASKET (8) AND SENSOR (7) ON DUCT
ASSY.
2. INSTALL BOLT (5) AND WASHER (6).
3. CONNECT ELECTRICAL CONNECTOR (4) TO SENSOR.
4. INSTALL COVER ASSY (3).
5. INSTALL SCREW (1) AND WASHER (2).

006

________________________________
CABIN
LATERAL PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: INSTALL ONLY PANEL 242BW.

007

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH
- 4HH
*****

AH

E N D

O F

T E X T

*****

21-61-21
CLN 10000-001
2-400 PAGE
3
APR 01/05

21-61-21
4

AH

TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

CLN 10000-001
APR05

21-61-21
CLN 10000-001

2-400

PAGE
4
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 210
242
: 242BW

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216120-046B-030

: REMOVAL AND INSTALLATION


OF CABIN LATERAL PANELS

25-23-23-RAI-10000

PUBLICATION
___________
JIC

AH

21-61-21
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAGS THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
MAN
- 4HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
AUTO

002

___________________________
CABIN
LATERAL PANEL REMOVAL
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: REMOVE ONLY PANEL 242BW.

003

_______
REMOVAL
REF. FIG. 216121-RAI-00100
1. REMOVE SCREW (1) AND WASHER (2).
2. REMOVE COVER ASSY (3).
3. DISCONNECT ELECTRICAL CONNECTOR (4) FROM
SENSOR.
4. REMOVE BOLT (5) AND WASHER (6).
5. REMOVE SENSOR (7) AND GASKET (8).
6. REPLACE GASKET IF NECESSARY.

004

____________
INSTALLATION
REF. FIG. 216121-RAI-00100
1. POSITION GASKET (8) AND SENSOR (7) ON DUCT
ASSY.
*** CONTINUED ***
AH

21-61-21
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-61-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
3

APR05

2. INSTALL BOLT (5) AND WASHER (6).


3. CONNECT ELECTRICAL CONNECTOR (4) TO SENSOR.
4. INSTALL COVER ASSY (3).
5. INSTALL SCREW (1) AND WASHER (2).
005

________________________________
CABIN
LATERAL PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: INSTALL ONLY PANEL 242BW.

006

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH
- 4HH

007

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-21
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-61-21
4

AH

TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

RAI 10000-001
APR05

21-61-21
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-61-23

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE

: 120

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 SENSOR

___
MEN

BULK MATERIAL : WHITE SPIRIT


COTTON RAG

_________
MAN-HOURS

216110-50-030
11-002

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

AH

25-21-21-RAI-10000

21-61-23
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-61-23

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
MAN
- 4HH AIR BLEED/COMPT TEMP/CABIN TEMP CTL/
AUTO

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 231CF.

004

_______
REMOVAL
REF. FIG. 216123-RAI 00100
1. REMOVE THERMAL BLANKET.
2. DISCONNECT ELECTRICAL CONNECTOR (1).
3. REMOVE NUT (2), WASHER (3) AND BOLT (4).
4. REMOVE TEMPERATURE SENSOR (5).

005

____________
INSTALLATION
REF. FIG. 216123-RAI-00100
1. CLEAN, WITH COTTON RAG SOAKED IN WHITE
SPIRIT, THE SKIN SURFACE ON WHICH THE
TEMPERATURE SENSOR MUST BE INSTALLED.
2. REMOVE ADHESIVE PROTECTION AND POSITION SKIN
*** CONTINUED ***
AH

21-61-23
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-61-23

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
3

MAR14

SENSOR EXERTING A UNIFORM AND FIRM HAND


PRESSURE TO ENSURE COMPLETE CONTACT.
3. INSTALL NUT (2), WASHER (3) AND BOLT (4).
4. CONNECT ELECTRICAL CONNECTOR (1).
5. INSTALL THERMAL BLANKET.
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 231CF.

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 2HH
- 4HH

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-23
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-61-23
4

AH

SKIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
MAR14

21-61-23
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-61-24

DUCT OVERTEMPERATURE
SWITCH REMOVAL AND
INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE

: 120
210

122

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 OVERTEMPERATURE SWITCH

216120-16-020

EXPENDABLE

: 01 O-RING

216120-16-010

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-61-24
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-61-24

DUCT OVERTEMPERATURE
SWITCH REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HH(2HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/MAN

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 222BF(231DF).

004

___________________________________
DUCT
OVERTEMPERATURE SWITCH REMOVAL
REF. FIG. 216124-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1).
2. CUT LOCKWIRE.
3. REMOVE OVERTEMPERATURE SWITCH 19HH(20HH) (2)
AND DISCARD O-RING (3).

005

________________________________________
DUCT
OVERTEMPERATURE SWITCH INSTALLATION
REF. FIG. 216124-RAI-00100
1. INSERT O-RING (3) ON TEMPERATURE SWITCH (2).
2. INSTALL THE OVERTEMPERATURE SWITCH 19HH
(20HH) (2).
3. INSTALL LOCKWIRE.
4. CONNECT ELECTRICAL CONNECTOR (1).
*** CONTINUED ***
AH

21-61-24
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-61-24

DUCT OVERTEMPERATURE
SWITCH REMOVAL AND
INSTALLATION

006

RAI 10000-001
3

MAR14

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 222BF (231DF).

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HH(2HH)
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-24
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-61-24
4

AH

DUCT OVERTEMPERATURE
SWITCH REMOVAL AND
INSTALLATION

RAI 10000-001
MAR14

21-61-24
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-61-25

DUCT TEMPERATURE LIMITER


REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE
ACCESS

: 120
210
: 222BF 231EF

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TEMPERATURE LIMITER

216120-05-130

EXPENDABLE

: 01 GASKET

216120-05-100

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-61-25
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-61-25

DUCT TEMPERATURE LIMITER


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 222BF (231EF).

004

________________________________
DUCT
TEMPERATURE LIMITER REMOVAL
REF. FIG. 216125-RAI-00100
1. DISCONNECT PIPE (1) FROM UNION (2).
2. UNSCREW UNION (2) AND DISCARD O-RING (3).
3. REMOVE BOLT (4) AND WASHER (5).
4. REMOVE TEMPERATURE LIMITER 6125HB (6126HB)
(6) AND SEAL (7).
5. REPLACE SEAL IF NECESSARY.

005

_____________________________________
DUCT
TEMPERATURE LIMITER INSTALLATION
REF. FIG. 216125-RAI-00100
1. POSITION TEMPERATURE LIMITER 6125HB (6126HB)
(6) AND SEAL (7) ON ITS PIPE.
*** CONTINUED ***
AH

21-61-25
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-61-25

DUCT TEMPERATURE LIMITER


REMOVAL AND INSTALLATION

RAI 10000-001
3

MAR14

2. INSTALL BOLT (4) AND WASHER (2).


3. INSERT O-RING (3) ON UNION (2).
4. INSTALL UNION (2) TO TEMPERATURE LIMITER
(6).
5. CONNECT PIPE (1) TO UNION (2).
006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 222BF(231EF).

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-25
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-61-25
4

AH

DUCT TEMPERATURE LIMITER


REMOVAL AND INSTALLATION

RAI 10000-001
MAR14

21-61-25
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-61-26

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE

: 121
210

122

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 SENSOR

216120-13-050

EXPENDABLE

: 01 GASKET

216120-13-40

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-61-26
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-61-26

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/MAN
- 3HH(4HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/AUTO

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 222BF(231DF).

004

_______________________________
DUCT
TEMPERATURE SENSOR REMOVAL
REF. FIG. 216126-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
SENSOR.
2. REMOVE BOLT (2) AND WASHER (3).
3. REMOVE SENSOR 13HH(14HH) (4) AND GASKET (5).
4. REPLACE GASKET IF NECESSARY.

005

____________________________________
DUCT
TEMPERATURE SENSOR INSTALLATION
REF. FIG. 216126-RAI-00100
1. POSITION SENSOR 13HH(14HH) (4) AND GASKET
(5) ON DUCT.
2. INSTALL BOLT (2) AND WASHER (3).
*** CONTINUED ***
AH

21-61-26
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-61-26

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
3

MAR14

3. CONNECT ELECTRICAL CONNECTOR (1) TO SENSOR.


006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 222BF(231DF).

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH)
- 3HH(4HH)

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-26
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-61-26
4

AH

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
MAR14

21-61-26
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-61-28

TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION

RAI 10000-001
1

MAR12

ZONING DATA
___________
ZONE

: 210

242

PREPARATION
___________
PROVISION
WORK

: SKILL
_____
MECHANIC

___
MEN

_________
MAN-HOURS
01

ELAPSED TIME

SPARE

: 01 FAN

216120-043B

: REMOVAL AND INSTALLATION


OF CABIN LATERAL PANELS
: ENGINE START (PROPELLER
BRAKE RELEASED) USING
DC GROUND POWER UNIT

25-23-23-RAI-10000

PUBLICATION
___________
JIC
JIC

AH

72-00-00-ERU-10030

21-61-28
RAI 10000-001
2-400 PAGE
1
MAR 01/12

21-61-28

TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION

001

RAI 10000-001
2

MAR12

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 21HH
COMPT TEMP/CABIN TEMP SNSR FAN

002

___________________________
CABIN
LATERAL PANEL REMOVAL
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: REMOVE ONLY PANEL 242BW.

003

_______
REMOVAL
REF. FIG. 216128-RAI-00100
1. REMOVE SCREW (1) AND WASHER (2).
2. REMOVE COVER ASSY (3).
3. DISCONNECT SPLICES (4) FROM FAN HARNESS.
4. REMOVE SCREW (5), WASHER (6) AND SPACER (8).
5. REMOVE FAN (7).

004

____________
INSTALLATION
REF. FIG. 216128-RAI-00100
1. POSITION FAN (7) ON BOX ASSY.
NOTE: THE FAN MUST BE INSTALLED WITH THE ARROW
OF FLOW INDICATION IN THE OPPOSITE
DIRECTION WITH RESPECT TO THE BOX.
2. INSTALL SCREW (5), WASHER (6) AND SPACER(8).
3. CONNECT SPLICES (4) TO FAN HARNESS (RED
*** CONTINUED ***
AH

21-61-28
RAI 10000-001
2-400 PAGE
2
MAR 01/12

21-61-28

TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION

RAI 10000-001
3

MAR12

WIRE TO THE 115 VAC, BLUE AND YELLOW WIRES


TO GROUND).
4. POSITION COVER ASSY (3).
5. INSTALL SCREW (1) AND WASHER (2).
005

________________________________
CABIN
LATERAL PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: INSTALL ONLY PANEL 242BW.

006

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 21HH

007

_________________________
ENGINE
GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030

008

OPERATIONAL TEST OF TEMPERATURE SENSOR


______________________________________
VENTILATION FAN
_______________
REF. FIG. 216128-OPT-00100
1. ON PANEL 22VU PRESS THE FOLLOWING PUSHBUTTON
SWITCHES:
- 28HA
ENG 2 BLEED
- 9HB
PACK VALVE, SYS 1
- 10HB
PACK VALVE, SYS 2
2. VERIFY THAT THE OFF LEGENDS OF PUSHBUTTON
SWITCHES GO OFF.
3. VERIFY THAT THE FAN SUCKS AIR FROM THE
*** CONTINUED ***
AH

21-61-28
RAI 10000-001
2-400 PAGE
3
MAR 01/12

21-61-28

TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION

RAI 10000-001
4

MAR12

LOUVER.
4. ON PANEL 22VU RELEASE PUSHBUTTON SWITCHES
28HA, 9HB AND 10HB.
009

______________________________________
SHUT
DOWN OF ENGINE GROUND IDLE RUN-UP
SEE JOB INSTRUCTION CARD
720000-ERU-10030
*****

AH

E N D

O F

T E X T

*****

21-61-28
RAI 10000-001
2-400 PAGE
4
MAR 01/12

21-61-28
5

AH

TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION

RAI 10000-001
MAR12

21-61-28
RAI 10000-001

2-400

PAGE
5
MAR 01/12

21-61-28
6

AH

TEMPERATURE SENSOR
VENTILATION FAN
OPERATIONAL TEST

RAI 10000-001
MAR12

21-61-28
RAI 10000-001

2-400

PAGE
6
MAR 01/12

21-61-51

TRIM AIR VALVE REMOVAL


AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191ML

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TRIM AIR VALVE

216150-05A-170

EXPENDABLE

: 01 O-RING
01 O-RING

216150-05A-060
211150-05A-070

: CHECK OF PACK LEAKAGE

21-51-00-CHK-10020

PUBLICATION
___________
JIC

AH

21-61-51
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-61-51

TRIM AIR VALVE REMOVAL


AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/MAN
- 3HH(4HH) AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/AUTO
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.
3. REMOVE ACCESS DOOR 191ML.

002

_______
REMOVAL
REF. FIG. 216151-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
VALVE (3).
2. DISCONNECT PIPES (5) AND (10) FROM VALVE,
CAP OPEN ENDS OF PIPES.
3. HOLD VALVE AND REMOVE COUPLINGS (2) AND (4).
4. NOTE DIRECTION OF AIR FLOW ARROW ON VALVE
BODY AND REMOVE VALVE (3).
5. REMOVE UNIONS (6) AND (9) FROM VALVE, CHECK
FOR CORRECT CONDITION.
6. REMOVE AND DISCARD O-RINGS (7) AND (8) FROM
UNION.
7. CAP OPEN END LINES OF VALVE.
*** CONTINUED ***
AH

21-61-51
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-61-51

TRIM AIR VALVE REMOVAL


AND INSTALLATION

003

RAI 10000-001
3

APR05

____________
INSTALLATION
REF. FIG. 216151-RAI-00100
1. INSTALL O-RINGS (7) AND (8) ON UNIONS (6)
AND (9).
2. REMOVE PROTECTIVE CAPS FROM VALVE.
3. INSTALL UNIONS (6) AND (9) ON VALVE.
4. POSITION VALVE 17HH(18HH) (3) BETWEEN DUCT
WITH ARROW POINTED IN DIRECTION NOTED
DURING REMOVAL.
5. INSTALL COUPLINGS (2) AND (4). TORQUE TO
40 LBF.IN (0.45 DAN.M).
6. REMOVE PROTECTIVE CAPS FROM PIPES (5) AND
(10) AND CONNECT THEM TO VALVE.
7. CONNECT ELECTRICAL CONNECTOR (1) TO VALVE.

004

________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL ACCESS DOOR 191ML.
3. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
4. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH)
- 3HH(4HH)

*** CONTINUED ***


AH

21-61-51
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-61-51

TRIM AIR VALVE REMOVAL


AND INSTALLATION

005

RAI 10000-001
4

APR05

_____________________
CHECK
OF PACK LEAKAGE
SEE JOB INSTRUCTION CARD
215100-CHK-10020
*****

AH

E N D

O F

T E X T

*****

21-61-51
RAI 10000-001
2-400 PAGE
4
APR 01/05

21-61-51
5

AH

TRIM AIR VALVE


LOCATION

RAI 10000-001
APR05

21-61-51
RAI 10000-001

2-400

PAGE
5
APR 01/05

21-61-52

HOT BY-PASS VALVE


REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE
ACCESS

: 191
192
210
: 191ML

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 HOT BY-PASS VALVE

215150-053-010

EXPENDABLE

: 01 O-RING

216150-05A-060

AH

___
MEN

_________
MAN-HOURS

21-61-52
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-61-52

HOT BY-PASS VALVE


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING PACK.
3. REMOVE ACCESS DOOR 191ML.

002

_______
REMOVAL
REF. FIG. 216152-RAI-00100
1. DISCONNECT DUCT (2) FROM VALVE (6).
2. HOLD VALVE AND REMOVE COUPLINGS (1) AND (5).
3. NOTE DIRECTION OF AIR FLOW ARROW ON VALVE
BODY AND REMOVE VALVE 6231HB (6232HB) (6).
4. REMOVE UNION (3) AND CHECK FOR CORRECT
CONDITION.
5. REMOVE AND DISCARD O-RING (4) FROM UNION.
6. CAP OPEN END LINES OF VALVE.

003

____________
INSTALLATION
REF. FIG. 216152-RAI-00100
1. INSTALL O-RING (4) ON UNION (3).
2. REMOVE PROTECTIVE CAPS FROM VALVE.
3. INSTALL UNION (3) ON VALVE.
4. POSITION VALVE (6) BETWEEN DUCT WITH FLOW
*** CONTINUED ***
AH

21-61-52
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-61-52

HOT BY-PASS VALVE


REMOVAL AND INSTALLATION

RAI 10000-001
3

APR05

ARROW POINTED IN DIRECTION NOTED DURING


REMOVAL.
5. TIGHTEN COUPLINGS (1) AND (5) TO 40 LBF.IN
(45 DAN.M).
6. CONNECT DUCT (2) TO VALVE.
004

________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. INSTALL ACCESS DOOR 191ML.
3. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-52
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-61-52
4

AH

HOT BY-PASS VALVE


LOCATION

RAI 10000-001
APR05

21-61-52
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-61-82

TEMPERATURE SELECTOR
REMOVAL AND INSTALLATION

RAI 10000-002
1

MAR10

ZONING DATA
___________

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-61-82
RAI 10000-002
2-400 PAGE
1
MAR 01/10

21-61-82

TEMPERATURE SELECTOR
REMOVAL AND INSTALLATION

001

RAI 10000-002
2

MAR10

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
AIR BLEED/COMPT TEMP/FLT COMPT
TEMP CTL/MAN
- 2HH
AIR BLEED/COMPT TEMP/CABIN TEMP
CTL/MAN

002

___________________
REMOVAL
OF RHEOSTAT
1. REMOVE VU PANEL (1) ON WHICH RHEOSTAT (5) IS
INSTALLED.
2. REMOVE SCREWS (2) RETAINING CONTROL KNOB (3)
ON RHEOSTAT (5) AXIS.
3. REMOVE NUT (4) ATTACHING RHEOSTAT ON VU
PANEL (1).
4. IDENTIFY ELECTRICAL CABLE (6).
5. DISCONNECT ELECTRICAL CABLE (6).
6. REMOVE RHEOSTAT (5).

003

________________________
INSTALLATION
OF RHEOSTAT
REF. FIG. 310000-RAI-00109
1. CLEAN AND INSPECT RHEOSTAT INSTALLATION
AREA.
2. INSTALL RHEOSTAT (5) ON VU PANEL (1).
3. ON RHEOSTAT (5), INSTALL AND TIGHTEN
NUT (4).
4. INSTALL CONTROL KNOB (3) ON RHEOSTAT
AXIS (5).
*** CONTINUED ***
AH

21-61-82
RAI 10000-002
2-400 PAGE
2
MAR 01/10

21-61-82

TEMPERATURE SELECTOR
REMOVAL AND INSTALLATION

RAI 10000-002
3

MAR10

5. INSTALL AND TIGHTEN SCREWS (2).


6. CONNECT ELECTRICAL CABLE (6).
7. INSTALL VU PANEL (1).
004

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE
THE FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH
- 2HH

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-82
RAI 10000-002
2-400 PAGE
3
MAR 01/10

21-61-82
4

AH

RHEOSTAT

RAI 10000-002
MAR10

21-61-82
RAI 10000-002

2-400

PAGE
4
MAR 01/10

21-61-83

COMPARTMENT TEMPERATURE
CONTROLLER REMOVAL AND
INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

SPARE

: 01 CONTROLLER-TEMPERATURE

AH

___
MEN

_________
MAN-HOURS

216180-02-30

21-61-83
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-61-83

COMPARTMENT TEMPERATURE
CONTROLLER REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIPS AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH)
AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/MAN
- 3HH(4HH)
AIR BLEED/COMPT TEMP/FLT COMPT
(CABIN) TEMP CTL/AUTO

002

REMOVAL OF EQUIPMENT FROM L OR R ELECTRONICS


____________________________________________
RACKS 80VU OR 90VU
__________________
NOTE: THE QUANTITY OF FIXING SCREWS AS WELL AS
THE SHAPE AND QUANTITY OF CONNECTORS MAY
BE DIFFERENT ACCORDING THE EQUIPMENT.
NEVERTHELESS, THE REMOVAL AND INSTALLATION PROCEDURE IS IDENTICAL.
REF. FIG. 310000-RAI-00106
1. REMOVE ACCESS DOOR.
2. DISCONNECT ELECTRICAL CONNECTOR(S) (2).
3. INSTALL PROTECTIVE CAP(S) ON EQUIPMENT
SIDE ELECTRICAL CONNECTOR(S).
4. UNSCREW EQUIPMENT ATTACHMENT SCREWS (3).
5. REMOVE EQUIPMENT (1) FROM ITS SHELF (4).

003

INSTALLATION OF EQUIPMENT IN L OR R ELECTRONICS


_______________________________________________
RACKS 80VU AND 90VU
___________________
REF. FIG. 310000-RAI-00106
1. CLEAN AND INSPECT EQUIPMENT (1) AND SHELF
(4) INTERFACE AREA.
2. LOCATE EQUIPMENT (1) AND ATTACH TO SHELF(4)
*** CONTINUED ***
AH

21-61-83
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-61-83

COMPARTMENT TEMPERATURE
CONTROLLER REMOVAL AND
INSTALLATION

RAI 10000-001
3

APR05

BY MEANS OF ATTACHMENT SCREWS (3).


3. REMOVE PROTECTIVE CAP(S) FROM EQUIPMENT SIDE
ELECTRICAL CONNECTOR(S) (2).
4. CONNECT ELECTRICAL CONNECTOR(S) (2).
5.REMOVE ACCESS DOOR
004

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HH(2HH)
- 3HH(4HH)

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-61-83
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-61-83
4

AH

R ELECTRONICS RACK
90VU EQUIPMENT

RAI 10000-001
APR05

21-61-83
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

CLN 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 213

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216310-010-010

EXPENDABLE

: 01 O-RING

216310-010-040

BULK MATERIAL : ISOPAR-H

_________
MAN-HOURS

11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF FLIGHT COMPARTMENT
LININGS AND FURNISHINGS

AH

25-13-10-RAI-10000

21-63-11
CLN 10000-001
2-400 PAGE
1
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

001

CLN 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK
AIR BLEED/COMPT TEMP/COMP & DUCT
TEMP IND
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.

002

___________________
PANEL
REMOVAL 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

003

_______
REMOVAL
REF. FIG. 216311-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
SENSOR.
2. REMOVE SENSOR (2) AND O-RING (3).
3. DISCARD O-RING (3).

004

________
CLEANING
WARNING: ISOPAR-H IS TOXIC AND FLAMMABLE. TAKE
THE FOLLOWING PRECAUTIONS:
- AVOID ANY CONTACT WITH FLAMES. DO
NOT SMOKE
- AVOID INHALATION OF GAS/VAPOURS/
FUMES.
- AVOID SKIN CONTACT AND EYES
CONTAMINATION.
*** CONTINUED ***
AH

21-63-11
CLN 10000-001
2-400 PAGE
2
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING

CLN 10000-001
3

APR05

- WEAR PROTECTIVE GLOVES DURING USE.


1. CLEAN ALL THE SENSORS WITH ISOPAR-H SOLVENT.
2. DRY ALL THE SENSORS WITH DRY COMPRESSED AIR.
005

____________
INSTALLATION
REF. FIG. 216311-RAI-00100
1. INSTALL O-RING (3) ON SENSOR (2).
2. INSTALL SENSOR (2).
3. CONNECT ELECTRICAL CONNECTOR (1) TO SENSOR
(2).

006

________________________
PANEL
INSTALLATION 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

007

________
CLOSE
UP
1. REMOVE WARNING NOTICE.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER.
ON PANEL 121VU
- 1HK
*****

AH

E N D

O F

T E X T

*****

21-63-11
CLN 10000-001
2-400 PAGE
3
APR 01/05

21-63-11
4

AH

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

CLN 10000-001
APR05

21-63-11
CLN 10000-001

2-400

PAGE
4
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 213

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216310-010-010

EXPENDABLE

: 01 O-RING

216310-010-040

: REMOVAL AND INSTALLATION


OF FLIGHT COMPARTMENT
LININGS AND FURNISHINGS

25-13-10-RAI-10000

PUBLICATION
___________
JIC

AH

21-63-11
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
2. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK
AIR BLEED/COMPT TEMP/COMP & DUCT
TEMP IND
WARNING: DISPLAY WARNING NOTICE PROHIBITING
PRESSURIZATION OF PNEUMATIC SYSTEM AND
OPERATION OF AIR CONDITIONING SYSTEM.

002

___________________
PANEL
REMOVAL 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

003

_______
REMOVAL
REF. FIG. 216311-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
SENSOR.
2. REMOVE SENSOR (2) AND O-RING (3).
3. DISCARD O-RING (3).

004

____________
INSTALLATION
REF. FIG. 216311-RAI-00100
1. INSTALL O-RING (3) ON SENSOR (2).
2. INSTALL SENSOR (2).
3. CONNECT ELECTRICAL CONNECTOR (1) TO SENSOR
(2).
*** CONTINUED ***
AH

21-63-11
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-63-11

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

005

RAI 10000-001
3

APR05

________________________
PANEL
INSTALLATION 211DC
SEE JOB INSTRUCTION CARD
251310-RAI-10000

006

________
CLOSE
UP
1. REMOVE WARNING NOTICE.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER.
ON PANEL 121VU
- 1HK

007

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-63-11
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-63-11
4

AH

FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION

RAI 10000-001
APR05

21-63-11
RAI 10000-001

2-400

PAGE
4
APR 01/05

21-63-21

CABIN TEMPERATURE SENSOR


CLEANING

CLN 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 210

242

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216320-15B-010

EXPENDABLE

: 01 O-RING

216320-15B-040

BULK MATERIAL : ISOPAR-H

_________
MAN-HOURS

11-004

PUBLICATION
___________
JIC

: REMOVAL AND INSTALLATION


OF CABIN LATERAL PANELS

AH

25-23-23-RAI-10000

21-63-21
CLN 10000-001
2-400 PAGE
1
APR 01/05

21-63-21

CABIN TEMPERATURE SENSOR


CLEANING

001

CLN 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HK
AIR BLEED/COMPT TEMP/COMPT & DUCT
TEMP IND
- 21HH
COMPT TEMP/CAB TEMP SNSR FAN

002

___________________________
CABIN
LATERAL PANEL REMOVAL
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: REMOVE ONLY PANEL 242BW.

003

_______
REMOVAL
REF. FIG. 216321-RAI-00100
1. REMOVE SCREWS (1) AND WASHERS (2).
2. REMOVE COVER ASSY (3).
3. DISCONNECT ELECTRICAL CONNECTOR (4) FROM
SENSOR (5) AND PUT A BLANKING CAP ON IT.
4. REMOVE LOCKWIRE (6).
5. REMOVE SENSOR (5) AND O-RING (7).
6. DISCARD O-RING (7).

004

________
CLEANING
WARNING: ISOPAR-H IS TOXIC AND FLAMMABLE. TAKE
THE FOLLOWING PRECAUTIONS:
- AVOID ANY CONTACT WITH FLAMES. DO
NOT SMOKE
- AVOID INHALATION OF GAS/VAPOURS/
FUMES.
*** CONTINUED ***
AH

21-63-21
CLN 10000-001
2-400 PAGE
2
APR 01/05

21-63-21

CABIN TEMPERATURE SENSOR


CLEANING

CLN 10000-001
3

APR05

- AVOID SKIN CONTACT AND EYES


CONTAMINATION.
- WEAR PROTECTIVE GLOVES DURING USE.
1. CLEAN ALL THE SENSORS WITH ISOPAR-H SOLVENT.
2. DRY ALL THE SENSORS WITH DRY COMPRESSED AIR.
005

____________
INSTALLATION
REF. FIG. 216321-RAI-00100
1. REMOVE BLANKING CAP FROM ELECTRICAL
CONNECTOR.
2. INSTALL O-RING (7) ON SENSOR (5).
3. INSTALL SENSOR (5) AND LOCKWIRE (6).
4. CONNECT ELECTRICAL CONNECTOR (4) ON SENSOR.
5. POSITION COVER ASSY (3).
6. INSTALL SCREWS (1) AND WASHERS (2).

006

________________________________
CABIN
LATERAL PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: INSTALL ONLY PANEL 242BW.

007

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HK
- 21HH
*****

AH

E N D

O F

T E X T

*****

21-63-21
CLN 10000-001
2-400 PAGE
3
APR 01/05

21-63-21
4

AH

CABIN TEMPERATURE SENSOR


LOCATION

CLN 10000-001
APR05

21-63-21
CLN 10000-001

2-400

PAGE
4
APR 01/05

21-63-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-002
1

MAR14

ZONING DATA
___________
ZONE

: 210

242

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 TEMPERATURE SENSOR

216320-15B-010

EXPENDABLE

: 01 O-RING

216320-15B-040

: OPENING AND CLOSING OF


OVERHEAD STOWAGE AND
SERVICE COMPARTMENTS
: REMOVAL AND INSTALLATION
OF CABIN LATERAL PANELS

25-24-21-OAC-10000

PUBLICATION
___________
JIC
JIC

AH

25-23-23-RAI-10000

21-63-21
RAI 10000-002
2-400 PAGE
1
MAR 01/14

21-63-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-002
2

MAR14

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HK
AIR BLEED/COMPT TEMP/COMPT & DUCT
TEMP IND
- 21HH
COMPT TEMP/CAB TEMP SNSR FAN

002

OPENING OF OVERHEAD STOWAGE COMPARTMENTS __________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252421-OAC-10000

003

___________________________
CABIN
LATERAL PANEL REMOVAL
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: REMOVE ONLY PANEL 242BW.

004

_______
REMOVAL
REF. FIG. 216321-RAI-00100
1. REMOVE SCREWS (1) AND WASHERS (2).
2. REMOVE COVER ASSY (3).
3. DISCONNECT ELECTRICAL CONNECTOR (4) FROM
SENSOR (5) AND PUT A BLANKING CAP ON IT.
4. REMOVE LOCKWIRE (6).
5. REMOVE SENSOR (5) AND O-RING (7).
6. DISCARD O-RING (7).

*** CONTINUED ***


AH

21-63-21
RAI 10000-002
2-400 PAGE
2
MAR 01/14

21-63-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

005

RAI 10000-002
3

MAR14

____________
INSTALLATION
REF. FIG. 216321-RAI-00100
1. REMOVE BLANKING CAP FROM ELECTRICAL
CONNECTOR.
2. INSTALL O-RING (7) ON SENSOR (5).
3. INSTALL SENSOR (5) AND LOCKWIRE (6).
4. CONNECT ELECTRICAL CONNECTOR (4) ON SENSOR.
5. POSITION COVER ASSY (3).
6. INSTALL SCREWS (1) AND WASHERS (2).

006

________________________________
CABIN
LATERAL PANEL INSTALLATION
SEE JOB INSTRUCTION CARD
252323-RAI-10000
NOTE: INSTALL ONLY PANEL 242BW.

007

CLOSING OF OVERHEAD STOWAGE COMPARTMENTS __________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252421-OAC-10000

008

________
CLOSE
UP
1. REMOVE SAFETY CLIPS AND TAGS AND CLOSE THE
FOLLOWING CIRCUIT BREAKERS:
ON PANEL 121VU
- 1HK
- 21HH

*** CONTINUED ***


AH

21-63-21
RAI 10000-002
2-400 PAGE
3
MAR 01/14

21-63-21

CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

009

RAI 10000-002
4

MAR14

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-63-21
RAI 10000-002
2-400 PAGE
4
MAR 01/14

21-63-21
5

AH

CABIN TEMPERATURE SENSOR


LOCATION

RAI 10000-002
MAR14

21-63-21
RAI 10000-002

2-400

PAGE
5
MAR 01/14

21-63-22

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
1

MAR14

ZONING DATA
___________
ZONE

: 121
210

122

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

___
MEN

_________
MAN-HOURS

ELAPSED TIME

SPARE

: 01 SENSOR

216320-05-020

EXPENDABLE

: 01 O-RING

216320-05-010

: REMOVAL AND INSTALLATION


OF PASSENGER SEATS

25-21-21-RAI-10000

PUBLICATION
___________
JIC

AH

21-63-22
RAI 10000-001
2-400 PAGE
1
MAR 01/14

21-63-22

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

001

RAI 10000-001
2

MAR14

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK
AIR BLEED/COMPT TEMP/COMPT & DUCT
TEMP IND
2. MAKE CERTAIN THAT PNEUMATIC SYSTEM IS
DEPRESSURIZED.
WARNING: IN FLIGHT COMPARTMENT DISPLAY WARNING
NOTICE PROHIBITING PRESSURIZATION OF
PNEUMATIC SYSTEM AND OPERATION OF AIR
CONDITIONING SYSTEM.

002

REMOVAL OF PASSENGER COMPARTMENT SEATS ________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

003

___________________
FLOOR
PANEL REMOVAL
1. REMOVE FLOOR PANEL 222BF (231EF).

004

_________________
REMOVAL
OF SENSOR
REF. FIG. 216322-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (1) FROM
SENSOR (2).
2. CUT LOCKWIRE.
3. REMOVE SENSOR 4HK(5HK) (2).
4. REMOVE AND DISCARD SEAL (3) FROM SENSOR.

*** CONTINUED ***


AH

21-63-22
RAI 10000-001
2-400 PAGE
2
MAR 01/14

21-63-22

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

005

RAI 10000-001
3

MAR14

______________________
INSTALLATION
OF SENSOR
REF. FIG. 216322-RAI-00100
1. REMOVE BLANKING CAP FROM SENSOR.
2. INSTALL O-RING (3) ON SENSOR (2).
3. INSTALL SENSOR 4HK(5HK) (2).
4. INSTALL LOCKWIRE.
5. CONNECT ELECTRICAL CONNECTOR (1).

006

________________________
FLOOR
PANEL INSTALLATION
1. INSTALL FLOOR PANEL 222BF (231EF).

007

INSTALLATION OF PASSENGER COMPARTMENT SEATS _____________________________________________


IF INSTALLED
____________
SEE JOB INSTRUCTION CARD
252121-RAI-10000

008

________
CLOSE
UP
1. REMOVE WARNING NOTICE.
2. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK

009

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-63-22
RAI 10000-001
2-400 PAGE
3
MAR 01/14

21-63-22
4

AH

DUCT TEMPERATURE SENSOR


REMOVAL AND INSTALLATION

RAI 10000-001
MAR14

21-63-22
RAI 10000-001

2-400

PAGE
4
MAR 01/14

21-63-81

COMPARTMENT TEMPERATURE
SELECTOR SWITCH REMOVAL
AND INSTALLATION

RAI 10000-001
1

MAR09

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-63-81
RAI 10000-001
2-400 PAGE
1
MAR 01/09

21-63-81

COMPARTMENT TEMPERATURE
SELECTOR SWITCH REMOVAL
AND INSTALLATION

001

RAI 10000-001
2

MAR09

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK AIR BLEED/COMPT TEMP/COMPT & DUCT
TEMP IND

002

_________________
REMOVAL
OF SWITCH
1. REMOVE VU PANEL ON WHICH SWITCH IS
INSTALLED.
2. REMOVE NUT (4) ATTACHING SWITCH (2) TO VU
PANEL (3).
3. IDENTIFY ELECTRICAL CABLE (1).
4. DISCONNECT ELECTRICAL CABLE (1) BY MEANS OF
AN EXTRACTION TOOL, TYPE CIET 20.
5. REMOVE SWITCH (2).

003

______________________
INSTALLATION
OF SWITCH
REF. FIG. 310000-RAI-00108
1. CLEAN AND INSPECT SWITCH INSTALLATION
AREA.
2. INSTALL SWITCH (2) ON VU PANEL (3).
3. ON SWITCH (2), INSTALL AND TIGHTEN NUT
(4).
4. CONNECT ELECTRICAL CABLE (1) BY MEANS OF AN
INSERTION TOOL, TYPE CIET 20.

*** CONTINUED ***


AH

21-63-81
RAI 10000-001
2-400 PAGE
2
MAR 01/09

21-63-81

COMPARTMENT TEMPERATURE
SELECTOR SWITCH REMOVAL
AND INSTALLATION

004

RAI 10000-001
3

MAR09

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-63-81
RAI 10000-001
2-400 PAGE
3
MAR 01/09

21-63-81
4

AH

SWITCH

RAI 10000-001
MAR09

21-63-81
RAI 10000-001

2-400

PAGE
4
MAR 01/09

21-63-82

COMPT/DUCT TEMPERATURE
INDICATOR REMOVAL AND
INSTALLATION

RAI 10000-001
1

APR05

ZONING DATA
___________
ZONE

: 210

PREPARATION
___________
PROVISION
WORK

: SKILL
_____

ELAPSED TIME

AH

___
MEN

_________
MAN-HOURS

21-63-82
RAI 10000-001
2-400 PAGE
1
APR 01/05

21-63-82

COMPT/DUCT TEMPERATURE
INDICATOR REMOVAL AND
INSTALLATION

001

RAI 10000-001
2

APR05

___________
PREPARATION
1. OPEN SAFETY CLIP AND TAG THE FOLLOWING
CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK AIR BLEED/COMPT TEMP/COMPT & DUCT
TEMP IND

002

STANDARD REMOVAL OF FLIGHT COMPARTMENT


______________________________________
EQUIPMENT
_________
NOTE:THE SHAPE OF LOCKING COLLARS,THE QUANTITY
OF BINDING SCREWS AS WELL AS THE SHAPE
AND QUANTITY OF CONNECTORS MAY BE DIFFERENT
ACCORDING THE EQUIPMENT.
NEVERTHELESS,THE REMOVAL AND INSTALLATION
PROCEDURE IS IDENTICAL.
REF. FIG. 310000-RAI-00101
CAUTION: DO NOT LOOSEN LOCKING COLLAR
ATTACHMENT SCREWS.
1. REMOVE CABIN PANEL VU (1).
2. SUFFICIENTLY LOOSEN BINDING SCREWS (6) OF
EQUIPMENT LOCKING COLLAR (2) ON CABIN PANEL
VU (1).(DO NOT COMPLETELY UNSCREW).
3. PULL EQUIPMENT (4) ALONG ITS LOCKING COLLAR
(2).
4. DISCONNECT CONNECTORS(3) FROM RECEPTACLE (5)
5. REMOVE EQUIPMENT (4).
6. INSTALL PROTECTIVE CAP ON EACH CONNECTOR (3)
AND ON EACH RECEPTACLE (5).

*** CONTINUED ***


AH

21-63-82
RAI 10000-001
2-400 PAGE
2
APR 01/05

21-63-82

COMPT/DUCT TEMPERATURE
INDICATOR REMOVAL AND
INSTALLATION

003

RAI 10000-001
3

APR05

STANDARD INSTALLATION OF FLIGHT COMPARTMENT


___________________________________________
EQUIPMENT
_________
REF. FIG. 310000-RAI-00101
1. CLEAN AND INSPECT INSTRUMENT CABIN PANEL VU
(1) AND EQUIPMENT (4) INTERFACE AREA.
2. REMOVE PROTECTIVE CAPS INSTALLED ON CONNECTORS (3) AND RECEPTACLES (5).
3. MAKE CERTAIN THAT PINS ARE IN CORRECT CONDITION AND CONNECT CONNECTORS (3) WITH RECEPTACLES (5).
4. INSTALL EQUIPMENT (4) BY SLIDING IT ALONG
ITS LOCKING COLLAR (2).
5. POSITION EQUIPMENT AND TIGHTEN LOCKING COLLAR (2) BINBING SCREWS (6).
6. INSTALL CABIN VU PANEL (1).

004

________
CLOSE
UP
1. REMOVE SAFETY CLIP AND TAG AND CLOSE THE
FOLLOWING CIRCUIT BREAKER:
ON PANEL 121VU
- 1HK

005

________________
OPERATIONAL
TEST
THIS TEXT IS NOT APPLICABLE
*****

AH

E N D

O F

T E X T

*****

21-63-82
RAI 10000-001
2-400 PAGE
3
APR 01/05

21-63-82
4

AH

FLIGHT COMPARTMENT
EQUIPMENT

RAI 10000-001
APR05

21-63-82
RAI 10000-001

2-400

PAGE
4
APR 01/05

12 - MAR 01/15

21-31-22-CLN-10000-001
21-31-22-RAI-10000-001
21-31-22-RAI-10000-002
21-31-23-CLN-10000-001
21-31-23-RAI-10000-002
21-31-23-RAI-10000-003
21-31-82-RAI-10000-002

AH

CONTENT CHANGED
TASK DELETED
NEW TASK
CONTENT CHANGED
TASK DELETED
NEW TASK
MINOR INFORMATION ADDITION

ALL
ALL
ALL
ALL
ALL
ALL
051 TO 062

12
PAGE
1
MAR 01/15

PAGE

1 TO

9 DEC/14

51 TO

62

1 TO

12 DEC/14

63 TO

65

1 TO
1 TO
1 TO

3 APR/05
4 MAR/11
3 DEC/14

ALL
ALL
51 TO

62

1 TO

3 DEC/14

63 TO

65

1 TO

5 APR/05

ALL

1 TO

5 DEC/14

51 TO

62

1 TO

5 DEC/14

63 TO

65

1 TO

4 APR/05

ALL

1 TO

4 DEC/14

51 TO

62

1 TO

7 DEC/14

63 TO

65

1 TO

5 DEC/14

51 TO

52

1 TO

6 DEC/14

51 TO

62

1 TO

6 DEC/14

63 TO

65

1 TO

4 DEC/14

51 TO

62

REVISION NO 12 - MAR/15

21-10-00-OPT-10000-001 PACK VALVE INDICATING


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST
21-10-00-OPT-10000-002 PACK VALVE INDICATING
AND ASSOCIATED CIRCUIT
OPERATIONAL TEST
21-11-51-CHK-10000-001 PACK VALVE FILTER CHECK
21-11-51-DNZ-10000-001 PACK VALVE DEACTIVATION
21-11-51-OPT-10000-001 PACK VALVE CLOSURE
OPERATIONAL TEST
21-11-51-OPT-10000-002 PACK VALVE CLOSURE
OPERATIONAL TEST
21-11-51-RAI-10000-001 PACK VALVE REMOVAL
AND INSTALLATION
21-11-52-OPT-10000-001 OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR
21-11-52-OPT-10000-002 OPERATIONAL TEST OF
SERVICE PRESSURE
REGULATOR
21-11-52-RAI-10000-001 SERVICE PRESSURE
REGULATOR REMOVAL AND
INSTALLATION
21-22-00-OPT-10000-001 CABIN AND FLIGHT COMPT
AIR DISTRIBUTION
OPERATIONAL TEST
21-22-00-OPT-10000-002 CABIN AND FLIGHT COMPT
AIR DISTRIBUTION
OPERATIONAL TEST
21-22-00-OPT-10020-001 OPT OF CABIN AIR
VENTILATION ISOLATION IN
CNTNR CONFIG (CLASS E)
21-22-21-RAI-10000-001 RECIRCULATION FAN
REMOVAL AND INSTALLATION
21-22-21-RAI-10000-002 RECIRCULATION FAN
REMOVAL AND INSTALLATION
21-22-23-DVI-10000-001 DETAILED VISUAL
INSPECTION OF
RECIRCULATION FAN GRIDS
AH

1
MAR/15

PAGE

1 TO

4 DEC/14

63 TO

65

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

3 DEC/14

51 TO

62

1 TO

3 DEC/14

63 TO

65

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

3 APR/05

ALL

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

4 MAR/12

ALL

1 TO

4 APR/05

ALL

1 TO

3 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

7 DEC/14

51 TO

REVISION NO 12 - MAR/15

21-22-23-DVI-10000-002 DETAILED VISUAL


INSPECTION OF
RECIRCULATION FAN GRIDS
21-22-23-RAI-10000-001 RECIRCULATION FAN INLET
GRID REMOVAL AND
INSTALLATION
21-22-23-RAI-10000-002 RECIRCULATION FAN INLET
GRID REMOVAL AND
INSTALLATION
21-22-25-CHK-10000-001 INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT
21-22-25-CHK-10000-002 INSPECTION OF CHECK
VALVE FOR WEAR AND
FLAPPERS FREE MOVEMENT
21-22-25-RAI-10000-001 AIR CONDITIONED CHECK
VALVE REMOVAL AND
INSTALLATION
21-22-25-RAI-10000-002 AIR CONDITIONED CHECK
VALVE REMOVAL AND
INSTALLATION
21-22-27-CHK-10000-001 CHECK OF AIR GRND CONN
CHECK VALVE DUCT FWD U/F
COMPT
21-22-27-RAI-10000-001 REMOVAL AND INSTALLATION
OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT
21-22-27-RAI-10000-002 REMOVAL AND INSTALLATION
OF AIR GRND CONN CHECK
VALVE DUCT FWD U/F COMPT
21-22-51-DVI-10000-001 DETAILED VISUAL
INSPECTION OF AIR GROUND
CONNECTION CHECK VALVE
21-22-51-RAI-10000-001 AIR GROUND CONNECTION
CHECK VALVE REMOVAL AND
INSTALLATION
21-22-91-CHK-10000-001 CHECK OF FLIGHT DECK
DISTRIBUTION CHECK VALVE
21-22-91-RAI-10000-001 FLIGHT DECK DISTRIBUTION
CHECK VALVE REMOVAL AND
INSTALLATION
21-23-00-OPT-10010-002 OPERATIONAL TEST OF AIR
EXTRACTION FAN

AH

62

2
MAR/15

PAGE

1 TO

9 DEC/14

63 TO

65

1 TO

7 DEC/14

51 TO

62

1 TO

9 DEC/14

63 TO

65

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

6 MAR/12

ALL

1 TO

5 MAR/12

ALL

1 TO

4 MAR/12

ALL

1 TO

4 MAR/12

ALL

1 TO

5 DEC/14

ALL

1 TO

5 MAR/12

ALL

1 TO

6 DEC/14

ALL

1 TO

3 APR/05

ALL

1 TO

5 DEC/14

ALL

1 TO

4 DEC/14

53 TO

65

1 TO

4 DEC/14

51 TO

52

1 TO

4 APR/05

ALL

1 TO

5 MAR/11

ALL

REVISION NO 12 - MAR/15

21-23-00-OPT-10010-003 OPERATIONAL TEST OF AIR


EXTRACTION FAN
21-23-00-OPT-10020-002 OPERATIONAL TEST OF
OVERBOARD VALVE
21-23-00-OPT-10020-003 OPERATIONAL TEST OF
OVERBOARD VALVE
21-23-16-OPT-10000-001 OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)
21-23-16-OPT-10000-002 OPERATIONAL TEST OF
ANTI-SMOKE VALVE(S)
21-23-16-RAI-10000-001 REMOVAL AND INSTALLATION
OF ANTI-SMOKE VALVE,
CONTROL LEVER AND CABLE
21-23-21-RAI-10000-001 REMOVAL AND INSTALLATION
OF AIR EXTRACTION FAN
21-23-22-CHK-10000-001 MANUAL CHECK OF
OVERBOARD VENT VALVE
21-23-22-RAI-10000-001 REMOVAL AND INSTALLATION
OF OVERBOARD VENTILATION
VALVE
21-23-23-OPT-10000-002 OPERATIONAL TEST OF
UNDERFLOOR VENTILATION
VALVE
21-23-23-RAI-10000-001 REMOVAL AND INSTALLATION
OF UNDERFLOOR
VENTILATION VALVE
21-23-25-RAI-10000-002 REMOVAL AND INSTALLATION
OF AIR EXTRACTION DUCT
CHECK VALVE
21-24-11-CHK-10000-001 CHECK OF BATTERIES
VENTILATION CHECK VALVE
21-24-11-RAI-10000-002 REMOVAL AND INSTALLATION
OF BATTERIES VENTILATION
CHECK VALVE
21-26-00-OPT-10000-001 OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION
21-26-00-OPT-10000-002 OPERATIONAL TEST OF
INDIVIDUAL AIR
DISTRIBUTION
21-27-00-CHK-10000-001 CHECK OF LAVATORY
COMPARTMENT VENTILATION
21-31-00-FUT-10000-001 OUTFLOW VALVES
OVERPRESSURE RELIEF
FUNCTIONAL TEST
AH

3
MAR/15

PAGE

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

7 DEC/14

51 TO

62

1 TO

8 DEC/14

63 TO

65

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

5 DEC/14

51 TO

62

1 TO

5 DEC/14

63 TO

65

1 TO

10 DEC/14

63 TO

65

1 TO

5 DEC/14

51 TO

62

1 TO

5 DEC/14

63 TO

65

1 TO

4 MAR/12

ALL

1 TO

4 MAR/14

ALL

1 TO

2 MAR/15

ALL

1 TO

4 MAR/11

ALL

TO

MAR/11

ALL

1 TO

5 MAR/15

ALL

REVISION NO 12 - MAR/15

21-31-00-FUT-10010-001 FUNCTIONAL TEST OF


DITCHING SYSTEM
21-31-00-FUT-10010-002 FUNCTIONAL TEST OF
DITCHING SYSTEM
21-31-00-FUT-10020-004 FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE
21-31-00-FUT-10020-005 FUNCTIONAL TEST ON
GROUND OF CABIN PRESSURE
CONTROL IN AUTO MODE
21-31-00-FUT-10030-002 FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING
21-31-00-FUT-10030-003 FUNCTIONAL TEST OF
EXCESSIVE CABIN ALTITUDE
WARNING
21-31-00-FUT-10040-001 FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG
21-31-00-FUT-10040-002 FUNCTIONAL TEST OF
EXCESSIVE CABIN
DIFFERENTIAL PRESS WNG
21-31-00-FUT-10050-001 FUNCTIONAL TEST OF CABIN
ALTITUDE INDICATION
21-31-00-OPT-10000-001 MANUAL PRESSURE CONTROL
SYSTEM OPERATIONAL TEST
21-31-00-OPT-10000-002 MANUAL PRESSURE CONTROL
SYSTEM OPERATIONAL TEST
21-31-20-DNZ-10000-001 ELECTROPNEUMATIC AND
PNEUMATIC OUTFLOW VALVES
BLOCKAGE IN OPEN POS
21-31-21-RAI-10000-001 JET PUMP REMOVAL AND
INSTALLATION
R 21-31-22-CLN-10000-001 CLEANING OF
ELECTROPNEUMATIC
OUTFLOW VALVE SEAT
21-31-22-DNZ-10000-001 ELECTROPNEUMATIC OUTFLOW
VALVE DEACTIVATION
D 21-31-22-RAI-10000-001 ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION
N 21-31-22-RAI-10000-002 ELECTROPNEUMATIC OUTFLOW
VALVE REMOVAL AND
INSTALLATION
AH

4
MAR/15

PAGE

1 TO

2 MAR/15

ALL

TO

MAR/12

ALL

1 TO

5 MAR/15

ALL

1 TO

4 MAR/11

ALL

1 TO

4 MAR/14

ALL

1 TO

4 MAR/14

ALL

1 TO

3 DEC/14

51 TO

62

1 TO

3 DEC/14

63 TO

65

1 TO

4 APR/05

ALL

1 TO

4 MAR/15

51 TO

62

1 TO

4 DEC/14

51 TO

62

1 TO

4 DEC/14

63 TO

65

1 TO

5 DEC/14

51 TO

62

1 TO

7 DEC/14

63 TO

65

1 TO
1 TO
1 TO

5 DEC/14
7 DEC/14
3 MAR/13

51 TO
63 TO
ALL

62
65

1 TO

8 MAR/11

ALL

1 TO

5 DEC/14

ALL

1 TO

4 DEC/14

ALL

1 TO

4 MAR/14

ALL

REVISION NO 12 - MAR/15

R 21-31-23-CLN-10000-001 CLEANING OF PNEUMATIC


OUTFLOW VALVE SEAT
D 21-31-23-RAI-10000-002 PNEUMATIC OUTFLOW VALVE
REMOVAL AND INSTALLATION
N 21-31-23-RAI-10000-003 PNEUMATIC OUTFLOW VALVE
REMOVAL AND INSTALLATION
21-31-24-RAI-10000-001 ELECTROPNEUMATIC OUTFLOW
VALVE FILTER REMOVAL AND
INSTALLATION
21-31-25-CHK-10000-001 INSPECTION OF CHECK
VALVE FOR CORRECT
OPERATION
21-31-25-RAI-10000-001 CHECK VALVE REMOVAL AND
INSTALLATION
21-31-81-OPT-10000-001 DIGITAL CONTROLLER
BITE TEST
21-31-81-OPT-10000-002 DIGITAL CONTROLLER
BITE TEST
21-31-81-RAI-10000-001 DIGITAL CONTROLLER
REMOVAL AND INSTALLATION
R 21-31-82-RAI-10000-002 MANUAL CONTROLLER
REMOVAL AND INSTALLATION
21-31-83-RAI-10000-002 CABIN PRESSURE INDICATOR
REMOVAL AND INSTALLATION
21-31-85-RAI-10000-001 REMOVAL AND INSTALLATION
OF AMBIENT PRESSURE
SENSOR
21-51-00-CHK-10010-001 CHECK OF PACK VALVE
DELIVERED PRESSURE
21-51-00-CHK-10010-002 CHECK OF PACK VALVE
DELIVERED PRESSURE
21-51-00-CHK-10020-001 CHECK OF PACK LEAKAGE
21-51-00-CHK-10020-002 CHECK OF PACK LEAKAGE
21-51-51-CHK-10000-001 INSPECTION AND CLEANING
OF HEAT EXCHANGER
21-51-51-RAI-10000-001 HEAT EXCHANGER REMOVAL
AND INSTALLATION
21-51-52-RAI-10000-001 AIR CYCLE MACHINE
REMOVAL AND INSTALLATION
21-51-53-FUT-10000-001 PACK OVERTEMPERATURE
SWITCH FUNCTIONAL TEST
21-51-53-RAI-10000-001 THERMAL SWITCH
REMOVAL AND INSTALLATION

AH

5
MAR/15

PAGE

1 TO

4 APR/05

ALL

1 TO

4 MAR/09

ALL

1 TO

5 APR/08

ALL

1 TO

3 APR/05

ALL

1 TO

4 MAR/14

ALL

1 TO

3 MAR/14

ALL

1 TO

4 APR/05

ALL

1 TO

3 DEC/14

ALL

1 TO

3 DEC/14

ALL

1 TO

5 MAR/12

ALL

1 TO

4 APR/07

ALL

1 TO

5 MAR/12

ALL

1 TO

4 APR/05

ALL

1 TO

6 MAR/12

ALL

1 TO

4 MAR/11

ALL

1 TO

4 DEC/14

51 TO

62

1 TO

6 DEC/14

63 TO

65

1 TO

5 DEC/14

51 TO

62

REVISION NO 12 - MAR/15

21-51-55-RAI-10000-001 CONDENSER REMOVAL AND


INSTALLATION
21-51-56-RAI-10000-001 WATER EXTRACTOR REMOVAL
AND INSTALLATION
21-51-58-RAI-10010-001 GROUND COOLING TURBOFAN
REMOVAL AND INSTALLATION
21-51-59-CHK-10000-001 RAM AIR CHECK VALVE
OPERATIONAL CHECK
21-51-59-RAI-10000-001 RAM AIR CHECK VALVE
REMOVAL AND INSTALLATION
21-51-91-CHK-10000-001 CHECK FOR FREE AIR FLOW
THROUGH THE WATER SPRAY
NOZZLE
21-51-91-RAI-10000-001 WATER SPRAY NOZZLE
REMOVAL AND INSTALLATION
21-51-93-CHK-10000-001 CHECK OF GROUND COOLING
TURBOFAN CHECK VALVE
21-51-93-RAI-10000-002 GROUND COOLING TURBOFAN
CHECK VALVE REMOVAL AND
INSTALLATION
21-51-94-FUT-10000-001 FUNCTIONAL TEST OF
TURBOFAN/SHUT-OFF VALVE
21-51-94-RAI-10000-001 REMOVAL AND INSTALLATION
OF TURBO FAN
SHUT-OFF VALVE
21-51-96-OPT-10010-001 OPERATIONAL TEST OF
ADDITIONAL DE-ICING
PRESSURE SWITCH
21-51-96-RAI-10000-001 ADDITIONAL DE-ICING
PRESSURE SWITCH
REMOVAL AND INSTALLATION
21-51-98-OPT-10000-002 OPERATIONAL TEST OF
TURBINE INLET CONTROL
VALVE
21-51-98-RAI-10000-002 TURBINE INLET CONTROL
VALVE REMOVAL AND
INSTALLATION
21-61-00-CHK-10000-002 CHECK OF DUCT
TEMPERATURE
21-61-00-CHK-10000-003 CHECK OF DUCT
TEMPERATURE
21-61-00-OPT-10000-001 FLIGHT COMPARTMENT AND
CABIN TEMPERATURE
CONTROL OPERATIONAL TEST
AH

6
MAR/15

PAGE

1 TO

6 DEC/14

63 TO

1 TO

4 DEC/14

ALL

1 TO

4 DEC/14

ALL

1 TO

4 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

4 MAR/14

ALL

1 TO

4 MAR/14

ALL

1 TO

4 MAR/14

ALL

1 TO

4 MAR/14

ALL

1 TO

6 MAR/12

ALL

1 TO

5 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

4 MAR/10

ALL

1 TO

4 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

4 APR/05

ALL

1 TO

4 APR/05

ALL

REVISION NO 12 - MAR/15

21-61-00-OPT-10000-002 FLIGHT COMPARTMENT AND


CABIN TEMPERATURE
CONTROL OPERATIONAL TEST
21-61-11-CLN-10000-001 FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING
21-61-11-RAI-10000-001 FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-61-13-RAI-10000-001 SKIN TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-61-21-CLN-10000-001 CABIN TEMPERATURE SENSOR
CLEANING
21-61-21-RAI-10000-001 CABIN TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-61-23-RAI-10000-001 SKIN TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-61-24-RAI-10000-001 DUCT OVERTEMPERATURE
SWITCH REMOVAL AND
INSTALLATION
21-61-25-RAI-10000-001 DUCT TEMPERATURE LIMITER
REMOVAL AND INSTALLATION
21-61-26-RAI-10000-001 DUCT TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-61-28-RAI-10000-001 TEMPERATURE SENSOR
VENTILATION FAN REMOVAL
AND INSTALLATION
21-61-51-RAI-10000-001 TRIM AIR VALVE REMOVAL
AND INSTALLATION
21-61-52-RAI-10000-001 HOT BY-PASS VALVE
REMOVAL AND INSTALLATION
21-61-82-RAI-10000-002 TEMPERATURE SELECTOR
REMOVAL AND INSTALLATION
21-61-83-RAI-10000-001 COMPARTMENT TEMPERATURE
CONTROLLER REMOVAL AND
INSTALLATION
21-63-11-CLN-10000-001 FLIGHT COMPARTMENT
TEMPERATURE SENSOR
CLEANING
21-63-11-RAI-10000-001 FLIGHT COMPARTMENT
TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-63-21-CLN-10000-001 CABIN TEMPERATURE SENSOR
CLEANING
AH

65

7
MAR/15

PAGE

1 TO

5 MAR/14

ALL

1 TO

4 MAR/14

ALL

1 TO

4 MAR/09

ALL

1 TO

4 APR/05

ALL

REVISION NO 12 - MAR/15

21-63-21-RAI-10000-002 CABIN TEMPERATURE SENSOR


REMOVAL AND INSTALLATION
21-63-22-RAI-10000-001 DUCT TEMPERATURE SENSOR
REMOVAL AND INSTALLATION
21-63-81-RAI-10000-001 COMPARTMENT TEMPERATURE
SELECTOR SWITCH REMOVAL
AND INSTALLATION
21-63-82-RAI-10000-001 COMPT/DUCT TEMPERATURE
INDICATOR REMOVAL AND
INSTALLATION

AH

8
MAR/15

Das könnte Ihnen auch gefallen