Beruflich Dokumente
Kultur Dokumente
Our offer:
Operation and maintenance with
long-term commitment on performance
and price
Structuring operation and maintenance
within complex tenders such as PPPs
Advisory and audit services
to optimise operation and
maintenance
And
via other Egis
specialised subsidiaries:
Project development (22 financial closings)
e-mail: contact.egis-roadoperation@egis.fr
Tel: +33 1 30 48 48 70
Fax: +33 1 30 48 46 71
www.egis-roadoperation.com
2012
Egis Road Operation RCS Versailles B411 601 842 Photos : Atlandes, Alicorne, Dominic Cunniffe, Nikos Danilidis, DSC, Dublin Port Tunnel, Egis Projects Canada 03/2012 Cration et ralisation : Verbe
Our core
business:
Key
figures
A world leader
in motorway and
toll operation
2012
Our
added value:
Experience of long-term
partnerships in numerous countries
Capacity to structure a comprehensive
O&M offer and commit to it
Capacity to expeditiously start-up or take
over an existing operation
Strong experience allowing to
optimise operation and
maintenance activities
Our
strong points:
23 operating subsidiaries
- covering a wide range of activities
- in different countries
- dealing with various operation issues
E
xtensive expertise in tunnel operation with 44 km
under operation
A
network of available experts
- both at the head office and in operating companies
-o
ffering a unique advisory and audit capabilities
in operation and maintenance
-u
sing expertise and know-how
capitalised over 15 years
Toll system
AUSTRIA
2x3, interurban
6.9 km tunnels
November 2009
January 2010
51 km
Shadow Toll
CROATIA
August 2004
60 km
ROUTALIS
A28 ROUEN-ALENCON
2x2, interurban
October 2005
2x2, interurban
FRANCE
GERMANY
GREECE
HUNGARY
IRELAND
POLAND
Portugal
UNITED
KINGDOM
AUSTRALIA
INDIA
KOREA
PHILIPPINES
CANADA
Toll lanes
Toll revenue
(m Euro)
Total staff
number**
Traffic AADT
(veh/day)
% trucks
% Non Cash
transactions
(all cards + ETC)
Number of Tags
39
22 200
9%
Closed System
54
22
134
16 600
10%
16 600
26%
125 km
Closed System
ETC
29
63
65
9 000
18%
9 200
90%
May 2011
105 km
Open System*
38*
41
29 200
29%
2x2, interurban
November 2007
45 km
Open System
16
13
26
6 300
11%
9 200
86%
BASTIA TUNNEL
2x1, urban
0.8 km tunnel
April 2009
0.8 km
Free structure
30 500
2%
2x3, interurban
May 2007
52 km
National Toll
(trucks only)
26
85 000
13%
ATTIKES DIADROMES
ATHENS RING ROAD
April 2001
65 km
193
265
921
146 000
5%
250 500
49%
474 000
ATTIKES DIADROMES
EGNATIA ODOS
2x2, interurban
November 2011
Open System
35
135
2x2, interurban
April 2010
65.1 km
35
7 100
15%
2x2, urban
4.5 km tunnel
December 2006
5.6 km
Open System
ETC
12
12
96
14 200
44%
14 200
51%
500
NORTHLINK
M1 DUNDALK
2x2, interurban
January 2011
56 km
Open System
ETC
16
20
60
29 500
19%
29 500
41%
200
10
31
6 000
22%
6 000
31%
SOUTHLINK
M7/M8 PORTLAOISE
2x2, interurban
January 2011
23 km
Open System
ETC
MIDLINK
N25 WATERFORD BYPASS
2x2, interurban
January 2011
43 km
Open System
ETC
14
15
42
19 000
20%
19 000
37%
VIA4
A4 KATOWICE-KRAKOW
2x2, interurban
April 2000
60.9 km
Open System
32
36
205
30 600
20%
61 300
16%
AESA
A2 NOWY TOMYSL-KONIN
2x2, interurban
December 2002
150 km
Open System
30
122
340
16 500
31%
50 000
45%
AESA
A2 SWIECKO-NOWY TOMYSL
2x2, interurban
December 2011
107 km
Closed System
48
180
12 000
36 000
30%
2x2 interurban
June 2012
Closed System*
75*
200
35000
35%
37%
OPERSCUT
A24 VISEU-CHAVES
2x2, interurban
1.5 km tunnels
December 2000
155 km
Shadow Toll
57
6 300
9%
September 2009
400 km
Open System
ETC
27
84
660
140 000
11%
135 000
30%
320 000
2x2, urban
0.5 km tunnel
May 1997
22 km
Open System
ETC
100
21
100 000
8%
100 000
95%
145 000
TLO
MELBOURNE CITYLINK
August 1999
25 km
Multilane Freeflow
full ETC
347
35
130 000
13%
765 000
100%
1 300 000
December 2010
27 km
Open System
ETC
56
1 200
180 000
10%
260 000
16%
110 000
2x2, interurban
October 2011
76 km
Open System
18
178
8700
35%
17500
drecl
DAEJEON RIVERSIDE EXPRESSWAY
2x3, urban
September 2004
5 km
Open System
ETC
21
75
47 400
10%
47 100
8%
TMC
NORTH LUZON EXPRESSWAY
2x4 to 2x1
urban and interurban
February 2005
84 km
153
113
760
157 000
8%
189 000
21%
73 000
TMC
SUBIC-CLARK-TARLAC EXPRESSWAY
2x2, interurban
April 2008
94 km
Closed System
58
17
320
27 000
5%
27 000
2x3, urban
1 km bridge
4.5 km
Multilane Freeflow
full ETC
July 2009
25
25
33
27 000
3%
35000
27 000
100%
56 000
* When fully operated/taken over ** Total staff including sub-contracting permanent personnel
1 910km
44km
1 400 000
5 720
total staff
Other references
Country
Number of km
operated
IRELAND
Start/Take-over of
Operations
Subsidiary network
Main features
Operating
period
Number
of km
operated
Toll system
ITS Road
Services Ltd
ITS equipment
maintenance
contract
CCTV cameras,
Variable Message
Signs, optic fibre,
telecommunications
system on M1 and N7
around Dublin
June 2007
to June 2012
Egis Projects
Ireland
East-Link O&M
services
contract
January 2011
to January 2015
1.5 km
Open
system
AUSTRALIA
Main features
Bhegis
M5 East Sydney
2x2, urban
4 km tunnel
December
2001 to
December 2011
10 km
Freeway
FRANCE
Subsidiary network
Country
Eperly
Lyon
North ring
road
March 1999
to July 2007
10 km
Open system
ETC
HUNGARY
Magyar
Transroute
M1-M15
motorway
2x2,
interurban
January 1996
to June 1999
55.7 km
Open
system
UNITED KINGDOM
UKHS
M40 LondonBirmingham
motorway
2x3,
Interurban
January 1997
to July 2007
126 km
Shadow
toll