Sub-Contr
Report No
Date
Page
Gentlemen,
We would like to have your presence for inspection according to the following sch
Place/Area
2-Jan-15
CPP Area
08.00 WITA
Inspection Item
Top of Padding
PK 3002
Piping
Civil
Instrument
Pipeline
Structural
Electrical
COMMENT
:
Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0
Performed By
Approved By
TSC
Reviewed By
JOB PMTS
FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-028
Date
31-Dec-14
Page
of
Inspection Item
Remarks
Mechanical
Reviewed By
JOB PMTS
TPI
(If applicable)
Sub-Contr
Report No
Date
Page
Gentlemen,
We would like to have your presence for inspection according to the following sch
Place/Area
CPP 2
Inspection Item
Top of Padding
PK 2228
Piping
Civil
Instrument
Pipeline
Structural
Electrical
COMMENT
:
Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0
Performed By
Approved By
TSC
Reviewed By
JOB PMTS
FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-028
Date
25-Dec-14
Page
of
Inspection Item
Remarks
Mechanical
Reviewed By
JOB PMTS
TPI
(If applicable)
Sub-Contr
Report No
Date
Page
Gentlemen,
We would like to have your presence for inspection according to the following sch
Place/Area
CPP 1
Inspection Item
Top of Padding
PK 6059
Piping
Civil
Instrument
Pipeline
Structural
Electrical
COMMENT
:
Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0
Performed By
Approved By
TSC
Reviewed By
JOB PMTS
FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-052
Date
08-Jan-15
Page
of
Inspection Item
Remarks
Mechanical
Reviewed By
JOB PMTS
TPI
(If applicable)
Sub-Contr
Report No
Date
Page
Gentlemen,
We would like to have your presence for inspection according to the following sch
Place/Area
CPP 1
Inspection Item
Top of Padding
PK 4001
Piping
Civil
Instrument
Pipeline
Structural
Electrical
COMMENT
:
Involvement
Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0001 Rev.0
Performed By
Approved By
TSC
Reviewed By
JOB PMTS
FOR INSPECTION
Sub-Contracto
Report No. SNO-Q-BPK-RFI-052
Date
08-Jan-15
Page
of
Inspection Item
Remarks
Mechanical
Reviewed By
JOB PMTS
TPI
(If applicable)
SNO-PK-2228
Reference Drawing
Equipment Name
Revision
Manufacturer
Elevation (mm)
DesignActualDeviation
+1
1 1354
151
2 1353 380
150
0
150
+1
3 1354 3
151
4 1352
149
-1
5 1353
150
0
6 1353
150
0
BM
:
2800 + 1003 = 3803
150
Elev Dsg :
Elev Ground : 2300
Target El: 3803 - (2300+150) = 1353
Note :
FS
: Number on Elevation Ruler
HI
: High Instrument
Design
: Foundation Design (Civil dwg)
No
FS
Actual
HI
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
25-Dec-14
of
: SNO-C-EF-10-268
:
SNO-Q-BPK-PIR-001
Rev 0
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-PK-9025
Equipment Name
Manufacturer
WHASUNG
Reference Drawing
BM
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
7
8
9
10
799
799.5
800
799
800
799
798.5
798.5
798.5
799
Note
FS
HI
Design
Actual
HI
99
9
Elevation (mm)
DesignActualDeviation
200
0
199.5
0.5
199
1
200
0
200
199
1
200
0
200.5
0.5
200.5
0.5
200.5
0.5
200
0
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
100 + 899 =
999
200
999 - 200 =
1
1
0
9
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-001
25-Dec-14
of
: SNO-C-EF-10-268
:
Rev 0
100 + 899 =
999
1
0
6
8
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-P-9035
Reference Drawing
Equipment Name
Revision
Manufacturer
BM
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
7
8
798
799
798
798
798
798
798
799
Note
FS
HI
Design
Actual
HI
99
7
Elevation (mm)
DesignActualDeviation
199
-1
198
-2
199
-1
199
-1
200
199
-1
199
-1
199
-1
198
-2
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
120 + 877 =
997
200
997 - 200 =
1
8
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-003B
25-Dec-14
of
: SNO-C-EF-80-037
:
Rev 2
120 + 877 =
997
5
7
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-P-9045
Reference Drawing
Equipment Name
Revision
Manufacturer
BM
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
7
8
799
798
798
798
799
797
797
798
Note
FS
HI
Design
Actual
HI
99
7
Elevation (mm)
DesignActualDeviation
198
-2
199
-1
199
-1
199
-1
200
198
-2
200
0
200
0
199
-1
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
120 + 877 =
997
200
997 - 200 =
1
8
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-003C
25-Dec-14
of
: SNO-C-EF-80-037
:
Rev 2
120 + 877 =
997
5
7
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-PK-9025
Reference Drawing
Equipment Name
Treated Pump
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
7
8
9
10
798
798
798
797
798
797
798
798
798
799
Note
FS
HI
Design
Actual
HI
99
7
Elevation (mm)
DesignActualDeviation
199
-1
199
-1
199
-1
200
0
200
199
-1
200
0
199
-1
199
-1
199
-1
197
-2
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
120 + 877 =
997
200
997 - 200 =
N
10
9
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-003A
25-Dec-14
of
: SNO-C-EF-80-037
:
Rev 2
120 + 877 =
997
10
5
8
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-T-9025C
Reference Drawing
Equipment Name
Oil Basin
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
HI
1
2
3
4
5
6
697
699
699
698
698
697
99
7
Note
FS
HI
Design
Actual
Elevation (mm)
DesignActualDeviation
300
0
298
-2
298
-2
300
297
-3
297
-3
300
0
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
120 + 877 =
997
300
997 - 300 =
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-003D
25-Dec-14
of
: SNO-C-EF-80-037
:
Rev 2
120 + 877 =
997
1
2
Reviewed By
JOB PMTS
Project Title
Job No
Client
Main Contractor
Equipment Tag Number
SNO-T-9025A
Reference Drawing
Equipment Name
CPI Separator
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
HI
1
2
3
4
5
6
7
8
697
697
670
698
698
698
698
699
99
7
Elevation (mm)
DesignActualDeviation
300
0
300
0
299.5
-0.5
300
300
0
300
0
300
0
300
0
300
0
120 + 877 =
997
300
997 - 300 =
1
5
Note
FS
HI
Design
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-001
25-Dec-14
of
: SNO-C-EF-80-037
:
Rev 2
120 + 877 =
997
Reviewed By
JOB PMTS
CT 4019
Reference Drawing
Equipment Name
Cooling Tower
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
814
814
814
814
815
813
Elevation (mm)
DesignActualDeviation
300
0
300
0
111
300
300
0
4
300
0
299
-1
+
301
498 + 616 =
1114
300
1114 - 300 =
HI
Note
FS
HI
Design
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-001
25-Dec-14
of
: SNO-C-EF-10-268
:
Rev 0
498 + 616 =
1114
Reviewed By
JOB PMTS
CT 4019
Reference Drawing
Equipment Name
Cooling Tower
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
814
814
814
814
815
813
Elevation (mm)
DesignActualDeviation
300
0
300
0
111
300
300
0
4
300
0
299
-1
+
301
2674 - 665 =
150
1114 - 300 =
HI
Note
FS
HI
Design
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-001
25-Dec-14
of
: SNO-C-EF-10-268
:
Rev 0
2674 - 665 =
Reviewed By
JOB PMTS
PK 3002
Reference Drawing
Equipment Name
Revision
Manufacturer
HI
:
Elev Ds:
Target :
No
FS
1
2
3
4
5
6
7
8
889
889
889
889
889
889
889
889
Note
FS
HI
Elevation (mm)
DesignActualDeviation
150
0
150
0
150
0
150
103
9
150
0
150
0
150
0
150
0
150
0
3339 - 2300
1039
150
1039 - 150 =
HI
:
: Number on Elevation Ruler
: High Instrument
Design
Actual
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-006
31-Dec-14
of
: SNO-C-EF-10-268
:
Rev 0
3339 - 2300 =
1039
1039 - 150 = 889
4
6
Reviewed By
JOB PMTS
PK 3002
Reference Drawing
Equipment Name
Revision
Manufacturer
No
1
2
3
4
5
6
7
8
Elevation (mm)
DesignActualDeviation
150
0
149
-1
148
-2
150
373
1
149
-1
149
-1
149
-1
148
-2
149
-1
FS
HI
1281
1280
1279
1280
1280
1280
1279
1280
Note
FS
HI
Design
Actual
BM
:
2674
BS
1057
HI
:
2674 + 105
150
3731
Elev Ds:
Elev Ground : 2300
Target :
3731 - (230
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
31-Dec-14
of
: SNO-C-EF-10-269
:
BM
SNO-Q-BPK-PIR-006
Rev 0
2674
1057
2674 + 1057 =
3731
4
6
Reviewed By
JOB PMTS
BK 9050
Reference Drawin
Equipment Name
Revision
Manufacturer
No
Elevation (mm)
DesignActualDeviation
350
0
350
0
350
0
349
-1
349
-1
348
-2
350
128
349
-1
2
348
-2
348
-2
348
-2
349
-1
349
-1
350
0
350
0
+1
351
349
-1
350
0
350
0
FS
932
932
932
933
933
934
933
934
934
934
933
933
932
932
931
933
932
932
Note
FS
HI
Design
HI
1
2
3
4
5
7
8
9
10
11
12
13
14
15
16
17
18
19
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
20
21
22
23
24
933
933
932
932
933
1282
350
349
349
350
350
349
-1
-1
0
0
-1
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
31-Dec-14
of
: SNO-C-EF-10-268
:
-1
-1
0
0
-1
SNO-Q-BPK-PR-005
Rev 0
HI 334: + 948 =
350
Elev1282
D:
Target: 1282 - 350 = 932
24
23
22
21
20
19
18
17
16
15
14
13
1
0
1
1
1
2
15
Reviewed By
JOB PMTS
14
13
PK 9050
Reference Drawin
Equipment Name
Revision
Manufacturer
No
Elevation (mm)
DesignActualDeviation
349
-1
349
-1
+2
352
349
-1
350
0
350
0
350
122
350
0
8
350
0
349
-1
350
0
+1
351
349
-1
348
-2
349
-1
+2
352
350
0
349
-1
350
0
FS
877
877
880
877
878
878
878
878
877
878
879
877
876
877
880
878
877
878
Note
FS
HI
Design
HI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
19
20
21
22
23
24
878
877
877
878
878
878
1228
350
350
349
349
350
350
350
BM = 0334
BS = 0894
HI = 0334 + 0894 = 1228
Elev Design = 350
Target El = 1228 - 350 = 878
0
-1
-1
0
0
0
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
31-Dec-14
of
: SNO-C-EF-10-199
:
0
-1
-1
0
0
0
SNO-Q-BPK-PR-005
Rev 3
24
23
22
21
20
19
18
17
16
15
14
13
1
0
1
1
1
2
15
Reviewed By
JOB PMTS
14
13
SNO-PK-6059
Reference Drawing
Equipment Name
Revision
Manufacturer
WHASUNG
BM
BS
HI
:
Elev Ds:
Target :
No
1
2
3
4
5
6
7
8
Elevation (mm)
DesignActualDeviation
2448
-2
2449
-1
-1
2450 2449
380
3
2448
-2
2448
-2
2449
-1
2449
-1
2448
-2
FS
Actual
3112
691
3112 + 691
150 + 230
3803
2450 - 2450
3803
HI
1351
1352
1352
1351
1351
1352
1352
1351
Note
FS
HI
Design
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
08-Jan-15
of
: SNO-C-EF-10-229
:
BM
SNO-Q-BPK-PIR-009
Rev 1
3112
691
3112 + 691 =
150 + 2300 =
3803
2450 - 2450 = 1353
3803
4
7
Reviewed By
JOB PMTS
SNO-PK-4001
Reference Drawing
Equipment Name
Revision
Manufacturer
ANGUIL
No
FS
1
2
3
4
5
6
7
8
9
10
11
12
768
768
768
768
768
769
768
768
768
769
768
768
Note
FS
HI
Elevation (mm)
DesignActualDeviation
2450
0
2450
0
2450
0
2450
0
2450
321
2450
0
8
+1
2451
2450
0
2450
0
2450
0
2451
+1
2450
0
2450
0
HI
:
: Number on Elevation Ruler
: High Instrument
2406
BM
:
BS
:
HI
:
Elev Ds:
Target :
812
2406 + 812
2300 + 150
3218 - 2450
12
1
1
1
0
Design
Actual
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-010 A
08-Jan-15
of
: SNO-C-EF-10-053
:
Rev 0
2
3
12
4
5
6
9
8
Reviewed By
JOB PMTS
SNO-PK-4001
Reference Drawing
Equipment Name
Revision
Manufacturer
ANGUIL
No
FS
1
2
3
4
5
6
768
768
768
769
768
768
Elevation (mm)
DesignActualDeviation
2450
0
2450
0
2450
321
2450
0
8
+
2451
1
2450
0
2450
0
HI
2406
BM
:
BS
: 812
HI
: 2406 + 8
Elev Dsg: 2300 + 1
Target E: 3218 - 24
1
2
3
Note
FS
HI
Design
Actual
:
: Number on Elevation Ruler
: High Instrument
: Foundation Design (Civil dwg)
: Actual Dimension of Foundation
Remarks :
Involvement Party
Signature
Name
Sign Date
Job Title
Form Code : SNO-Q-FM-0168 Rev.0
Performed By
Approved By
TSC
Revie
JOB
SPECTION REPORT
Sub-Contractor
Report No.
Date
Page
Reference Drawing
SNO-Q-BPK-PIR-10 B
08-Jan-15
of
: SNO-C-EF-10-053
:
Rev 0
2406
812
2406 + 812 = 3218
2300 + 150 = 2450
3218 - 2450 = 768
Reviewed By
JOB PMTS