Sie sind auf Seite 1von 4

Rubric for Forecasting Demand Problem in Mid Term Exam

(Production Planning and Control, Year 2015-2016)


Student name

Student ID

Student outcomes: Student will have the ability to use the techniques, skills
and modern and classical engineering tools required by industrial
engineers (ABET-k)
Performance Indicators (PIs):
1. Selects appropriate tools, skills and techniques in solving the industrial
engineering problems
2. Uses modern tools and techniques in modelling and solving industrial
engineering problems
3. Analyses and interprets the results gained from the industrial engineering
problems
Forecasting Demand Problem using Forecasting Techniques
Item from: Mid Term Exam No. 1
Date:
Max
Scores
Comments
Points
Plotting Data vs
Time
Selecting some
forecasting
techniques
Calculating the
future demand
using chosen
forecasting
techniques
Choosing the
appropriate
forecasting
technique
Accuracy of
forecasting result
Analysing and

PIs

14

10

Interpreting results
of forecasting
Total Scores

40

Rubric for Aggregate/Production Planning Problem in Mid


Term Exam
(Production Planning and Control, Year 2015-2016)
Student name

Student ID

Student outcomes: Student will have the ability to identify, formulate and solve
industrial engineering problems (ABET-e).
Performance Indicators (PIs):
2. Determines different approaches to solve engineering problems and chooses
an effective approach
Aggregate/Production Planning Problem
Item from: Mid Term Exam No. 2
Date:
Max
Scores
Comments
Points
Parameters used in
10
the strategies chosen
Calculating
production planning
20
for each strategy
Accuracy of the
5
result
Choosing the best
strategy for
5
production planning
Total Scores
40

Rubric for Capacity Planning Problem in Mid Term Exam


(Production Planning and Control, Year 2015-2016)
Student name

Student ID

Student outcomes: Student will have the ability to use the techniques, skills
and modern and classical engineering tools required by industrial
engineers (ABET-k)
Performance Indicators (PIs):
1. Selects appropriate tools, skills and techniques in solving the industrial
engineering problems
2. Uses modern tools and techniques in modelling and solving industrial
engineering problems
3. Analyses and interprets the results gained from the industrial engineering
problems
Capacity Planning Problem using Rough Cut Capacity Planning (RCCP)
Item from: Mid Term Exam No. 3
Date:
PIs
Max
Scores
Comments
Points
Selecting the
appropriate
4
1
approach
Calculating required
capacity for each
8
2
work centre (WC)
Accuracy of the
4
2
results
Analysing and
4
3
Interpreting results
Total Scores
20

Das könnte Ihnen auch gefallen