Engineering Cost Estimate for Operation and Maintenance of WTP System

Project Scheme: Bulk water investment for Umbulan System - Schema


Production Volume (m3/month) =
10.160.640
Breakdown of Operation and Maintenance Cost
1. Remuneration
Number of staff (person) =
Salary per month (Rp/person) =
Conversion to per m3 water (Rp/m3) =

50
15.000.000,00
73,81

Number of Managers (person) =


Salary per month (Rp/person) =
Conversion to per m3 water (Rp/m3) =

4
125.000.000,00
49,21

Security (person) =
Salary per month (Rp/person) =
Conversion to per m3 water (Rp/m3) =

20
5.000.000,00
9,84

Total remuneration (Rp/m3) =

132,87

2. Chemicals
Coagulant =
Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

PAC
0
7000,00
0,00

Coagulant aid =
Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

polymer
0
10000,00
0,00

Softener =
Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

Soda Ash
0
5000,00
0,00

pH adjustment =
Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

Lime
0
1000,00
0,00

Disinfectant =
Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

chlorine
2
12000,00
24,00

Sludge treatment chemical


Chemical Dose (mg/L) =
Unit cost of chemical (Rp/kg) =
Conversion to per m3 water (Rp/m3) =

polymer
0
20000,00
0,00

Total chemicals cost (Rp/m3) =

24,00

Capacity:
Raw water

3.920 L/s
3.920 L/s

3. Electrical Energy
Main Pumping system at Umbulan
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

4400
60,00
3269
1200
278,01

Booster Pump 1 system at PIER


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

3850
60,00
2861
1200
243,26

Booster Pump 2 system at Gunungsari


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

2200
60,00
1635
1200
139,00

Booster Pump 3 system at Segoromadu


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

1100
60,00
817
1200
69,50

In-line Pump system at Winongan


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Pohjentrek
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

278,01

243,26

139,00

69,50

125
0,00
1200
0,00

0,00

75
0,00
1200
0,00

In-line Pump system at Pleret


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

1200
0,00

In-line Pump system at PIER


Capacity (L/s) =
Total Head (m) =

100
38,97

0,00

110
0,00

0,00

730

Energy required (kW) =


Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

48
1200
4,10

4,10

In-line Pump system at Bangil


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

140
14,31
25
1200
2,11

2,11

In-line Pump system at Gempol


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Porong II
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Porong I
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Tanggulangin
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Candi
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Sidoarjo
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Buduran
Capacity (L/s) =

70
0,00
1200
0,00

0,00

100
0,00
1200
0,00

0,00

50
0,00
1200
0,00

0,00

150
0,00
1200
0,00

0,00

200
0,00
1200
0,00

0,00

300
0,00
1200
0,00

100

0,00

Total Head (m) =


Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Gedangan
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =
In-line Pump system at Waru
Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

0,00
1200
0,00

0,00

200
0,00
1200
0,00

0,00

200
0,00
1200
0,00

0,00

In-line Pump system at Alas Malang


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

1200
0,00

0,00

In-line Pump system at Giri


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

1000
0,02
0
1200
0,02

0,02

Pompa Transfer Rejoso


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

300
10,00
61
1200
5,14

Pompa Transfer Tapak


Capacity (L/s) =
Total Head (m) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

700
10,00
141
1200
12,00

Compressor for trush diffuser


Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

0,00
1.200,00
0,00

Backwash pumps
Capacity (L/s) =
Total Head (m) =

1000
0,00

0
20

0,00

Energy required (kW) =


Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

0
1.200,00
0,00

0,00

Blower
Capacity (L/s) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

0
0
1.200,00
0,00

0,00

Dosing pumps for chemicals


Maximum for 4 chemicals
Capacity (L/min) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

50
2,00
1.200,00
0,17

0,17

Sludge treatment by using Decanter System


Approximated sludge flowrate (m3/h) =
Energy required (kW) =
Energy tariff (Rp/kWH) =
Conversion to per m3 water (Rp/m3) =

150
0
1.200,00
0,00

0,00

Mixer for chemical solution using motorized impeller


Maximum for 4 chemicals @ in kW =
4,00
Energy required (kW) =
10,00
Energy tariff (Rp/kWH) =
1.200,00
Conversion to per m3 water (Rp/m3) =
0,04

0,04

Mixer in sludge collection pit using motorized impeller


Energy required (kW) =
0,00
Energy tariff (Rp/kWH) =
1.200,00
Conversion to per m3 water (Rp/m3) =
0,00

0,00

Total electrical energy cost (Rp/m3) =


Specific energy (kWH/m3) =

753
0,63

4. Others Cost
Raw water tariff (Rp/m3) =
Capacity (L/s) =
Conversion to per m3 water (Rp/m3) =

50,00
4400
56,12

Research and development (Rp/m3) =


Fuel subsidy (Rp/m3) =

10,00
5

Eid allowance (Rp/m3) =


New year allowances (Rp/m3) =
Annual Bonus (Rp/m3) =

11,1
11,1
11,1

Traveling Jakarta-Surabaya, visit/month


Number of person =
Air ticket (Rp/flight) =
Duration of visit (day) =
OSA (Rp/day) =

3,00
7,00
2.000.000,00
3
2.500.000,00

736,21

17,15
tapak rejoso

Total traveling cost (Rp/month) =


Conversion to per m3 water (Rp/m3) =
Total others cost (Rp/m3) =

241.500.000,00
23,77
128,48

5. Summary
1. Remuneration
2. Chemicals
3. Electrical Energy
4. Others Cost

(Rp/m3)
(Rp/m3)
(Rp/m3)
(Rp/m3)

133
24
753
128

5. Total

(Rp/m3)

1.039