Daily site diary

&
progress report

Project no.. : S14006-0100D

Day Work No :137/730

Employer: Ministry of Finance


On site staff & labour record
No.

Trade

No.

Hrs

No.

Trade

Day:Wednsday
No.

Hrs

10

A.P.M

10

17 Elect.Foreman

C.M

10

18 Plumber

10

10

Technical engineer

10

19 Electricain

21

10

Civil Engineer

15

10

20 Surveyor

10

10

Elect.Engineer

10

21 Surveyor Helper

12

10

Mech. Engineer

10

22 Civil Foreman

14

10

Q.C. Engineer

10

23 Driver

10

10

Planning Engineer

10

24 Equip.Foreman

10

No.

Administrator

10

25 IT. Technician

10

10 Accountant

10

26 LABOR

82

10

11 Doc. Controller

10

27 Tea boy

10

12 Safety Engineer

10

28 Mech.Foreman

10

10

Subcontractors
29 (Man Power)

144

10

13

Safety Officer

14

Weather

Temperature

15 Security Guard

11

10

10

Name

Windy

Dusty

Minimum: 14C

Maximum:27C

Material

Qty.

Description of works do
Organization

No.

Works

Drilling holes for blasting at the at the Electrical tunnel

Metro viaduct foundation-Excavation

S-PRC-SS-02(F19) REV 1

Unit

Visitors on site
No.

Rainy

10

384

Cloudy

Delivery of materials

Total

Sunny

14 Security officer

16 Male nurse

Date: 17/ 12/2014

Page 1 of 5

Blasting Chiller B

Road L11 Cleaning &Clearing(Station425 to Station845)

Road L5 Cleaning &Clearing(Station00 to Station220)

plain concrete under Metro viaduct foundation

plain concrete under Treated gray water tank foundation

Remarks
13/82 labour with surveyors
10/82 labour with safety
49/82 labour site works
Bore holes balance 15 in Chiller B

Total excavation volume


Submission:
Project Manager:

S-PRC-SS-02(F19) REV 1

Page 2 of 5

Signature:

Engineer:

Dar Al-Handasah Consultants

Ref.:

(Shair & partners)

FTCO

Contractor:

Sheet
No.

On site plant & equipment record


No.

Category

No.

Hrs

No.

35

10

17
18

Excavator

Bobcat

10

Bulldozer (D9R)

10

Tower lights

106

10

Generator (150kva)

27

10

Forklift (3 Ton)

10

Compactor

10

Pick-up (ISUZU)

10

10

Bus (COASTER)

10

10

Mobile Crane

10

11

Dump Truck-BIG

40

12

12

Dump Truck-Small

10

10

13

Water tanker

14

GPS (LAICA)

10

15

TOTAL STATION

10

16

LEVEL (LAICA)

10

16

Category

No.

Hrs

Drilling Machine

10

Grader

10

10

Total Excavation

Description of works done


Works

QTY

UNIT

UPTO TODAY(M3 or count or


Precentage)

at the Electrical tunnel

450

Count

8034

500

12300

vation
S-PRC-SS-02(F19) REV 1

Page 3 of 5

4000

101600

tation425 to Station845)

100%

ation00 to Station220)

100%

duct foundation

ay water tank foundation

195

M2

781

390

M2

2750

vation volume

469250
Noted:
Signed by:

S-PRC-SS-02(F19) REV 1

Signature:

Page 4 of 5

Sub-Contractor Daily Details

Trade

NO

Excavation
Eng
Forman
Labour
Truck Drivers
Heavy equipement operators
water tanker Driver

0
2
10
50
46
16

Concrete works
Eng

Forman

Steel fixer

Labour

Blasting team
Operators
Forman Supervisor

Subcontractors (Man Power)

4
1

144