ENCOFRADO DE VERTICALES

Personas

11

h dia

9.6
Dia de Obra
hh
hhacum
metrado
metrado acum
Rendim diario
Rendim Acum

Rendim Presupuestado

32
105.60
3,379.20
101.94
4,000.64
1.04
0.84

33
105.60
3,484.80
135.21
4,135.85
0.78
0.84

34
105.60
3,590.40
142.43
4,278.28
0.74
0.84

35
105.60
3,696.00
120.50
4,398.78
0.88
0.84

1.00

1.00

1.00

1.00
Operario

Formacin de Oficial
Cuadrilla
Peon
Total

LAST DAY

Amotiguador

Amotiguador

36
105.60
3,801.60
101.94
4,500.72
1.04
0.84

37
105.60
3,907.20
135.21
4,635.93
0.78
0.84

38
105.60
4,012.80
142.43
4,778.36
0.74
0.84

39
105.60
4,118.40
120.50
4,898.86
0.88
0.84

40
105.60
4,224.00
101.94
5,000.80
1.04
0.84

41
105.60
4,329.60
5,000.80
0.87

42
105.60
4,435.20
5,000.80
0.89

1.00

1.00

1.00

1.00

1.00

1.00

1.00

0.16

0.13

0.11

776.80

671.20

565.60

9,710.00

7,047.60

5,938.80

12.5

10.5

10.5

6.00

Dif Rend

0.00

Dif HH

5.00

Dif Soles

11.00

Amotiguador

Amotiguador

43
105.60
4,540.80
5,000.80
0.91

44
105.60
4,646.40
5,000.80
0.93

1.00

1.00

0.09

0.07

460.00

354.40

HH

4,830.00

3,721.20

S/.

10.5

10.5

18
11

5
7

12

13.66666667 13.5333

hh/m2

jornada
rendimiento

8 hrs
16 m3/dia

FORMATO DE CURVAS DE PRODUCTIVIDAD

CONC
SEMANA 29
LUNES

MARTES

MIRCOLES

6/25/2012

6/26/2012

6/27/2012

22.50

25.00

25.00

1672.50

1697.50

1722.50

45.00

23.50

41.00

Metrado Acumulado

2256.73

2280.23

2321.23

Rend Presupuestado

0.72

0.72

0.72

Rend Diario

0.50

1.06

0.61

Rend Acumulado

0.74

0.74

0.74

Horas Hombre (HH)


HH Acumulado
Metrado

GRAFICO DE CURVAS DE PRODUCTIVIDAD


1.20

1.00

0.80

0.60

0.40

0.20

0.00
LUNES

MARTES

MIRCOLES

JUEVES

0.00
LUNES

MARTES

MIRCOLES

JUEVES

CONCRETO EN MUROS, COLUMNAS, PLACAS Y LOSAS


SEMANA 29

SEMANA 30

JUEVES

VIERNES

SBADO

LUNES

MARTES

MIRCOLES

6/28/2012

6/29/2012

6/30/2012

7/2/2012

7/3/2012

7/4/2012

25.00

22.50

13.00

20.00

22.50

8.00

1747.50

1770.00

1783.00

1803.00

1825.50

1833.50

45.50

45.50

16.50

36.00

40.00

9.00

2366.73

2412.23

2428.73

2464.73

2504.73

2513.73

0.72

0.72

0.72

0.72

0.72

0.72

0.55

0.49

0.79

0.56

0.56

0.89

0.74

0.73

0.73

0.73

0.73

0.73

REND. Pres.
REND. Diario
REND. Acum.

MIRCOLES

JUEVES

VIERNES

SBADO

LUNES

MARTES

MIRCOLES

JUEVES

VIERNES

MIRCOLES

JUEVES

VIERNES

SBADO

LUNES

MARTES

MIRCOLES

JUEVES

VIERNES

AS
SEMANA 30
JUEVES

VIERNES

SBADO

7/5/2012

7/6/2012

7/7/2012

22.00

25.00

15.00

1855.50

1880.50

1895.50

33.00

40.00

18.50

2546.73

2586.73

2605.23

0.72

0.72

0.72

0.67

0.63

0.81

0.73

0.73

0.73

REND. Pres.
REND. Diario
REND. Acum.

JUEVES

VIERNES

SBADO

JUEVES

VIERNES

SBADO

Problemas de productividad de WRC


1
1
0.15
0.15
1
1
1
1
6.3
0.63
6.93

operario
peon
chofer de cisterna
ayudante p/ motobomba de cisterna (peon)
operador de rodillo
ayudante de operador de rodillo
operador de motoniveladora
ayudante de operador de motoniveladora
10% de capataz

Partida : Afirmado con


equipo e=7.5cm
Mano de Obra
Cisterna
Rodillo
Motoniveladora

Ru

1000
1000
1000
1000

Nhombres
Rend. MO/Equipo N
o equipos
de h*H/Ru
H
6.93
0.15
1
1

0.06 HH/m2
0.001 HH/m2
0.01 HH/m2
0.01 HH/m2

Productividad
Ru/N Horas*H
18.04 m2/HH
833.3 m2/HH
125 m2/HH
125 m2/HH

Velocidad de
Produccion
Ru/N de horas
125
125
125
125

m2/H
m2/H
m2/H
m2/H