Photo Size: (800*600px), Good Clarity, Proper angle photo /zoom, setting should be proper ( Date, Time & mode ),
First photo should be Panorama photo ( Tower , Fence, Gate & shelter ) required for every site.
All the three sector Antenna, TMA photo should be unique. (First to third sector photo should be taken by orderly;
otherwise it will be big issue to identify the sectors.
Photographs of all installed equipments should be submitted according to this document.
If any photo not matching according to requirement vendor needs to go site & resubmit correct photographs.
If the photo submitted by vendor is not as per requirement and delay in submitting, ZTE have reserve the right to
refuse sign up on WCC.
Folder name should be yyyymmdd_Circle_ Vendor Name _Site Name_Auditor name_(Status of Site)
e.g. 20121218_PB_Blue_Chandigarh TE_Rajesh_(WIP)
2.2 Forbidden:
1)
2)
Vendor:
Submit within 2 days
PE/CL
Audit 100% in 1 days
CQL:
1. Audit 100%,in 1 day
2. Upload: ftp://
10.32.134.5:9321
3. Inform to PQM with tracker
Vertical Feeder routing from top-bottom , ( In this photo feeder clamp distance and feeder routing should be clear
visible)
Horizontal Feeder routing ( In this photo feeder bending radius and routing should be clear visible)
Feeder grounding connected to tower (1Pic), Feeder grounding at EGB, Hatch Plate, grounding direction. (1 Pic.)
Feeder grounding direction, weather proofing and grounding connection should be clear visible
Feeder grounding connection at Hatch plate, grounding direction, weather proofing, and Drip arc should be clear
visible.
All power cable ,E1 cable, Alarm cable, jumper cable labeling should be proper visible
photo(Clear photo)
Grouting (1 pic):Expansion bolt installation, installation of insulation flat & spring washers
10
Photo checklist
Important notes:Photo checklist for print, and take photos by regular order as below, otherwise ZTE will refuse receiving
description
Name
Site 1
Panorama of site
Antenna
Sector 1 front
1.
2.
Antenna
Back
side
photo
Site 5
Sector 2 back
Sector 3 front
Sector 3 back
TMA:
1.
Site 4
Sector 2 front
closely
Pic.)
3.
Site 3
11
with
10
installation
4
5
Antenna
Site 2
Sector 1
Sector 2
2.
Sector 3
Feeder routing:
13
Feeder grounding
14
1.
at tower top
15
16
Horizontally
2.
At corner
17
At hatch
18
19
EGB
Indoor panorama: include ground, cable Indoor panorama
tray, BTS and other devices
20
Arrester
stand
2.
BTS top
BTS internal:
1.
23
(1 pic)
2.
and
installation. Feeder
(1Pics)
21
22
Surge
Jumper
24
MCB&IGB
MCB.(1 pic) ,IGB(1-pic)
25
26
MCB
IGB
27
MW:
Antenna,
Installation,
Power
Cable
routing,
connection
IDU MW installation
(1-Pics),
Grounding
11
12