Sie sind auf Seite 1von 11

Description

Accounts

Unit

Total Capac(empty)

Cassette
5
Boss Cabin 1
Cassette
4
Boss Cabin 2
Cassette
3
Cabin 1
High Wall
1.7
Change Room
High Wall
2
Chemical Lab
Cassette
8
Circuit 1
(empty)
(empty)
Circuit 2
(empty)
(empty)
Circuit 3
(empty)
(empty)
Circuit 4
(empty)
(empty)
Circuit 5
(empty)
(empty)
Circuit 5
(empty)
(empty)
Conference Hall (150 sqft)
Cassette
2
Conference hall 2
Cassette
5
Control Sample 1
High Wall
2.5
Control Sample 2

High Wall
2.5
Control Sample 3
High Wall
2
Corridor
Cassette
4
Cassette
4
Culture Store
High Wall
2.5
Documentation Room
Cassatte
5
Electrical Panel Room
Ductable
6
Factory Head
High Wall
2
Factory Staf
High Wall
1
First Floor
(empty)
(empty)
Fume Hood 1
High Wall
1.7
Fume Hood 2
High Wall
1.7
Ground Floor
(empty)
(empty)
High Side Machines
(empty)
(empty)
Hot Zone
High Wall
1.25
Indoor Units
(empty)
(empty)
Instrument room
High Wall
5

Media Prepration 1
High Wall
2.5
Media Prepration 2
High Wall
2
Outdoor units
(empty)
(empty)
Packing room 1
High Wall
2
Packing room 2
High Wall
2
Packing room 3
High Wall
2.5
Production Manager Room
Cassatte
4
QA Dept 1
High Wall
2.5
QA Dept 2
High Wall
2
QC Dept 1
High Wall
2.5
QC Dept 2
High Wall
3.4
Received Sample room
High Wall
2
Server Room
High Wall
1.2
Store Room
High Wall
2
Third Floor
(empty)
(empty)
Waiting area
High Wall
4
Washing area

High Wall
2.5
Washing Room 1
Cassette
1.2
Washing Room 2
Cassette
1.2
(empty)
(empty)
(empty)
Total Result

S. No.
1

Description

Unit

Capacity
(HP)

High Side Machines


Indoor Units

Ground Floor
Circuit 2
Electrical Panel Room

Ductable

Cassatte
Cassatte
High Wall
High Wall
High Wall
High Wall

4
5
2
2
2.5
2

1
2
3
4
5
6

Circuit 1
Control Sample 1
Control Sample 2
Control Sample 3
Washing area
Instrument room
Chemical Lab

High Wall
High Wall
High Wall
High Wall
High Wall
Cassette

2.5
2.5
2
2.5
2.5
4

1
2
3
4
5
6
7
8

Circuit 3
QC Dept 1
Cabin 1
QA Dept 1
Hot Zone
Fume Hood 1
Fume Hood 2
Corridor
Corridor

High Wall
High Wall
High Wall
High Wall
High Wall
High Wall
Cassette
Cassette

2.5
1.7
2.5
1.25
1.7
1.7
4
2

Circuit 4
Accounts

Cassette

2.5

First Floor

1
2
3
4
5
6

Circuit 2
Production Manager Room
Documentation Room
Packing room 1
Packing room 2
Packing room 3
Store Room

Third Floor

2
3
4
5
6
7
8
9

Conference Hall (150 sqft)


Boss Cabin 1
Boss Cabin 2
Server Room
Conference hall 2
Waiting area
Factory Head
Factory Staf

Cassette
Cassette
Cassette
High Wall
Cassette
High Wall
High Wall
High Wall

2
4
3
1.2
5
4
2
1

1
2
3
4
5
6
7
8
9

Circuit 5
Change Room
Washing Room 1
Washing Room 2
Received Sample room
QC Dept 2
QA Dept 2
Culture Store
Media Prepration 1
Media Prepration 2

High Wall
Cassette
Cassette
High Wall
High Wall
High Wall
High Wall
High Wall
High Wall

2
1.2
1.2
2
1.7
2
2.5
2.5
2

Outdoor units
1
2
3
4
5

Circuit
Circuit
Circuit
Circuit
Circuit

1
2
3
4
5

Qty

Total
Capacity

1
1
1
1
1
1

4
5
2
2
2.5
2

1
1
1
1
2
2

2.5
2.5
2
2.5
5
8

1
1
1
1
1
1
1
2

2.5
1.7
2.5
1.25
1.7
1.7
4
4

Delivered

Coating

22
22
18
20
20

1
1
1
1
1
1
1
1

2
4
3
1.2
5
4
2
1

1
1
1
1
2
1
1
1
1

2
1.2
1.2
2
3.4
2
2.5
2.5
2

HP
HP
HP
HP
HP

S. No.

Description

Ground Floor
Circuit 2

First Floor
Circuit 2
Third Floor
Circuit 1
Circuit 3
Circuit 4
Circuit 5

Expected Date

Marking

Supporting

30/Sep/2016

1/Oct/2016

1/Oct/2016

3/Oct/2016

Pipe Layout

30/Sep/2016
4/Oct/2016
1/Oct/2016
5/Oct/2016

Wiring

3/Oct/2016
6/Oct/2016
4/Oct/2016
7/Oct/2016

Machine Hanging

5/Oct/2016
10/Oct/2016
7/Oct/2016
11/Oct/2016

Machine
Connection

7/Oct/2016
11/Oct/2016
8/Oct/2016
12/Oct/2016

Dressing

10/Oct/2016
12/Oct/2016
11/Oct/2016
13/Oct/2016

Pressure
Testing

11/Oct/2016
13/Oct/2016
11/Oct/2016
14/Oct/2016

Commissioning

12/Oct/2016
14/Oct/2016
12/Oct/2016
15/Oct/2016

Das könnte Ihnen auch gefallen