FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE

DESCRIPTION

PROJECT/JOB NO.

WEST SUMBAWA CFSPP PROJECT 2X7 MW

PROJECT/JOB NAME

PLTU SUMBAWA BARAT 2X7 MW

CLIENT NAME

PT PLN (Persero) UIP KITRING NUSRA

SITE NAME

TALIWANG

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

CHIMNEY STRUCTURE KSB

LOAD COMBINATION GROUP NAME


REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 1

FOUNDATION LISTS
Group Name

No.

CHIMNEYKSB

Description
F1

Copyright (c) GS E&C. All Rights Reserved

No.

Description

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 2

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 3

1. GENERAL
1.1 CODE & STANDARD
Items

Description

Design Code

American Concrete Institute (ACI 318) [Metric]

Horizontal Force for Wind

AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-02]

Horizontal Force for Seismic

AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-02]

Unit System

Input : MKS,

Output : MKS,

Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items

Value
2

Concrete (fck : compressive strength)

250.000 kgf/cm

Lean Concrete (Lfck : compressive strength)

150.000 kgf/cm

Reinforcement (10M ~ 16M , yield strength)

2400.000 kgf/cm

Reinforcement (19M ~ , yield strength)

3900.000 kgf/cm

2
2
2

Rs (Soil unit weight)

1.800 ton/m

Rc (Concrete unit weight)

2.400 ton/m

Es (Steel Modulus of Elasticity)

2.000 106 kgf/cm

Ec (Concrete Modulus of Elasticity)

235000.000 kgf/cm

3
2
2

- Pile Capacity
Items

Value

Pile Name

CHIMNEY KSB

Footing List

F1

Diameter

350 mm

Length

20 m

Thick

350 mm

Shape

Square

Capacity ( Ha , Ua , Va )

5 , 17 , 70 tonf

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items

Description

Allowable Increase of Soil (Wind)

0%

Allowable Increase of Soil (Seismic)

0%

Allowable Increase of Soil (Test)

0%

Allowable Increase of Pile Horizontal (Wind)

0%

Allowable Increase of Pile Horizontal (Seismic)

0%

Allowable Increase of Pile Horizontal (Test)

0%

Allowable Increase of Pile Vertical (Wind)

0%

Allowable Increase of Pile Vertical (Seismic)

0%

Allowable Increase of Pile Vertical (Test)

0%

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Allowable Increase of Pile Uplift (Wind)

0%

Allowable Increase of Pile Uplift (Seismic)

0%

Allowable Increase of Pile Uplift (Test)

0%

Safety factor against overturning for OVM1(FO1)

Safety factor against overturning for OVM2(FO2)

Safety factor against overturning for OVM3(FO3)

Safety factor against overturning for OVM4(FO4)

Safety factor against sliding for the SL1(FS1)

Safety factor against sliding for the SL2(FS2)

Safety factor against sliding for the SL3(FS3)

Safety factor against sliding for the SL4(FS4)

Friction factor (m)

0.35

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 4

1.4 LOAD COMBINATION


Comb . ID

Load Combination for stability

1000

1.0 SW + .75 DL + .75 Loadtype None Title Ll

2000

1.0 SW + .75 DL + .75 Loadtype Seismic Title Slx + .75 Loadtype None Title Ll

210

1.0 SW

220

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Wind Title Wlx

230

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Wind Title Wlz

240

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Wind Title Wlx

250

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Wind Title Wlz

260

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Seismic Title Slx + .22 Loadtype
Seismic Title Slz

270

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Seismic Title Slx + -.225 Loadtype
Seismic Title Slz

280

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Seismic Title Slx + -.225
Loadtype Seismic Title Slz

290

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + -.75 Loadtype Seismic Title Slx + .225 Loadtype
Seismic Title Slz

300

1.0 SW + .75 Loadtype Dead Title Dl + .75 Loadtype Live Title Ll + .75 Loadtype Seismic Title Slx + .225 Loadtype
Seismic Title Slz + .75 Loadtype None Title Cl6

3000

1.0 SW + .75 DL + -.75 Loadtype Seismic Title Slx

4000

1.0 SW + .75 DL + 1.0 Loadtype Seismic Title Slx

5000

1.0 SW + .75 DL + .75 Loadtype None Title Ll + .3 Loadtype None Title Slz

Comb . ID

Load Combination for Reinforcement

100

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wx

110

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wz

120

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ex

130

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ex

140

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ez

150

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ez

160

1.0 SW + .9 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wx

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 5

170

1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wx

180

1.0 SW + 1.0 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wz

190

1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wz

60

1.0 SW + 1.4 Loadtype Dead Title Dl

70

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll

80

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wx

90

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wz

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 6

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 7

REFERENCE DWGS
A01

NO.

DWG NO.

DWG TITLE

395

NOTES
* OUTPUT UNIT : mm

01
PLTU SUMBAWA BARAT 2X7 MW PROJECT

397

FOUNDATION LOCATION PLAN

SQUAD CHECK

CHIMNEY STRUCTURE KSB

396

PROCESS PIPING VESSELS STRUCT.

ELEC.

INST.

F1

SCALE

JOB NO.

MICROFILM NO.

WEST
AS SHOWN
SUMBAWA CFSPP PROJECT 2X7 MW

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 8

2.2 DETAIL SKETCH

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 9

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING
11000
1000

1000
1000

1000

4500x2

1
1

395

NOTES

3000x3

4500x2

11000

CL FOOTING

* PILE
16-350 CHIMNEY KSB
* OUTPUT UNIT : mm

397

396

1000

1000

1000

PLTU SUMBAWA BARAT 2X7 MW PROJECT

FOUNDATION DETAIL FOR


F1

1000
SQUAD CHECK

3000x3

FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT.

SCALE
REV. DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

DRWNCHKDAPPDAPPDAPPD

JOB NO.

ELEC.

INST.

MICROFILM NO.

WEST
AS SHOWN
SUMBAWA CFSPP PROJECT 2X7 MW

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 10

REFERENCE DWGS
NO.

DWG NO.

DWG TITLE

CL FOOTING
BOTTOM

50
TYP.

TOP

NOTES

16M@200

16M@200

* PILE
16-350 CHIMNEY KSB
* OUTPUT UNIT : mm

PLTU SUMBAWA BARAT 2X7 MW PROJECT

FOUNDATION DETAIL FOR


F1

16M@200
SQUAD CHECK

16M@200

REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT.

SCALE
REV. DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

DRWNCHKDAPPDAPPDAPPD

JOB NO.

ELEC.

INST.

MICROFILM NO.

WEST
AS SHOWN
SUMBAWA CFSPP PROJECT 2X7 MW

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 11

396

395

800

500

397

397

LEAN CONC. 50 THK


2

396

ELEVATION S1 - X

OUTPUT UNIT : mm
Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Page 12

Item No.

2
600
50
TYP.

62.5
475

13M

396

397
3500
50
TYP.

62.5

70-19M

Copyright (c) GS E&C. All Rights Reserved

19M

13M 100
@150
70

30 GR.
800

13M 100
@150
70

75 PR.
19M

75

800

30 GR.

10-19M

13M

75

62.5

13M

1512.5 1512.5
475

75 PR.

475

475

62.5

62.5

50
TYP.

1512.5 1512.5
475

600

75 PR.

13M 100
@150
70

800

19M

75

75

75

19M

30 GR.

75 PR.

13M 100
@150
70

800

13M 100
@150
70

800

19M

62.5
475

10-19M
30 GR.

10-19M
30 GR.

10-19M

62.5

62.5

13M
62.5

13M

62.5

62.5

50
TYP.

475

600
50
TYP.

62.5

600

395

475

F1

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 13

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name

11000

395

11000

MAT

Area

121.000 m

Ft. Thickness

800.00 mm

Ft. Volume

96.800 m

Ft. Weight

232.320 tonf

Soil Height

500.00 mm

Soil Volume

55.124 m

Soil Weight

99.223 tonf

Buoyancy

Not Consider

Self Weight (except Pr.SW)

331.543 tonf

396

800

Ft. Type

500
800

397

F1

The Origin coordinate


The Center of Gravity & Pile (0,0) mm

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )

Ft.Name

F1

Pr.Name

Shape

Pl

Pw

Ph

Circle

600.000

600.000

800.000

0.283

0.543

-4500.000

4500.000

Circle

600.000

600.000

800.000

0.283

0.543

-4500.000

-4500.000

395

Circle

600.000

600.000

800.000

0.283

0.543

4500.000

4500.000

396

Circle

600.000

600.000

800.000

0.283

0.543

4500.000

-4500.000

397

Circle

3500.000

3500.000

800.000

9.621

18.473

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

Area

Weight

Off X

Off Y

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 14

3.3 SECTION DATA


Ft.Name / Sec.Name

F1 / S1
Unit : mm

11000

11000

Direction

All Direct

F.Volume

96.800 m

Section Area

121.000 m

F.Weight

232.320 tonf

S.Volume

55.124 m

S.Weight

99.223 tonf

Pier Wt

20.644 tonf

Total Weight

352.187 tonf

3.4 LOAD CASE


Fz
Fy

Mz

Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
based on the right hand rule.

My
Fx
Mx

Index

Load Case Name

SW

Loadtype Seismic Title Slx

Loadtype None Title Dl

Loadtype None Title Ll

Loadtype None Title Wlx

Loadtype None Title Slz

DL

Unit( tonf , tonf-m )

Ft.Name

Pr.Name

1
F1

Load Case

Fx

Fy

Fz

Mx

My

0.000

0.000

-0.543

0.000

0.000

12.500

-3.137

89.625

0.000

0.000

-0.687

0.592

-11.436

0.000

0.000

-0.338

0.261

-7.435

0.000

0.000

5.767

-1.416

40.465

0.000

0.000

0.862

-2.567

19.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

-0.543

0.000

0.000

12.506

3.140

89.653

0.000

0.000

-0.687

-0.592

-11.436

0.000

0.000

-0.338

-0.261

-7.435

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

395

396

397

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 15

5.770

1.418

40.480

0.000

0.000

-0.862

-2.567

-19.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

-0.543

0.000

0.000

12.500

3.137

-89.625

0.000

0.000

0.687

0.592

-11.436

0.000

0.000

0.338

0.261

-7.435

0.000

0.000

5.767

1.416

-40.465

0.000

0.000

-0.862

-2.567

19.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

-0.543

0.000

0.000

12.506

-3.140

-89.653

0.000

0.000

0.687

-0.592

-11.436

0.000

0.000

0.338

-0.261

-7.435

0.000

0.000

5.770

-1.418

-40.480

0.000

0.000

0.862

-2.567

-19.141

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

-18.473

0.000

0.000

0.000

0.000

-90.000

0.000

0.000

0.000

0.000

-331.543

0.000

0.000

Footing SW

3.5 LOAD COMBINATION


In Pier Top
without Self Weight

In Footing Bottom
with Pier Self Weight,
But without Footing Self Weight,

In Footing Bottom Center


with Pier & Footing Self Weight & Soil Weight,
Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.5.1 Load Combination in Pier Top (Without SW)


Ft.Name

SFx

SFy

SFz

SMx

SMy

1000

-0.253

0.196

-5.576

0.000

0.000

2000

9.122

-2.157

61.643

0.000

0.000

210

0.000

0.000

0.000

0.000

0.000

220

0.000

0.000

0.000

0.000

0.000

230

0.000

0.000

0.000

0.000

0.000

240

0.000

0.000

0.000

0.000

0.000

250

0.000

0.000

0.000

0.000

0.000

260

9.375

-2.353

67.219

0.000

0.000

270

9.375

-2.353

67.219

0.000

0.000

280

-9.375

2.353

-67.219

0.000

0.000

290

-9.375

2.353

-67.219

0.000

0.000

300

9.375

-2.353

67.219

0.000

0.000

Pr.Name L.Comb.

F1

Unit( tonf , tonf-m )

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

395

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 16

3000

-9.375

2.353

-67.219

0.000

0.000

4000

12.500

-3.137

89.625

0.000

0.000

5000

0.005

-0.574

0.166

0.000

0.000

100

0.000

0.000

0.000

0.000

0.000

110

0.000

0.000

0.000

0.000

0.000

120

0.000

0.000

0.000

0.000

0.000

130

0.000

0.000

0.000

0.000

0.000

140

0.000

0.000

0.000

0.000

0.000

150

0.000

0.000

0.000

0.000

0.000

160

0.000

0.000

0.000

0.000

0.000

170

0.000

0.000

0.000

0.000

0.000

180

0.000

0.000

0.000

0.000

0.000

190

0.000

0.000

0.000

0.000

0.000

60

0.000

0.000

0.000

0.000

0.000

70

0.000

0.000

0.000

0.000

0.000

80

0.000

0.000

0.000

0.000

0.000

90

0.000

0.000

0.000

0.000

0.000

1000

-0.253

-0.196

-5.576

0.000

0.000

2000

9.126

2.159

61.663

0.000

0.000

210

0.000

0.000

0.000

0.000

0.000

220

0.000

0.000

0.000

0.000

0.000

230

0.000

0.000

0.000

0.000

0.000

240

0.000

0.000

0.000

0.000

0.000

250

0.000

0.000

0.000

0.000

0.000

260

9.379

2.355

67.240

0.000

0.000

270

9.379

2.355

67.240

0.000

0.000

280

-9.379

-2.355

-67.240

0.000

0.000

290

-9.379

-2.355

-67.240

0.000

0.000

300

9.379

2.355

67.240

0.000

0.000

3000

-9.379

-2.355

-67.240

0.000

0.000

4000

12.506

3.140

89.653

0.000

0.000

5000

-0.512

-0.966

-11.319

0.000

0.000

100

0.000

0.000

0.000

0.000

0.000

110

0.000

0.000

0.000

0.000

0.000

120

0.000

0.000

0.000

0.000

0.000

130

0.000

0.000

0.000

0.000

0.000

140

0.000

0.000

0.000

0.000

0.000

150

0.000

0.000

0.000

0.000

0.000

160

0.000

0.000

0.000

0.000

0.000

170

0.000

0.000

0.000

0.000

0.000

180

0.000

0.000

0.000

0.000

0.000

190

0.000

0.000

0.000

0.000

0.000

60

0.000

0.000

0.000

0.000

0.000

70

0.000

0.000

0.000

0.000

0.000

80

0.000

0.000

0.000

0.000

0.000

90

0.000

0.000

0.000

0.000

0.000

1000

0.253

0.196

-5.576

0.000

0.000

2000

9.628

2.549

-72.795

0.000

0.000

210

0.000

0.000

0.000

0.000

0.000

220

0.000

0.000

0.000

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

396

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 17

230

0.000

0.000

0.000

0.000

0.000

240

0.000

0.000

0.000

0.000

0.000

250

0.000

0.000

0.000

0.000

0.000

260

9.375

2.353

-67.219

0.000

0.000

270

9.375

2.353

-67.219

0.000

0.000

280

-9.375

-2.353

67.219

0.000

0.000

290

-9.375

-2.353

67.219

0.000

0.000

300

9.375

2.353

-67.219

0.000

0.000

3000

-9.375

-2.353

67.219

0.000

0.000

4000

12.500

3.137

-89.625

0.000

0.000

5000

-0.005

-0.574

0.166

0.000

0.000

100

0.000

0.000

0.000

0.000

0.000

110

0.000

0.000

0.000

0.000

0.000

120

0.000

0.000

0.000

0.000

0.000

130

0.000

0.000

0.000

0.000

0.000

140

0.000

0.000

0.000

0.000

0.000

150

0.000

0.000

0.000

0.000

0.000

160

0.000

0.000

0.000

0.000

0.000

170

0.000

0.000

0.000

0.000

0.000

180

0.000

0.000

0.000

0.000

0.000

190

0.000

0.000

0.000

0.000

0.000

60

0.000

0.000

0.000

0.000

0.000

70

0.000

0.000

0.000

0.000

0.000

80

0.000

0.000

0.000

0.000

0.000

90

0.000

0.000

0.000

0.000

0.000

1000

0.253

-0.196

-5.576

0.000

0.000

2000

9.633

-2.551

-72.816

0.000

0.000

210

0.000

0.000

0.000

0.000

0.000

220

0.000

0.000

0.000

0.000

0.000

230

0.000

0.000

0.000

0.000

0.000

240

0.000

0.000

0.000

0.000

0.000

250

0.000

0.000

0.000

0.000

0.000

260

9.379

-2.355

-67.240

0.000

0.000

270

9.379

-2.355

-67.240

0.000

0.000

280

-9.379

2.355

67.240

0.000

0.000

290

-9.379

2.355

67.240

0.000

0.000

300

9.379

-2.355

-67.240

0.000

0.000

3000

-9.379

2.355

67.240

0.000

0.000

4000

12.506

-3.140

-89.653

0.000

0.000

5000

0.512

-0.966

-11.319

0.000

0.000

100

0.000

0.000

0.000

0.000

0.000

110

0.000

0.000

0.000

0.000

0.000

120

0.000

0.000

0.000

0.000

0.000

130

0.000

0.000

0.000

0.000

0.000

140

0.000

0.000

0.000

0.000

0.000

150

0.000

0.000

0.000

0.000

0.000

160

0.000

0.000

0.000

0.000

0.000

170

0.000

0.000

0.000

0.000

0.000

180

0.000

0.000

0.000

0.000

0.000

190

0.000

0.000

0.000

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

397

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 18

60

0.000

0.000

0.000

0.000

0.000

70

0.000

0.000

0.000

0.000

0.000

80

0.000

0.000

0.000

0.000

0.000

90

0.000

0.000

0.000

0.000

0.000

1000

0.000

0.000

-67.500

0.000

0.000

2000

0.000

0.000

-67.500

0.000

0.000

210

0.000

0.000

0.000

0.000

0.000

220

0.000

0.000

0.000

0.000

0.000

230

0.000

0.000

0.000

0.000

0.000

240

0.000

0.000

0.000

0.000

0.000

250

0.000

0.000

0.000

0.000

0.000

260

0.000

0.000

0.000

0.000

0.000

270

0.000

0.000

0.000

0.000

0.000

280

0.000

0.000

0.000

0.000

0.000

290

0.000

0.000

0.000

0.000

0.000

300

0.000

0.000

0.000

0.000

0.000

3000

0.000

0.000

-67.500

0.000

0.000

4000

0.000

0.000

-67.500

0.000

0.000

5000

0.000

0.000

-67.500

0.000

0.000

100

0.000

0.000

0.000

0.000

0.000

110

0.000

0.000

0.000

0.000

0.000

120

0.000

0.000

0.000

0.000

0.000

130

0.000

0.000

0.000

0.000

0.000

140

0.000

0.000

0.000

0.000

0.000

150

0.000

0.000

0.000

0.000

0.000

160

0.000

0.000

0.000

0.000

0.000

170

0.000

0.000

0.000

0.000

0.000

180

0.000

0.000

0.000

0.000

0.000

190

0.000

0.000

0.000

0.000

0.000

60

0.000

0.000

0.000

0.000

0.000

70

0.000

0.000

0.000

0.000

0.000

80

0.000

0.000

0.000

0.000

0.000

90

0.000

0.000

0.000

0.000

0.000

3.5.2 Load Combination in Footing Bottom (With Pier SW)


Ft.Name
F1

Unit( tonf , tonf-m )

SFx

SFy

SFz

SMx

SMy

1000

-0.253

0.196

-6.119

-0.313

-0.406

2000

9.122

-2.157

61.100

3.451

14.594

210

0.000

0.000

-0.543

0.000

0.000

220

0.000

0.000

-0.543

0.000

0.000

230

0.000

0.000

-0.543

0.000

0.000

240

0.000

0.000

-0.543

0.000

0.000

250

0.000

0.000

-0.543

0.000

0.000

260

9.375

-2.353

66.676

3.764

15.000

270

9.375

-2.353

66.676

3.764

15.000

280

-9.375

2.353

-67.762

-3.764

-15.000

290

-9.375

2.353

-67.762

-3.764

-15.000

300

9.375

-2.353

66.676

3.764

15.000

Pr.Name L.Comb.

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

395

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 19

3000

-9.375

2.353

-67.762

-3.764

-15.000

4000

12.500

-3.137

89.082

5.019

20.000

5000

0.005

-0.574

-0.377

0.919

0.008

100

0.000

0.000

-0.543

0.000

0.000

110

0.000

0.000

-0.543

0.000

0.000

120

0.000

0.000

-0.543

0.000

0.000

130

0.000

0.000

-0.543

0.000

0.000

140

0.000

0.000

-0.543

0.000

0.000

150

0.000

0.000

-0.543

0.000

0.000

160

0.000

0.000

-0.543

0.000

0.000

170

0.000

0.000

-0.543

0.000

0.000

180

0.000

0.000

-0.543

0.000

0.000

190

0.000

0.000

-0.543

0.000

0.000

60

0.000

0.000

-0.543

0.000

0.000

70

0.000

0.000

-0.543

0.000

0.000

80

0.000

0.000

-0.543

0.000

0.000

90

0.000

0.000

-0.543

0.000

0.000

1000

-0.253

-0.196

-6.119

0.313

-0.406

2000

9.126

2.159

61.121

-3.455

14.602

210

0.000

0.000

-0.543

0.000

0.000

220

0.000

0.000

-0.543

0.000

0.000

230

0.000

0.000

-0.543

0.000

0.000

240

0.000

0.000

-0.543

0.000

0.000

250

0.000

0.000

-0.543

0.000

0.000

260

9.379

2.355

66.697

-3.768

15.007

270

9.379

2.355

66.697

-3.768

15.007

280

-9.379

-2.355

-67.783

3.768

-15.007

290

-9.379

-2.355

-67.783

3.768

-15.007

300

9.379

2.355

66.697

-3.768

15.007

3000

-9.379

-2.355

-67.783

3.768

-15.007

4000

12.506

3.140

89.110

-5.024

20.010

5000

-0.512

-0.966

-11.861

1.545

-0.819

100

0.000

0.000

-0.543

0.000

0.000

110

0.000

0.000

-0.543

0.000

0.000

120

0.000

0.000

-0.543

0.000

0.000

130

0.000

0.000

-0.543

0.000

0.000

140

0.000

0.000

-0.543

0.000

0.000

150

0.000

0.000

-0.543

0.000

0.000

160

0.000

0.000

-0.543

0.000

0.000

170

0.000

0.000

-0.543

0.000

0.000

180

0.000

0.000

-0.543

0.000

0.000

190

0.000

0.000

-0.543

0.000

0.000

60

0.000

0.000

-0.543

0.000

0.000

70

0.000

0.000

-0.543

0.000

0.000

80

0.000

0.000

-0.543

0.000

0.000

90

0.000

0.000

-0.543

0.000

0.000

1000

0.253

0.196

-6.119

-0.313

0.406

2000

9.628

2.549

-73.338

-4.078

15.406

210

0.000

0.000

-0.543

0.000

0.000

220

0.000

0.000

-0.543

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

396

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 20

230

0.000

0.000

-0.543

0.000

0.000

240

0.000

0.000

-0.543

0.000

0.000

250

0.000

0.000

-0.543

0.000

0.000

260

9.375

2.353

-67.762

-3.764

15.000

270

9.375

2.353

-67.762

-3.764

15.000

280

-9.375

-2.353

66.676

3.764

-15.000

290

-9.375

-2.353

66.676

3.764

-15.000

300

9.375

2.353

-67.762

-3.764

15.000

3000

-9.375

-2.353

66.676

3.764

-15.000

4000

12.500

3.137

-90.168

-5.019

20.000

5000

-0.005

-0.574

-0.377

0.919

-0.008

100

0.000

0.000

-0.543

0.000

0.000

110

0.000

0.000

-0.543

0.000

0.000

120

0.000

0.000

-0.543

0.000

0.000

130

0.000

0.000

-0.543

0.000

0.000

140

0.000

0.000

-0.543

0.000

0.000

150

0.000

0.000

-0.543

0.000

0.000

160

0.000

0.000

-0.543

0.000

0.000

170

0.000

0.000

-0.543

0.000

0.000

180

0.000

0.000

-0.543

0.000

0.000

190

0.000

0.000

-0.543

0.000

0.000

60

0.000

0.000

-0.543

0.000

0.000

70

0.000

0.000

-0.543

0.000

0.000

80

0.000

0.000

-0.543

0.000

0.000

90

0.000

0.000

-0.543

0.000

0.000

1000

0.253

-0.196

-6.119

0.313

0.406

2000

9.633

-2.551

-73.359

4.081

15.413

210

0.000

0.000

-0.543

0.000

0.000

220

0.000

0.000

-0.543

0.000

0.000

230

0.000

0.000

-0.543

0.000

0.000

240

0.000

0.000

-0.543

0.000

0.000

250

0.000

0.000

-0.543

0.000

0.000

260

9.379

-2.355

-67.783

3.768

15.007

270

9.379

-2.355

-67.783

3.768

15.007

280

-9.379

2.355

66.697

-3.768

-15.007

290

-9.379

2.355

66.697

-3.768

-15.007

300

9.379

-2.355

-67.783

3.768

15.007

3000

-9.379

2.355

66.697

-3.768

-15.007

4000

12.506

-3.140

-90.196

5.024

20.010

5000

0.512

-0.966

-11.861

1.545

0.819

100

0.000

0.000

-0.543

0.000

0.000

110

0.000

0.000

-0.543

0.000

0.000

120

0.000

0.000

-0.543

0.000

0.000

130

0.000

0.000

-0.543

0.000

0.000

140

0.000

0.000

-0.543

0.000

0.000

150

0.000

0.000

-0.543

0.000

0.000

160

0.000

0.000

-0.543

0.000

0.000

170

0.000

0.000

-0.543

0.000

0.000

180

0.000

0.000

-0.543

0.000

0.000

190

0.000

0.000

-0.543

0.000

0.000

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

397

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 21

60

0.000

0.000

-0.543

0.000

0.000

70

0.000

0.000

-0.543

0.000

0.000

80

0.000

0.000

-0.543

0.000

0.000

90

0.000

0.000

-0.543

0.000

0.000

1000

0.000

0.000

-85.973

0.000

0.000

2000

0.000

0.000

-85.973

0.000

0.000

210

0.000

0.000

-18.473

0.000

0.000

220

0.000

0.000

-18.473

0.000

0.000

230

0.000

0.000

-18.473

0.000

0.000

240

0.000

0.000

-18.473

0.000

0.000

250

0.000

0.000

-18.473

0.000

0.000

260

0.000

0.000

-18.473

0.000

0.000

270

0.000

0.000

-18.473

0.000

0.000

280

0.000

0.000

-18.473

0.000

0.000

290

0.000

0.000

-18.473

0.000

0.000

300

0.000

0.000

-18.473

0.000

0.000

3000

0.000

0.000

-85.973

0.000

0.000

4000

0.000

0.000

-85.973

0.000

0.000

5000

0.000

0.000

-85.973

0.000

0.000

100

0.000

0.000

-18.473

0.000

0.000

110

0.000

0.000

-18.473

0.000

0.000

120

0.000

0.000

-18.473

0.000

0.000

130

0.000

0.000

-18.473

0.000

0.000

140

0.000

0.000

-18.473

0.000

0.000

150

0.000

0.000

-18.473

0.000

0.000

160

0.000

0.000

-18.473

0.000

0.000

170

0.000

0.000

-18.473

0.000

0.000

180

0.000

0.000

-18.473

0.000

0.000

190

0.000

0.000

-18.473

0.000

0.000

60

0.000

0.000

-18.473

0.000

0.000

70

0.000

0.000

-18.473

0.000

0.000

80

0.000

0.000

-18.473

0.000

0.000

90

0.000

0.000

-18.473

0.000

0.000

3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p

Ft.Name
F1

L.Comb.

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

SMy

C.G. of Loads

1000

0.000

0.000

-441.992

0.000

0.000

5500.0 , 5500.0

2000

37.509

0.000

-441.992

0.000

1270.141

8237.9 , 5500.0

210

0.000

0.000

-352.187

0.000

0.000

5500.0 , 5500.0

220

0.000

0.000

-352.187

0.000

0.000

5500.0 , 5500.0

230

0.000

0.000

-352.187

0.000

0.000

5500.0 , 5500.0

240

0.000

0.000

-352.187

0.000

0.000

5500.0 , 5500.0

250

0.000

0.000

-352.187

0.000

0.000

5500.0 , 5500.0

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 22

260

37.509

0.000

-352.187

0.000

1270.141

8936.0 , 5500.0

270

37.509

0.000

-352.187

0.000

1270.141

8936.0 , 5500.0

280

-37.509

0.000

-352.187

0.000

-1270.141

2064.0 , 5500.0

290

-37.509

0.000

-352.187

0.000

-1270.141

2064.0 , 5500.0

300

37.509

0.000

-352.187

0.000

1270.141

8936.0 , 5500.0

3000

-37.509

0.000

-419.687

0.000

-1270.141

2616.6 , 5500.0

4000

50.012

0.000

-419.687

0.000

1693.521

9344.5 , 5500.0

5000

0.000

-3.080

-441.992

108.290

0.000

5500.0 , 5266.1

Load Combination of Ultimate Condition


: PileType
- C.G. of Load is coordinate from left bottom. Unit : mm
p

Ft.Name

F1 p

Sec.Nam L.Comb.

SFx

Unit( tonf , tonf-m )

SFy

SFz

SMx

SMy

C.G. of Loads

100

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

110

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

120

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

130

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

140

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

150

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

160

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

170

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

180

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

190

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

60

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

70

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

80

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

90

0.000

0.000

-20.644

0.000

0.000

5500.0 , 5500.0

S1

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 23

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Bi-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz
SMy X
SMx Y
a. Vertical - Bi Axial : R =
2
2
S Xi
S Yi
Np
- Ru = Rmax
- Uf = Min[ 0 , Rmin ]
- Ru < Va => OK
2
2
(SHxi + SHyi )
b. Horizontal - Hmax =
< Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


Ft.Name

Np(EA)

Fl (mm)

Fw (mm)

SXi (m )

SYi (m )

F1

16

11000

11000

180

180

Unit( tonf )

Ft.Name

L.Comb.

Pile

R Max

R Min

Ru

Uf

Ra

Ua

Result

F1

4000

CHIMNEY

68.568

-16.108

68.568

-16.108

70

17

OK

4.1.3 Check Of Horizontal Reaction


Ft.Name

L.Comb.

Pile

Hmax (tonf)

Ha (tonf)

Result

F1

4000

CHIMNEY
KSB

3.126

OK

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 24

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data

Unit( mm , tonf , tonf-m )

Ft.Name Sec.Nam

Dir.

L.Comb.

Fl or Fw

Sl or Sw

SFz

SM

SQ

100

11000.00

11000.00

20.644

0.00

20.644

110

11000.00

11000.00

20.644

0.00

20.644

120

11000.00

11000.00

20.644

0.00

20.644

130

11000.00

11000.00

20.644

0.00

20.644

140

11000.00

11000.00

20.644

0.00

20.644

150

11000.00

11000.00

20.644

0.00

20.644

160

11000.00

11000.00

20.644

0.00

20.644

170

11000.00

11000.00

20.644

0.00

20.644

180

11000.00

11000.00

20.644

0.00

20.644

190

11000.00

11000.00

20.644

0.00

20.644

60

11000.00

11000.00

20.644

0.00

20.644

70

11000.00

11000.00

20.644

0.00

20.644

80

11000.00

11000.00

20.644

0.00

20.644

F1 p

S1

S1

90

11000.00

11000.00

20.644

0.00

20.644

100

11000.00

11000.00

20.644

0.000

20.644

110

11000.00

11000.00

20.644

0.000

20.644

120

11000.00

11000.00

20.644

0.000

20.644

130

11000.00

11000.00

20.644

0.000

20.644

140

11000.00

11000.00

20.644

0.000

20.644

150

11000.00

11000.00

20.644

0.000

20.644

160

11000.00

11000.00

20.644

0.000

20.644

170

11000.00

11000.00

20.644

0.000

20.644

180

11000.00

11000.00

20.644

0.000

20.644

190

11000.00

11000.00

20.644

0.000

20.644

60

11000.00

11000.00

20.644

0.000

20.644

70

11000.00

11000.00

20.644

0.000

20.644

80

11000.00

11000.00

20.644

0.000

20.644

90

11000.00

11000.00

20.644

0.000

20.644

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 25

5.1.2 Design Parameters


Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing
2

Unit(kgf/cm ,mm)

f(Flexure)

f(Shear)

fck

fy1

fy2

f_cl

f_clt

fp_clb

0.9

0.75

250.00

2400.00

3900.00

50.0

50.0

150.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement
---- ACI CODE 7.12.2
As As1 = fac b h
, fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used .......................................................................................................
fy
- Required Reinforcement by Analysis
As As2 = r.req b d
- At every section of flexural members where tensile reinforcement is required
3 fck
200
As (As5 =
bw d) (As4 =
b d)
---- ACI Eq (10-3)
fy
fy
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis
---- ACI CODE 10.5.3
As3 = 1.333 r.req b d
Asmax = 0.75 rb b d
fck
0.003 Es
rb = 0.85 b 1
fy
0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu
0.85 fck
2Rn
Rn =
, r.req =
1- 12 , f = 0.9
fbd
fy
0.85fck

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 26

5.2.2 Check of Footing Reinforcement


Footing Name : F1
GroupType : Mat_Foundation
- X direction (Unit Width)

Sec.Name

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

90

top

5 - 16M @ 200

7.150

1.000

74.200

10.053

90

botom

5 - 16M @ 200

5.500

1.000

64.200

10.053

S1

Sec.Name

Mu (tonf-m)

Rn

r.Req

90

top

0.198

0.040

0.0000

90

bottom

L.Comb.

S1

Sec.Name

Using Bar (mm)

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

90

top

8.000

0.124

0.165

43.473

38.885

299.160

90

bottom

8.000

37.614

33.644

258.842

S1

Sec.Name

L.Comb.

Using As(cm )

Select As(cm )

Result

90

top

10.053

8.000

OK

90

bottom

10.053

8.000

OK

S1

- Y direction (Unit Width)

Sec.Name

L.Comb.

Loc. (m)

Width b (m)

d (cm)

As (cm )

90

top

5 - 16M @ 200

7.150

1.000

72.600

10.053

90

botom

5 - 16M @ 200

5.500

1.000

62.600

10.053

S1

Sec.Name

L.Comb.

Mu (tonf-m)

Rn

r.Req

90

top

0.198

0.042

0.0000

90

bottom

S1

Sec.Name

Using Bar (mm)

L.Comb.

As1(cm )

As2(cm )

As3(cm )

As4(cm )

As5(cm )

Asmax(cm )

90

top

8.000

0.126

0.168

42.536

38.047

292.709

90

bottom

8.000

36.677

32.806

252.391

S1

Sec.Name

L.Comb.

Using As(cm )

Select As(cm )

Result

90

top

10.053

8.000

OK

90

bottom

10.053

8.000

OK

S1

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 27

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.75 2 fck B'w d
(eq 11-3)
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F1

GroupType : Mat_Foundation

PileType : True

Unit : mm
11000

395

9092

11000

397

396

9092

- X direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

100

Loc. (mm)

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

9092

642

1000

40.373

0.07

OK

Loc. (mm)

d (mm)

Bw (mm)

fVc (tonf)

Vu (tonf)

Result

9092

626

1000

39.367

0.07

OK

- Y direction One-Way Shear (Unit Width)

Sec.Name L.Comb.
S1

100

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Foundation

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 28

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.75 2 (1 + 2/b c) fck bo d
(eq 11-33) <- Vc1
(b) f Vc2 = 0.75 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.75 4 fck bo d
(eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3)
ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear


Ft.Name
11000

Pr.Name

90 f Vc2

1043.525 tonf

Pl

3500 mm f Vc3

1050.278 tonf

Pw

3500 mm f Vc

1043.525 tonf

11000

L.Comb.

397

396

bo / d
bc / as

5.5 PILE PUNCHING SHEAR FORCE


5.5.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.75 2 (1 + 2/bc)

fck bo d

(b) f Vc2 = 0.75 2 (1 + as d / 2 b o)


(c) f Vc3 = 0.75 4

fck bo d

f Vc = Min(f Vc1 , f Vc2 , f Vc3)


Vu

(eq 11-33)

fck bo d (eq 11-34)


(eq 11-35)

<- Vc1
<- Vc2

<- Vc3

ACI 318-05 CODE 11.12.2.1

f Vc , then OK

where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved

14.941 / 16
1575.416 tonf

395

397 Pile effect

134527.800 cm

Circle f Vc1

Shape
1

F1 Punching Area

13007.25 / 642 mm Vu
1 / 40 Result

17.250 tonf

OK

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Foundation

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 29

5.5.2 Check of Pile Punching Shear


Ft.Name
11000

Pile No.

13

14

15

16

10

11

12

Shape

11000

L.Comb.
PileName
5

Diameter
1

bo
d

Copyright (c) GS E&C. All Rights Reserved

F1 Punching Area
1 bc / as

9840.641 cm

1 / 40

Square f Vc1

480.598 tonf

100 f Vc2

678.586 tonf

CHIMNEY KSB f Vc3

320.398 tonf

350mm f Vc
3968mm Vu
642mm Result

320.398 tonf
22.012 tonf

OK

COLUMN CALCULATION SHEET


One-Stop Solution for Column

TITLE

DESCRIPTION

PROJECT/JOB NO.

WEST SUMBAWA CFSPP PROJECT 2X7 MW

PROJECT/JOB NAME

PLTU SUMBAWA BARAT 2X7 MW

CLIENT NAME

PT PLN (Persero) UIP KITRING NUSRA

SITE NAME

TALIWANG

DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME

CHIMNEY STRUCTURE KSB

GROUP NAME
LOADCOMBINATION GROUP NAME
REV

DATE

Copyright (c) GS E&C. All Rights Reserved

DESCRIPTION

PREP'D

CHK'D

APPR'D

APPR'D

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

CONTENTS
1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA

2. PM DIAGRAM
2.1 FORMULA
2.2 PM DIAGRAM & ANALYSIS
2.3 ANALYSIS & RESULT
2.4 DETAIL PM DIAGRAM

3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 1

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 2

1. INPUT DATA
1.1 General
Design Code

American Concrete Institute (ACI 318) [Metric]

Input Unit

MKS

f Bending

Output Unit

f Axial
0.9

fck

fy (10M ~ 16M)
2

250 kgf/cm

f Sprial reinf.
0.9

2400 kgf/cm

MKS

f Tied reinf.

0.7

Ec

fy (19M ~)
2

3900 kgf/cm

f Shear

0.65

Es
2

235000 kgf/cm

2000000 kgf/cm

0.75

Steel Db

Cover

ASTM A615 (M)

50 mm

1.2 Pier Data


600

50

Pier Name

Ver Bar

19M, 10 EA

Pier Shape

Circle

Tie Bar

Width

600 mm

Fck

250 kgf/cm

Length

600 mm

fy

3900 kgf/cm

Height

800 mm

Using As

28.35 cm

dy

dx
Main Bar
Bar Check
600

Bar Check
600

Main Bar
Bar Check

3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm


Reinforcrment Area is OK
50

Pier Name

Ver Bar

19M, 10 EA

Pier Shape

Circle

Tie Bar

Width

600 mm

Fck

250 kgf/cm

Length

600 mm

fy

3900 kgf/cm

Height

800 mm

Using As

28.35 cm

dx
Main Bar

dy

Pier Name

395

Ver Bar

19M, 10 EA

Pier Shape

Circle

Tie Bar

Width

600 mm

Fck

250 kgf/cm

Length

600 mm

fy

3900 kgf/cm

Height

800 mm

Using As

28.35 cm

dx

dy

3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm


Reinforcrment Area is OK
50

3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm


Reinforcrment Area is OK

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

600

50

Bar Check
3500

Main Bar
Bar Check

Client : PT PLN (Persero)... Page 3

Pier Name

396

Ver Bar

19M, 10 EA

Pier Shape

Circle

Tie Bar

Width

600 mm

Fck

250 kgf/cm

Length

600 mm

fy

3900 kgf/cm

Height

800 mm

Using As

28.35 cm

dx
Main Bar

Project No. : WEST SUMBAWA CFSPP PR..

dy

Pier Name

397

Ver Bar

19M, 70 EA

Pier Shape

Circle

Tie Bar

Width

3500 mm

Fck

250 kgf/cm

Length

3500 mm

fy

3900 kgf/cm

Height

800 mm

Using As

198.47 cm

dx

dy

3 EA , Area = 28.353cm , Amin (1%) = 28.3cm , Amax (5%) = 141.4cm


Reinforcrment Area is OK
50

18 EA , Area = 198.47cm2 , Amin (1%) = 962.1cm2 , Amax (5%) = 4810.6cm2


Reinforcrment Area is too small

1.3 Loading Data


1.3.1 Load Case
Pier Name

395

396

Unit( tonf , tonf-m )

Name

Fx

Fy

Fz

SW
Loadtype Seismic

12.5

Loadtype None Title Dl

-0.687

Loadtype None Title Ll


Loadtype None Title

Mx

My

-0.543

-3.137

89.625

0.592

-11.436

-0.338

0.261

-7.435

5.767

-1.416

40.465

Loadtype None Title

0.862

-2.567

19.141

DL

SW
Loadtype Seismic

-0.543

12.506

3.14

89.653

Loadtype None Title Dl

-0.687

-0.592

-11.436

Loadtype None Title Ll


Loadtype None Title

-0.338

-0.261

-7.435

5.77

1.418

40.48

Loadtype None Title

-0.862

-2.567

-19.141

DL

SW
Loadtype Seismic

-0.543

12.5

3.137

-89.625

Loadtype None Title Dl

0.687

0.592

-11.436

Loadtype None Title Ll


Loadtype None Title

0.338

0.261

-7.435

5.767

1.416

-40.465

Loadtype None Title

-0.862

-2.567

19.141

DL

SW

-0.543

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 4

Loadtype Seismic

12.506

-3.14

-89.653

Loadtype None Title Dl

0.687

-0.592

-11.436

Loadtype None Title Ll


Loadtype None Title

0.338

-0.261

-7.435

5.77

-1.418

-40.48

Loadtype None Title

0.862

-2.567

-19.141

DL

SW

-18.473

DL

-90

397

1.3.2 Load Combination List


Comb . ID

Load Combination for Reinforcement

100

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wx

110

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.3 Loadtype Wind Title Wz

120

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ex

130

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ex

140

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + 1.0 Loadtype Seismic Title Ez

150

1.0 SW + 1.2 Loadtype Dead Title Dl + .5 Loadtype Live Title Ll + -1.0 Loadtype Seismic Title Ez

160

1.0 SW + .9 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wx

170

1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wx

180

1.0 SW + 1.0 Loadtype Dead Title Dl + 1.3 Loadtype Wind Title Wz

190

1.0 SW + .9 Loadtype Dead Title Dl + -1.3 Loadtype Wind Title Wz

60

1.0 SW + 1.4 Loadtype Dead Title Dl

70

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll

80

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wx

90

1.0 SW + 1.2 Loadtype Dead Title Dl + 1.6 Loadtype Live Title Ll + .8 Loadtype Wind Title Wz

1.3.3 In Pier Top


P. Name

Unit( tonf , tonf-m )

LC#

SFx

SFy

SFz

SMx

SMy

100

110

120

130

140

150

160

170

180

190

60

70

80

90

100

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 5

110

120

130

140

150

160

170

180

190

60

70

80

90

100

110

120

130

140

150

160

170

180

190

60

70

80

90

100

110

120

130

140

150

160

170

180

190

60

70

80

90

395

396

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 6

100

110

120

130

140

150

160

170

180

190

60

70

80

90

397

1.3.4 In Pier Bottom


P. Name

Unit( tonf , tonf-m )

LC#

SFx

SFy

SFz

SMx

SMy

100

0.543

110

0.543

120

0.543

130

0.543

140

0.543

150

0.543

160

0.543

170

0.543

180

0.543

190

0.543

60

0.543

70

0.543

80

0.543

90

0.543

100

0.543

110

0.543

120

0.543

130

0.543

140

0.543

150

0.543

160

0.543

170

0.543

180

0.543

190

0.543

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 7

60

0.543

70

0.543

80

0.543

90

0.543

100

0.543

110

0.543

120

0.543

130

0.543

140

0.543

150

0.543

160

0.543

170

0.543

180

0.543

190

0.543

60

0.543

70

0.543

80

0.543

90

0.543

100

0.543

110

0.543

120

0.543

130

0.543

140

0.543

150

0.543

160

0.543

170

0.543

180

0.543

190

0.543

60

0.543

70

0.543

80

0.543

395

396

397

90

0.543

100

18.473

110

18.473

120

18.473

130

18.473

140

18.473

150

18.473

160

18.473

170

18.473

180

18.473

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 8

190

18.473

60

18.473

70

18.473

80

18.473

90

18.473

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

2. ONE-WAY SHEAR
2.1 FORMULA
1) Maximum Axial Load Strength
- Po = 0.85 fck (Ag-Ast) + S fy Ast
- Pnmax = f1 Po ( f1 = Axial Strenth Resuction Factiors)
- Mnmax = The Value of diagram, When P is Pn.
- Pumax = f2 Pnmax
f2 = Sprial or Tied Reinforcement Reduction Factor

2) Balanced Strain Condition


A balanced Strain condition exists at a cross-setion
when the maximum strain at the extreme
compression fiber just reaches eu = 0.003 simultaneously
with the first yield strain of es = fy/Es in the tension reinforcement.
The ratio of neutral axis depth cb is shown below
eu
Cb
=
eu + ey
d
eu = 0.003
fc = 0.85 fck

3) Strength for Combined Flexure and Axial Load


Maximum usable strain at extreme
concrete compression fiber shall
be assumed equal to eu = 0.003
if c that is neutral axis is supposed,
Pn and Mn can be calculated as below
fPn = f0.85 fck ( Acomp - S(1 to 11) Ast ) + S(1 to 28) fs Ast
fMn = f0.85 fck ( Acomp - S(1 to 11) Ast ) ( h/2 - c + yc )
+ S(1 to 28) fs Ast ( h/2 - c + ys )
fs(i) = e(i) Es , - fy fs(i) fy
Sprial or Tied Reinforcement Reduction Factor
Pa = 0.1 fck Ag
Acomp is Area from top to a (b 1c)
b 1c = 0.85 - 0.05 ( fck - 4000 ) / 1000

0.65

f = 0.9 - 0.2

Pn
Pa

0.9

(psi)

4) Slenderness Effects
dns =

Cm
1-Pu/0.75Pc

p EI
2
(klu)
2

Pc =

5) Shear
fVc = f 2

fck bw d

, fVs =

fVsmax = f 8 fck bw d (psi)


fVn = fVc + fVs

Copyright (c) GS E&C. All Rights Reserved

f fy Av d
(psi)
s

EI =

0.2EcIg + EsIse
1+b d

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 9

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 10

2.2 PM DIAGRAM & ANALYSIS


2.2.1 Pier Name : 1
(tonf , tonf-m )

Axis

X - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.04 tonf-m / 11.23 tonf-m

Pb / fPb

329.529 tonf / 230.670 tonf

200

Mb / fM

46.25 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.11 tonf-m / 11.23 tonf-m

Pb / fPb

341.918 tonf / 230.670 tonf

200

Mb / fM

45.87 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

Mx

0
-100
10

20

30

40

50

60

(tonf , tonf-m )

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

My

0
-100
10

20

30

40

Copyright (c) GS E&C. All Rights Reserved

50

60

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 11

2.2.2 Pier Name : 2


(tonf , tonf-m )

Axis

X - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.04 tonf-m / 11.23 tonf-m

Pb / fPb

329.529 tonf / 230.670 tonf

200

Mb / fM

46.25 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.11 tonf-m / 11.23 tonf-m

Pb / fPb

341.918 tonf / 230.670 tonf

200

Mb / fM

45.87 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

Mx

0
-100
10

20

30

40

50

60

(tonf , tonf-m )

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

My

0
-100
10

20

30

40

Copyright (c) GS E&C. All Rights Reserved

50

60

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 12

2.2.3 Pier Name : 395


(tonf , tonf-m )

Axis

X - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.04 tonf-m / 11.23 tonf-m

Pb / fPb

329.529 tonf / 230.670 tonf

200

Mb / fM

46.25 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.11 tonf-m / 11.23 tonf-m

Pb / fPb

341.918 tonf / 230.670 tonf

200

Mb / fM

45.87 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

Mx

0
-100
10

20

30

40

50

60

(tonf , tonf-m )

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

My

0
-100
10

20

30

40

Copyright (c) GS E&C. All Rights Reserved

50

60

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 13

2.2.4 Pier Name : 396


(tonf , tonf-m )

Axis

X - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.04 tonf-m / 11.23 tonf-m

Pb / fPb

329.529 tonf / 230.670 tonf

200

Mb / fM

46.25 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

662.841 tonf

Pn / fPn

596.557 tonf / 417.590 tonf

Mn / fMn

16.11 tonf-m / 11.23 tonf-m

Pb / fPb

341.918 tonf / 230.670 tonf

200

Mb / fM

45.87 tonf-m / 32.38 tonf-m

100

c(Balanced)

376.79 mm

emin

33.24 mm

klu / rx

10.67

Slender

Neglect

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

Mx

0
-100
10

20

30

40

50

60

(tonf , tonf-m )

P
700
Pnmax

600
500

fPnmax

400

Balanced

300

My

0
-100
10

20

30

40

Copyright (c) GS E&C. All Rights Reserved

50

60

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016


Project Na. : PLTU SUMBAWA BARAT 2X7

Calculation Sheet
of
Pier

..

Project No. : WEST SUMBAWA CFSPP PR..


Client : PT PLN (Persero)... Page 14

2.2.5 Pier Name : 397


(tonf , tonf-m )

P
20000

15000

Pnmax

fPnmax

Balanced

10000

5000

X - Axis (All comb.)

Po

20878.720 tonf

Pn / fPn

18790.850 tonf / 13153.590 tonf

Mn / fMn

2863.27 tonf-m / 2004.29 tonf-m

Pb / fPb

12732.190 tonf / 8912.532 tonf

Mb / fM

7535.05 tonf-m / 5274.54 tonf-m

c(Balanced)

2448.21 mm

emin

120.24 mm

klu / rx

1.83

Slender

Neglect

Axis

Y - Axis (All comb.)

Po

20878.720 tonf

Pn / fPn

18790.850 tonf / 13153.590 tonf

Mn / fMn

2863.29 tonf-m / 2004.29 tonf-m

Pb / fPb

12739.900 tonf / 8912.532 tonf

Mb / fM

7532.15 tonf-m / 5274.54 tonf-m

c(Balanced)

2448.21 mm

emin

120.24 mm

klu / rx

1.83

Slender

Neglect

Mx

0
2000

4000

6000

8000

10000

(tonf , tonf-m )

P
20000

15000

Axis

Pnmax

fPnmax

Balanced

10000

5000

My

0
2000

4000

6000

8000

10000

2.3 ANALYSIS & RESULT


2.3.1 Moment Check
Pier

unit (tonf-m )

L/C#

dx

dy

SdMux

SdMuy

fMnx

fMny

Result

100

0.02

0.02

10.41

10.55

OK

110

0.02

0.02

10.41

10.55

OK

120

0.02

0.02

10.41

10.55

OK

130

0.02

0.02

10.41

10.55

OK

140

0.02

0.02

10.41

10.55

OK

150

0.02

0.02

10.41

10.55

OK

160

0.02

0.02

10.41

10.55

OK

170

0.02

0.02

10.41

10.55

OK

180

0.02

0.02

10.41

10.55

OK

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 15

190

0.02

0.02

10.41

10.55

OK

60

0.02

0.02

10.41

10.55

OK

70

0.02

0.02

10.41

10.55

OK

80

0.02

0.02

10.41

10.55

OK

90

0.02

0.02

10.41

10.55

OK

100

0.02

0.02

10.41

10.55

OK

110

0.02

0.02

10.41

10.55

OK

120

0.02

0.02

10.41

10.55

OK

130

0.02

0.02

10.41

10.55

OK

140

0.02

0.02

10.41

10.55

OK

150

0.02

0.02

10.41

10.55

OK

160

0.02

0.02

10.41

10.55

OK

170

0.02

0.02

10.41

10.55

OK

180

0.02

0.02

10.41

10.55

OK

190

0.02

0.02

10.41

10.55

OK

60

0.02

0.02

10.41

10.55

OK

70

0.02

0.02

10.41

10.55

OK

80

0.02

0.02

10.41

10.55

OK

90

0.02

0.02

10.41

10.55

OK

100

0.02

0.02

10.41

10.55

OK

110

0.02

0.02

10.41

10.55

OK

120

0.02

0.02

10.41

10.55

OK

130

0.02

0.02

10.41

10.55

OK

140

0.02

0.02

10.41

10.55

OK

150

0.02

0.02

10.41

10.55

OK

160

0.02

0.02

10.41

10.55

OK

170

0.02

0.02

10.41

10.55

OK

180

0.02

0.02

10.41

10.55

OK

190

0.02

0.02

10.41

10.55

OK

60

0.02

0.02

10.41

10.55

OK

70

0.02

0.02

10.41

10.55

OK

80

0.02

0.02

10.41

10.55

OK

90

0.02

0.02

10.41

10.55

OK

100

0.02

0.02

10.41

10.55

OK

110

0.02

0.02

10.41

10.55

OK

120

0.02

0.02

10.41

10.55

OK

130

0.02

0.02

10.41

10.55

OK

140

0.02

0.02

10.41

10.55

OK

150

0.02

0.02

10.41

10.55

OK

160

0.02

0.02

10.41

10.55

OK

170

0.02

0.02

10.41

10.55

OK

395

396

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 16

180

0.02

0.02

10.41

10.55

OK

190

0.02

0.02

10.41

10.55

OK

60

0.02

0.02

10.41

10.55

OK

70

0.02

0.02

10.41

10.55

OK

80

0.02

0.02

10.41

10.55

OK

90

0.02

0.02

10.41

10.55

OK

100

2.22

2.22

517.26

516.74

OK

110

2.22

2.22

517.26

516.74

OK

120

2.22

2.22

517.26

516.74

OK

130

2.22

2.22

517.26

516.74

OK

140

2.22

2.22

517.26

516.74

OK

150

2.22

2.22

517.26

516.74

OK

160

2.22

2.22

517.26

516.74

OK

170

2.22

2.22

517.26

516.74

OK

180

2.22

2.22

517.26

516.74

OK

190

2.22

2.22

517.26

516.74

OK

60

2.22

2.22

517.26

516.74

OK

70

2.22

2.22

517.26

516.74

OK

80

2.22

2.22

517.26

516.74

OK

90

2.22

2.22

517.26

516.74

OK

397

2.3.2 Force Check


Pier

unit (tonf )

L/C#

SFz

fPs

fPnmax

Result

100

-61.14

417.59

0.54

OK

110

-61.14

417.59

0.54

OK

120

-61.14

417.59

0.54

OK

130

-61.14

417.59

0.54

OK

140

-61.14

417.59

0.54

OK

150

-61.14

417.59

0.54

OK

160

-61.14

417.59

0.54

OK

170

-61.14

417.59

0.54

OK

180

-61.14

417.59

0.54

OK

190

-61.14

417.59

0.54

OK

60

-61.14

417.59

0.54

OK

70

-61.14

417.59

0.54

OK

80

-61.14

417.59

0.54

OK

90

-61.14

417.59

0.54

OK

100

-61.14

417.59

0.54

OK

110

-61.14

417.59

0.54

OK

120

-61.14

417.59

0.54

OK

130

-61.14

417.59

0.54

OK

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 17

140

-61.14

417.59

0.54

OK

150

-61.14

417.59

0.54

OK

160

-61.14

417.59

0.54

OK

170

-61.14

417.59

0.54

OK

180

-61.14

417.59

0.54

OK

190

-61.14

417.59

0.54

OK

60

-61.14

417.59

0.54

OK

70

-61.14

417.59

0.54

OK

80

-61.14

417.59

0.54

OK

90

-61.14

417.59

0.54

OK

100

-61.14

417.59

0.54

OK

110

-61.14

417.59

0.54

OK

120

-61.14

417.59

0.54

OK

130

-61.14

417.59

0.54

OK

140

-61.14

417.59

0.54

OK

150

-61.14

417.59

0.54

OK

160

-61.14

417.59

0.54

OK

170

-61.14

417.59

0.54

OK

180

-61.14

417.59

0.54

OK

190

-61.14

417.59

0.54

OK

60

-61.14

417.59

0.54

OK

70

-61.14

417.59

0.54

OK

80

-61.14

417.59

0.54

OK

395

90

-61.14

417.59

0.54

OK

100

-61.14

417.59

0.54

OK

110

-61.14

417.59

0.54

OK

120

-61.14

417.59

0.54

OK

130

-61.14

417.59

0.54

OK

140

-61.14

417.59

0.54

OK

150

-61.14

417.59

0.54

OK

160

-61.14

417.59

0.54

OK

170

-61.14

417.59

0.54

OK

180

-61.14

417.59

0.54

OK

190

-61.14

417.59

0.54

OK

60

-61.14

417.59

0.54

OK

70

-61.14

417.59

0.54

OK

80

-61.14

417.59

0.54

OK

90

-61.14

417.59

0.54

OK

100

-427.96

13153.59

18.47

OK

110

-427.96

13153.59

18.47

OK

120

-427.96

13153.59

18.47

OK

396

397

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 18

130

-427.96

13153.59

18.47

OK

140

-427.96

13153.59

18.47

OK

150

-427.96

13153.59

18.47

OK

160

-427.96

13153.59

18.47

OK

170

-427.96

13153.59

18.47

OK

180

-427.96

13153.59

18.47

OK

190

-427.96

13153.59

18.47

OK

60

-427.96

13153.59

18.47

OK

70

-427.96

13153.59

18.47

OK

80

-427.96

13153.59

18.47

OK

90

-427.96

13153.59

18.47

OK

3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d
(eq 11-3)
Av fy d
- Vs =
(eq 11-15)
s
- Vu <= f Vc + f Vs , f = 0.75 (eq 11-1)
- When, Value of f Vs shall not exceed f 8 fck Bw d (Vs max)

3.2 ONE-WAY SHEAR


P. Name

Dir.

Unit(tonf)

LC#

fVc

fVs

fVs max

Vu

Result

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

X
1

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 19

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

395

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 20

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

17.945

8.402

71.781

OK

X
396

Copyright (c) GS E&C. All Rights Reserved

TAIL PULLEY FRAME COAL CONVEYOR C-1B - Method 1 - ACI318(MKS) 4/11/2016

Calculation Sheet
of
Pier

..

Project Na. : PLTU SUMBAWA BARAT 2X7


Project No. : WEST SUMBAWA CFSPP PR..
Client : PT PLN (Persero)... Page 21

110

17.945

8.402

71.781

OK

120

17.945

8.402

71.781

OK

130

17.945

8.402

71.781

OK

140

17.945

8.402

71.781

OK

150

17.945

8.402

71.781

OK

160

17.945

8.402

71.781

OK

170

17.945

8.402

71.781

OK

180

17.945

8.402

71.781

OK

190

17.945

8.402

71.781

OK

60

17.945

8.402

71.781

OK

70

17.945

8.402

71.781

OK

80

17.945

8.402

71.781

OK

90

17.945

8.402

71.781

OK

100

605.419

54.592

2421.675

OK

110

605.419

54.592

2421.675

OK

120

605.419

54.592

2421.675

OK

130

605.419

54.592

2421.675

OK

140

605.419

54.592

2421.675

OK

150

605.419

54.592

2421.675

OK

160

605.419

54.592

2421.675

OK

170

605.419

54.592

2421.675

OK

180

605.419

54.592

2421.675

OK

190

605.419

54.592

2421.675

OK

60

605.419

54.592

2421.675

OK

70

605.419

54.592

2421.675

OK

80

605.419

54.592

2421.675

OK

90

605.419

54.592

2421.675

OK

100

605.419

54.592

2421.675

OK

110

605.419

54.592

2421.675

OK

120

605.419

54.592

2421.675

OK

130

605.419

54.592

2421.675

OK

140

605.419

54.592

2421.675

OK

150

605.419

54.592

2421.675

OK

160

605.419

54.592

2421.675

OK

170

605.419

54.592

2421.675

OK

180

605.419

54.592

2421.675

OK

190

605.419

54.592

2421.675

OK

60

605.419

54.592

2421.675

OK

70

605.419

54.592

2421.675

OK

80

605.419

54.592

2421.675

OK

90

605.419

54.592

2421.675

OK

397

Copyright (c) GS E&C. All Rights Reserved