Beruflich Dokumente
Kultur Dokumente
MULTIPHASE BOOSTING
A CHANGE OF PERSPECTIVE
Why do companies
buy Bornemann
Multiphase Pumps?
INTELLIGENT UPSTREAM SYSTEMS
FOR THE OIL AND GAS INDUSTRY
UNTREATED STREAM
There is a Multiphase solution to suit a whole range
of potential flows. Untreated products ranging from
wet gas to heavy crude are pumped reliably in any
situation off-shore, subsea, thermal, conventional.
In addition flaring can be avoided making this byproduct available for profitable use.
INACCESSIBLE ENVIRONMENTS
Exploiting oilfields in harsh environments and subsea.
Extending the life of dying oilfields in this way is the
perfect opportunity to generate a sizeable profit.
The comparatively small investment and impressively
low maintenance and running costs are the benefits.
0003
LESS SEPARATION
Multiphase makes wellhead separators
obsolete and the profit is in your hand!
CONVENTIONAL STREAM
Gas compressor
gas
oil
WELLS
sepArator
liquid Pump
Flare
sepArator
liquid Pump
Gas
compressor
sepArator
liquid Pump
LESS COSTS
CAPITAL INVESTMENT AND OPERATIONAL EXPENDITURE DOWN
00 04
saving.
WELLS
oil
multiphase
pump
the accessibility!
0005
MINIMAL IMPACT
POLLUTION DOWN NEAR ZERO.
LAND REQUIREMENTS REDUCED.
ENERGY SAVING.
00 06
0007
PERFORMANCE TO SUITE
THE bornemann
MULTIPHASE DESIGN
You will get the best solution for your
application with our tailor-made pumping
screw design
00 08
DESIGN RANGE
oil industry.
saving of up to 25%.
STANDARD SCREW
degressive SCREW
multiphase service.
0009
FROM PUMPS
TO SYSTEMS TO SOLUTIONS
Contact, Consult, Select, Trust Bornemann
Complete multiphase
pumping systems
With our experience in research &
development, engineering, production
and commissioning all over the world
we are able to supply complete system
solutions for a wide range of performance conditions and harsh ambient
environmental conditions.
00 10
Safety first
The Bornemann system guarantees
full safety and automatic operation
under all circumstances.
0011
Maintenance-Free Oil
Extraction At Seabed
Level
Move Bornemann multiphase
technology closer to
the deeper and undeveloped
resources.
00 12
Conventional
Recovery
Straight to the
seabed
The change of
perspective
mentally unfriendly.
opportunities.
0013
SELECTION CRITERIA
WORK ENVELOPES
TO SUITE
MW
MW 12
4,700
20,000
710,000
MW 11
2,420
10,655
365,000
MSL
MW 10
Single Well
Multiphase Pump
892
3,840
134,000
CAPACIT Y
110
m/h
490
gpm
BPD 16,000
MW 9
MSL 6
MW 8
MW 7T
MSL 5
MSL 4
DIFFERENTIAL
PRESSURE
00 14
MW 7
8
116
14
200
16
230
bar
psi
DIFFERENTIAL
PRESSURE
19
275
30 32 33
440 465 480
48
700
57 bar
830 psi
CAPACIT Y
8,000
m/h
35,200
gpm
BPD 1,200,000
8,000
m/h
35,200
gpm
BPD 1,200,000
MPC
SMPC
SMPC 630
MPC 630
4,700
20,000
710,000
4,700
20,000
710,000
SMPC 500
MPC 500
2,420
10,655
365,000
2,420
10,655
365,000
SMPC 400
MPC 400
MPC 208
MPC 168
MPC 133
MPC 112/133
MPC 335
MPC 268
SMPC 335
SMPC 268
DIFFERENTIAL
PRESSURE
18
260
25
360
35
508
42
610
70
1,016
bar
psi
DIFFERENTIAL
PRESSURE
18
260
25
360
42
610
70 bar
1,016 psi
0015
SERVICE
Bornemann Services
Worldwide
Drive, Courage, Responsibility, Reliability - thats our team spirit.
In the desert, at sea, in ice and snow - we are equipped
for extremes. Serving you night and day - we have the know-how
and Maintenance capability.
maintenance
ff
ff
ff
ff
ff
ff
Pump check
Inspection
Overhaul
Multiphase testing
Preventive Maintenance
Condition Monitoring
Multiphase Testbed
Service on site
ff
ff
ff
ff
ff
ff
Specialist Hotline
Inspections Pumps & Systems
Maintenance Plans
Preventive Maintenance
Repairs
Mechanical seal service
00 16
rEpair shop
ff
ff
ff
ff
ff
ff
ff
On-site Service
training
ff
ff
ff
ff
ff
Training at Bornemann
Training on-site
Theory and practice
Clear and complete training
documentation
Systematic operation;
maintenance; trouble shooting
procedures
Service line
ff +49 5724 390-100
ff service@bornemann.com
0017
BP
ff
ff
ff
ff
ff
ff
ff
00 18
PDVSA
ff
ff
ff
ff
ff
ff
ff
ff
ff
ff
Wintershall Noordzee
ff
ff
ff
ff
ff
ff
RWE-DEA
ff
ff
ff
ff
ff
ff
Mittelplate Germany
MPC 335
Installed in 2005
Fluid Multiphase Mixture
Capacity 470 m/h
71,212 BPD
GVF up to 74%
lukoil
ff
ff
ff
ff
ff
Siberia, Russia
Harsh Environmental
Installation
100 Installations
Capacity up to 500 m/h
75,757 BPD
GVF 96%
Cairn Energy
ff
ff
ff
ff
ff
0019
MEET THE
MULTIPHASE-TEAM
Gero von der Wense,
Leader Bornemann
Multiphase Boosting Team
support!
Complete Project-Management
00 20
0021
WELCOME TO
BORNEMANN GERMANY
00 22
MILESTONES
1853
1934
1985
1989
Joh. Heinrich
Bornemann opens his
Locksmith Shop
Development of
twin-screw pumps,
patent granted
1993
2005
2006
First 3,000 kW
(4035 HP) pumps
2007
0023
Unique solutions
made by the Leading company
in multiphase systems
Industriestrae 2
31683 Obernkirchen
Germany
Fon:
+49 5724 390-0
Fax: +49 5724 390-290
info@bornemann.com
www.bornemann.com
Germany Headquarter
USA China
Bornemann Pumps Inc.
P.O. Box 1769
Matthews, NC 28106
USA
Fon: +1 704 8498636
Fax: +1 704 8498637
info.usa@bornemann.com
Canada
Bornemann Inc.
320 441, 5th Avenue S.W.
Calgary, Alberta
Canada T2P 2V1
Fon: +1 403 6680552
Fax: +1 403 2624073
info.cdn@bornemann.com
Argentina
Bombas Bornemann S.R.L.
Armenia 2898
B1605CDP Munro
Prov. Buenos Aires
Fon: +54 11 47568008
Fax: +54 11 47565541
info.cn@bornemann.com
www.bornemann-ar.com
Singapore
Bornemann Pumps Asia Pte. Ltd.
25 Intern. Business Park
German Centre, # 04-08
Singapore 609916
Singapore
Fon: +65 6 5616782
Fax: +65 6 5616784
info.sg@bornemann.com
Presented by
2008 Bornemann Sunderdiek Designagentur Photosources: Bornemann, iStock Photo, Getty Images, Corbis, matton images, C. Sunderdiek, astrofoto.de, Astronaut Photography-Images courtesy of Earth Sciences and Image Analysis Laboratory, NASA Johnson Space Center