PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.

482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Item

Description

Qty

Unit

BILL NO.01 PRELIMINARIES

Conditions of Contract, Specifications and


Employer's Requirements
a

Allow for mobilization

Item

Allow for Contractor's Site Office


Establishment (inc. tel, fax, electricity,
water - incl. maintaining for the duration
of Contract)

Item

Allow for Engineer's / PM Site Office


Establishment - 2 rooms (inc. tel, fax,
electricity, water - incl. maintaining for
the duration of Contract)

Item

Allow for providing secretarial services to


Engineer / PM

Item

Allow for providing and maintaining


Insurances for Plant & Equipment; CAR; 3rd
party, Workmen

Item

Allow for Prof. Indemnity Insurance for


Design of Shoring & Dewatering system

Item

Allow for Providing Safety, First Aid

Item

Allow for providing Lightings for Night


Works

Item

Allow for Temp. Fencing, Hoarding / Sign


Boards

Item

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/1
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Rate in AED

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Allow for coordination of existing services

Allow for preparation of Method


Statements ; Risk Assessments etc

Item

Item

To Collection AED

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/2
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Item
l

Description

Qty

Allow for Obtaining all NOCs, Permits from


authorities and complying with all local
regulations

Unit
1

Item

Allow for Security for duration of Contract

Item

Allow for Administration and Supervision of


Works
Allow for Progress Reporting, Meeting
Attendance

Item

Item

Allow for Designs, Calculations, Shop


Drawings and reviews - for Piling as
required

Item

Allow for Designs, Calculations, Shop


Drawings and reviews - for Dewatering
system to achieve the required draw down of
water 1 m below the final excavation level
etc as required

Item

Allow for As-Built Drawings and Handing


Over documentation

Item

Allow for Provision of Water, fuel,


consumable for works

Item

Allow for Handing over documentation


procedures

Item

Allow for demobilization, cleaning site


etc.

Item

Allow for any additional site survey,


investgations required to site Setting out
accuracy and to establish 3 control points

Item

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/3
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

and

Rate in AED

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Allow for any other item to comply with


contract requirements

Item

To Collection AED
Page No
COLLECTION

FROM PAGE

01/1
01/2

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/4
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/5
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Amount in AED

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/6
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/7
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Amount in AED

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/8
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

Amount in AED

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/9
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Piling, Excavation and
Dewatering
Works (Phase 2)
BILL OF QUANTITIES

BILL NO 01 PRELIMINARIES
3B+G+M+4P+30
01/10
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

Item

Description

Qty

Unit

BILL NO.02 PILIG WORKS


Supply delivery and installation of piling works in
accordance with Contractor's approved Design, Drawings
specifications with designed toe levels to support
final excavations levels depth varying from -13.20 m
(-9.90 DMD) up to -17.90 m (-14.60 m DMD) as per
approved design

750mm diameter primary piles having designed


concrete strength. (Unreinforced)

227

Nos.

750mm diameter secondary piles


concrete strength. (Reinforced)

228

Nos.

900mm diameter primary piles having designed


concrete strength. (Unreinforced)

62

Nos.

900mm diameter secondary piles


concrete strength. (Reinforced)

having designed

63

Nos.

Allow for Concrete Capping Beam & Strut Supports

Item

Allow for Anchors 3 sides in required rows as per


approved design

Item

Allow for structural struts on 2 corners as per


approved design.

Item

Allow for H-Sections and precast panels for temp


shoring above Capping Beam - to meet Local
regulations and as per approved design

Item

Provision of Independent testing company to ascertain


the quality of the concrete during casting of piles

Item

having designed

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/11
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/12
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

Pile layout Verification


j

Allow for Verificatin of As-built Layout of Secant


pile coordinates by the approved independent land
surveyor. It is the responsibility of the contractor
and the independent surveying company to ensure works
as per approved design layout.

Item

Load tests to be carried out by the pilling


subcontractor in accordance with BS 8004/ACI 336 and
IBC 2012

load test on on 1200mm diameter preliminary pile


tested for minimum of 2 x working load.

load test on on 1200mm diameter working pile tested


for minimum of 1.5 x working load.

nr

nr

INTEGRITY TEST
Integrity test on piles carried out by an approved
company.

nr

CORE TEST
Concrete core tests according to ACI and BS codes as
per Engineer's instruction.

nr

SUNDRY ITEMS
Allow lump sum for layout of pile coordinates by an
approved land surveyor. Its is the responsibility of
the contractor and surveying company to ensure the
accuracy of the pile coordinates as shown in the
drawing (Total number of piles = )
Provision of independent testing company to ascertain
the quality of the concrete during casting of piles.

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/13
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Item

Item

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/14
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

Rate in AED

Amount in AED

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/15
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/16
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/17
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and Dewatering Works (Phase 1)
BILL OF QUANTITIES

BILL NO 02
SECANT PILING SHORING WORKS
3B+G+M+4P+30
02/18
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Item

Description

Qty

Unit

BILL NO.03 EXCAVATION, EARTHWORK & DEWATERING


EXCAVATION AND EARTHWORK

EXCAVATION
Unless otherwise measured seperatly rates for excavation
shall include for
Note

a.Working space
b.Stacking of excavated material for

removal

c.Handling and re- handling of earth

The rates for excavation shall include for excavating in any


material including solid rock, keeping excavations free fom
water as may be necessary, for trimming, levelling and
compacting bulking of materials and all double or multiple
handling.

Excavation of top soil from existing ground level reduced to


required piling plateform level -11.55 m (-8.25 m DMD) as
specified in the drawings. Please refer to Excavation Plan &
Sections Drg no.S-200, S-201 & S202

Note

71738

m3

Item

Allow for ramp access arrangement to lower platform levels

Allow for removing the ramp access

Item

DEWATERING
d

Installing dewatering and ground water control system as per


approved design. Dewatering system shall be uniterupted for
24 hours operation.

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/19
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Item

Rate in
AED

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Allow for monitoring and maintaining the dewatering system up


to end of Contruction period (total 7 months) after
successful installation incl. manpower, fuels, Maintenance,
etc

Provisional Rates for monitorig and Maintaining Dewatering


system after 6 months. Tenderer to provide monthly rates

Item

month

Disposal of surplus materials


g

disposing of excavated soil as per approval

disposing of soil arising from boreholes and

piling

m3

Item

To Collection AED

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/20
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Page No

COLLECTION

FROM PAGE

03/1

To Summary AED

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/21
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Amount in AED

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/22
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Rate Only

0
0

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/23
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Amount in AED

BILL NO 03
EXCAVATION, EARTHWORKS DEWATERING WORKS
3B+G+M+4P+30
03/24
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Item

Description

Qty

Unit

BILL NO.04 PROVISIONAL SUM ITEMS


STEEL PIPES FOR DEWATERING
a

PROVISIONAL SUM for Steel pipes about 25 to 30 m apart as


per design, overall required length inside secant
piles(Reinforced) to make dewatering feasible for main
contractor in the future. (Steel Pipe 16" or 400mm dia,
9.5mm wall thickness),should extend 50cm above capping
beam depends on site condition.

1 Item

Allow for Contractor's Attendance, Overhead and Profit


and misc works for Provisional sum item of Steel Pipes Material handling, loading , unloading, placing in
position, connections etc.

1 Item

FRENCH DRAINS FOR DEWATERING


c

PROVISIONAL SUM for providng FRENCH DRAINS of required


size - including excavation, compacting, placing gravels,
uPVC perforated pipe etc as required

1 Item

Allow for Contractor's Attendance, Overhead and Profit


and misc works for Provisional sum item of FRENCH DRAINs

1 Item

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/25
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

COLLECTION

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/26
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/27
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

Rate in AED

200,000.00

Amount in AED

200,000.00

300,000.00

300,000.00

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/28
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

To Collection AED
Page No

500,000.00
Amount in AED

FROM PAGE

04/1

500,000.00

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/29
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482 (345-409) BLK.
BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring, Excavation and Dewatering Works (Phase
1)
BILL OF QUANTITIES

To Summary AED

500,000.00

BILL NO 04
PROVISIONAL SUM ITEMS
3B+G+M+4P+30
04/30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Item

Description
BILL NO.5 TENDERER'S ADJUSTMENT SCHEDULE
TENDERER'S ADJUSTMENT SCHEDULE
NOTES
(1)The Tenderer shall detail in the
following pages any new items which are
required in addition to those in the
Bills of Quantities, or any of the
printed items which tenderer feels
should be omitted from the Bills of
Quantities.
(2)Any additions or omissions entered
into the Tenderer's Adjustment Schedule
must have been measured and prepared in
accordance with Standard Method of
Measurement (SMM7)

(3)The Tenderer will be required to


submit all quantity take off
calculations and other documentation
deemed necessary in order to justify
any new and/or omitted items

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /31
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Qty

Unit

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /32
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Item

Description
ADDITIONS

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /33
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Qty

Unit

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /34
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Item

Description
OMISSIONS

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /35
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Qty

Unit

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /36
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

COLLECTION

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /37
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Summary AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /38
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Rate in AED Amount in AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /39
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /40
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Rate in AED Amount in AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /41
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /42
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Rate in AED Amount in AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /43
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Collection AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /44
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

Page No

Amount in AED

FROM PAGE

05/1

05/2

05/3

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /45
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT: 3B+G+M+4P+30 STOREY HOTEL RESIDENTIAL APARTMENT BUILDING AT PLOT NO.


482 (345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of Shoring,
Excavation and DewateringWorks (Phase 1)
BILL OF QUANTITIES

To Summary AED

BILL NO 05
TENDERER'S ADJUSTMENT SCHEDULE
05 /46
3B+G+M+4P+30
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

PROJECT:
3B+G+M+4P+30 STOREY HOTEL & RESIDENTIAL APARTMENT BUILDING AT
(345-409) BLK. BURJ KHALIFA 345, DUBAI, UAE Design and Construction of
Excavation and Dewatering Works (Phase 1)

BILL OF QUANTITIES

MAIN SUMMARY

BILL No.01

PRELIMINARIES

BILL No.02

PILLING WORK

BILL No.03
EXCAVATION, EARTHWORK AND DEWATERING
BILL No.04

PROVISIONAL SUM ITEMS

BILL No.05

TENDERER'S ADJUSTMENT SCHEDULE

TOTAL CARRIED TO FORM OF TENDER


(Amount in words UAE Dirhams)

SIGNATURE OF
MAIN SUMMARY
Design and Construction of Shoring, Excavation and Dewatering Works (Phase 1)
3B+G+M+4P+30
MS/47
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

TENDERER

:..

STAMP

MAIN SUMMARY
Design and Construction of Shoring, Excavation and Dewatering Works (Phase 1)
3B+G+M+4P+30
MS/48
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

OTEL & RESIDENTIAL APARTMENT BUILDING AT PLOT NO. 482


DUBAI, UAE Design and Construction of Shoring,
(Phase 1)

OF QUANTITIES

AED
01/3

02/2

03/2

04/2

05/4

AED

500,000.00

500,000.00

MAIN SUMMARY
Design and Construction of Shoring, Excavation and Dewatering Works (Phase 1)
3B+G+M+4P+30
MS/49
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

MAIN SUMMARY
Design and Construction of Shoring, Excavation and Dewatering Works (Phase 1)
3B+G+M+4P+30
MS/50
HOTEL RESIDENTIAL APARTMENT BUILDING AT DUBAI
1308

Das könnte Ihnen auch gefallen