CONTENT
Preface
Acknowledgement
Content
CHAPTER 01: TRAINING ESTABLISHMENT
1.1. About the training Organization
1.2. Profile of the Organization
1.3. Introduction of Project
1.4. Site Organization Chart
1.5. Construction Sequence

1-4

CHAPTER 02: ROAD CONSTRUCTION


2.1. Sub Grade Preparation

5-29

2.1.1. Introduction
2.1.2. Materials
2.1.3. Equipment
2.1.4. Method & Procedure

2.2. Aggregate Base Course (ABC)


2.2.1. Introduction
2.2.2. ABC Laying & Compaction

2.3. Cement Bound Material (CBM)


2.3.1. Introdution
2.3.2. CBM Laying
2.3.3. CBM Compaction
2.3.4. Curing Of CBM
2.3.5. Testing Of CBM
2.3.6. Equipment & Manpower

2.4. Asphalt
2.4.1. Introduction
2.4.2. General Sequence of Work
2.4.3. Aggregate from Crushing Plant
2.4.4. Tack Coat
2.4.5. Hot Mix Asphalt Work
2.4.6. Drum Trucks
2.4.7. Equipment & Manpower

In-Plant Training Report Conte


nt

CHAPTER 03: ROAD MARKING


3.1. Road Marking Material

30-38

3.1.1. Thermoplastic
3.1.2. Characteristics
3.1.3. Packaging
3.1.4. Glass Beads DP

3.2. Preparing & Operating Machine


3.2.1. Preparing the Machine
3.2.2. Operating the Machine

3.3. Mixing of Materials


3.4. Method of Application
3.4.1. Preparation of Site
3.4.2. Preparation of Thermoplastic material on Site
3.4.3. Laying
3.4.4. Yield

3.5. Machine Used for Road Marking


3.5.1. Pre-Heater Boiler
3.5.2. Screed Machine

CHAPTER 04: REINFORCEMENT


4.1. Introduction
4.2. Type of Reinforcement
4.3. Cover Block
4.4. Bar Notations
4.5. Bar bending & Cutting
4.6. Lapping of Reinforcement
4.7. Placing of Reinforcement
4.8. Important checks during the Reinforcement
4.9. Bar Scheduling

39-44

CHAPTER 05: CONCRETE


5.1. Introduction
5.2. Properties of Concrete
5.3. Reinforced Concrete
5.4. Materials of the Concrete

45-58

5.4.1. Cement
5.4.2. Aggregates
5.4.3. Water

In-Plant Training Report Conte


nt

5.5. Mixing of Concrete


5.5.1. Hand Mixing
5.5.2. Machine Mixing

5.6. Ready mix Concrete


5.7. Transporting of Concrete
5.8. Placing of Concrete
5.9. Compaction of Concrete
5.10. Curing of Concrete
CHAPTER 06: CONCRETE TESTS
6.1. Slump Test

59-64

6.1.1. Introduction
6.1.2. Aim of the Test
6.1.3. Type of the Slump
6.1.4. The apparatus
6.1.5. Procedure of Testing
6.1.6. The Results

6.2. Cube Test


6.2.1. Introduction
6.2.2. The Apparatus
6.2.3. Procedure of Preparing Cubes
6.2.4. Procedure of Testing

6.3. Rebound Hammer Test


6.3.1. Aim of the Test
6.3.2. The Reason occurred to be this Result
6.3.3. Equipments Used
6.3.4. Procedure of Testing

CHAPTER 07: MACHINES & EQUIPMENT


7.1 Electric Grinder
7.2 Poker Vibrator
7.3 power Saw
7.4 Tamping Roller
7.5 Vibrating Roller
7.6 Welding Plant
7.7 Bar Bending Machine
7.8 Rebar cutter
7.9 Leveling Machine

65-69

In-Plant Training Report Conte


nt

7.10 Total Machine


7.11 Concrete Breaker
7.12 Truck Mixer
7.13 Concrete mixer
7.14 Pump Car
7.15 Gas Cutter
7.16 JCB
7.17 Tippers
CHAPTER 08: SITE MANAGEMENT
8.1 Introduction
8.2 Duties and Responsibilities of Project Manager
8.3 Duties of Engineering
8.4 Progress of the Work
8.5 Daily Maintaining Records
8.6 Human Resource & Welfare

70-75

8.6.1. Physical Site Organization


8.6.2. Planning of Site Facilities

8.7 Store Management


8.7.1. Material Requisition
8.7.2. Purchase Requisition
8.7.3. Store Requisition
8.7.4. Transfer Voucher

8.8 Material Storage


8.9 Site Security
CHAPTER 09: SITE SAFETY
9.1 Introduction
9.2 Criteria of the site Safety
9.3 Traffic Control and Sign Arrangement
Conclusion