Introduction
1.
2.
3.
4.
7 ton / day
Raw Material
Consumption Rate
Price in L.E
Used Oil
10 ton / day
35,000
Sulfuric Acid
350 Kg / day
700
Soda Ash
105 kg / day
630
1050 kg / day
5,500
=41,830
= 7,170 L.E
Property
Appearance
Oily liquid
Physical state
Liquid
Color
yellow
Odor
pH
Mild
Specific Gravity @ 25
6
0.86-0.870
Flash point
Viscosity(Red wood) @ 25
Solubility in Water
Chemical Stability
Hazardous decomposition
(35-40) sec.
Partially soluble in cold and hot
water
Material is stable under normal
conditions
None expected under normal
conditions of use
Technical Study
Process
1 day
Water evaporation
3 hr
Acid treatment
1 hr
2 days
3 hr
Clay settling
3 hr
Oil filtration
5 hr
Mechanical Study
Unit
Capacity
# of units
Objective
Storage tank
6 ton
Reactor
4 ton
12 ton
4 ton
With heaters
Reactor
2 ton
Filter
Heat exchanger
Storage tank
6 ton
Utility
Capacity
# of units
Steam boiler
Condenser
Receiver
1 ton
Vacuum pump
Air compressor
Valve
Chiller
Electrical generator
185 KW
1
2
1 ton
Objective
Capacity
# of units
Objective
Reactor
4 ton
12 ton
4 ton
With heaters
Filter
Heat exchanger
Employment
Job Title
#/shift
Operational Engineer
2,000
Operational Technician
1,500
Maintenance Technician
1,500
Electrician
1,500
Worker
800 X 4 = 3,200
Boiler Operator
800
=9
= 10,500
= 18
= 21,000
Building
# of sections/offices
Administration
Financials
Office
Laboratory
Tool Store
Workshop
Dressing Room
W.C.
Economical Study
m x m x 1mm = 8kg
steel