Beruflich Dokumente
Kultur Dokumente
State:
District :
Block
From
To
In Built up area -
Km
In Open Area -
Km
Year of completion
Yes
NO
6. Estimated Cost Rs :
Cost sharing pattern for this road
Normal Area
Special Area
Item
Total Cost in
Rs.
Flexible Pavement
Rigid Pavement
Others ( CD Works, Protective works & Misc items)
Cost due to higher specification such as carriage way width,
Higher Axle load , Hard shoulders, Shifting of Utilities
or
T-
Name of Habitation
MRL-
Population
Overall Weightage
Total weight
Yes
MDR
SH
No
NH
Yes
No
carriage way
yes
b) Indicate the actual widths of the following for the proposed road
Roadway width
No
yes
No
yes
i) Carriageway
ii) Roadway
iii) Road Land Width
Target Habitation
Name
H2
H2
ROAD
MDR-42
MSH-6
H1
CD1
CD2
No
In the Open Area (m)
CD3
9 Name of Road :
Cross Section details
Thickness
Item
Thickness
10
Cars,Jeep,
Vans,Three
Wheelers
Motorised
two
Wheelers
Light
Commercial
Vehicle
Trucks
U
OL
OL
Day 1
Day 2
Day 3
Day 4
Day5
Day 6
Day 7
Average
7 day count required in case design is done with IRC 37:2001
Passenger car unit( PCU)
Cumulative ESAL =
Traffic Category =
Traffic Details in case degisn is done as per IRC 37-2001 /IRC 37 :2012
A= Intitial traffic in the year of completion of construction in terms of the number of commericial
vehicles per day
D= Lane distribution factor
F= Vehicle damage factor
n= Design life in years
r= growth rate adopted %
N= The cumulative number of standard axles to be catered for the design in terms of
msa
CVPD
Cycle
Rickshawa
Cycles
Buses
OL
SWC
Num. Tyred
Thickness in mm
Quantity
Rate Rs
Cost Rs.
IRCSP 62:2004
Design done with
GSB
WBM
Dry lean concrete( DLC)
ii
C. Protection works
Chainage
From
To
Length( m)
Cost in Rs
Average cost / m
Retaining wall
Breast wall
Toe wall
Gabbion
Pitching / turfing for slopes
Total cost of protection works
Chainage
From
To
Length(
m)
Cost in Rs
Average cost / m
Cost in Rs
Average cost / km
Number
Number of Boards
Cost/ km
(Rs)
Cost in lakhs
% Cost
Cost /km
G/ Total of maintenance
Yes
NO
Yes
No
14. Whether the road has Geometrics as per Rural Roads Manual RRM / Latest Circulars of NRRDA.
15.Whether C.D.works / Protection works are provided as per RRM / Latest Circulars of NRRDA/ Respective Codes of IRC.
16.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase
Material
Source
Cement
Emulsion
Bitumen
Steel
Prepared By
(Name)
Checked By
Vetted at
NRRDA
Yes
No
Lead Distance
Year
18
19
Have you satisfied yourself that the proposed road is a part of DRRP
20
21
In case , Traffic is projected beyond T 7 Category and road designed using IRC 37 are you satisfied with
the reason given by PIU
22
In case, sub grade CBR is less than 5; has Soil Stabilisation etc. been proposed
( If not , specific Reasons given by PIU)
23
Is the design of the following elements as per Rural Roads Manul / Circulars of NRRDA:
Is the design of flexible Pavement as per IRC SP: 72- 2007 and design of Rigid Pavement as per IRC SP:62- 2004 .
Is the design of flexible Pavement as per IRC 37 2001 and design of Rigid Pavement as per IRC SP:58- 1998.
25
26
( Specific remarks of STA about the overall project are necessary on each DPR)
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provided by PIU Engineers . The
Proposal after final Correction is entered on the OMMS.The Propasal may be considered for clearance.
Signature
Name
Date
Co-ordinator STA:
Signature
Name
Date