CHAPTER 03
CONTRACT ADMINATION
And
DRAWING OFFICE PRACTICE
The Q/S branch has to calculate the cost per monthly. The monthly cost will maintain in this
file. It includes Material cost, Direct labour cost, Sub contractor work cost, Plant, machine &
vehicle cost, Direct overhead cost, Electricity, telephone, water, staff salary, welfare...etc
Test reports
All the test reports must be in the site. Steel, concrete, blocketc.
Request for clarification (RFC)
In the drawings there may be some problems. So we have to ask it from consultant. Then we
should give the RFC for consultant.
Calibration records
The entire instrument from batching plant to 5m tape (all calibrated instruments) should be
check regarding calibration. Those results are in this file.
These are the some of important documents in the site
Structural drawings- all the structural drawings are hear
Architectural drawings- all the architectural drawings are hear
Plumbing drawings- all the plumbing drawings are hear
Electrical drawings
Variation order
Monthly progress report (MPR)
Weekly progress preview meetings (WPRM) consultant
Cash flow
Weekly progress review meeting (WPRM)
Monthly progress review meeting (MPRM)