PEMASANGAN 1 UNIT REGULATOR CLASS 900 CSR PEMPING

ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

Task Name

Duration
Month -1
W-2

Pemasangan 1 Unit Regulator Class 900 CSR Pemping


Kontrak / SPMK

W1

Month 1
W2
W3

W4

W5

W6

Month 2
W7
W8

W9

W10

Month 3
W11 W12

W13

W14

Month 4
W15 W16

W17

W18

W19

Month 5
W20 W21

W22

W23

Month 6
W24 W25

W26

W27

Month 7
W28 W29 W30

W31

W32

Month 8
W33 W34

W35

W36

Month 9
W37 W38

W39

W40

Month 10
W41 W42 W43

W44

W45

Month 11
W46 W47

W48

W49

315 days
1 day

MILLISTONE

315 days

EXECUTION WORK

135 days

MAINTENANCE PERIOD

180 days

EXECUTION WORK

EXECUTION WORK
MAINTENANCE PERIOD

134 days

PREPARATION

44 days

Mobilisasi & Demobilisasi

7 days

Site Survey

2 days

ENGINEERING

26 days

Deatai Design

21 days

Drawing

21 days

Persentasi Design

1 day

PROCUREMENT

104 days

W eld Neck Flanges 2 " #900


Gas Pressure Regulator #900 of 2 Inch , Self Regulating,
range 1.200 - 800 Psi
Studbolt & Nut flourocarbon 2 " 900

30 days
104 days
30 days

Pipe Spool API-5L 2 " #600 Schedule 80

30 days

W eld Neck Flanges 2 " #600

30 days

Studbolt & Nut flourocarbon 2 " 600

30 days

W eld " 0 " Let 2 " x3/4 " #600

30 days

Pipe Spool API-5L 3/4 " #600

30 days

W eld Neck Flanges 3/4 " #600

30 days

Ball Valve, 3/4 " #600

60 days

Three Way 3/4 " x 3/4 " x 3/4 " Threaded #600,3/4 " #600

60 days

Three Way Needle Valve 3/4 " stainless Steel, male


connection (at re-location spot)
Pressure Gauge 0/1500 Psig

45 days

Double Nipple NPT 3/4 " #600

30 days

Gasket RF 2 " class #900

30 days

Gasket RF 2 " class #600

30 days

Gasket RF3/4 " class #600

30 days

Elbow 2 " of 90 #600

30 days

Tubing stainless steel 3/8 " type SUS 316

45 days

Stud bolt & Nut FluoroCarbon 3/4 #600

30 days

Plug (for existing at 4 " pipe) 3/4 #600

30 days

Ferrul connection 3/8 " type SUS 316

30 days

Tubing Connector 3/8 NPT to tubing connection

45 days

45 days

CONSTRUCTION

82 days

FABRIKASI

72 days

Cutting, Fit-up & Welding


NDT

30 days
7 days

Sand Blasting & Painting


Assembly

21 days
2 days

Delivery to Site

5 days

TESTING

28 days

Hydrotest

3 days

FAT

2 days

INSTALLATION

82 days

Installation Regulator Class 900

10 days

Installation Ball Valve (Tie In)

10 days

Relocation Pipe Support

30 days

Relocation Regulator Class 600

30 days

SAT & COMMISSIONING

8 days

SAT

5 days

Commissioning

3 days

Maintenance Period

Project: Jadwal Pelaksanaan


Date: Fri 22/04/16

W-1

180 days

Task

Milestone

Project Summary

External Milestone

Inactive Milestone

Manual Task

Manual Summary Rollup

Start-only

Deadline

Split

Summary

External Tasks

Inactive Task

Inactive Summary

Duration-only

Manual Summary

Finish-only

Progress

Page 1

Month 12
W50