Gateway to DTP
Anir Bhattacharyya
th
Tuesday 11 Dec 12:30 PM
FUJITSU CONSULTING
Agenda
APS Architecture
Data Collection
Oracle
Transaction
System
Data Collection
Demand
Planning
ASCP
Execute Suggestions
ATP
Planning
Output
Plan Def./History
Demand Plan
OLAP
Databa
se
ATP as a concept
Profiles
OM Setups
INV Set ups
ASCP Set ups
CPG
Steel
Hi Tech/Semi Conductor
b.
PDS data (generated by an ASCP Plan) which uses the profile
setting: INV:Capable to Promise = ATP/CTP Based on Planning Data?
2.
PDS
Basic ATP
Allocated ATP
OM ASCP
Basic ATP
Allocated ATP
Multi Level/Multi Org ATO and PTO Configuration ATP
Allocated ATP
Capable to Promise
Capable to Deliver
End Item Substitution
Single Level Supply Chain ATP also uses sourcing rules and in-transit
lead times
Demand Class ATP using a separate MPS for each Demand Class
Product Family ATP using Product Family Supply in MPS
Profile Option that can be set at Site, Responsibility and User levels
Flag on Sales Order Line
Generates over-committed exception in ASCP
Profile Option to trigger notification to Planner
Global ATP
Steal from Lower Priority Customer or Sales Channel to meet Requested Ship Date
If still not available, looks at nearest Scheduled Receipt or Production or nearest CTP Date
possible (better date out of these 2 methods)
Allocation
Demand
Planning
Data Collection
Oracle
Transaction
System
Data Collection
ASCP
Execute Suggestions
Allocated ATP
Plan Def./History
Demand Plan
ATP
OLAP
Databa
se
Planning
Output
Allocation
Rules
Profile Option for initiating Workflow Notification to item planner, sales rep
and customer contact, on stealing supply
Allocation Workbench to view allocations
Diagnostic ATP
Cannot use any of the internal sources to include the supply and
demand related to external sources distorts the ATP of the
internal sources
Firm
Production
Scheduling
Line Downtime
Already
recorded
For clean up
Based on size
and
flavor
OPM
Resource
Definition
Capacity
Throughput
Definition
Via
Recipe
ASCP
Generates
Planned
Supplies
Based on
Demand
Due Dates
Without
Respecting
flavors
And
Sizes
Around the
Downtimes
Seque
nce
Class
Production
Scheduling
Ready
OPM
Sched
uler
Workb
ench
Automatic
Removal
Of Holds
For
Scheduler
Schedule
The lines
Using a
Methodology*
Assign
Responsibility
To CSR
And Schedulers
Scheduler
Has access to
Order
Scheduling
For CSR
Define a new OM
Template
Where SSD
Will be grayed out
Line goes on
Hold
No scheduling
For Scheduler
Define a new
Template
Where SSD is
Not grayed
out
Order Entry
By CSR
FC and SCM