Procurement of Goods
Foreword
These Bidding Documents for Procurement of Goods have been prepared for the procurement of
goods through National Competitive Bidding (NCB) for projects in the Republic of Iraq that are
financed in whole or in part by the World Bank. They are consistent with the May 2004 [edition
of the] Guidelines for Procurement under IBRD Loans and IDA Credits.
These Standard Bidding Documents are based on the October 2001 version of the Master
Bidding Documents for Procurement of Goods and Users Guide, prepared by the Multilateral
Development Banks and International Financing Institutions. The Master Bidding Documents
reflect best practices by these institutions.
These Bidding Documents for Procurement of Goods, assume that no prequalification has taken
place before bidding.
ii
Section II.
Section III.
Section IV.
Bidding Forms
This Section includes the forms for the Bid Submission, Price Schedules, and Bid
Security to be submitted with the Bid.
Section V.
Eligible Countries
This Section contains information regarding eligible countries.
Schedule of Requirements
This Section includes the List of Goods and Related Services, the Delivery and
Completion Schedules, the Technical Specifications and the Drawings that
describe the Goods and Related Services to be procured.
PART 3 CONTRACT
Section VII. General Conditions of Contract (GCC)
This Section includes the general clauses to be applied in all contracts. The text
of the clauses in this Section shall not be modified.
Section VIII.
Summary Description
iii
This Section includes clauses specific to each contract that modify or supplement
Section VII, General Conditions of Contract.
Section IX:
Contract Forms
This Section includes the form for the Agreement, which, once completed,
incorporates corrections or modifications to the accepted bid that are permitted
under the Instructions to Bidders, the General Conditions of Contract, and the
Special Conditions of Contract.
The forms for Performance Security and Advance Payment Security, when
required, shall only be completed by the successful Bidder after contract award.
Attachment: Invitation for Bids
An Invitation for Bids form is provided at the end of the Bidding Documents
for information.
iv
BIDDING DOCUMENTS
Issued on: ____________________
for
Procurement of
[insert identification of the Goods]
______________________________
______________________________
NCB No: [insert NCB number]
Table of Contents
PART 1 Bidding Procedures...............................................................................................................1
Section I. Instructions to Bidders....................................................................................................2
Section II. Bidding Data Sheet (BDS)...........................................................................................18
Section III. Evaluation and Qualification Criteria.........................................................................22
Section IV. Bidding Forms............................................................................................................25
Section V. Eligible Countries.........................................................................................................37
PART 2 Supply Requirements..........................................................................................................38
Section VI. Schedule of Requirements..........................................................................................39
PART 3 - Contract...............................................................................................................................47
Section VII. General Conditions of Contract.................................................................................48
Section VIII. Special Conditions of Contract................................................................................62
Section IX. Contract Forms...........................................................................................................65
General.............................................................................................................................4
1
Scope of Bid........................................................................................................................4
Source of Funds...................................................................................................................4
Eligible Bidders...................................................................................................................5
B.
C.
Preparation of Bids...........................................................................................................7
9
Cost of Bidding...................................................................................................................7
10
Language of Bid..................................................................................................................7
11
12
13
Alternative Bids..................................................................................................................8
14
15
16
17
18
19
Bid Security.........................................................................................................................9
20
D.
22
23
Late Bids...........................................................................................................................11
24
25
Bid Opening......................................................................................................................11
E.
Confidentiality...................................................................................................................12
27
Clarification of Bids..........................................................................................................12
28
Responsiveness of Bids.....................................................................................................12
29
30
31
32
Evaluation of Bids.............................................................................................................14
33
Comparison of Bids...........................................................................................................14
34
35
Purchasers Right to Accept Any Bid, and to Reject Any or All Bids................................15
F.
Award of Contract...........................................................................................................15
36
Award Criteria...................................................................................................................15
37
38
Notification of Award........................................................................................................15
39
Signing of Contract...........................................................................................................15
40
Performance Security........................................................................................................15
Scope of Bid
1.1
The Purchaser indicated in the Bidding Data Sheet (BDS), issues these Bidding Documents for the
supply of Goods and Related Services incidental thereto as specified in Section VI, Schedule of
Requirements. The name and identification number of this National Competitive Bidding (NCB)
procurement are specified in the BDS. The name, identification, and number of lots of are provided
in the BDS.
1.2
Source of Funds
1.1.
The Borrower or Recipient (hereinafter called Borrower) specified in the BDS has applied for or
received financing (hereinafter called funds) from the International Bank for Reconstruction and
Development or the International Development Association (hereinafter called the Bank) toward
the cost of the project named in the BDS. The Borrower intends to apply a portion of the funds to
eligible payments under the contract for which these Bidding Documents are issued.
2.1
Payments by the Bank will be made only at the request of the Borrower and upon approval by the
Bank in accordance with the terms and conditions of the financing agreement between the
Borrower and the Bank (hereinafter called the Loan Agreement), and will be subject in all respects
to the terms and conditions of that Loan Agreement. The Loan Agreement prohibits a withdrawal
from the loan account for the purpose of any payment to persons or entities, or for any import of
goods, if such payment or import, to the knowledge of the Bank, is prohibited by decision of the
United Nations Security Council taken under Chapter VII of the Charter of the United Nations. No
party other than the Borrower shall derive any rights from the Loan Agreement or have any claim
to the funds.
3.1
The Bank requires that Borrowers (including beneficiaries of Bank loans), as well as bidders,
suppliers, contractors, and consultants under Bank-financed contracts, observe the highest standard
of ethics during the procurement and execution of such contracts. In pursuit of this policy, the
Bank:
(a) defines, for the purposes of this provision, the terms set forth below as follows:
(i)
corrupt practice means the offering, giving, receiving, or soliciting, directly
or indirectly, of anything of value to influence the action of a public official in
the procurement process or in contract execution;
(ii)
(iii)
(iv)
3.2
Eligible Bidders
4.1
A Bidder, and all parties constituting the Bidder, may have the nationality of any country, subject
to the restrictions specified in Section V, Eligible Countries. A Bidder shall be deemed to have the
nationality of a country if the Bidder is a citizen or is constituted, incorporated, or registered and
operates in conformity with the provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed subcontractors or suppliers for any part of
the Contract including Related Services.
4.2
A Bidder shall not have a conflict of interest. All bidders found to have conflict of interest shall be
disqualified. Bidders may be considered to have a conflict of interest with one or more parties in
this bidding process, if they:
(a) are or have been associated in the past, with a firm or any of its affiliates which have been
engaged by the Purchaser to provide consulting services for the preparation of the design,
specifications, and other documents to be used for the procurement of the goods to be
purchased under these Bidding Documents ; or
(b) submit more than one bid in this bidding process, except for alternative offers permitted
under ITB Clause 13. However, this does not limit the participation of subcontractors in
more than one bid;
A Bidder that is under a declaration of ineligibility by the Bank in accordance with ITB Clause 3,
at the date of contract award, shall be disqualified. The list of debarred firms is available at the
electronic address specified in the BDS. Similarly a Bidder that is under a declaration of
ineligibility, suspension or debarment by the Government of Iraq, Office of Government Public
Contract Policy at the time of contract award, shall be disqualified.
4.3
4.4
Government-owned enterprises of Iraq shall be eligible only if they can establish that they (i) are
legally and financially autonomous, (ii) operate under commercial law, and (iii) are not a
dependent agency of the Purchaser.
4.5
Bidders shall provide such evidence of their continued eligibility satisfactory to the Purchaser, as
the Purchaser shall reasonably request.
5.1
All the Goods and Related Services to be supplied under the Contract and financed by the Bank
may have their origin in any country in accordance with Section V, Eligible Countries.
5.2
For purposes of this Clause, the term goods includes commodities, raw material, machinery,
equipment, and industrial plants; and related services includes services such as insurance,
installation, training, and initial maintenance.
5.3
The term origin means the country where the goods have been mined, grown, cultivated,
produced, manufactured or processed; or, through manufacture, processing, or assembly, another
commercially recognized article results that differs substantially in its basic characteristics from its
components.
6.1
The Bidding Documents consist of Parts 1, 2, and 3, which include all the Sections indicated below,
and should be read in conjunction with any Addendum issued in accordance with ITB Clause 8.
PART 1 Bidding Procedures
PART 3 Contract
6.2
The Invitation for Bids issued by the Purchaser is not part of the Bidding Documents.
6.3
The Purchaser is not responsible for the completeness of the Bidding Documents and their
addendum, if they were not obtained directly from the Purchaser.
6.4
The Bidder is expected to examine all instructions, forms, terms, and specifications in the Bidding
Documents. Failure to furnish all information or documentation required by the Bidding
Documents may result in the rejection of the bid.
7.1
A prospective Bidder requiring any clarification of the Bidding Documents shall contact the
Purchaser in writing at the Purchasers address specified in the BDS. The Purchaser will respond
in writing to any request for clarification, provided that such request is received no later than
twenty-one (21) days prior to the deadline for submission of bids. The Purchaser shall forward
copies of its response to all those who have acquired the Bidding Documents directly from it,
including a description of the inquiry but without identifying its source. Should the Purchaser
deem it necessary to amend the Bidding Documents as a result of a clarification, it shall do so
following the procedure under ITB Clause 8 and ITB Sub-Clause 22.2.
8.1
At any time prior to the deadline for submission of bids, the Purchaser may amend the Bidding
Documents by issuing addendum.
8.2
Any addendum issued shall be part of the Bidding Documents and shall be communicated in
writing to all who have obtained the Bidding Documents directly from the Purchaser.
8.3
To give prospective Bidders reasonable time in which to take an addendum into account in
preparing their bids, the Purchaser may, at its discretion, extend the deadline for the submission of
bids, pursuant to ITB Sub-Clause 22.2
C. Preparation of Bids
9
Cost of Bidding
9.1
The Bidder shall bear all costs associated with the preparation and submission of its bid, and the
Purchaser shall not be responsible or liable for those costs, regardless of the conduct or outcome of
the bidding process.
10 Language of Bid
10.1 The Bid, as well as all correspondence and documents relating to the bid exchanged by the Bidder
and the Purchaser, shall be written in the language specified in the BDS. Supporting documents
and printed literature that are part of the Bid may be in another language provided they are
accompanied by an accurate translation of the relevant passages into the language specified in the
BDS, in which case, for purposes of interpretation of the Bid, such translation shall govern.
13 Alternative Bids
13.1 Unless otherwise specified in the BDS, alternative bids shall not be considered.
satisfaction, that the substitutions ensure substantial equivalence or are superior to those specified
in the Schedule of Requirements.
19 Bid Security
19.1 The Bidder shall furnish as part of its bid, a Bid Security or a Bid-Securing Declaration, if
required, as specified in the BDS.
19.2 The Bid Security shall be in the amount specified in the BDS and denominated in the currency of
the Iraq or a freely convertible currency, and shall:
(a) at the bidders option, be in the form of either a letter of credit, or a bank guarantee from a
banking institution, or a bond issued by a surety;
(b) be issued by a reputable institution selected by the bidder. If the institution issuing the bond
is located outside Iraq, it shall have a correspondent financial institution located in Iraq to
make it enforceable.
(c) be substantially in accordance with one of the forms of Bid Security included in Section IV,
Bidding Forms, or other form approved by the Purchaser prior to bid submission;
(d) be payable promptly upon written demand by the Purchaser in case the conditions listed in
ITB Clause 19.5 are invoked;
(e) be submitted in its original form; copies will not be accepted;
(f)
remain valid for a period of 28 days beyond the validity period of the bids, as extended, if
applicable, in accordance with ITB Clause 18.2.
19.3 If a Bid Security or a Bid- Securing Declaration is required in accordance with ITB Sub-Clause
19.1, any bid not accompanied by a substantially responsive Bid Security or Bid Securing
Declaration in accordance with ITB Sub-Clause 19.1, shall be rejected by the Purchaser as nonresponsive.
19.4 The Bid Security of unsuccessful Bidders shall be returned as promptly as possible upon the
successful Bidders furnishing of the Performance Security pursuant to ITB Clause 40.
19.5 The Bid Security may be forfeited or the Bid Securing Declaration executed:
(a) if a Bidder withdraws its bid during the period of bid validity specified by the Bidder on the
10
(b)
19.6 The Bid Security or Bid- Securing Declaration of a JV must be in the name of the JV that submits
the bid. If the JV has not been legally constituted at the time of bidding, the Bid Security or BidSecuring Declaration shall be in the names of all future partners as named in the letter of intent
mentioned.
11
of the Purchaser and Bidders previously subject to the deadline shall thereafter be subject to the
deadline as extended.
23 Late Bids
23.1 The Purchaser shall not consider any bid that arrives after the deadline for submission of bids, in
accordance with ITB Clause 22. Any bid received by the Purchaser after the deadline for
submission of bids shall be declared late, rejected, and returned unopened to the Bidder.
25 Bid Opening
25.1 The Purchaser shall conduct the bid opening in public at the address, date and time specified in the
BDS. Any specific electronic bid opening procedures required if electronic bidding is permitted in
accordance with ITB Sub-clause 21.1, shall be as specified in the BDS.
25.2 First, envelopes marked WITHDRAWAL shall be opened and read out and the envelope with the
corresponding bid shall not be opened, but returned to the Bidder. No bid withdrawal shall be
permitted unless the corresponding withdrawal notice contains a valid authorization to request the
withdrawal and is read out at bid opening. Next, envelopes marked SUBSTITUTION shall be
opened and read out and exchanged with the corresponding Bid being substituted, and the
substituted Bid shall not be opened, but returned to the Bidder. No Bid substitution shall be
permitted unless the corresponding substitution notice contains a valid authorization to request the
substitution and is read out at bid opening. Envelopes marked MODIFICATION shall be opened
and read out with the corresponding Bid. No Bid modification shall be permitted unless the
corresponding modification notice contains a valid authorization to request the modification and is
read out at Bid opening. Only envelopes that are opened and read out at Bid opening shall be
considered further.
25.3 All other envelopes shall be opened one at a time, reading out: the name of the Bidder and whether
there is a modification; the Bid Prices, including any discounts and alternative offers; the presence
of a Bid Security or Bid-Securing Declaration, if required; and any other details as the Purchaser
may consider appropriate. Only discounts and alternative offers read out at Bid opening shall be
considered for evaluation. No Bid shall be rejected at Bid opening except for late bids, in
accordance with ITB Sub-Clause 23.1.
25.4 The Purchaser shall prepare a record of the Bid opening that shall include, as a minimum: the name
12
of the Bidder and whether there is a withdrawal, substitution, or modification; the Bid Price, per lot
if applicable, including any discounts, and alternative offers if they were permitted; and the
presence or absence of a Bid Security or Bid-Securing Declaration, if one was required. The
Bidders representatives who are present shall be requested to sign the attendance sheet. A copy of
the record shall be distributed to all Bidders who submitted bids in time, and posted online when
electronic bidding is permitted.
27 Clarification of Bids
27.1 To assist in the examination, evaluation, comparison and post-qualification of the bids, the
Purchaser may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification
submitted by a Bidder in respect to its Bid and that is not in response to a request by the Purchaser
shall not be considered. The Purchasers request for clarification and the response shall be in
writing. No change in the prices or substance of the Bid shall be sought, offered, or permitted,
except to confirm the correction of arithmetic errors discovered by the Purchaser in the Evaluation
of the bids, in accordance with ITB Clause 29.
28 Responsiveness of Bids
28.1 The Purchasers determination of a bids responsiveness is to be based on the contents of the bid
itself.
28.2 A substantially responsive Bid is one that conforms to all the terms, conditions, and specifications
of the Bidding Documents without material deviation, reservation, or omission. A material
deviation, reservation, or omission is one that:
(a) affects in any substantial way the scope, quality, or performance of the Goods and Related
Services specified in the Contract; or
(b) limits in any substantial way, inconsistent with the Bidding Documents, the Purchasers
rights or the Bidders obligations under the Contract; or
(c) if rectified would unfairly affect the competitive position of other bidders presenting
substantially responsive bids.
28.3 If a bid is not substantially responsive to the Bidding Documents, it shall be rejected by the
Purchaser and may not subsequently be made responsive by the Bidder by correction of the
material deviation, reservation, or omission.
13
32 Evaluation of Bids
32.1 The Purchaser shall evaluate each bid that has been determined, up to this stage of the evaluation,
to be substantially responsive.
32.2 To evaluate a Bid, the Purchaser shall only use all the factors, methodologies and criteria defined
in ITB Clause 32. No other criteria or methodology shall be permitted.
14
33 Comparison of Bids
33.1 The Purchaser shall compare all substantially responsive bids to determine the lowest-evaluated
bid, in accordance with ITB Clause 32.
F. Award of Contract
36 Award Criteria
36.1 The Purchaser shall award the Contract to the Bidder whose offer has been determined to be the
lowest evaluated bid and is substantially responsive to the Bidding Documents, provided further
that the Bidder is determined to be qualified to perform the Contract satisfactorily.
15
quantity of Goods and Related Services originally specified in Section VI, Schedule of
Requirements, provided this does not exceed the percentages specified in the BDS, and without
any change in the unit prices or other terms and conditions of the bid and the Bidding Documents.
38 Notification of Award
38.1 Prior to the expiration of the period of bid validity, the Purchaser shall notify the successful Bidder,
in writing, that its Bid has been accepted.
38.2 Until a formal Contract is prepared and executed, the notification of award shall constitute a
binding Contract.
38.3 Upon the successful Bidders furnishing of the signed Contract Form and performance security
pursuant to ITB Clause 40, the Purchaser will promptly notify each unsuccessful Bidder and will
discharge its bid security, pursuant to ITB Clause 19.4.
39 Signing of Contract
39.1 Promptly after notification, the Purchaser shall send the successful Bidder the Agreement and the
Special Conditions of Contract.
39.2 Within twenty-eight (28) days of receipt of the Agreement, the successful Bidder shall sign, date,
and return it to the Purchaser.
40 Performance Security
40.1 Within twenty eight (28) days of the receipt of notification of award from the Purchaser, the
successful Bidder, if required, shall furnish the Performance Security in accordance with the GCC,
using for that purpose the Performance Security Form included in Section IX Contract forms, or
another Form acceptable to the Purchaser. The Purchaser shall promptly notify the name of the
winning Bidder to each unsuccessful Bidder and discharge the Bid Securities of the unsuccessful
bidders pursuant to ITB Sub-Clause 19.4.
40.2 Failure of the successful Bidder to submit the above-mentioned Performance Security or sign the
Contract shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid
Security or execution of the Bid-Securing Declaration. In that event the Purchaser may award the
Contract to the next lowest evaluated Bidder, whose offer is substantially responsive and is
determined by the Purchaser to be qualified to perform the Contract satisfactorily.
16
A. General
ITB 1.1
ITB 1.1
The name and identification number of the NCB are: [insert name and
identification number]
The number, identification and names of the lots comprising this NCB are:
[insert number; list the lots and related Goods]
ITB 2.1
The Borrower is: [insert the name of Borrower, as indicated in the Loan
Agreement of the Project]
ITB 2.1
The name of the Project is: [insert the name of the Project]
ITB 4.3
17
C. Preparation of Bids
ITB 10.1
The Bidder shall submit the following additional documents in its bid:
[insert list of documents, if any]
ITB 13.1
or
A bidder may submit an alternative bid with or without a bid for the base
case. The Purchaser shall consider bids offered for alternatives as specified in
the Technical Specifications of Section VI, Schedule of Requirements All bids
received, for the base case, as well as alternative bids meeting the specified
requirements, shall be evaluated on their own merits in accordance with the
same procedures, as specified in the ITB 36.]
ITB 14.7
Prices quoted for each lot shall correspond at least to [insert figure] % of the
items specified for each lot.
Prices quoted for each item of a lot shall correspond at least to [insert figure]
percent of the quantities specified for this item of a lot.
ITB 16.3
ITB 17.1 (a)
Period of time the Goods are expected to be functioning (for the purpose of
spare parts): [insert duration ]
After sales service is: [insert required or not required]
ITB 18.1
ITB 19.1
18
(a)
(b)
(c)
ITB 19.2
ITB 20.1
In addition to the original of the bid, the number of copies is: [insert number]
Bidders [insert shall or shall not] have the option of submitting their
bids electronically.
If bidders shall have the option of submitting their bids electronically, the
electronic bidding submission procedures shall be: [insert a description of the
electronic bidding submission procedures]
The inner and outer envelopes shall bear the following additional
identification marks: [insert the name and/or number that must appear on the
bid envelope to identify this specific bidding process].
ITB 22.1
ITB 25.1
19
ITB 25.1
(b)
(c)
(d)
ITB 32.5
F. Award of Contract
ITB 37.1
20
21
Contents
1.
Evaluation Criteria
2.
Multiple Contracts
3.
Post-qualification Requirements
22
Delivery schedule.
The Goods specified in the List of Goods are required to be delivered within the
acceptable time range (after the earliest and before the final date, both dates
inclusive) specified in Section VI, Delivery Schedule. No credit will be given to
deliveries before the earliest date, and bids offering delivery after the final date shall
be treated as non responsive. Within this acceptable period, an adjustment, as
specified in BDS Sub-Clause 32.3(d), will be added, for evaluation purposes only, to
the bid price of bids offering deliveries later than the Earliest Delivery Date
specified in Section VI , Delivery Schedule.
(b)
Cost of major replacement components, mandatory spare parts, and service. [insert
one of the following]
The list of items and quantities of major assemblies, components, and selected spare
parts, likely to be required during the initial period of operation specified in the BDS
Sub-Clause 16.3, is in the List of Goods. An adjustment equal to the total cost of these
items, at the unit prices quoted in each bid, shall be added to the bid price, for
evaluation purposes only.
(c)
or
(ii)
An adjustment to take into account the productivity of the goods offered in the
bid will be added to the bid price, for evaluation purposes only, if specified in
BDS Sub-Clause 32.3(d). The adjustment will be evaluated based on the cost
per unit of the actual productivity of goods offered in the bid with respect to
minimum required values, using the methodology specified in BDS Sub-Clause
32.3(d).
(g)
23
evaluate only lots or contracts that include at least the percentages of items per lot and
quantity per item as specified in ITB Sub Clause 14.7
(b)
(ii)
the price reduction per lot and the methodology for its application as offered by
the Bidder in its bid.
Financial Capability
The Bidder shall furnish documentary evidence that it meets the following financial
requirement(s): [list the requirement(s)]
(b)
(c)
The Bidder shall furnish documentary evidence to demonstrate that the Goods it
offers meet the following usage requirement: [list the requirement(s)]
24
25
In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB Sub-Clause
4.1.
In case of government owned entity from Iraq, documents establishing legal and financial
autonomy and compliance with commercial law, in accordance with ITB Sub-Clause 4.5.
26
In case of government owned entity from Iraq, documents establishing legal and financial
autonomy and compliance with commercial law, in accordance with ITB Sub-Clause 4.5.
27
28
(i) The following commissions, gratuities, or fees have been paid or are to be paid with respect
to the bidding process or execution of the Contract: [insert complete name of each
Recipient, its full address, the reason for which each commission or gratuity was paid and
the amount and currency of each such commission or gratuity]
Name of Recipient
Address
Reason
Amount
29
30
2
Description of Goods
3
Delivery Date
4
Quantity and
physical unit
5
Unit price DDP
6
Total price per line
item
(Col. 4 5)
[insert
number of
the item]
[insert quoted
Delivery Date]
7
Country of Origin
31
1
Service
N
2
Description of Services
3
Country of
Origin
4
Delivery Date at
place of Final
destination
[insert
number of
the
Service ]
[insert country
of origin of the
Services]
5
Quantity and physical unit
Date:_________________________
NCB No: _____________________
Alternative No: ________________
Page N ______ of ______
6
7
Unit price
Total Price per
Service
(Col. 5 x 6 or
estimate)
[insert unit price per
item]
32
We have been informed that [insert name of the Bidder] (hereinafter called "the Bidder") has
submitted to you its bid dated [insert date] (hereinafter called "the Bid") for the execution of
[insert name of Contract].
Furthermore, we understand that, according to your conditions, bids must be supported by a Bid
Guarantee.
At the request of the Bidder, we [insert name of Bank] hereby irrevocably undertake to pay you
any sum or sums not exceeding in total an amount of [insert amount in figures expressed in Iraqi
Dinars], [insert amount in words] upon receipt by us of your first demand in writing
accompanied by a written statement stating that the Bidder is in breach of its obligation(s) under
the bid conditions, because the Bidder:
(a)
has withdrawn its Bid during the period of bid validity specified by the Bidder in the Bid
Submission Form; or
(b)
having been notified of the acceptance of its Bid by the Purchaser during the period of bid
validity as stated in the Bid Submission Form or extended by the Employer at any time
prior to expiration of this period, (i) fails or refuses to execute the Contract, if required, or
(ii) fails or refuses to furnish the Performance Security, in accordance with the ITB.
This Guarantee will expire: (a) if the Bidder is the successful Bidder, upon our receipt of copies
of the Contract signed by the Bidder and the Performance Security issued to you upon the
instruction of the Bidder; or (b) if the Bidder is not the successful Bidder, upon the earlier of (i)
our receipt of a copy of your notification to the Bidder that the Bidder was unsuccessful; or (ii)
twenty-eight days after the expiration of the Bidders Bid.
Consequently, any demand for payment under this Guarantee must be received by us at the office
on or before that date.
This Guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458.
[Signature(s) of authorized banks representative(s)]
33
fails or refuses to execute the Contract Form in accordance with the Instructions to
Bidders, if required; or
fails or refuses to furnish the Performance Security in accordance with the
Instructions to Bidders;
then the Surety undertakes to immediately pay to the Purchaser up to the above amount upon
receipt of the Purchaser's first written demand, without the Purchaser having to substantiate its
demand, provided that in its demand the Purchaser shall state that the demand arises from the
occurrence of any of the above events, specifying which event(s) has occurred.
The Surety hereby agrees that its obligation will remain in full force and affect up to and
including the date 28 days after the date of expiration of the Bid validity as stated in the
Invitation to Bid. Any demand in respect of this Bond should reach the Surety not later than the
above date.
IN TESTIMONY WHEREOF, the Principal and the Surety have caused these presents to be
executed in their respective names this ____ day of ____________ 20__.
34
[Name of
_______________________________
(Signature)
____________________________________
(Signature)
_______________________________
(Printed name and title)
____________________________________
(Printed name and title)
35
Bid-Securing Declaration
[The Bidder shall fill in this Form in accordance with the instructions indicated .]
Date: [insert date (as day, month and year) of Bid Submission]
NCB No.: [insert number of bidding process]
Alternative No.: [insert identification No if this is a Bid for an alternative]
To: [insert complete name of Purchaser]
We, the undersigned, declare that:
1.
We understand that, according to your conditions, bids must be supported by a BidSecuring Declaration.
2.
We accept that we will automatically be suspended from being eligible for bidding in any
contract with the Purchaser for the period of time of [insert number of months or years] starting
on [insert date], if we are in breach of our obligation(s) under the bid conditions, because we:
(a)
have withdrawn our Bid during the period of bid validity specified by us in the Bidding
Data Sheet; or
(b)
having been notified of the acceptance of our Bid by the Purchaser during the period of
bid validity, (i) fail or refuse to execute the Contract, if required, or (ii) fail or refuse to
furnish the Performance Security, in accordance with the ITB.
3.
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of a copy of your notification of the name of the
successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.
4.
We understand that if we are a Joint Venture, the Bid Securing Declaration must be in the
name of the Joint Venture that submits the bid. If the Joint Venture has not been legally
constituted at the time of bidding, the Bid Securing Declaration shall be in the names of all future
partners as named in the letter of intent.
Signed: [insert signature of person whose name and capacity are shown] In the capacity of
[insert legal capacity of person signing the Bid Securing Declaration]
Name: [insert complete name of person signing the Bid Securing Declaration]
Duly authorized to sign the bid for and on behalf of: [insert complete name of Bidder]
Dated on ____________ day of __________________, _______ [insert date of signing]
36
In accordance with Para 1.8 of the Guidelines: Procurement under IBRD Loans and IDA
Credits, dated May 2004, the Bank permits firms and individuals from all countries to
offer goods, works and services for Bank-financed projects. As an exception, firms of a
Country or goods manufactured in a Country may be excluded if:
Para 1.8 (a) (i): as a matter of law or official regulation, the Borrowers Country
prohibits commercial relations with that Country, provided that the
Bank is satisfied that such exclusion does not preclude effective
competition for the supply of the Goods or Works required, or
Para 1.8 (a) (ii): by an Act of Compliance with a Decision of the United Nations
Security Council taken under Chapter VII of the Charter of the
United Nations, the Borrowers Country prohibits any import of
goods from that Country or any payments to persons or entities in
that Country.
2.
For the information of borrowers and bidders, at the present time firms, goods and
services from the following countries are excluded from this bidding:
(a)
(b)
37
38
1.
2.
3.
Technical Specifications.................................................................................................41
4.
Drawings.........................................................................................................................43
5.
39
40
1.
[The Purchaser shall fill in this table (Columns A to G inclusive) with column H which is to be filled by the Bidder]
Line
Item
Description of Goods
Quantity
Physical
unit
A
[insert
item No]
B
[insert description of Goods]
C
[insert
quantity of
item to be
supplied]
D
[insert
physical unit
for the
quantity]
Final (Project
Site)
Destination
E
[insert place of
Delivery]
Delivery Date
Earliest Delivery
Date
Latest Delivery
Date
Bidders offered
Delivery date [to be
provided by the
bidder]
H
[insert the number of days
following the date of
effectiveness the Contract]
2.
41
[This table shall be filled in by the Purchaser. The Required Completion Dates should be realistic, and consistent with the
required Goods Delivery Dates]
Service
N
Description of Service
Quantity1
Physical Unit
Final Completion
Date(s) of Services
[insert
Service No]
[insert quantity of
items to be supplied]
1. If applicable
3.
42
Technical Specifications
The purpose of the Technical Specifications (TS), is to define the technical characteristics of the
Goods and Related Services required by the Purchaser. The Purchaser shall prepare the detailed
TS take into account that:
The TS constitute the benchmarks against which the Purchaser will verify the technical
responsiveness of bids and subsequently evaluate the bids. Therefore, well-defined TS will
facilitate preparation of responsive bids by bidders, as well as examination, evaluation, and
comparison of the bids by the Purchaser.
The TS shall require that all goods and materials to be incorporated in the goods be new,
unused, and of the most recent or current models, and that they incorporate all recent
improvements in design and materials, unless provided for otherwise in the contract.
The TS shall make use of best practices. Samples of specifications from successful similar
procurements in the same country or sector may provide a sound basis for drafting the TS.
Standards for equipment, materials, and workmanship specified in the Bidding Documents
shall not be restrictive. Reference to brand names, catalogue numbers, or other details that
limit any materials or items to a specific manufacturer should be avoided as far as possible.
Where unavoidable, such item description should always be followed by the words or
substantially equivalent.
Reference to brand names and catalogue numbers should be avoided as far as possible;
where unavoidable the words or at least equivalent shall always follow such references.
Technical Specifications shall be fully descriptive of the requirements in respect of, but not
limited to, the following:
(a)
(b)
(c)
(d)
(e)
43
The TS shall specify all essential technical and performance characteristics and
requirements, including guaranteed or acceptable maximum or minimum values, as
appropriate. Whenever necessary, the Purchaser shall include an additional ad-hoc bidding
form (to be an Attachment to the Bid Submission Sheet), where the Bidder shall provide
detailed information on such technical performance characteristics in respect to the
corresponding acceptable or guaranteed values.
When the Purchaser requests that the Bidder provides in its bid a part or all of the Technical
Specifications, technical schedules, or other technical information, the Purchaser shall specify in
detail the nature and extent of the required information and the manner in which it has to be
presented by the Bidder in its bid.
[If a summary of the Technical Specifications (TS) has to be provided, the Purchaser shall insert
information in the table below. The Bidder shall prepare a similar table to justify compliance
with the requirements]
Summary of Technical Specifications. The Goods and Related Services shall comply with
following Technical Specifications and Standards:
Item No
[insert item
No]
Name of Goods or
Related Service
[insert name]
44
4.
Drawings
List of Drawings
Drawing Nr.
Drawing Name
Purpose
5.
45
The following inspections and tests shall be performed: [insert list of inspections and tests]
Brief Description
of Item
46
PART 3 - Contract
47
Scope of Bid.....................................................................................................................4
Source of Funds................................................................................................................4
Eligible Bidders................................................................................................................5
Cost of Bidding.................................................................................................................7
10
Language of Bid...............................................................................................................7
11
12
13
Alternative Bids................................................................................................................8
14
15
16
17
18
19
Bid Security......................................................................................................................9
20
21
22
23
Late Bids.........................................................................................................................11
24
25
Bid Opening....................................................................................................................11
26
Confidentiality................................................................................................................12
27
Clarification of Bids........................................................................................................12
28
Responsiveness of Bids...................................................................................................12
29
30
31
48
32
Evaluation of Bids..........................................................................................................14
33
Comparison of Bids........................................................................................................14
34
35
Purchasers Right to Accept Any Bid, and to Reject Any or All Bids.............................15
36
Award Criteria.................................................................................................................15
37
38
Notification of Award......................................................................................................15
39
Signing of Contract.........................................................................................................15
40
Performance Security......................................................................................................15
49
Definitions
1.1
The following words and expressions shall have the meanings hereby assigned to them:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
Bank means the World Bank and refers to the International Bank for Reconstruction and
Development (IBRD) or the International Development Association (IDA).
Contract means the Contract Agreement entered into between the Purchaser and the
Supplier, together with the Contract Documents referred to therein, including all
attachments, appendices, and all documents incorporated by reference therein.
Contract Documents means the documents listed in the Contract Agreement, including
any amendments thereto.
Contract Price means the price payable to the Supplier as specified in the Contract
Agreement, subject to such additions and adjustments thereto or deductions therefrom, as
may be made pursuant to the Contract.
Day means calendar day.
Completion means the fulfillment of the Related Services by the Supplier in accordance
with the terms and conditions set forth in the Contract.
GCC means the General Conditions of Contract.
Goods means all of the commodities, raw material, machinery and equipment, and/or
other materials that the Supplier is required to supply to the Purchaser under the Contract.
Purchaser means the entity purchasing the Goods and Related Services, as specified in
the SCC.
Related Services means the services incidental to the supply of the goods, such as
insurance, installation, training and initial maintenance and other such obligations of the
Supplier under the Contract.
SCC means the Special Conditions of Contract.
Subcontractor means any natural person, private or government entity, or a combination
of the above, to whom any part of the Goods to be supplied or execution of any part of the
Related Services is subcontracted by the Supplier.
Supplier means the natural person, private or government entity, or a combination of the
above, whose bid to perform the Contract has been accepted by the Purchaser and is named
as such in the Contract Agreement.
The Project Site, where applicable, means the place named in the SCC.
Contract Documents
2.1
Subject to the order of precedence set forth in the Contract Agreement, all documents forming the
Contract (and all parts thereof) are intended to be correlative, complementary, and mutually
explanatory. The Contract Agreement shall be read as a whole.
3.1
The Bank requires that Borrowers (including beneficiaries of Bank loans), as well as Bidders,
Suppliers, Contractors, and Consultants under Bank-financed contracts, observe the highest
standard of ethics during the procurement and execution of such contracts. In pursuit of this
50
defines, for the purposes of this provision, the terms set forth below as follows:
(i)
corrupt practice means the offering, giving, receiving, or soliciting, directly
or indirectly, of anything of value to influence the action of a public official in
the procurement process or in contract execution; and
(ii)
(iii)
(iv)
(b)
(c)
Interpretation
4.1
If the context so requires it, singular means plural and vice versa.
4.2
Entire Agreement:
The Contract constitutes the entire agreement between the Purchaser and the Supplier and
supersedes all communications, negotiations and agreements (whether written or oral) of the
parties with respect thereto made prior to the date of Contract.
4.3
Amendment:
No amendment or other variation of the Contract shall be valid unless it is in writing, is dated,
expressly refers to the Contract, and is signed by a duly authorized representative of each party
thereto.
4.4
Nonwaiver:
(a)
(b)
4.5
Severability
If any provision or condition of the Contract is prohibited or rendered invalid or unenforceable,
51
such prohibition, invalidity or unenforceability shall not affect the validity or enforceability of any
other provisions and conditions of the Contract.
Language
5.1
The Contract as well as all correspondence and documents relating to the Contract exchanged by
the Supplier and the Purchaser, shall be written in the language specified in the SCC. Supporting
documents and printed literature that are part of the Contract may be in another language provided
they are accompanied by an accurate translation of the relevant passages in the language specified,
in which case, for purposes of interpretation of the Contract, this translation shall govern.
5.2
The Supplier shall bear all costs of translation to the governing language and all risks of the
accuracy of such translation, for documents provided by the Supplier.
6.1
If the Supplier is a joint venture, consortium, or association, all of the parties shall be jointly and
severally liable to the Purchaser for the fulfillment of the provisions of the Contract and shall
designate one party to act as a leader with authority to bind the joint venture, consortium, or
association. The composition or the constitution of the joint venture, consortium, or association
shall not be altered without the prior consent of the Purchaser.
Notices
7.1
Any notice given by one party to the other pursuant to the Contract shall be in writing to the
address specified in the SCC. The term in writing means communicated in written form with
proof of receipt.
7.2
A notice shall be effective when delivered or on the notices effective date, whichever is later.
Governing Law
8.1
The Contract shall be governed by and interpreted in accordance with the laws of Iraq.
Settlement of Disputes
9.1
The Purchaser and the Supplier shall make every effort to resolve amicably by direct informal
negotiation any disagreement or dispute arising between them under or in connection with the
Contract.
9.2
10 Scope of Supply
10.1 The Goods and Related Services to be supplied shall be as specified in the Schedule of
Requirements.
12 Suppliers Responsibilities
52
12.1 The Supplier shall supply all the Goods and Related Services included in the Scope of Supply in
accordance with GCC Clause 10, and the Delivery and Completion Schedule, as per GCC Clause
11.
13 Contract Price
13.1 Prices charged by the Supplier for the Goods supplied and the Related Services performed under
the Contract shall not vary from the prices quoted by the Supplier in its bid.
14 Terms of Payment
14.1 The Contract Price, including any Advance Payments, if applicable, shall be paid as specified in
the SCC.
14.2 The Suppliers request for payment shall be made to the Purchaser in writing, accompanied by
invoices describing, as appropriate, the Goods delivered and Related Services performed, and by
the documents submitted pursuant to GCC Clause 11 and upon fulfillment of all other obligations
stipulated in the Contract.
14.3 Payments shall be made promptly by the Purchaser, but in no case later than sixty (60) days after
submission of an invoice or request for payment by the Supplier, and after the Purchaser has
accepted it.
14.4
In the event that the Purchaser fails to pay the Supplier any payment by its due date or within the
period set forth in the SCC, the Purchaser shall pay to the Supplier interest on the amount of such
delayed payment at the rate shown in the SCC, for the period of delay until payment has been
made in full, whether before or after judgment or arbitrage award.
16 Performance Security
16.1 If required as specified in the SCC, the Supplier shall, within twenty-eight (28) days of the
notification of contract award, provide a performance security for the performance of the Contract
in the amount specified in the SCC.
16.2 The proceeds of the Performance Security shall be payable to the Purchaser as compensation for
any loss resulting from the Suppliers failure to complete its obligations under the Contract.
16.3 As specified in the SCC, the Performance Security, if required, shall be in one of the format
stipulated by the Purchaser in the SCC, or in another format acceptable to the Purchaser.
16.4 The Performance Security shall be discharged by the Purchaser and returned to the Supplier not
later than twenty-eight (28) days following the date of Completion of the Suppliers performance
obligations under the Contract, including any warranty obligations, unless specified otherwise in
the SCC.
17 Copyright
53
17.1 The copyright in all drawings, documents, and other materials containing data and information
furnished to the Purchaser by the Supplier herein shall remain vested in the Supplier, or, if they
are furnished to the Purchaser directly or through the Supplier by any third party, including
suppliers of materials, the copyright in such materials shall remain vested in such third party
18 Confidential Information
18.1 The Purchaser and the Supplier shall keep confidential and shall not, without the written consent
of the other party hereto, divulge to any third party any documents, data, or other information
furnished directly or indirectly by the other party hereto in connection with the Contract, whether
such information has been furnished prior to, during or following completion or termination of the
Contract. Notwithstanding the above, the Supplier may furnish to its Subcontractor such
documents, data, and other information it receives from the Purchaser to the extent required for
the Subcontractor to perform its work under the Contract, in which event the Supplier shall obtain
from such Subcontractor an undertaking of confidentiality similar to that imposed on the Supplier
under GCC Clause 18.
18.2 The Purchaser shall not use such documents, data, and other information received from the
Supplier for any purposes unrelated to the contract. Similarly, the Supplier shall not use such
documents, data, and other information received from the Purchaser for any purpose other than
the performance of the Contract.
18.3 The obligation of a party under GCC Sub-Clauses 18.1 and 18.2 above, however, shall not apply
to information that:
(a)
(b)
(c)
(d)
the Purchaser or Supplier need to share with the Bank or other institutions participating in
the financing of the Contract;
now or hereafter enters the public domain through no fault of that party;
can be proven to have been possessed by that party at the time of disclosure and which was
not previously obtained, directly or indirectly, from the other party; or
otherwise lawfully becomes available to that party from a third party that has no obligation
of confidentiality.
18.4 The above provisions of GCC Clause 18 shall not in any way modify any undertaking of
confidentiality given by either of the parties hereto prior to the date of the Contract in respect of
the Supply or any part thereof.
18.5 The provisions of GCC Clause 18 shall survive completion or termination, for whatever reason, of
the Contract.
19 Subcontracting
19.1 The Supplier shall notify the Purchaser in writing of all subcontracts awarded under the Contract
if not already specified in the bid. Such notification, in the original bid or later shall not relieve
the Supplier from any of its obligations, duties, responsibilities, or liability under the Contract.
19.2 Subcontracts shall comply with the provisions of GCC Clause 3.
54
(a)
(b)
(c)
The Goods and Related Services supplied under this Contract shall conform to the technical
specifications and standards mentioned in Section VI, Schedule of Requirements and, when
no applicable standard is mentioned, the standard shall be equivalent or superior to the
official standards whose application is appropriate to the Goods country of origin.
The Supplier shall be entitled to disclaim responsibility for any design, data, drawing,
specification or other document, or any modification thereof provided or designed by or on
behalf of the Purchaser, by giving a notice of such disclaimer to the Purchaser.
Wherever references are made in the Contract to codes and standards in accordance with
which it shall be executed, the edition or the revised version of such codes and standards
shall be those specified in the Schedule of Requirements. During Contract execution, any
changes in any such codes and standards shall be applied only after approval by the
Purchaser and shall be treated in accordance with GCC Clause 29.
22 Insurance
22.1 The Goods supplied under the Contract shall be fully insured against loss or damage incidental to
manufacture or acquisition, transportation, storage, and delivery.
55
23.5 The Purchaser may require the Supplier to carry out any test and/or inspection not required by the
Contract but deemed necessary to verify that the characteristics and performance of the Goods
comply with the technical specifications codes and standards under the Contract, provided that the
Suppliers reasonable costs and expenses incurred in the carrying out of such test and/or
inspection shall be added to the Contract Price. Further, if such test and/or inspection impedes the
progress of manufacturing and/or the Suppliers performance of its other obligations under the
Contract, due allowance will be made in respect of the Delivery Dates and Completion Dates and
the other obligations so affected.
23.6 The Supplier shall provide the Purchaser with a report of the results of any such test and/or
inspection.
23.7 The Purchaser may reject any Goods or any part thereof that fail to pass any test and/or inspection
or do not conform to the specifications. The Supplier shall either rectify or replace such rejected
Goods or parts thereof or make alterations necessary to meet the specifications at no cost to the
Purchaser, and shall repeat the test and/or inspection, at no cost to the Purchaser, upon giving a
notice pursuant to GCC Sub-Clause 23.4.
23.8 The Supplier agrees that neither the execution of a test and/or inspection of the Goods or any part
thereof, nor the attendance by the Purchaser or its representative, nor the issue of any report
pursuant to GCC Sub-Clause 23.6, shall release the Supplier from any warranties or other
obligations under the Contract.
24 Liquidated Damages
24.1 Except as provided under GCC Clause 28, if the Supplier fails to deliver any or all of the Goods
by the Date(s) of delivery or perform the Related Services within the period specified in the
Contract, the Purchaser may without prejudice to all its other remedies under the Contract, deduct
from the Contract Price, as liquidated damages, a sum equivalent to the percentage specified in the
SCC of the delivered price of the delayed Goods or unperformed Services for each week or part
thereof of delay until actual delivery or performance, up to a maximum deduction of the
percentage specified in those SCC. Once the maximum is reached, the Purchaser may terminate
the Contract pursuant to GCC Clause 31.
25 Warranty
25.1 The Supplier warrants that all the Goods are new, unused, and of the most recent or current
models, and that they incorporate all recent improvements in design and materials, unless
provided otherwise in the Contract.
25.2 Subject to GCC Sub-Clause 20.1(b), the Supplier further warrants that the Goods shall be free
from defects arising from any act or omission of the Supplier or arising from design, materials,
and workmanship, under normal use in the conditions prevailing in the country of final
destination.
25.3 Unless otherwise specified in the SCC, the warranty shall remain valid for twelve (12) months
after the Goods, or any portion thereof as the case may be, have been delivered to and accepted at
the final destination indicated in the SCC, or for eighteen (18) months after the date of shipment
from the port or place of loading in the country of origin, whichever period concludes earlier.
25.4 The Purchaser shall give notice to the Supplier stating the nature of any such defects together with
all available evidence thereof, promptly following the discovery thereof. The Purchaser shall
56
afford all reasonable opportunity for the Supplier to inspect such defects.
25.5 Upon receipt of such notice, the Supplier shall, within the period specified in the SCC,
expeditiously repair or replace the defective Goods or parts thereof, at no cost to the Purchaser.
25.6 If having been notified, the Supplier fails to remedy the defect within the period specified in the
SCC, the Purchaser may proceed to take within a reasonable period such remedial action as may
be necessary, at the Suppliers risk and expense and without prejudice to any other rights which
the Purchaser may have against the Supplier under the Contract.
26 Patent Indemnity
26.1 The Supplier shall, subject to the Purchasers compliance with GCC Sub-Clause 26.2, indemnify
and hold harmless the Purchaser and its employees and officers from and against any and all suits,
actions or administrative proceedings, claims, demands, losses, damages, costs, and expenses of
any nature, including attorneys fees and expenses, which the Purchaser may suffer as a result of
any infringement or alleged infringement of any patent, utility model, registered design,
trademark, copyright, or other intellectual property right registered or otherwise existing at the
date of the Contract by reason of:
(a)
the installation of the Goods by the Supplier or the use of the Goods in the country where
the Site is located; and
(b) the sale in any country of the products produced by the Goods.
Such indemnity shall not cover any use of the Goods or any part thereof other than for the purpose
indicated by or to be reasonably inferred from the Contract, neither any infringement resulting
from the use of the Goods or any part thereof, or any products produced thereby in association or
combination with any other equipment, plant, or materials not supplied by the Supplier, pursuant
to the Contract.
26.2 If any proceedings are brought or any claim is made against the Purchaser arising out of the
matters referred to in GCC Sub-Clause 26.1, the Purchaser shall promptly give the Supplier a
notice thereof, and the Supplier may at its own expense and in the Purchasers name conduct such
proceedings or claim and any negotiations for the settlement of any such proceedings or claim.
26.3 If the Supplier fails to notify the Purchaser within twenty-eight (28) days after receipt of such
notice that it intends to conduct any such proceedings or claim, then the Purchaser shall be free to
conduct the same on its own behalf.
26.4 The Purchaser shall, at the Suppliers request, afford all available assistance to the Supplier in
conducting such proceedings or claim, and shall be reimbursed by the Supplier for all reasonable
expenses incurred in so doing.
26.5 The Purchaser shall indemnify and hold harmless the Supplier and its employees, officers, and
Subcontractors from and against any and all suits, actions or administrative proceedings, claims,
demands, losses, damages, costs, and expenses of any nature, including attorneys fees and
expenses, which the Supplier may suffer as a result of any infringement or alleged infringement of
any patent, utility model, registered design, trademark, copyright, or other intellectual property
right registered or otherwise existing at the date of the Contract arising out of or in connection
with any design, data, drawing, specification, or other documents or materials provided or
designed by or on behalf of the Purchaser.
57
27.1 Unless otherwise specified in the Contract, if after the date of 28 days prior to date of Bid
submission, any law, regulation, ordinance, order or bylaw having the force of law is enacted,
promulgated, abrogated, or changed in Iraq (which shall be deemed to include any change in
interpretation or application by the competent authorities) that subsequently affects the Delivery
Date and/or the Contract Price, then such Delivery Date and/or Contract Price shall be
correspondingly increased or decreased, to the extent that the Supplier has thereby been affected
in the performance of any of its obligations under the Contract.
28 Force Majeure
28.1 The Supplier shall not be liable for forfeiture of its Performance Security, liquidated damages, or
termination for default if and to the extent that its delay in performance or other failure to perform
its obligations under the Contract is the result of an event of Force Majeure.
28.2 For purposes of this Clause, Force Majeure means an event or situation beyond the control of
the Supplier that is not foreseeable, is unavoidable, and its origin is not due to negligence or lack
of care on the part of the Supplier. Such events may include, but not be limited to, acts of the
Purchaser in its sovereign capacity, wars or revolutions, fires, floods, epidemics, quarantine
restrictions, and freight embargoes.
28.3 If a Force Majeure situation arises, the Supplier shall promptly notify the Purchaser in writing of
such condition and the cause thereof. Unless otherwise directed by the Purchaser in writing, the
Supplier shall continue to perform its obligations under the Contract as far as is reasonably
practical, and shall seek all reasonable alternative means for performance not prevented by the
Force Majeure event.
drawings, designs, or specifications, where Goods to be furnished under the Contract are to
be specifically manufactured for the Purchaser;
the method of shipment or packing;
the place of delivery; and
the Related Services to be provided by the Supplier.
29.2 If any such change causes an increase or decrease in the cost of, or the time required for, the
Suppliers performance of any provisions under the Contract, an equitable adjustment shall be
made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract
shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must
be asserted within twenty-eight (28) days from the date of the Suppliers receipt of the Purchasers
change order.
29.3 Prices to be charged by the Supplier for any Related Services that might be needed but which
were not included in the Contract shall be agreed upon in advance by the parties and shall not
exceed the prevailing rates charged to other parties by the Supplier for similar services.
29.4 Subject to the above, no variation in or modification of the terms of the Contract shall be made
58
30 Extensions of Time
30.1 If at any time during performance of the Contract, the Supplier or its subcontractors should
encounter conditions impeding timely delivery of the Goods or completion of Related Services
pursuant to GCC Clause 11, the Supplier shall promptly notify the Purchaser in writing of the
delay, its likely duration, and its cause. As soon as practicable after receipt of the Suppliers
notice, the Purchaser shall evaluate the situation and may at its discretion extend the Suppliers
time for performance, in which case the extension shall be ratified by the parties by amendment of
the Contract.
30.2 Except in case of Force Majeure, as provided under GCC Clause 28, a delay by the Supplier in the
performance of its Delivery and Completion obligations shall render the Supplier liable to the
imposition of liquidated damages pursuant to GCC Clause 24, unless an extension of time is
agreed upon, pursuant to GCC Sub-Clause 30.1.
31 Termination
31.1 Termination for Default
(a)
The Purchaser, without prejudice to any other remedy for breach of Contract, by written
notice of default sent to the Supplier, may terminate the Contract in whole or in part:
(i)
if the Supplier fails to deliver any or all of the Goods within the period specified in
the Contract, or within any extension thereof granted by the Purchaser pursuant to
GCC Clause 30;
(ii)
if the Supplier fails to perform any other obligation under the Contract; or
(iii)
(b)
if the Supplier, in the judgment of the Purchaser has engaged in fraud and corruption,
as defined in GCC Clause 3, in competing for or in executing the Contract.
In the event the Purchaser terminates the Contract in whole or in part, pursuant to GCC
Clause 31.1(a), the Purchaser may procure, upon such terms and in such manner as it
deems appropriate, Goods or Related Services similar to those undelivered or not
performed, and the Supplier shall be liable to the Purchaser for any additional costs for
such similar Goods or Related Services. However, the Supplier shall continue performance
of the Contract to the extent not terminated.
The Purchaser may at any time terminate the Contract by giving notice to the Supplier if
the Supplier becomes bankrupt or otherwise insolvent. In such event, termination will be
without compensation to the Supplier, provided that such termination will not prejudice or
affect any right of action or remedy that has accrued or will accrue thereafter to the
Purchaser
(b)
The Purchaser, by notice sent to the Supplier, may terminate the Contract, in whole or in
part, at any time for its convenience. The notice of termination shall specify that
termination is for the Purchasers convenience, the extent to which performance of the
Supplier under the Contract is terminated, and the date upon which such termination
becomes effective.
The Goods that are complete and ready for shipment within twenty-eight (28) days after the
59
to have any portion completed and delivered at the Contract terms and prices; and/or
(ii)
to cancel the remainder and pay to the Supplier an agreed amount for partially
completed Goods and Related Services and for materials and parts previously
procured by the Supplier.
32 Assignment
32.1 Neither the Purchaser nor the Supplier shall assign, in whole or in part, their obligations under this
Contract, except with prior written consent of the other party.
60
GCC 1.1(i)
GCC 5.1
The language shall be: [insert the name of the language ie English or Arabic]
GCC 7.1
GCC 11.1
GCC 14.1
Sample provision
GCC 14.1The method and conditions of payment to be made to the
Supplier under this Contract shall be as follows:
61
The payment-delay period after which the Purchaser shall pay interest to the
supplier shall be [insert number] days.
The interest rate that shall be applied is [insert number] %
GCC 16.1
GCC 16.3
GCC 16.4
GCC 21.2
The packing, marking and documentation within and outside the packages shall
be: [insert in detail the type of packing required, the markings in the packing
and all documentation required]
GCC 23.1
The inspections and tests shall be: [insert nature, frequency, procedures for
carrying out the inspections and tests]
GCC 23.2
The Inspections and tests shall be conducted at: [insert name(s) of location(s)]
GCC 25.1
62
GCC 24.1
GCC 25.3
The period of validity of the Warranty shall be: [insert number] days
For purposes of the Warranty, the place(s) of final destination(s) shall be:
[insert name(s) of location(s)]
GCC 25.5
The period for repair or replacement shall be: [insert number(s)] days.
63
64
1. Contract Agreement
[The successful Bidder shall fill in this form in accordance with the instructions indicated]
THIS CONTRACT AGREEMENT is made
the [ insert: number ] day of [ insert: month ], [ insert: year ].
BETWEEN
(1)
(2)
WHEREAS the Purchaser invited bids for certain Goods and ancillary services, viz., [insert brief
description of Goods and Services] and has accepted a Bid by the Supplier for the supply of
those Goods and Services in the sum of [insert Contract Price in words and figures] (hereinafter
called the Contract Price).
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:
1.
In this Agreement words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract referred to.
2.
The following documents shall constitute the Contract between the Purchaser and the
Supplier, and each shall be read and construed as an integral part of the Contract:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
65
3.
This Contract shall prevail over all other Contract documents. In the event of any
discrepancy or inconsistency within the Contract documents, then the documents shall
prevail in the order listed above.
4.
5.
The Purchaser hereby covenants to pay the Supplier in consideration of the provision of the
Goods and Services and the remedying of defects therein, the Contract Price or such other
sum as may become payable under the provisions of the Contract at the times and in the
manner prescribed by the Contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with the laws of Iraq on the day, month and year indicated above.
For and on behalf of the Purchaser
66
2. Performance Security
[The bank, as requested by the successful Bidder, shall fill in this form in accordance with the
instructions indicated]
Date: [insert date (as day, month, and year) of Bid Submission]
NCB No. and title: [insert no. and title of bidding process]
Banks Branch or Office: [insert complete name of Guarantor]
Beneficiary: [insert complete name of Purchaser]
PERFORMANCE GUARANTEE No.:
We have been informed that [insert complete name of Supplier] (hereinafter called "the
Supplier") has entered into Contract No. [insert number] dated [insert day and month], [insert
year] with you, for the supply of [description of Goods and related Services] (hereinafter called
"the Contract").
Furthermore, we understand that, according to the conditions of the Contract, a Performance
Guarantee is required.
At the request of the Supplier, we hereby irrevocably undertake to pay you any sum(s) not
exceeding [insert amount(s1) in figures and words] upon receipt by us of your first demand in
writing declaring the Supplier to be in default under the Contract, without cavil or argument, or
your needing to prove or to show grounds or reasons for your demand or the sum specified
therein.
This Guarantee shall expire no later than the [insert number] day of [insert month] [insert
year],2 and any demand for payment under it must be received by us at this office on or before
that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No.
458, except that subparagraph (ii) of Sub-article 20(a) is hereby excluded.
[signatures of authorized representatives of the bank and the Supplier]
1
2
The Bank shall insert the amount(s) specified in the SCC and denominated, as specified in the SCC.
Dates established in accordance with Clause 17.4 of the General Conditions of Contract (GCC), taking
into account any warranty obligations of the Supplier under Clause 15.2 of the GCC intended to be secured by
a partial Performance Guarantee. The Purchaser should note that in the event of an extension of the time to
perform the Contract, the Purchaser would need to request an extension of this Guarantee from the Bank. Such
request must be in writing and must be made prior to the expiration date established in the Guarantee. In
preparing this Guarantee, the Purchaser might consider adding the following text to the Form, at the end of the
penultimate paragraph: We agree to a one-time extension of this Guarantee for a period not to exceed [six
months] [one year], in response to the Purchasers written request for such extension, such request to be
presented to us before the expiry of the Guarantee.
67
The bank shall insert the amount(s) specified in the SCC and denominated, as specified in the SCC.
Insert the Delivery date stipulated in the Contract Delivery Schedule. The Purchaser should note that in the event
of an extension of the time to perform the Contract, the Purchaser would need to request an extension of this
Guarantee from the bank. Such request must be in writing and must be made prior to the expiration date
established in the Guarantee. In preparing this Guarantee, the Purchaser might consider adding the following text
to the Form, at the end of the penultimate paragraph: We agree to a one-time extension of this Guarantee for a
period not to exceed [six months][one year], in response to the Purchasers written request for such extension, such
request to be presented to us before the expiry of the Guarantee.
4