Photo Requirement of Site Installation


1. Scope
Antenna, Feeder, ID BTS/Node B, OD BTS/NodeB, MW installation photo should be taken. All equipments photo should
be taken orderly.

2. Universal requirement of site photos


2.1 Requirement
1)
2)
3)
4)
5)
6)
7)

Photo Size: (800*600px), Good Clarity, Proper angle photo /zoom, setting should be proper ( Date, Time & mode ),
First photo should be Panorama photo ( Tower , Fence, Gate & shelter ) required for every site.
All the three sector Antenna, TMA photo should be unique. (First to third sector photo should be taken by orderly;
otherwise it will be big issue to identify the sectors.
Photographs of all installed equipments should be submitted according to this document.
If any photo not matching according to requirement vendor needs to go site & resubmit correct photographs.
If the photo submitted by vendor is not as per requirement and delay in submitting, ZTE have reserve the right to
refuse sign up on WCC.
Folder name should be yyyymmdd_Circle_ Vendor Name _Site Name_Auditor name_(Status of Site)
e.g. 20121218_PB_Blue_Chandigarh TE_Rajesh_(WIP)

2.2 Forbidden:
1)

2)

Fake photos forbidden strictly!


a) Same photo for different sites
b) Photo mismatch
Meaningless photo not required;

3. Work flow for Photo Submission

Vendor:
Submit within 2 days

Email

PE/CL
Audit 100% in 1 days

Email

CQL:
1. Audit 100%,in 1 day
2. Upload: ftp://
10.32.134.5:9321
3. Inform to PQM with tracker

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.1 Site Panorama (1 pic)


Site Panorama: Tower, shelter should be include in same picture.

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.2 Antenna front, back & connector - 3pic for each


antenna
Antenna installation with weather proofing from front (3 Pic.),
it will cover antenna, weather proofing and Jumper/feeder connection point
Antenna Back side closely photo including Mount bracket (3 pic)
this photo should be taken closely over tower

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.3 TMA 3pic


If NSBT/TMA/Diplexer is available, then total photo required, sector1- sector3.

4.4 4-Feeder routing


Feeder Routing, Feeder clamps (1- Horizontal, 2-Vertical ) (2 Pic.)

Vertical Feeder routing from top-bottom , ( In this photo feeder clamp distance and feeder routing should be clear
visible)

Horizontal Feeder routing ( In this photo feeder bending radius and routing should be clear visible)

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.5 Feeder grounding photo


1.

Feeder grounding connected to tower (1Pic), Feeder grounding at EGB, Hatch Plate, grounding direction. (1 Pic.)

Feeder grounding direction, weather proofing and grounding connection should be clear visible

Feeder grounding connection at Hatch plate, grounding direction, weather proofing, and Drip arc should be clear
visible.

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4. Required photos for BTS/NodeB installation


1.
2.
3.

BTS (Door open) , Antistatic wrist strap, body grounding.(1 pic)


BTS Grouting, Expansion bolt installation, installation of insulation flat & spring washers(1-pic)
DDF , Grounding , E1 Cable , Alarm Cable , Labeling & Punching (1-Pics)

4.6 BTS Indoor panorama (1 pic)


Indoor panorama: include ground, cable tray, BTS and other devices(1 pic)

4.7 Jumper and BTS top (2 pic)


1.
2.

Labeling of Jumper and Feeder, Surge Arrester stand installation.(1Pics)


Routing of power, grounding, E1, alarm cables & Labeling at BTS top.(1Pic)
a)

All power cable ,E1 cable, Alarm cable, jumper cable labeling should be proper visible

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.8 BTS internal (2 pic)


Antistatic wrist strap, body grounding.(1 pic):BTS

Jumper routing , OFC routing with ESD available

photo(Clear photo)

Grouting (1 pic):Expansion bolt installation, installation of insulation flat & spring washers

4.9 Power connections (2 pic)


MCB (1 PIC), IGB (1 PIC)
7

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

4.10 DDF (1 pic)


DDF: Door open, Grounding , E1 Cable , Alarm Cable , Labeling & Punching

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

5. Required photos for Microwave installation,


Photo contents: MW antenna, ODU, IF cable connector, waterproofing arrangement, grounding connections, IF cable
routing, IDU, Power & ground connection.

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

IF outdoor grounding photos

10

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

Photo checklist
Important notes:Photo checklist for print, and take photos by regular order as below, otherwise ZTE will refuse receiving

Circle: __________ Cluster:____________ Photo Taker: ______________ Date:____________


No.

description

Name

Site 1

Panorama photo of every site

Panorama of site

Antenna

Sector 1 front

1.

2.

Antenna

Back

side

photo

Site 5

Sector 2 back
Sector 3 front
Sector 3 back

Take order: 2G , 3G (if available)

TMA:
1.

Site 4

Sector 2 front

closely

Pic.)

3.

Site 3

weather Sector 1back

should be taken closely over tower) (3

11

with

including Mount bracket (this photo

10

installation

proofing from front. (3 Pic.)

4
5

Antenna

Site 2

Sector 1

If TMA/NSBT/Diplexer available, then

Sector 2

total photo required (3 Pic/sector wise)


12

2.

Sector 3

Take order: 2G , 3G (if available)

Feeder routing:

Include weather proofing from front. (3 Pic.) vertically

13

Feeder grounding

14

1.

at tower top

Feeder grounding connected to tower Grounding point


( 1Pic)

15
16

Horizontally

2.

At corner

Feeder grounding at EGB, Hatch Plate, Grounding point


grounding direction. (1 Pic.)

17

At hatch

18
19

EGB
Indoor panorama: include ground, cable Indoor panorama
tray, BTS and other devices

20

Jumper & BTS top,


1.

Arrester

stand

2.

BTS top

Routing of all type calbes (1 Pics)

BTS internal:
1.

23

BTS board layout

Antistatic wrist strap, body grounding.


BTS grouting

(1 pic)
2.

and

installation. Feeder

(1Pics)

21

22

Surge

Jumper

Expansion installation of insulation flat


& spring washers(1-pic)

24

MCB&IGB
MCB.(1 pic) ,IGB(1-pic)

25
26

MCB
IGB

DDF: Grounding , E1 Cable , Alarm Cable , DDF installation


Labeling & Punching (1-Pics)

27

MW:

Antenna,

Installation,

Power

Cable

routing,

connection

IDU MW installation

(1-Pics),

Grounding

11

All Rights reserved, No Spreading abroad without Permission of ZTE

Internal Use Only

12

All Rights reserved, No Spreading abroad without Permission of ZTE