Sie sind auf Seite 1von 88

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PRIORITY III-DAMAGED INFRA(with Detailed Information)
TYPHOON:
AS of:
REGION :
District Engineering Office :
LOCATION
NAME OF ROAD/BRIDGES
( STATION Limits)

(1)

BARANGAY

MUNICIPALITY/
CITY

PROVINCE

(2)

(3)

(4)

DESCRIPTION OF THE
EXTENT OF DAMAGE
(5)

NOTE:

To be submitted within twelve (12) hours after calamity. Cost of priority I group should be thoser that can be funded by the immediate Resp

Prepared by:

DANILO O. MESINA
Chief Maintenenance Section

End. "6"
BOM-SDMCD Form 2015-05

Length/Area/
Volme of
Damage

Type/No. of
Equipment
Needed

ESTIMATED COST OF
RESTORATION

ESTIMATED
DURATION
OF REPAIR
WORKS

(6)

(7)

(8)

(9)

REMARKS

(10)

ed by the immediate Response Fund abd/or the Quick response Fund.

Submitted by:

DAVID A. BULIYAT
District Engineer

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DISASTER OPERATION CENTER ACTIVITION REPORT
District Disaster Risk Reduction Management Team
TYPHOON:
As of:
REGION:
DISTRICT ENGINEERING OFFICE:
NAME OF PERSON MANNING THE OPERATION CENTER

PERSONNEL ON DUTY AT REGIONAL/DISTRICT O

( DRRM TEAM)

Day/Date

Day 1/
Incident Commander

Contact No.

Deputy Incident Commander

Contact No.

Day 2/

Name of Person
a.
b.
c.
a.
b.
c.
a.
b.

Day3/
Public Information Officer

Contact No.

c.
a.
b.

Day4/
Safety Officer

Contact No.

c.
a.
b.

Day5/
Liason Officer

Contact No.

c.
a.
b.

Day6/
Operations Chief

Contact No.

c.
a.
b.

Day7/
Planning Chief

Contact No.

c.
a.
b.

Day8/
Logistics Chief

Contact No.

c.
a.
b.

Day9/

c.

Admin./Finance Chief

Contact No.

a.
b.

Day 10/

c.

mydoc/carol forms/BOM-SDMCD Form 2015-01


NOTE: TO BE Submitted prior to the occurrence of calamity or landfall of Typhoon

Prepared By:

(Name & Position)

c of the Phillippines

DUTY AT REGIONAL/DISTRICT OPERATION CENTER


Designation

Contact Numbers

6:00:AM 6:00P.M. 6:00:PM 6:00AM.

Submitted By:

(Name & Position)

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


DISASTER OPERATION CENTER ACTIVATION REPORT
District Disaster Risk Reduction Management Team

REGION: CAR
District Engineering Office: ABRA
NAME OF PERSON MANNING THE OPERATION CENTER
(DRRM TEAM)

Day/
Date
Day 1/

LORETO B. DACOROON
Incident Commander

0917-512-2753
Contact No.

EDWIN T. BRINGAS
Deputy Incident Commander

0917-581-1928
Contact No.

PACIENCIA P. BELLO
Public Information Officer

0927-456-9894
Contact No.

AGNES B. BERNARDEZ
Safety Officer

0917-799-4238
Contact No.

ERNESTO P. BAYOAN
Liaison Officer

0926-404-3721
Contact No.

ARLON DON G. BARBERO


Operations Chief

0917-799-4270
Contact No.

CHONA LUISA A. RAMOS


Planning Chief

0917-799-0304
Contact No.

ARNEL N. BRILLANTES
Logistics Chief

0915-574-3124
Contact No.

Day 2/

Day 3/

Day 4/

Day 5/

Day 6/

Day 7/

Day 8/

Day 9/

PERSONNEL ON DUTY AT REGIONA

Day 9/
NERIO P. PLURAD
Admin./Finance Chief

0906-239-8151
Contact No.
Day 10/

Republic of the Philippines

EPARTMENT OF PUBLIC WORKS AND HIGHWAYS

DISASTER OPERATION CENTER ACTIVATION REPORT


District Disaster Risk Reduction Management Team
TYPHOON: Ineg
As of: August 20, 2015 (6:00 am)

PERSONNEL ON DUTY AT REGIONAL/DISTRICT OPERATION CENTER


Name of Person
a. SOCORRO LITO S. BENEDITO
b. XERXES N. ASTUDILLO, JR.
c. ELENO T. CADAEG
a. ARLON DON G. BARBERO
b. DANNY V. BRINGAS
c. NICOLAS B. DAVID
a. ROMMEL MORENO B. ORTEGA
b. LORETO E. CASTILLO, JR.
c. ROGELIO DASALLA
a.
b.
c.
a.
b.
c.
a.
b.
c.
a.
b.
c.
a.
b.
c.
a.

Designation

Contact Numbers

Engineer II
Const. & Maint Foreman
Electrician II
Engineer II
Admin. Officer II
Const. & Maint. Man
Engineer II
Painter II
Engineering Assistant

0915-750-0166
0917-922-8595
0916-277-4587
0917-799-4270
0927-581-1920
0927-265-7188
0917-514-7097
0917-793-1739

6:00AM6:00PM

6:00PM6:00AM

b.
c.
a.
b.
c.
Prepared by:

Submitted by:

SOCORRO LITO S. BENEDITO


Engineer II

ARLON DON G. BARBERO


Engineer II

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PRE-POSITIONING OF ASSETS
TYPHOON
As of

REGION :
CAR
District Engineering Office:

Ineng
August 20, 2015 (6:00 am)

ABRA

POSSIBLE ROAD SECTIONS TO BE AFFECTED BY


THE CALAMITY DISASTER

:
:

FACILITIES AND EQUIPMENTS AVAILABLE FOR


DISASTER OPERATION

TYPE
2

NUMBER
3

LOCATION
4

1. Abra-Kalinga Road

Payloader
Road Grader
Dumptruck
Chainsaw

1
1
1
1

K0409+000
K0469+000
K0441+000
K0441+000

2. Abra-Ilocos Norte Road

Road Grader
Chainsaw

1
1

K0435+000
K0412+000

3. Abra-Ilocos Sur Road

Dumptruck
Chainsaw
Backhoe

1
1
1

K0399+000
K0399+000
K0394+000

4. Abra-Cervantes Road

Mini-Dumptruck
Chainsaw

1
1

K0432+000
K0435+000

mydoc/carol/forms/BOM-SDMCD FORM 2015-02


NOTE: TO BE SUBMITTED Prior to the occurrence of calamity or landfall of Typhoon
Prepared by:

SOCORRO LITO S. BEN

Philippines

WORKS AND HIGHWAYS

NG OF ASSETS

15 (6:00 am)

MANPOWER

LIST OF INFRA IN DANGER OF


BEING AFFECTED/DAMAGED

REMARKS

21

Expected Road Closure due to


landslides and fallen trees.

14

Expected Road Closure due to


landslides and fallen trees.

12

Expected Road Closure due to


fallen trees.

Expected Road Closure due to


landslides and fallen trees.

Submitted by:

SOCORRO LITO S. BENEDITO


Engineer II

ARLON DON G. BARBERO


Engineer II

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
TYPHOON : "INENG"
As of : August 22, 2015; 12:00 P.M.
REGIO: CAR
DISTRICT: ABRA
AFFECTED AREAS
MAJOR/SECONDARY
ROAD/BRIDGE

(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang, Abra
Abra-Kalinga Road
a. K0436+200; San Isidro, Lagangilang, Abra
b.K0436+500; San Isidro, Lagangilang, Abra
c. K0436+700; San Isidro, Lagangilang, Abra
d. K0438+850; Nagtipulan, Lagangilang, Abra
e. K0439+500; Nagtipulan, Lagangilang, Abra

DATE
REPORTED
TO CENTRAL
OFFICE
2

SITUATION
DURING
CALAMITY

ACTION TAKEN
DESCRIPTION OF DAMAGE

( Equipment used/deployed)
5

Punch-thru
Punch-thru
Punch-thru
Punch-thru
Punch-thru
Not Passable
Not Passable

Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Road cut

Further clearing is on-going


Further clearing is on-going
Further clearing is on-going
Further clearing is on-going
Further clearing is on-going
Clearing operation on going

Not Passable

Sinking Bridge Pier

Installed traffic advisory

One lane passable


Not Passable
passable
One lane passable
Not Passable

Soil
Soil
Soil
Soil
Soil

Further clearing is on-going


Clearing operation on going
Further clearing is on-going
Further clearing is on-going
Coordinated with private
contractor for the clearing
operation

f. K0439+500; Nagtipulan, Lagangilang, Abra

Not Passable

Soil Collapse

Coordinated with private


contractor for the clearing
operation

g. K0448+250; Lenneng, Baay-Licuan, Abra


h. K0448+950; Lenneng, Baay-Licuan, Abra
i. K0453+450; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable
One lane passable

Soil Collapse and fallen trees


Soil Collapse and fallen trees
Soil Collapse and fallen trees

Further clearing is on-going


Further clearing is on-going
Further clearing is on-going

Collapse and fallen trees


Collapse
Collapse
Collapse
Collapse

j. K0462+750; Tumalip, Baay-Licuan, Abra


k. K0463+150; Tumalip, Baay-Licuan, Abra
l. K0463+200; Tumalip, Baay-Liucan, Abra
m. K0463+300; Tumalip, Baay-Liucan, Abra
n. K0468+450; Nalbuan, Baay-Licuan, Abra

One lane passable


One lane passable
One lane passable
One lane passable
Punch-thru

Soil
Soil
Soil
Soil
Soil

Collapse and Rockfall


Collapse
Collapse and fallen trees
Collapse
Collapse and fallen trees

o. K0474+300; Aguibo, Malibcong, Abra


p. K0475+600; Duldulao, Malibcong, Abra
q. K0479+000; Duldulao, Malibcong, Abra

Not Passable
Not Passable
Not Passable

Landslide
Landslide
Landslide

Further
Further
Further
Further
Further

clearing
clearing
clearing
clearing
clearing

is
is
is
is
is

on-going
on-going
on-going
on-going
on-going

Coordinated with the


contractor for the clearing
operation

mydoc/carol/forms/BOM-SDMCD form 2015-03

NOTE : To be submitted every Six (6) hours after calamity


Prepared by:

EDWIN T. BRINGAS
Chief, Maintenance Section

Encl. "4"
BOM-SDMCD Form 2015-03

D HIGHWAYS

AND BRIDGES

N TAKEN
used/deployed)
5

PREL.EST.
OF DAMAGE
( P'M)

a. POINTMAN
b.CONTACT NUMBER

REMARKS

; ; ; ; ; / Abra/Nagaparan/Danglas

ng is on-going
ng is on-going
ng is on-going
ng is on-going
ng is on-going
ation on going

a. LORETO E. CASTILLO, JR.


b. 0917-514-7097

Section was passable


Section was passable
Section was passable
Section was passable
Section was passable
Not Passable
Not Passable

c advisory

a. XERXES N. ASTUDILLO, JR.


b. 0917-922-8595

the bridge was closed to traffic

ng is on-going
ation on going
ng is on-going
ng is on-going
ith private
the clearing

a. ARLON DON G. BARBERO


b. 0917-799-4270

Section was passable


Not Passable
Section was passable
Section was passable
Not Passable

ith private
the clearing

ng is on-going
ng is on-going
ng is on-going

Not Passable

a.

ROMMEL MORENO B. ORTEGA

Section was passable


Section was passable
Section was passable

567

ng
ng
ng
ng
ng

is
is
is
is
is

on-going
on-going
on-going
on-going
on-going

b. 0927-265-7188

ith the
the clearing

ection

Section was passable


Section was passable
Section was passable
Section was passable
Section was passable @ 4:00
P.M. of Aug 21, 2015
Section is under contract
Section is under contract
Section is under contract

Submitted by:

LORETO B. DACOROON
Caretaker

aparan/Danglas

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
TYPHOON : "INENG"
As of : August 22, 2015; 08:00 P.M.
REGIO: CAR
DISTRICT: ABRA
AFFECTED AREAS
MAJOR/SECONDARY
ROAD/BRIDGE

(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra

DATE
REPORTED
TO CENTRAL
OFFICE

SITUATION
DURING
CALAMITY

ACTION TAKEN
DESCRIPTION OF DAMAGE

( Equipment used/deployed)

Passable
Passable
Passable
Passable
Passable
Passable
Passable

Soil
Soil
Soil
Soil
Soil
Soil
Soil

Not Passable

Road Cut

Not Passable

Sinking Bridge Pier before


abutment B

Installed traffic advisory

Abra-Kalinga Road
a. K0436+200; San Isidro, Lagangilang, Abra
b.K0436+500; San Isidro, Lagangilang, Abra
c. K0436+700; San Isidro, Lagangilang, Abra
d. K0438+850; Nagtipulan, Lagangilang, Abra
e. K0439+500; Nagtipulan, Lagangilang, Abra
f. K0448+000; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable
passable
One lane passable
Punch-thru
Passable

Soil
Soil
Soil
Soil
Soil
Soil

Collapse and fallen trees


Collapse
Collapse
Collapse
Collapse
Collapse

Further clearing is on-going


Further clearing is on-going
Further clearing is on-going
Further clearing is on-going
Further clearing is on-going
Soil Collapse cleared

g. K0448+250; Lenneng, Baay-Licuan, Abra


h. K0448+950; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable

Soil Collapse and fallen trees


Soil Collapse and fallen trees

Further clearing is on-going


Further clearing is on-going

h.K0434+400; Nagaparan, Danglas, Abra


Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees

5
Soil
Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse

cleared
cleared
cleared
cleared
cleared
cleared
cleared

i. K0453+450; Lenneng, Baay-Licuan, Abra


j. K0462+750; Tumalip, Baay-Licuan, Abra
k. K0463+150; Tumalip, Baay-Licuan, Abra
l. K0463+200; Tumalip, Baay-Liucan, Abra
m. K0463+300; Tumalip, Baay-Liucan, Abra
n. K0468+450; Nalbuan, Baay-Licuan, Abra

One lane passable


One lane passable
One lane passable
One lane passable
One lane passable
Punch-thru

Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse

o. K0474+300; Aguibo, Malibcong, Abra


p. K0475+600; Duldulao, Malibcong, Abra
q. K0479+000; Duldulao, Malibcong, Abra

Not Passable
Not Passable
Not Passable

Landslide
Landslide
Landslide

and fallen trees


and Rockfall
and fallen trees
and fallen trees

Further
Further
Further
Further
Further
Further

clearing
clearing
clearing
clearing
clearing
clearing

is
is
is
is
is
is

on-going
on-going
on-going
on-going
on-going
on-going

Coordinated with the


contractor for the clearing
operation

mydoc/carol/forms/BOM-SDMCD form 2015-03

NOTE : To be submitted every Six (6) hours after calamity


Prepared by:
EDWIN T. BRINGAS
Chief, Maintenance Section

Encl. "4"
BOM-SDMCD Form 2015-03

D HIGHWAYS
AND BRIDGES

N TAKEN
used/deployed)
5

PREL.EST.
OF DAMAGE
( P'M)
6

a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097

leared

REMARKS

8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration

c advisory

a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595

the bridge was closed to traffic;


needs immediate rehabilitation

ng is on-going
ng is on-going
ng is on-going
ng is on-going
ng is on-going
leared

a. ARLON DON G. BARBERO


b. 0917-799-4270

Section was passable


Section was passable
Section was passable
Section was passable
Section was passable
Section was opened 6:15 PM,
August 22, 2015
Section was passable
Section was passable

ng is on-going
ng is on-going

ng
ng
ng
ng
ng
ng

is
is
is
is
is
is

on-going
on-going
on-going
on-going
on-going
on-going

a. ROMMEL MORENO B. ORTEGA


b. 0927-265-7188

ith the
the clearing

ection

Section was passable


Section was passable
Section was passable
Section was passable
Section was passable
Section was passable @ 4:00
P.M. of Aug 21, 2015
Section is under contract
Section is under contract
Section is under contract

Submitted by:
LORETO B. DACOROON
Caretaker

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
TYPHOON : "INENG"
As of : August 23, 2015; 02:00 P.M.
REGIO: CAR
DISTRICT: ABRA
AFFECTED AREAS
MAJOR/SECONDARY
ROAD/BRIDGE

(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang
b. K0434+800; Bangbangcag, Bucay
c. K0450+050; Bilabila, Sallapadan,
d. K0452+000; Bilabila, Sallapadan,
e. K0452+750; Bilabila, Sallapadan,

Abra-Kalinga Road

DATE
REPORTED
TO CENTRAL
OFFICE

SITUATION
DURING
CALAMITY

ACTION TAKEN
DESCRIPTION OF DAMAGE

( Equipment used/deployed)

Passable
Passable
Passable
Passable
Passable
Passable
Passable

Soil
Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees

Not Passable

Cut Road Section

Not Passable

Sinking Bridge Pier before


abutment B

Passable
Passable
Passable
Not Passable

Collapsed Stone Masonry


Collapsed Stone Masonry
Collapsed Stone Masonry
Soil Collapse

5
Soil
Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse

cleared
cleared
cleared
cleared
cleared
cleared
cleared

Installed traffic advisory

Coordinated with the


contractor for the clearing
operation

a. K0414+450; Deet, Tayum, Abra


b. K0436+200; San Isidro, Lagangilang, Abra
c.K0436+500; San Isidro, Lagangilang, Abra
d. K0436+700; San Isidro, Lagangilang, Abra
e. K0438+850; Nagtipulan, Lagangilang, Abra
f. K0439+500; Nagtipulan, Lagangilang, Abra
g. K0441+260/K0444+100; Bonglo, Baay-Licuan,
Abra

Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable

Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry

h. K0448+000; Lenneng, Baay-Licuan, Abra

One lane passable

Soil Collapse

i. K0448+250; Lenneng, Baay-Licuan, Abra


j. K0448+950; Lenneng, Baay-Licuan, Abra
k. K0450+000; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable
Not Passable

Soil Collapse and fallen trees


Soil Collapse and fallen trees
Soil Collapse

l. K0453+450; Lenneng, Baay-Licuan, Abra


m. K0457+500; Poblacion, Baay-Licuan, Abra

One lane passable


Not Passable

Soil Collapse and fallen trees


Soil Collapse

Not Passable

Soil Collapse

o. K0462+750; Tumalip, Baay-Licuan, Abra


p. K0463+150; Tumalip, Baay-Licuan, Abra
q. K0463+200; Tumalip, Baay-Liucan, Abra
r. K0463+300; Tumalip, Baay-Liucan, Abra

One
One
One
One

Soil
Soil
Soil
Soil

s. K0465+200; Nalbuan, Baay-Licuan, Abra

Not Passable

Soil Collapse

t. K0468+450; Nalbuan, Baay-Licuan, Abra

Punch-thru

Soil Collapse and fallen trees

u. K0474+000; Aguibo, Malibcong, Abra

Not Passable

Cut Road Section

u. K0474+300; Aguibo, Malibcong, Abra


w. K0474+800; Aguibo, Malibcong, Abra

Not Passable
Not Passable

Landslide
Cut Road Section

x. K0475+600; Duldulao, Malibcong, Abra

Not Passable

Landslide

n. K0459+900; Capcapo, Cawayan, Baay-Licuan,


Abra

lane
lane
lane
lane

passable
passable
passable
passable

Collapse and Rockfall


Collapse
Collapse and fallen trees
Collapse

Private-owned and DPWH


equipment are on stand-by for
possible recurrent of soil
collapsed.

Coordinated with the


contractor for the clearing
operation
Coordinated with the
contractor for the clearing
operation
Coordinated with the
contractor for the clearing
operation
Private-owned and DPWH
equipment are on stand-by for
possible recurrent of soil
collapsed.
Coordinating with the
contractor for the clearing
operation

Coordinated with the


contractor for the clearing
operation

operation

y. K0479+000; Duldulao, Malibcong, Abra


Abra-Ilocos Sur Road
a. K0394+680; Sulvec, Pidigan
b. K0395+620; Garreta, Pidigan
c. K0399+130; Naguirayan, Pidigan
c. K0402+880; Monggoc, Pidigan
e. K0403+560; Monggoc, Pidigan
f. K0404+485; Palao, Bangued, Abra

Not Passable

Landslide

Passable
Passable
One lane passable
Passable
Passable

damaged curb and gutter


Scoured foundation Stone Masonry
Soil Collapse
damaged stone masonry
damaged stone masonry

Not passable

Soil Collapsed/Debris flow

g. K0404+984; Palao, Bangued, Abra

Not passable

Soil Collapsed/Debris flow

h. K0405+265; Palao, Bangued, Abra


i. K0405+340; Palao, Bangued, Abra
j. K0407+025; Ubbog-Lipcan, Bangued

passable
passable
Passable

Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement

Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.

Installed Warning Signs

mydoc/carol/forms/BOM-SDMCD form 2015-03

NOTE : To be submitted every Six (6) hours after calamity


Prepared by:
EDWIN T. BRINGAS
Chief, Maintenance Section

Encl. "4"
BOM-SDMCD Form 2015-03

D HIGHWAYS
AND BRIDGES

N TAKEN
used/deployed)
5

PREL.EST.
OF DAMAGE
( P'M)
6

a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097

leared

c advisory

ith the
the clearing

REMARKS

8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration

a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595

the bridge was closed to traffic;


needs immediate rehabilitation
Section was passable
Section was passable
Section was passable
Not Passable; Needs immediate
restoration

ned and DPWH


e on stand-by for
current of soil
apsed.

a. ARLON DON G. BARBERO


b. 0917-799-4270

ith the
the clearing

was
was
was
was
was
was
was

passable
passable
passable
passable
passable
passable
passable

Section was opened 6:15 PM,


August 22, 2015
Section was passable
Section was passable
Section was opened 11:30 AM,
August 22, 2015

ith the
the clearing

ith the
the clearing

Section
Section
Section
Section
Section
Section
Section

a. ROMMEL MORENO B. ORTEGA


b. 0927-265-7188

Section was passable


Section was opened 12:00 PM,
August 22, 2015
Section was opened 12:30 PM,
August 22, 2015

and DPWH
e on stand-by for
rent of soil

Section
Section
Section
Section

with the
the clearing

Section is under contract. Not


Passable;

ted with the


or the clearing
eration

was
was
was
was

passable
passable
passable
passable

Section was passable @ 4:00


P.M. of Aug 21, 2015
Section is under contract. Not
Passable; Needs immediate
restoration
Section is under contract
Section is under contract. Not
Passable; Needs immediate
restoration
Section is under contract

Section is under contract


a. SOCORRO LITO S. BENEDITO
b. 0915-750-0166

was
was
was
was
was

passable
passable
cleared 9:00 AM
passable
passable

Section was closed to traffic at


3:00 AM but was opened at 6:45
AM, August 23, 2015

hru by private
losely monitored
ecurrent. Closely
d for possible
urrent.

Section was passable with muddy


surface.

Warning Signs

ection

Section
Section
Section
Section
Section

Section was passable

Submitted by:
LORETO B. DACOROON
Caretaker

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
TYPHOON : "INENG"
As of : August 23, 2015; 08:00 P.M.
REGIO: CAR
DISTRICT: ABRA
AFFECTED AREAS
MAJOR/SECONDARY
ROAD/BRIDGE

(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang
b. K0434+800; Bangbangcag, Bucay
c. K0450+050; Bilabila, Sallapadan
d. K0452+000; Bilabila, Sallapadan
e. K0452+750; Bilabila, Sallapadan

DATE
REPORTED
TO CENTRAL
OFFICE

SITUATION
DURING
CALAMITY

ACTION TAKEN
DESCRIPTION OF DAMAGE

( Equipment used/deployed)

Passable
Passable
Passable
Passable
Passable
Passable
Passable

Soil
Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees

Not Passable

Cut Road Section

Not Passable

Sinking Bridge Pier before


abutment B

Passable
Passable
Passable
Not Passable

Collapsed Stone Masonry


Collapsed Stone Masonry
Collapsed Stone Masonry
Soil Collapse

5
Soil
Soil
Soil
Soil
Soil
Soil
Soil

Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse

cleared
cleared
cleared
cleared
cleared
cleared
cleared

Installed traffic advisory

Coordinated with the


contractor for the clearing
operation

f. K0454+400; Subusob, Sallapadan

Not Passable

Soil Collapse

Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable

Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry

h. K0448+000; Lenneng, Baay-Licuan, Abra

One lane passable

Soil Collapse

i. K0448+250; Lenneng, Baay-Licuan, Abra


j. K0448+950; Lenneng, Baay-Licuan, Abra
k. K0450+000; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable
Not Passable

Soil Collapse and fallen trees


Soil Collapse and fallen trees
Soil Collapse

l. K0453+450; Lenneng, Baay-Licuan, Abra


m. K0457+500; Poblacion, Baay-Licuan, Abra

One lane passable


Not Passable

Soil Collapse and fallen trees


Soil Collapse

Not Passable

Soil Collapse

o. K0462+750; Tumalip, Baay-Licuan, Abra


p. K0463+150; Tumalip, Baay-Licuan, Abra
q. K0463+200; Tumalip, Baay-Liucan, Abra
r. K0463+300; Tumalip, Baay-Liucan, Abra

One
One
One
One

Soil
Soil
Soil
Soil

s. K0465+200; Nalbuan, Baay-Licuan, Abra

Not Passable

Soil Collapse

t. K0468+450; Nalbuan, Baay-Licuan, Abra

Punch-thru

Soil Collapse and fallen trees

u. K0474+000; Aguibo, Malibcong, Abra

Not Passable

Cut Road Section

Abra-Kalinga Road
a. K0414+450; Deet, Tayum, Abra
b. K0436+200; San Isidro, Lagangilang, Abra
c.K0436+500; San Isidro, Lagangilang, Abra
d. K0436+700; San Isidro, Lagangilang, Abra
e. K0438+850; Nagtipulan, Lagangilang, Abra
f. K0439+500; Nagtipulan, Lagangilang, Abra
g. K0441+260/K0444+100; Bonglo, Baay-Licuan,
Abra

n. K0459+900; Capcapo, Cawayan, Baay-Licuan,


Abra

lane
lane
lane
lane

passable
passable
passable
passable

Collapse and Rockfall


Collapse
Collapse and fallen trees
Collapse

Coordinated with the


contractor for the clearing
operation

Private-owned and DPWH


equipment are on stand-by for
possible recurrent of soil
collapsed.

Coordinated with the


contractor for the clearing
operation
Coordinated with the
contractor for the clearing
operation
Coordinated with the
contractor for the clearing
operation
Private-owned and DPWH
equipment are on stand-by for
possible recurrent of soil
collapsed.
Coordinating with the
contractor for the clearing
operation

Coordinated with the


contractor for the clearing
operation

u. K0474+300; Aguibo, Malibcong, Abra


w. K0474+800; Aguibo, Malibcong, Abra

Not Passable
Not Passable

Landslide
Cut Road Section

x. K0475+600; Duldulao, Malibcong, Abra


y. K0479+000; Duldulao, Malibcong, Abra
Abra-Ilocos Sur Road
a. K0394+680; Sulvec, Pidigan
b. K0395+620; Garreta, Pidigan
c. K0399+130; Naguirayan, Pidigan
c. K0402+880; Monggoc, Pidigan
e. K0403+560; Monggoc, Pidigan

Not Passable
Not Passable

Landslide
Landslide

Passable
Passable
One lane passable
Passable
Passable

damaged curb and gutter


Scoured foundation Stone Masonry
Soil Collapse
damaged stone masonry
damaged stone masonry

Not passable

Soil Collapsed/Debris flow

f. K0404+485; Palao, Bangued, Abra

Coordinated with the


contractor for the clearing
operation

g. K0404+984; Palao, Bangued, Abra

Not passable

Soil Collapsed/Debris flow

h. K0405+265; Palao, Bangued, Abra


i. K0405+340; Palao, Bangued, Abra
j. K0407+025; Ubbog-Lipcan, Bangued

passable
passable
Passable

Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement

Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.

Installed Warning Signs

mydoc/carol/forms/BOM-SDMCD form 2015-03

NOTE : To be submitted every Six (6) hours after calamity


Prepared by:
EDWIN T. BRINGAS
Chief, Maintenance Section

Encl. "4"
BOM-SDMCD Form 2015-03

D HIGHWAYS
AND BRIDGES

N TAKEN
used/deployed)
5

PREL.EST.
OF DAMAGE
( P'M)
6

a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097

leared

c advisory

ith the
the clearing

REMARKS

8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration

a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595

the bridge was closed to traffic;


needs immediate rehabilitation
Section was passable
Section was passable
Section was passable
Section was opened to traffic 4:00
PM, August 23, 2015

ith the
the clearing

ned and DPWH


e on stand-by for
current of soil
apsed.

Section was closed to traffic

a. ARLON DON G. BARBERO


b. 0917-799-4270

ith the
the clearing

was
was
was
was
was
was
was

passable
passable
passable
passable
passable
passable
passable

Section was opened 6:15 PM,


August 22, 2015
Section was passable
Section was passable
Section was opened 11:30 AM,
August 22, 2015

ith the
the clearing

ith the
the clearing

Section
Section
Section
Section
Section
Section
Section

a. ROMMEL MORENO B. ORTEGA


b. 0927-265-7188

Section was passable


Section was opened 12:00 PM,
August 22, 2015
Section was opened 12:30 PM,
August 22, 2015

and DPWH
e on stand-by for
rent of soil

Section
Section
Section
Section

with the
the clearing

Section is under contract. Not


Passable;

ted with the


or the clearing
eration

was
was
was
was

passable
passable
passable
passable

Section was passable @ 4:00


P.M. of Aug 21, 2015
Section is under contract. Not
Passable; Needs immediate
restoration

Section is under contract


Section is under contract. Not
Passable; Needs immediate
restoration
Section is under contract
Section is under contract
a. SOCORRO LITO S. BENEDITO
b. 0915-750-0166

was
was
was
was
was

passable
passable
cleared 9:00 AM
passable
passable

Section was closed to traffic at


3:00 AM but was opened at 6:45
AM, August 23, 2015

hru by private
losely monitored
ecurrent. Closely
d for possible
urrent.

Section was passable with muddy


surface.

Warning Signs

ection

Section
Section
Section
Section
Section

Section was passable

Submitted by:
LORETO B. DACOROON
Caretaker

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
TYPHOON : "INENG"
As of : August 24, 2015; 08:00 A.M.
REGIO: CAR
DISTRICT: ABRA
AFFECTED AREAS
MAJOR/SECONDARY
ROAD/BRIDGE

(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra

DATE
REPORTED
TO CENTRAL
OFFICE

SITUATION
DURING
CALAMITY

ACTION TAKEN
DESCRIPTION OF DAMAGE

( Equipment used/deployed)
5

Passable
Passable
Passable
Passable
Passable
Passable
Passable
Not Passable

Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse and fallen trees
Soil Collapse and fallen trees
Cut Road Section

Soil Collapse cleared


Soil Collapse cleared
Soil Collapse cleared
Soil Collapse cleared
Soil Collapse cleared
Soil Collapse cleared
Soil Collapse cleared
Coordinated with the contractor
for the clearing operation
Coordinated with the contractor
for the clearing operation

i. K0437+150; Nagaparan, Danglas, Abra

Passable

Road Slip

j. K0437+905.5; Nagaparan, Danglas, Abra

Passable

Road Slip

"

k. K0438+100; Nagaparan, Danglas, Abra


l. K0438+200; Nagaparan, Danglas, Abra
m. K0438+617.5; Nagaparan, Danglas, Abra
n. K0444+132; Nagaparan, Danglas, Abra
o. K0444+300; Nagaparan, Danglas, Abra
p. K0444+320; Nagaparan, Danglas, Abra
q. K0444+380; Nagaparan, Danglas, Abra
r. K0444+462; Nagaparan, Danglas, Abra
s. K0445+082; Nagaparan, Danglas, Abra

Passable
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Passable

Road Slip
Road Slip
Road Slip
Soil Collapse
Soil Collapse
Road Slip
Road Slip
Road Slip
Road Slip

"
"
"
"
"
"
"
"
"

t. K0445+082; Nagaparan, Danglas, Abra


u. K0445+414; Nagaparan, Danglas, Abra
v. K0445+450; Nagaparan, Danglas, Abra
w. K0445+846; Nagaparan, Danglas, Abra
x. K0445+846; Nagaparan, Danglas, Abra
y. K0446+047; Nagaparan, Danglas, Abra
z. K0446+862; Nagaparan, Danglas, Abra
aa. K0447+320; Nagaparan, Danglas, Abra
ab. K0447+630; Nagaparan, Danglas, Abra
ac. K0447+723; Nagaparan, Danglas, Abra
ad. K0448+328; Nagaparan, Danglas, Abra
af. K0448+500; Nagaparan, Danglas, Abra
ag. K0448+508; Nagaparan, Danglas, Abra
ah. K0449+500; Nagaparan, Danglas, Abra
ai. K0449+600; Nagaparan, Danglas, Abra
aj. K0449+860; Nagaparan, Danglas, Abra
ak. K0449+900; Nagaparan, Danglas, Abra
al. K0449+931; Nagaparan, Danglas, Abra
am. K0449+938; Nagaparan, Danglas, Abra
an. K0449+974; Nagaparan, Danglas, Abra
ao. K0450+140; Nagaparan, Danglas, Abra
ap. K0451+450; Nagaparan, Danglas, Abra
aq. K0451+665; Nagaparan, Danglas, Abra
ar. K0451+956; Nagaparan, Danglas, Abra
as. K0451+975; Nagaparan, Danglas, Abra
at. K0452+410; Nagaparan, Danglas, Abra
au. K0452+560; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang
b. K0434+800; Bangbangcag, Bucay
c. K0450+050; Bilabila, Sallapadan
d. K0452+000; Bilabila, Sallapadan
e. K0452+750; Bilabila, Sallapadan

Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable

Road Slip
Soil Collapse/Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Soil Collapse
Soil Collapse

Not Passable

Sinking Bridge Pier before


abutment B

Passable
Passable
Passable
Not Passable

Collapsed Stone Masonry


Collapsed Stone Masonry
Collapsed Stone Masonry
Soil Collapse

Road Slip
Soil Collapse
Road Slip
Road Slip
Soil Collapse
Road Slip
Road Slip
Soil Collapse
Road Slip
Road Slip
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Installed traffic advisory

Coordinated with the contractor


for the clearing operation

f. K0454+400; Subusob, Sallapadan

Not Passable

Soil Collapse

Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable

Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry

h. K0448+000; Lenneng, Baay-Licuan, Abra

One lane passable

Soil Collapse

i. K0448+250; Lenneng, Baay-Licuan, Abra


j. K0448+950; Lenneng, Baay-Licuan, Abra
k. K0450+000; Lenneng, Baay-Licuan, Abra

One lane passable


One lane passable
Not Passable

Soil Collapse and fallen trees


Soil Collapse and fallen trees
Soil Collapse recur

l. K0453+450; Lenneng, Baay-Licuan, Abra


m. K0457+500; Poblacion, Baay-Licuan, Abra

One lane passable


Not Passable

Soil Collapse and fallen trees


Soil Collapse

Not Passable

Soil Collapse

o. K0462+750; Tumalip, Baay-Licuan, Abra


p. K0463+150; Tumalip, Baay-Licuan, Abra
q. K0463+200; Tumalip, Baay-Liucan, Abra
r. K0463+300; Tumalip, Baay-Liucan, Abra

One
One
One
One

Soil
Soil
Soil
Soil

s. K0465+200; Nalbuan, Baay-Licuan, Abra

Not Passable

Soil Collapse

t. K0468+450; Nalbuan, Baay-Licuan, Abra

Punch-thru

Soil Collapse and fallen trees

u. K0474+000; Aguibo, Malibcong, Abra

Not Passable

Cut Road Section

Abra-Kalinga Road
a. K0414+450; Deet, Tayum, Abra
b. K0436+200; San Isidro, Lagangilang, Abra
c.K0436+500; San Isidro, Lagangilang, Abra
d. K0436+700; San Isidro, Lagangilang, Abra
e. K0438+850; Nagtipulan, Lagangilang, Abra
f. K0439+500; Nagtipulan, Lagangilang, Abra
g. K0441+260/K0444+100; Bonglo, Baay-Licuan,
Abra

n. K0459+900; Capcapo, Cawayan, Baay-Licuan,


Abra

lane
lane
lane
lane

passable
passable
passable
passable

Collapse and Rockfall


Collapse
Collapse and fallen trees
Collapse

Coordinated with the contractor


for the clearing operation

Private-owned and DPWH


equipment are on stand-by for
possible recurrent of soil
collapsed.

Coordinated with the contractor


for the clearing operation

Coordinated with the contractor


for the clearing operation
Coordinated with the contractor
for the clearing operation
Private-owned and DPWH
equipment are on stand-by for
possible recurrent of soil
collapsed.

Coordinating with the contractor


for the clearing operation

Coordinated with the contractor


for the clearing operation

u. K0474+300; Aguibo, Malibcong, Abra


w. K0474+800; Aguibo, Malibcong, Abra

Not Passable
Not Passable

Landslide
Cut Road Section

x. K0475+600; Duldulao, Malibcong, Abra


y. K0479+000; Duldulao, Malibcong, Abra
Abra-Ilocos Sur Road
a. K0394+680; Sulvec, Pidigan
b. K0395+620; Garreta, Pidigan
c. K0399+130; Naguirayan, Pidigan
c. K0402+880; Monggoc, Pidigan
e. K0403+560; Monggoc, Pidigan

Not Passable
Not Passable

Landslide
Landslide

Passable
Passable
One lane passable
Passable
Passable

damaged curb and gutter


Scoured foundation Stone Masonry
Soil Collapse
damaged stone masonry
damaged stone masonry

Not passable

Soil Collapsed/Debris flow

f. K0404+485; Palao, Bangued, Abra

Coordinated with the contractor


for the clearing operation

g. K0404+984; Palao, Bangued, Abra

Not passable

Soil Collapsed/Debris flow

h. K0405+265; Palao, Bangued, Abra


i. K0405+340; Palao, Bangued, Abra
j. K0407+025; Ubbog-Lipcan, Bangued

passable
passable
Passable

Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement

Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.

Installed Warning Signs

mydoc/carol/forms/BOM-SDMCD form 2015-03

NOTE : To be submitted every Six (6) hours after calamity


Prepared by:
EDWIN T. BRINGAS
Chief, Maintenance Section

Encl. "4"
BOM-SDMCD Form 2015-03

ND HIGHWAYS

S AND BRIDGES

ON TAKEN

t used/deployed)
5

PREL.EST.
OF DAMAGE
( P'M)
6

a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097

leared
with the contractor
aring operation
with the contractor
aring operation

REMARKS

8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August
22, 2015
Not Passable;
Needs immediate
restoration
Section is under contract. One
lane is Passable;

"

"

"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

c advisory

ith the contractor


g operation

"
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595

lanes are not passable


lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
End of Widening
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable
lanes are not passable

the bridge was closed to traffic;


needs immediate rehabilitation
Section was passable
Section was passable
Section was passable
Section was opened to traffic 4:00
PM, August 23, 2015

ith the contractor


g operation

ned and DPWH


re on stand-by for
ecurrent of soil
lapsed.

Section was closed to traffic

a. ARLON DON G. BARBERO


b. 0917-799-4270

ith the contractor


g operation

was
was
was
was
was
was
was

passable
passable
passable
passable
passable
passable
passable

Section was opened 6:15 PM,


August 22, 2015
Section was passable
Section was passable
Section closed to traffic as of
8:00 AM

ith the contractor


g operation

ith the contractor


g operation

Section
Section
Section
Section
Section
Section
Section

a. ROMMEL MORENO B. ORTEGA


b. 0927-265-7188

Section was passable


Section was opened 12:00 PM,
August 22, 2015
Section was opened 12:30 PM,
August 22, 2015

and DPWH
e on stand-by for
rent of soil

Section
Section
Section
Section

with the contractor


g operation

Section is under contract. Not


Passable;

with the contractor


aring operation

was
was
was
was

passable
passable
passable
passable

Section was passable @ 4:00


P.M. of Aug 21, 2015
Section is under contract. Not
Passable; Needs immediate
restoration

Section is under contract


Section is under contract. Not
Passable; Needs immediate
restoration
Section is under contract
Section is under contract
a. SOCORRO LITO S. BENEDITO
b. 0915-750-0166

was
was
was
was
was

passable
passable
cleared 9:00 AM
passable
passable

Section was closed to traffic at


3:00 AM but was opened at 6:45
AM, August 23, 2015

hru by private
Closely monitored
ecurrent. Closely
d for possible
current.

Section was passable with muddy


surface.

Warning Signs

ection

Section
Section
Section
Section
Section

Section was passable

Submitted by:
LORETO B. DACOROON
Caretaker

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

ASSETS DEPLOYMENT
TYPHOON :
Ineng
As of : August 20, 2015 (6:00 am)

REGION :

CAR

DEPLOYED ASSESTS
DISTRICT OFFICE

(1)

EQUIPMENTS

MANPOWER

(2)

(3)

ABRA

1
1
1
1

unit Payloader
unit Road Grader
unit Dumptruck
unit Chainsaw

21

ABRA

1 unit Road Grader


1 unit Chainsaw

14

ABRA

1 unit Dumptruck
1 unit Chainsaw
1 unit Backhoe

12

ABRA

1 unit Mini-Dumptruck
1 unit Chainsaw

mydoc/carol/forms/BOM-SDMCD form 2015-04

NOTE : To be submitted prior to the deployment of assets


Prepared by:

SOCORRO LITO S. BENEDITO


Engineer II

e Phillippines
C WORKS AND HIGHWAYS

PLOYMENT

SITUATIONAL REPORTS ON MAJOR ROADS BRIDG

2015 (6:00 am)

DESTINATION
(Name of Road Section/Barangay/
Municipality/Province

REMARKS

(4)

(5)

Abra-Kalinga
Abra-Kalinga
Abra-Kalinga
Abra-Kalinga

Road/Zone 7/Bangued/Abra
Road/Baquero/Baay-Licuan/Abra
Road/Quersodan/Lagangilang/Abra
Road/Quersodan/Lagangilang/Abra

Abra-Ilocos Norte/Nagaparan/Danglas/Abra
Abra-Ilocos Norte/Mudeng/La Paz/Abra

Abra-Ilocos Sur/Pangtud/Pidigan/Abra
Abra-Ilocos Sur/Pangtud/Pidigan/Abra
Abra-Ilocos Sur/Sulbec/Pidigan/Abra
Abra-Cervantes Road/Nagbalitangan/Bucay
Abra-Cervantes Road/Nagbalitangan/Bucay

O S. BENEDITO

Submitted by:

ARLON DON G. BARBERO


Engineer II

S ON MAJOR ROADS BRIDGES

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS AND HIG

PRIORITY 1-DAMAGED INFRA(with Detailed In


TYPHOON: "INENG"
AS of: August 22, 2015; 8:00 P.M.
REGION : CAR
District Engineering Office :

ABRA
LOCATION

NAME OF ROAD/BRIDGES/
FC STRUCTURE
BARANGAY
( STATION Limits)

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

(1)
Abra-Ilocos Norte Road; K0424+300
to K0432+600 @ various sections

(2)
Abaquid/ Nagaparan Danglas

(4)

Abra-Ilocos Norte Road; K0434+400

Nagaparan

Abra-Kalinga Road; K0436+200 to


K0468+450 @ various sections

San iSidro/
Lagangilang/ Baay-Licuan Abra
Nagtipulan/ Lenneng/
Tumalip/ Nalbuan

Soil Collapse and Fallen Trees

Abra-Kalinga Road; K0414+450

Deet

Tayum

Abra

Road Slip

Abra-Kalinga Road; K0441+260;


K0444+100

Bonglo

Baay-Licuan

Abra

Collapsed Stone Masonry

Abra-Cervantes Road; K0450+050

BilaBila

Sallapadan

Abra

Collapsed Stone Masonry and


pavement

Abra-Cervantes Road; K0452+000

BilaBila

Sallapadan

Abra

Collapsed Stone Masonry and


pavement

Abra-Cervantes Road; K0434+800

Bangbangcag

Bucay

Abra

Collapsed Gabion Revetment

Abra-Cervantes Road; 432+182;


Baay Bridge

San Isidro

Lagangilang

Abra

Sinking Bridge Pier

Abra-Ilocos Sur Road; K0394+680

Sulvec

Pidigan

Abra

damage curb and guutter

Abra-Ilocos Sur Road; K0395+620

Garreta

Pidigan

Abra

Scoured foundation of stone masonry

(3)

Danglas

(5)

Abra

Soil Collapse

Abra

Cut Road Section

Abra-Ilocos Sur Road; K0402+880

Monggoc

Pidigan

Abra

Damaged stone masonry

Abra-Ilocos Sur Road; K0403+560

Monggoc

Pidigan

Abra

Damaged stone masonry

Abra-Ilocos Sur Road; K0407+025

Ubbog Lipcan

Bangued

Abra

Damaged stone masonry

NOTE: To be submitted within twelve (12) hours after calamity. Cost of priority I group should be those that can be funded by the immediate Resp
Prepared by:

EDWIN T. BRINGAS
Chief Maintenenance Section

End. "6"
BOM-SDMCD Form 2015-05

he Phillippines
UBLIC WORKS AND HIGHWAYS

NFRA(with Detailed Information)


N: "INENG"
2, 2015; 8:00 P.M.

Length/Area/
Volume of
Damage
(6)
4,072 cu.m.

Type/No. of
Equipment
Needed

Estimated Cost of
Restoration

(7)
(8)
Payloader/ Backhoe 1,000,000.00

Estimated
Duration of
Repair Works
(9)
14 C.D.

K0436+200;
K0436+500;
K0424+300;
K0436+700;
K0424+450;
K0438+850;
K0424+600;
(10)
K0439+500;
K0424+800;
Immediate rehabilitation to quickly restore mobility and K0448+000;
K0425+400;
ensure safety of the affected areas.
K0448+250;
K0430+600;
K0448+950;
K0432+600
Immediate rehabilitation to quickly restore mobility and K0453+450;
K0462+750;
ensure safety of the affected areas.
K0463+150;
Immediate rehabilitation to quickly restore mobility and K0463+200;
ensure safety of the affected areas.
K0463+300;
K0468+450
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
REMARKS

5,000,000.00

45 C.D.

Payloader/ Backhoe 1,500,000.00

21 C.D.

30 l.m.

1,000,000.00

30 C.D.

60 l.m.

5,000,000.00

64 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

40 l.m.

850,000.00

24 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

40 l.m.

1,100,000.00

26 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

15 l.m.

750,000.00

22 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

5,000,000.00

30 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

100,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

100,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

6000 cu.m.

TOTAL

750,000.00

23 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

1,000,000.00

26 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

1,000,000.00

26 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

23,150,000.00

by the immediate Response Fund and/or the Quick response Fund.


Submitted by:

LORETO B. DACOROON
Caretaker

Republic of the Phillippines

DEPARTMENT OF PUBLIC WORKS AND HIG


PRIORITY 1-DAMAGED INFRA(with Detailed In
TYPHOON: "INENG"
AS of: August 23, 2015; 2:00 P.M.
REGION : CAR
District Engineering Office :

ABRA
LOCATION

NAME OF ROAD/BRIDGES/
FC STRUCTURE
BARANGAY
( STATION Limits)

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

(4)

(5)

(1)
Abra-Ilocos Norte Road; K0424+300
to K0432+600 @ various sections

(2)
Abaquid/ Nagaparan Danglas

Abra-Ilocos Norte Road; K0434+400

Nagaparan

Abra-Kalinga Road; K0436+200 to


K0468+450 @ various sections

San iSidro/
Lagangilang/ Baay-Licuan Abra
Nagtipulan/ Lenneng/
Tumalip/ Nalbuan

Soil Collapse and Fallen Trees

Abra-Kalinga Road; K0414+450

Deet

Tayum

Abra

Road Slip

Abra-Kalinga Road; K0441+260;


K0444+100

Bonglo

Baay-Licuan

Abra

Collapsed Stone Masonry

Abra-Cervantes Road; K0450+050

BilaBila

Sallapadan

Abra

Collapsed Stone Masonry and


pavement

Abra-Cervantes Road; K0452+000

BilaBila

Sallapadan

Abra

Collapsed Stone Masonry and


pavement

Abra-Cervantes Road; K0452+750

BilaBila

Sallapadan

Abra

Soil Collapsed

Abra-Cervantes Road; K0434+800

Bangbangcag

Bucay

Abra

Collapsed Gabion Revetment

Abra-Cervantes Road; 432+182;


Baay Bridge

San Isidro

Lagangilang

Abra

Sinking Bridge Pier

(3)

Danglas

Abra

Soil Collapse

Abra

Cut Road Section

Abra-Ilocos Sur Road; K0399+130 to Palao/Naguirayan


K0405+340 @ various sections
Section

Bangued/Pidigan

Abra

Soil Collapse/ Debris Flow

Abra-Ilocos Sur Road; K0394+680

Sulvec

Pidigan

Abra

damage curb and guutter

Abra-Ilocos Sur Road; K0395+620

Garreta

Pidigan

Abra

Scoured foundation of stone masonry

Abra-Ilocos Sur Road; K0402+880

Monggoc

Pidigan

Abra

Damaged stone masonry

Abra-Ilocos Sur Road; K0403+560

Monggoc

Pidigan

Abra

Damaged stone masonry

Abra-Ilocos Sur Road; K0407+025

Ubbog Lipcan

Bangued

Abra

Damaged pavement

NOTE: To be submitted within twelve (12) hours after calamity. Cost of priority I group should be those that can be funded by the immediate Resp
Prepared by:

EDWIN T. BRINGAS
Chief Maintenenance Section

End. "6"
BOM-SDMCD Form 2015-05

he Phillippines

UBLIC WORKS AND HIGHWAYS


NFRA(with Detailed Information)
N: "INENG"
3, 2015; 2:00 P.M.

Length/Area/
Volume of
Damage
(6)
4,072 cu.m.

Type/No. of
Equipment
Needed

Estimated Cost of
Restoration

REMARKS

(9)
14 C.D.

(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.

5,000,000.00

45 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

Payloader/ Backhoe 1,500,000.00

21 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

30 l.m.

1,000,000.00

30 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

60 l.m.

5,000,000.00

64 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

40 l.m.

850,000.00

24 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

40 l.m.

1,100,000.00

26 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

200,000.00

7 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

750,000.00

22 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

5,000,000.00

30 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

6000 cu.m.

15 l.m.

(7)
(8)
Payloader/ Backhoe 1,000,000.00

Estimated
Duration of
Repair Works

Payloader/ Backhoe 100,000.00

TOTAL

7 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

100,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

100,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

750,000.00

23 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

1,000,000.00

26 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

200,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

23,650,000.00

by the immediate Response Fund and/or the Quick response Fund.


Submitted by:

LORETO B. DACOROON
Caretaker

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS
PRIORITY 1-DAMAGED INFRA(with De
TYPHOON: "Carina"
AS of: August 03,2016
REGION : CAR
District Engineering Office :

ABRA

NAME OF ROAD/BRIDGES/
STRUCTURE

LOCATION

FC
BARANGAY

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

( STATION Limits)
(1)
Abra-Ilocos Norte Road; K0434+480;
Nagaparan, Danglas, Abra

(2)

(3)

(4)

(5)

Nagaparan

Danglas

Abra

Rockslide

Abra-Ilocos Norte Road; K0438+150;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Road slip

Abra-Ilocos Norte Road; K0440+600;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Road slip

Abra-Ilocos Norte Road; K0444+500;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Landslide

Abra-Ilocos Norte Road; K0445+200;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Landslide

Abra-Ilocos Norte Road; K0446+200;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Landslide

Abra-Ilocos Norte Road; K0446+300;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Landslide

Abra-Ilocos Norte Road; K0446+500;


Nagaparan, Danglas, Abra

Nagaparan

Danglas

Abra

Landslide

Bagalay

Tayum

Abra

Road slip

Balais

Lagangilang

Abra

Road slip

San Isidro

Lagangilang

Abra

Road slip

San Isidro

Lagangilang

Abra

Road slip

Abra-Kalinga Road; K0418+090


Abra-Kalinga Road; K0425+335
Abra-Kalinga Road; K0435+078
Abra-Kalinga Road; K0436+910

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS
PRIORITY 1-DAMAGED INFRA(with De
TYPHOON: "Carina"
AS of: August 03,2016
REGION : CAR
District Engineering Office :

ABRA

NAME OF ROAD/BRIDGES/
STRUCTURE

LOCATION

FC
BARANGAY

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

(2)

(3)

(4)

(5)

San Isidro

Lagangilang

Abra

Road slip

Bongol

Baay-Licuan

Abra

Road slip

Bongol

Baay-Licuan

Abra

Road slip

Bongol

Baay-Licuan

Abra

Road slip

Bongol

Baay-Licuan

Abra

Road slip

Bongol

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

Lenneng

Baay-Licuan

Abra

Road slip

( STATION Limits)
(1)
Abra-Kalinga Road; K0441+980
Abra-Kalinga Road; K0442+010
Abra-Kalinga Road; K0443+090
Abra-Kalinga Road; K0443+580
Abra-Kalinga Road; K0444+400
Abra-Kalinga Road; K0444+550
Abra-Kalinga Road; K0448+550
Abra-Kalinga Road; K0448+580
Abra-Kalinga Road; K0450+210
Abra-Kalinga Road; K0450+720
Abra-Kalinga Road; K0451+550
Abra-Kalinga Road; K0453+500

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS
PRIORITY 1-DAMAGED INFRA(with De
TYPHOON: "Carina"
AS of: August 03,2016
REGION : CAR
District Engineering Office :

ABRA

NAME OF ROAD/BRIDGES/
STRUCTURE

LOCATION

FC
BARANGAY

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

(2)

(3)

(4)

(5)

Poblacion

Baay-Licuan

Abra

Road slip

Poblacion

Baay-Licuan

Abra

Road slip

Poblacion

Baay-Licuan

Abra

Road slip

Tumalip

Baay-Licuan

Abra

Road slip

Tumalip

Baay-Licuan

Abra

Road slip

Tumalip

Baay-Licuan

Abra

Road slip

Subagan

Baay-Licuan

Abra

Err:509

Nalbuan

Baay-Licuan

Abra

Landslide

Abra-Kalinga Road; K0474+000; Aguibo,


Malibcong, Abra

Aguibo

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0474+700; Aguibo,


Malibcong, Abra

Aguibo

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0484+700; Duldulao,


Malibcong, Abra

Duldulao

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0485+100; Duldulao,


Malibcong, Abra

Duldulao

Malibcong

Abra

Landslide

( STATION Limits)
(1)
Abra-Kalinga Road; K0455+850
Abra-Kalinga Road; K0456+750
Abra-Kalinga Road; K0457+750
Abra-Kalinga Road; K0461+240
Abra-Kalinga Road; K0462+500
Abra-Kalinga Road; K0462+800
Err:509
Abra-Kalinga Road; K0468+150; Nalbuan,
Baay-Licuan, Abra

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS
PRIORITY 1-DAMAGED INFRA(with De
TYPHOON: "Carina"
AS of: August 03,2016
REGION : CAR
District Engineering Office :

ABRA

NAME OF ROAD/BRIDGES/
STRUCTURE

LOCATION

FC
BARANGAY

MUNICIPALITY/
CITY

PROVINCE

Description of the Extent of


Damage

( STATION Limits)
(1)
Abra-Kalinga Road; K0486+980; Gacab,
Malibcong, Abra

(2)

(3)

(4)

(5)

Gacab

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0488+200; Gacab,


Malibcong, Abra

Gacab

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0488+500; Gacab,


Malibcong, Abra

Gacab

Malibcong

Abra

Landslide

Abra-Kalinga Road; K0489+800; Gacab,


Malibcong, Abra

Gacab

Malibcong

Abra

Landslide

Manicbel Bridge Approach along AbraCervantes Road

Gangal

Sallapadan

Abra

Collapsed Revetment

group should be those that can be funded by the immediate Response Fund and/or the Quick response Fund.
Prepared by:

EDWIN T. BRINGAS
Chief Maintenenance Section

End. "6"
BOM-SDMCD Form 2015-05

blic of the Phillippines


OF PUBLIC WORKS AND HIGHWAYS
AGED INFRA(with Detailed Information)
YPHOON: "Carina"
of: August 03,2016

Length/Area/
Volume of
Damage

Type/No. of
Equipment
Needed

Estimated Cost of
Restoration

Estimated
Duration of
Repair Works

REMARKS

(6)

(7)

(8)

(9)

25 l.m.

Payloader/ Backhoe

200,000.00

21 D.C.

(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.

20 l.m.

2,110,500.00

32 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

7 l.m.

538,000.00

32 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

220,000.00

21 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

55 l.m.

50,000.00

7 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

25 l.m.

75,000.00

7 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

23 l.m.

290,000.00

21 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

14 l.m.

160,000.00

21 D.C.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

20 l.m.

375,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

10 l.m.

309,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

15 l.m.

690,000.00

17 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

7 l.m.

350,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

15 l.m.

Payloader/ Backhoe

End. "6"
BOM-SDMCD Form 2015-05

blic of the Phillippines


OF PUBLIC WORKS AND HIGHWAYS
AGED INFRA(with Detailed Information)
YPHOON: "Carina"
of: August 03,2016

Type/No. of

Estimated Cost of
Restoration

Estimated
Duration of
Repair Works

(8)

(9)

12 l.m.

297,000.00

14 C.D.

(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.

10 l.m.

555,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

15 l.m.

500,000.00

15 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

5 l.m.

133,000.00

12 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

10 l.m.

998,000.00

20 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

12 l.m.

260,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

6 l.m.

285,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

7 l.m.

275,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

7 l.m.

177,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

16 l.m.

365,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

8 l.m.

162,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

8 l.m.

196,000.00

13 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

Length/Area/
Volume of
Damage
(6)

Equipment
Needed
(7)

REMARKS

End. "6"
BOM-SDMCD Form 2015-05

blic of the Phillippines


OF PUBLIC WORKS AND HIGHWAYS
AGED INFRA(with Detailed Information)
YPHOON: "Carina"
of: August 03,2016

Type/No. of

Estimated Cost of
Restoration

Estimated
Duration of
Repair Works

(8)

(9)

17 l.m.

1,614,000.00

30 C.D.

(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.

12 l.m.

270,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

25 l.m.

841,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

16 l.m.

508,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

14 l.m.

348,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

8 l.m.

293,000.00

16 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

18 l.m.

Err:509

Err:509

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

30 l.m.

750,000.00

21 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

10 l.m.

100,000.00

14 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

40 l.m.

750,000.00

21 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

25 l.m.

250,000.00

18 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

15 l.m.

75,000.00

7 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

Length/Area/
Volume of
Damage
(6)

Equipment
Needed
(7)

REMARKS

End. "6"
BOM-SDMCD Form 2015-05

blic of the Phillippines


OF PUBLIC WORKS AND HIGHWAYS
AGED INFRA(with Detailed Information)
YPHOON: "Carina"
of: August 03,2016

Type/No. of

Estimated Cost of
Restoration

Estimated
Duration of
Repair Works

(8)

(9)

20 l.m.

75,000.00

7 C.D.

(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.

15 l.m.

100,000.00

7 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

55 l.m.

200,000.00

18 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

10 l.m.

50,000.00

7 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

90 l.m.

4,180,000.00

32 C.D.

Immediate rehabilitation to quickly restore mobility and


ensure safety of the affected areas.

Length/Area/
Volume of
Damage
(6)

Equipment
Needed
(7)

TOTAL

Err:509

Submitted by:

LORETO B. DACOROON
Caretaker

REMARKS

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIG
CALAMITY DAMAGE ASSESSMENT REPORT (Request for Rel
Typhoon: "Carina"
As Of August 3, 2016
REGION:
CAR
District Engineering Office:

ABRA-DEO

NAME OF PROJECT/LOCATION

TYPE OF
DESCRIPTION OF EXTENT
INFRASTRUCTURE
OF DAMAGED

REPAIR/REHABILATION OF ABRA ILOCOS NORTE ROAD

1 Abra-Ilocos Norte Road; K0434+480; Nagaparan, Danglas, Abra


2 Abra-Ilocos Norte Road; K0438+150; Nagaparan, Danglas, Abra
3 Abra-Ilocos Norte Road; K0440+600; Nagaparan, Danglas, Abra
4 Abra-Ilocos Norte Road; K0444+500; Nagaparan, Danglas, Abra
5 Abra-Ilocos Norte Road; K0445+200; Nagaparan, Danglas, Abra
6 Abra-Ilocos Norte Road; K0446+200; Nagaparan, Danglas, Abra
7 Abra-Ilocos Norte Road; K0446+300; Nagaparan, Danglas, Abra
8 Abra-Ilocos Norte Road; K0446+500; Nagaparan, Danglas, Abra

Stone Masonry
Stone Masonry

Rockslide
Road slip
Road slip
Landslide
Landslide
Landslide
Landslide
Landslide

REPAIR/REHABILATION OF ABRA-KALINGA ROAD

1 Abra-Kalinga Road; K0418+090


2 Abra-Kalinga Road; K0425+335
3 Abra-Kalinga Road; K0435+078
4 Abra-Kalinga Road; K0436+910
5 Abra-Kalinga Road; K0441+980
6 Abra-Kalinga Road; K0442+010
7 Abra-Kalinga Road; K0443+090
8 Abra-Kalinga Road; K0443+580
9 Abra-Kalinga Road; K0444+400
10 Abra-Kalinga Road; K0444+550

Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone

Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry

Road
Road
Road
Road
Road
Road
Road
Road
Road
Road

slip
slip
slip
slip
slip
slip
slip
slip
slip
slip

11 Abra-Kalinga Road; K0448+550


12 Abra-Kalinga Road; K0448+580
13 Abra-Kalinga Road; K0450+210
14 Abra-Kalinga Road; K0450+720
15 Abra-Kalinga Road; K0451+550
16 Abra-Kalinga Road; K0453+500
17 Abra-Kalinga Road; K0455+850
18 Abra-Kalinga Road; K0456+750
19 Abra-Kalinga Road; K0457+750
20 Abra-Kalinga Road; K0461+240
21 Abra-Kalinga Road; K0462+500
22 Abra-Kalinga Road; K0462+800

Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone

Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry

Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road

slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip

23 Abra-Kalinga Road; K0468+150; Nalbuan, Baay-Licuan, Abra


24 Abra-Kalinga Road; K0474+000; Aguibo, Malibcong, Abra
25 Abra-Kalinga Road; K0474+700; Aguibo, Malibcong, Abra
26 Abra-Kalinga Road; K0484+700; Duldulao, Malibcong, Abra
27 Abra-Kalinga Road; K0485+100; Duldulao, Malibcong, Abra
28 Abra-Kalinga Road; K0486+980; Gacab, Malibcong, Abra
29 Abra-Kalinga Road; K0488+200; Gacab, Malibcong, Abra
30 Abra-Kalinga Road; K0488+500; Gacab, Malibcong, Abra
31 Abra-Kalinga Road; K0489+800; Gacab, Malibcong, Abra

Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide

REPAIR/REHABILATION OF ABRA-CERVANTES ROAD

1 Manicbel Bridge Approach along Abra-Cervantes Road


TOTAL

GABION

Collapsed Revetment

Supporting documents to be attached:

Inspected by:
1. POW
2. BP 202

Priority
Priority
Priority
Priority

Guiude
I
II
III

3. Captioned Pictures

ARLON DON G. BARBERO

4. Site Location Map

Engineer II

Involves iummediate rehabilitation of collapsed bridges, cut road section, breach seawalls and dikes to quickly restore mo
Involves ordinary repair works such as patching potholes,resurfacing of washed out roads and slightly destroyed flood co
Involves minor repair work and/or improvement to prevent further deterioration

Republic of the Philippines


NT OF PUBLIC WORKS AND HIGHWAYS
MENT REPORT (Request for Release of Calamity Funds)
Typhoon: "Carina"
As Of August 3, 2016

REQUIRED SCOPE ESTIMATED COST


OF WORK
OF REPAIR

End. "9"

JUSTIFICATION
to restore the road to prevent further damage and ensure road
safety within the section.

21 D.C.
32 D.C.
32 D.C.
21 D.C.
7 D.C.
7 D.C.
21 D.C.
21 D.C.

200,000.00
2,110,500.00
538,000.00
220,000.00
50,000.00
75,000.00
290,000.00
160,000.00
to restore the road to prevent further damage and ensure road
safety within the section.

14
14
17
14
14
16
15
12
20
13

C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.

375,000.00
309,000.00
690,000.00
350,000.00
297,000.00
555,000.00
500,000.00
133,000.00
998,000.00
260,000.00

13
13
13
14
13
13
30
14
16
16
16
16

C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.

285,000.00
275,000.00
177,000.00
365,000.00
162,000.00
196,000.00
1,614,000.00
270,000.00
841,000.00
508,000.00
348,000.00
293,000.00

750,000.00
100,000.00
750,000.00
250,000.00
75,000.00
75,000.00
100,000.00
200,000.00
50,000.00

21 C.D.
14 C.D.
21 C.D.
18 C.D.
7 C.D.
7 C.D.
7 C.D.
18 C.D.
7 C.D.

to restore the road to prevent further damage and ensure road


safety within the section.
32 C.D.

4,180,000.00
19,974,500.00

Assessed by:

Submitted by:

EDWIN T. BRINGAS

LORETO B. DACOROON

Chief, Maintenance Section

Caretaker

awalls and dikes to quickly restore mobility and ensure the safety of the affected areas.
oads and slightly destroyed flood control structures.

Republic of the Phillippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
PRIORITY II-DAMAGED INFRA(with Detailed Informa
TYPHOON:
AS of:
REGION :
District Engineering Office :
LOCATION
NAME OF ROAD/BRIDGES/FC STRUCTURE
(Station Limits)

(1)

BARANGAY

MUNICIPALITY/
CITY

PROVINCE

(2)

(3)

(4)

NOTE:

To be submitted within twelve (12) hours after calamity. Cost of priority I group should be thoser that can be fund

Prepared by:

DANILO O. MESINA
Chief Maintenenance Section

the Phillippines
WORKS AND HIGHWAYS
FRA(with Detailed Information)

DESCRIPTION OF THE
EXTENT OF DAMAGE
(5)

BOM-SDMCD Form 2015-05

Length/Area/
Volme of
Damage

Type/No. of
Equipment
Needed

ESTIMATED COST OF
RESTORATION

ESTIMATED
DURATION
OF REPAIR
WORKS

(6)

(7)

(8)

(9)

be thoser that can be funded by the immediate Response Fund abd/or the Quick response Fund.

enance Section

Submitted by:

DAVID A. BULIYAT
District Engineer

End. "6"
BOM-SDMCD Form 2015-05

REMARKS

(10)

Republic of the Philippines


DEPARTMENT OF PRUBLIC WORKS AND HIGHWAYS
REQUISITE PERIOD OF REPORTING (SAMPLE)*

2/1/2015
(DAY 1)

1/31/2015
3 AM

4 AM

5 AM

OCCURRENCE OF CALAMITY

2 AM

6 AM

7 AM

8 AM

9 AM

10 AM

BOM-SDMCD FORM 2015-03

1 AM

BOM-SDMCD FORM 2015-01 &


BOM-SDMCD FORM 2015-02

12AM

* Sample frequency/type of reporting of calamity occurred at 2 am


BOM-SDMC
BOM-SDMC
BOM-SDMC
BOM-SDMC
BOM-SDMC
BOM-SDMC

Form
Form
Form
Form
Form
Form

2015-01
2015-02
2015-03
2015-04
2015-05
2015-06

DISASTER OPERATION CENTER ACTIVATION REPORT


PRE-POSITIONING OF ASSETS
SITUATIONAL REPORTS ON MAJOR ROADS AND BRIDGES
ASSETS DEPLOYMENT
PRIORITY L-DAMAGED INFRA ( with Detailed Information)
PRIORITY II-DAMAGED INFRA ( with Detailed Information)

11 AM

BOM-SDMC Form 2015-04

PRIORITY lll-DAMAGED INFRA ( with Detailed Information)

2/1/2015
(DAY 1)

2 PM
3 PM
4 PM
5 PM
6 PM
7 PM
8 PM
9 PM

UPDATED BOM-SDMCD FORM 2015-03,


UPDATED BOM-SDMCD FORM 2015-05,
BOM-SDMCD FORM 2015-06 &
BOM-SDMCD FORM 2015-07

1 PM

UPDATED BOM-SDMCD FORM 2015-03 &


UPDATED BOM-SDMCD FORM 2015-05

12 AM

UPDATED BOM-SDMCD FORM 2015-03,


BOM-SDMCD FORM 2015-04 &
BOM-SDMCD FORM 2015-05

End. "10"

2/2/2015
( DAY 2)

11 PM

Das könnte Ihnen auch gefallen