Beruflich Dokumente
Kultur Dokumente
MAY
(mm)
JUN
(mm)
Latitud Sud:
Longitud Oeste:
Altura m/s/n/m:
64 56' 00"
19 55' 00"
2460 m.s.n.m.
AO
ENE
(mm)
FEB
(mm)
MAR
(mm)
ABR
(mm)
JUL
(mm)
AGO
(mm)
SEP
(mm)
OCT
(mm)
NOV
(mm)
DIC
(mm)
ANUAL
(mm)
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
92.60
42.50
83.20
110.00
140.60
28.00
61.10
23.90
67.40
10.90
47.80
61.30
174.90
2.30
42.10
35.70
65.90
61.00
28.30
25.40
26.60
27.50
112.50
19.80
63.40
25.00
108.00
60.10
16.80
25.60
49.90
14.70
23.00
0.00
32.80
15.50
126.10
15.70
64.10
4.20
6.80
31.80
112.40
8.60
31.20
0.00
0.00
0.00
10.70
2.00
28.10
6.30
0.00
2.10
9.60
9.50
3.20
0.00
0.00
0.00
0.00
0.00
3.10
2.00
0.00
15.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.20
0.00
0.00
0.00
7.40
0.00
4.20
0.00
25.00
10.50
0.00
0.00
0.00
6.30
0.00
3.20
10.40
0.00
3.00
0.00
7.40
14.80
12.70
7.30
6.30
1.50
6.30
9.40
0.00
7.40
2.10
0.00
31.10
12.60
0.00
15.70
19.10
3.10
7.50
63.70
10.40
26.30
5.50
7.40
0.00
0.00
45.80
13.80
49.70
17.80
23.60
0.00
14.70
53.20
4.20
40.90
4.30
11.80
26.30
40.40
43.60
30.60
34.70
40.30
10.00
16.70
67.40
31.60
16.70
22.80
16.80
21.20
49.30
58.00
30.00
52.60
56.70
44.60
25.30
12.50
94.80
19.70
33.40
43.60
28.00
47.00
23.00
365.50
273.30
339.80
342.70
325.10
169.10
184.40
261.60
503.80
139.40
324.60
150.40
397.30
214.80
MAX
MIN
MEDIA
174.90
2.30
67.61
112.50
19.80
50.09
126.10
0.00
30.50
112.40
0.00
15.75
15.70
0.00
1.71
4.30
0.00
0.54
25.00
0.00
4.79
14.80
0.00
5.59
63.70
0.00
14.46
53.20
0.00
21.86
67.40
10.00
31.58
94.80
12.50
40.66
503.80
139.40
285.13
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
ANUAL
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
67.61
50.09
30.50
15.75
1.71
0.54
4.79
5.59
14.46
21.86
31.58
40.66
285.13
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
ANUAL
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
50.71
37.57
22.88
11.81
1.29
0.40
3.59
4.19
10.84
16.40
23.68
30.49
213.85
n mes
Q (lt/S)
V(m3)
Q (lt/S)
V(m3)
31.00
1.05
FEB
28.00
31.00
ABR
30.00
MAY
31.00
JUN
JUL
30.00
31.00
AGO
31.00
SEP
30.00
0.48
0.25
0.03
0.01
0.07
0.09
0.23
657.25
71.54
22.36
199.71
233.09
603.30
0.62
0.86
MAR
OCT
31.00
0.34
NOV
30.00
0.51
DIC
31.00
0.63
ANUAL
365.00
0.38
0.51
0.28
0.15
0.02
0.01
0.04
0.05
0.14
0.20
0.30
0.37
0.22
1661.11 1230.78
749.39
386.98
42.12
13.16
117.59
137.24
355.21
537.21
775.89
998.95
7005.61
19.60
25.30
25.80
16.30
14.30
10.00
7.40
18.50
35.60
15.40
12.60
12.50
20.80
20.30
"C"
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
AREA
CUENCA
(km2)
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
DESCARGA
ANUAL
(m3)
32,310.20
24159.72
30038.32
30294.68
28738.84
14948.44
16300.96
23125.44
44535.92
12322.96
28694.64
13295.36
35121.32
18988.32
35.60
7.40
18.17
CUENCA
44535.92
12322.96
25205.37
"C"
AREA
(km2)
0.52
0.17
APORTE
(m3)
25,205.37
CUENCA
AREA
(km2)
0.52
0.17
APORTE
(m3)
18,904.02
AREA
Sector
(km2)
0.52
0.107
Chimurillo
0.52
0.063
Qhocha Punta
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
31
28
31
30
31
30
31
31
30
31
30
31
50.71
37.57
22.88
11.81
1.29
0.40
3.59
4.19
10.84
16.40
23.68
30.49
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
0.170
8619.91
6386.84
3888.75
2008.13
218.57
68.30
610.18
712.18
1843.29
2787.70
4026.27
5183.79
Coef. Escorrentia
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
0.52
Descarga (m3)
4482
3321
2022
1044
114
36
317
370
959
1450
2094
2696
4482
3321
2022
1044
114
36
317
370
959
1450
2094
2696
Caudal (lt/seg)
1.67
1.37
0.75
0.40
0.04
0.01
0.12
0.14
0.37
0.54
0.81
1.01
Derechos de Terceros
ANUAL
365
213.85
0.170
36353.89
0.52
18904
0
18904
0.60
Sector:
Beneficiario:
Comunidad:
Municipio:
Provincia:
Departamento:
1. Dimensiones geomtricas
Volumen de agua en el atajado
V=
300.0 m
L'y = 0.689(V/Hd)0.5
8.44
a=
10.90
L'x = 1.155(V/Hd)0.5
14.15
Altura de diseo
b=
Hd =
10.00
Hd = 0.475(V)1/5
v =1
h1 =
1.50
m=
33.69
v =1
h2 =
2.00
1.49
2.00 m
n=
26.57
a' = a + 2 m Hd
a' =
16.90 m
b' = b + 2 m Hd
18.00 m
Altura muerta
Hm = 0.15 Hd 0.30 m
b' =
Hm =
Hb = 0.5 Hd 0.80 m
Hb =
0.50 m
Altura total
Ht = Hm + Hd + Hb
Ht =
2.70 m
Ancho de coronamiento
C = 0.5 Hd 1 m
C=
1.00 m
A = a + 2 m Ht
A=
19.00 m
B = b + 2 m Ht
B=
20.80 m
s=
At =
Ac = (Ht(1 - sh1)+Hm)0.5a
1.00
0.20 m
0.20 m/m
5.74 m
Ac =
11.39 m
Ar = 0.5(Hm2 h1)
Ar =
0.03 m
Atc = At + Ac + Ar
Atc =
17.16 m
Vc =
223.74 m
B t = C + H t h 1 + Ht h 2
Bt =
10.45 m
At = 0.5 (Bt + C) Ht
At =
15.46 m
lt = a+Ht(2h1+ h2)+C
lt =
25.40 m
Lt = b+2Ht(h1+ h2)+2C
Lt =
30.90 m
Vt = At (Lt + lt)
Vt =
870.26 m
ESQUEMA GRAFICO
Canales de aduccin
Desarenador
1.00
1.00
20.8
Vertedor
10.9
19.0
25.4
10.00
Camara ingreso
30.9
Valvula
Camar de amortiguacin
395.2
Canal de conduccin
Corte transversal
1.00
0.50
1
2.00
1
1.5
10.9
1.5
0.20
Corte longitudinal
4.95
1.00
1
1.5
2.7
2.0
1.00
1
1.5
1
1.5
D=
At =
0.076 m
Cd =
0.600
1.5
10.0
2. Condiciones hidraulicas
Dimetro de la tubera de desfogue
Area del orificio de la tubera
D=
At = D /4
plg
Coeficiente de descarga
0.005 m
Qd1 =
17.14 l/s
Qd2 =
5.42 l/s
Aem = A B
Aem =
395.2 m
Ae = 0.5(Aem + Ab)
Ae =
252.1 m
Tiempo de descarga
t =2AeHd0.5/(CdAt(2g)0.5)/3600
0.5
0.5
t=
16.34 h
IJCHUYOJ
PALAMANA SUINDIRI
1200
Sector:
Comunidad:
Municipio:
Provincia:
Departamento:
CANAL DE ADUCCION
QT =
Caudal en el canal
0.03 m3/seg
B=
0.30 m
z=
0.5
n = 0.025
S=
Yo =
Pendiente asumida
0.0050
0.20 m
Tirante normal
F= 0
Tirante critico
F=1
Area mojada
A = BYo + zY
A = 0.079 m2
Perimetro mojado
P = 0.742 m
Radio Hidraulico
R=A/P
R = 0.106 m
Velocidad
V = Q/A
Nmero de Froude
F = V / (g L)
V=
Yc =
2
o
0.5
1.68 m/seg
0.04 m
V=
0.32 m/seg
F=
0.10 Subcrt
BIEN
0.20
0.5
1
0.5
0.30
Caudal de ingreso
0.03 m3/seg
B=
0.40 m
z=
n = 0.016
Tirante normal
F= 0
S=
Yo =
Tirante critico
F=1
Yc =
Area mojada
A = BYo + zYo2
Perimetro mojado
P = B + 2Yo (1+z )
P = 0.733 m
Radio Hidraulico
R=A/P
R = 0.091 m
Pendiente asumida
0.0050
0.17 m
0.11 m
A = 0.067 m2
2 0.5
Velocidad
V = Q/A
Nmero de Froude
F = V / (g L)
V=
0.5
5.00 m/seg
V=
0.37 m/seg
F=
0.93 Subcrt
BIEN
0.15
0.13
0.30
0.17
0.40
0.15
VERTEDOR DE EXCEDENCIAS
QT =
0.10 m3/seg
L=
0.40 m
C=
Hd =
2.4
0.22 m
B=
0.60 m
z=
Hd = (Q/(C.L)
2/3
n = 0.016
S = (n.Q/(A.R ))
2/3
S=
0.0070
0.0070
Tirante normal
F= 0
S=
Yo =
Tirante critico
F=1
Yc =
Area mojada
A = BYo + zYo2
Perimetro mojado
P = B + 2Yo (1+z )
P = 0.897 m
Radio Hidraulico
R=A/P
R = 0.099 m
Velocidad
V = Q/A
Nmero de Froude
F = V / (g L)
V=
Pendiente asumida
0.15 m
0.14 m
A = 0.089 m2
2 0.5
0.5
5.00 m/seg
V=
1.12 m/seg
F=
0.93 Subcrt
BIEN
0.15
0.25
0.40
0.15
0.60
0.15
DESARENADOR
Caudal de ingreso
Velocidad de ingreso
Velocidad horizontal en el desrenador
Dimetro de la partcula a decantar
Q=
0.05 m3/seg
V=
VH =
0.63 m/seg
0.08 m/seg
= 0.20 mm
Vd = 0.022 m/seg
hd =
0.4 m
f=
Longitud de decantacin
Ld = ( VH / Vd ) . hd . f
Ld =
1.50 m
Longitud de entrada
Le =
1.50 m
Le = Ld / f
B = Q / (VH . hd )
B=
1.50 m
Longitud de salida
Ls = 0.5 Le
Ls =
0.80 m
Qs =
0.04 kg/m3
Densidad de la arena
n=
t=
2600 kg/m3
5
15 das
ht = Vt / ( B . Ld )
Vt =
ht =
1.99 m3
Flm = n / t
Flm =
10
H1 = hd + ht
H1 =
1.29 m
d=
0.08 m
A = d /4
A=
=
0.00 m2
0.89 m
Desfogue de sedimentos
3
plg
Coeficiente de gasto
Caudal de desfogue
Q=(A).(2.g.(H1-0.5d))0.5
pendiente de salida
Ss =(Q . N / (A . R ))
2/3
0.6
Q = 0.003 m3/seg
Ss = 0.139 m/m
Esquema Desarenador
BL =
0.13
0.40
0.15
0.84
0.89
=3
1.50
1.50
0.80
0.15
0.6
0.15
1.50
0.15
0.15
=3
0.15
0.15
rebose
Seccin de tubo PVC extraible
1.29
0.15
3"
W=
1.00 m
Pt = 2 W / 3
Pt =
0.67 m
L=4W /3
L=
1.33 m
p=3W/8
p=
0.38 m
e=
0.15 m
0.10
=3
0.38
0.38
Qmax= 24.69
0.67
0.15
0.15
1.00
0.8
0.15
0.15
=3
1.00
0.15
0.3
Canal de tierra