3.2
Component
3.3
Switching
performance
Switch Electrical
rating
Characteristics
Format of Record
Material
specification
Mfrs material
Conformity
certificate
F/FQC/08
Dimensions
Test certificate
F/FQC/08
Internal Inspection
report
F/FQC/11 and
F/FQC/09
Internal Inspection
report
F/FQC/08
Test certificate
F/FQC/08
HV, IR
Internal Inspection
report
F/FQC/08
Dimensions and
Type of Mounting
Inspection report
3.4
Mounting
3.5
Workmanship
3.6
Enclosure
Material
Weatherproof
Ingress protection
Manufacturers
material Certificate
Type Test
Record/Test
certificate Number
F/FQC/08
Remarks
TAGNO.
LOCATION
Atchlorine
34GBN15CP022to
tonner
34GBN15CP025
manifold
Atexpansion
34GBN15CP026to
chamber
34GBN15CP029
inlet
At
34GBN17CP034to
Evaporator
34GBN17CP037
downstream
At
34GBN17CP038to
Evaporator
34GBN17CP041
downstream
AtPRDV
34GBN20CP054to
downstream
34GBN20CP057
34GBN04CP003
34GBN07CP008
34GBN07CP009
Booster
pump
suction
header
Booster
pump
discharge
header
Booster
pump
discharge
header
TABLE1
(Kg/cm) (Kg/cm)
CWCHLORINATIONSYSTEM
Liquid
4
Chlorine
0.357
165
Nos.
Liquid
Chlorine
Chlorine
gas
Chlorine
gas
Chlorine
gas
4
Nos.
4
Nos.
0.357
1.428
165
165
SET
POINT
(Kg/cm)
2.0
2.5
15
4
Nos.
0.357
165
2.5
4
Nos.
0.24
33
2.75
Water
1
No
0.24
33
0.8
Water
1
No
0.357
165
3.67
Water
1
No
0.357
60
3.3
ACTUATION IsolationValve
On
decreasing
pressure
On
Increasing
pressure
On
Increasing
pressure
On
Increasing
pressure
On
Increasing
pressure
On
Decreasing
pressure
IS3224Valve
IS3224Valve
IS3224Valve
IS3224Valve
IS3224Valve
2waygauge
valve
On
Increasing
pressure
2waygauge
valve
On
Decreasing
pressure
2waygauge
valve
We here by certify that the above mentioned material ordered vide your Purchase Order are manufactured at our works /
vendors works conforms to the specification imposed by Client / above mentioned approved data sheet, and have been
Checked, as per Capital Controls, applicable quality program, and found to meet or exceed the same.
VinayYadav
(12.08.2016)
QUALITY ASSURANCE
RWCHLORINATIONSYSTEM
Atchlorine
34GBN01CP007to
tonner
34GBN01CP008
manifold
34GBN05CP013to AtPRDV
34GBN05CP014 downstream
Boosterpump
34GBN10CP003
discharge
Boosterpump
34GBN10CP004
discharge
34GBN18CP046to Acrossgas
34GBN18CP049 filter
Chlorine
Gas
2
Nos.
Chlorine
Gas
2
Nos.
1
Water
No.
1
Water
No.
04
Chlorine
Nos.
0.357
60
0.24
33
2.75
0.357
60
4.4
0.357
60
0.5
0.4to4
49.5
OnDecreasing IS3224Valve
pressure
OnIncreasing
pressure
OnIncreasing
pressure
OnDecreasing
pressure
IS3224Valve
2waygauge
valve
2waygauge
valve
We here by certify that the above mentioned material ordered vide your Purchase Order are manufactured at
our works / Sub-vendors works conforms to the specification imposed by Client / above mentioned approved data
sheet, and have been checked, as per Capital Controls, applicable quality program, and found to meet or exceed the
same.
For CAPITAL CONTROLS INDIA PVT LTD
VinayYadav
(12.08.2016)