ELECTRICAL DAILY REPORT

WORK STATUS

SL.NO

PM

1
2
3
4

SAC feed pump -1


sludge transf. pump - 1
BC - 1A
Vibro feeder - 1 & 2

Completed
Completed
Completed
Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l

REPORT
MAINTENANCE WORK
(a)Boiler lightning work
(b)110 kv switch yard
grass removing work
(c)All DT transformer wheel
cleaning with emery
paper & brush for providing
black paint for electrical
inspection

DATE: 12.01.2016
WORK STATUS
checked 4 no's of 150 wats fittings in
this chock was damaged.
U/P
Completed.

n, HDBL 15S/MH

SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's

Dt: 11.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan
Sakthivel

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

UF back wash pump-1

Completed

(a)PA & SA lightning work

Completed

HP dosing pump-2

Completed

(b)110 kv switch yard

Completed

DE-2, RAV-2,

Completed

grass removing work

Completed

Completed

(c) GT&UAT transformer wheel


cleaning with emerypaper & brush
for providingblack paint for electrical
inspection

Completed

N-Pit pump -1

CT fan-3 power cable


removing due to

MAINTENANCE WORK

DATE: 13.01.2016
WORK STATUS

U/P

painting work.

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's
2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
3) 150 & 70 W lighting material not available in our store.

Dt: 12.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Two no.of 150 watt bulb &
ignator replaced

ns 5600 - Req - 10 no's

Murugan

ELECTRICAL DAILY REPORT

DATE: 14.01.2016

SL.NO

PM

WORK STATUS

MAINTENANCE WORK

WORK STATUS

UF back wash pump-1

Completed

(A) All Bore well starter cleaned.


And tightness checked

Completed

Hrscc feed pump - 1

winding failure

(B) GT & UAT transformer area


supporting angel black paint provided.

Completed

Secondary screen - 1A

Completed

( C) DT - 2 & DT -3 silicajel replaced

Completed

Fines cleaning Pump -1

Completed

CT fan-3 power cable


removing due to

U/P

painting work.

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's
2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
3) 150 & 70 W lighting material not available in our store.

Dt: 13.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan &
danabalan
Baniyan waste - 2 Kg
Silicagel - 4 KG

5600 - Req - 10 no's

ELECTRICAL DAILY REPORT

DATE: 15.01.2016

SL.NO

PM

WORK STATUS

MAINTENANCE WORK

WORK STATUS

Service air compressor - 2

Completed

(B) GT & UAT transformer area


supporting angel black paint provided.

Completed

Completed

Fins cleaning shifted to HRSC


feedpump motor , NO load current R
-4.6 A, Y - 4.7A, B - 4.6 A. repctively.
Load current R -11.2A, Y -11.1A, B
-11.1A.

Completed

BC - 3

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's
2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
3) 150 & 70 W lighting material not available in our store.

Dt: 14.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan , Selvam

32 A fuse - 3 nos

600 - Req - 10 no's

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

BC -1 B

Completed

BFP - 2

Completed

Hotwell pump - 2

Completed

Primary screen - 1B

Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

DAILY REPORT

DATE: 16.01.2016

MAINTENANCE WORK

WORK STATUS

Silo side security tower light not


working. Checked and found cable
short and rectified the problem

Completed

e crompton, HDBL 15S/MH

type MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
lable in our store.

Dt: 15.01.2016

MATERIAL CONSUMED LEAVE DETAILS

600 - Req - 10 no's

Murugan , Selvam

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

DAILY REPORT

DATE: 17.01.2016

MAINTENANCE WORK

WORK STATUS

SAC - 1 delay timer relay fault found ,


so replaced new one.

Completed

Rapper coil remote not started from


dcs, so cleaned and tightness was
checked

Completed

DT - 1 , DT -2 , DT - 3 area cleaned

Completed

e crompton, HDBL 15S/MH

type MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
lable in our store.

Dt: 16.01.2016

MATERIAL CONSUMED LEAVE DETAILS

600 - Req - 10 no's

Murugan , Selvam

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

Fly ash conditioner - 1

Completed

Fludising blower - 1 ,2, 3

Completed

BC - 1B, vibro feeder -3 & 4

Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

AILY REPORT

DATE: 18.01.2016
MAINTENANCE WORK

WORK STATUS

BFP -2 Emergency pushbutton was


checked and found normal

Completed

ompton, HDBL 15S/MH

e MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
e in our store.

Dt: 17.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan ,

- Req - 10 no's

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

Secondary screen - 1B

Completed

OVEF - 2 , IAC - 2

Completed

LP dosing - 2

Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

AILY REPORT

DATE: 19.01.2016
MAINTENANCE WORK

WORK STATUS

one 400 W fittng fixed in Switchyard.


For control room front illumination.

Completed

IAC - 2 cooling fan motor Due to lock


damaged, so replaced new one

Completed

Switchyard inside DE watering work


done

Completed

ompton, HDBL 15S/MH

e MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
e in our store.

Dt: 18.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan ,

LUG -1.5 Sqmm

- Req - 10 no's

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

Loop seal blower - 2

Completed

R o HP pump - 2

Completed

GSVC - 2

Completed

Oil centrifuge - 2

Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

AILY REPORT

DATE: 20.01.2016
MAINTENANCE WORK

WORK STATUS

Dss Motor checked and found that, NO


load current - R -2.6 A,Y -2.5A, B -2.5A.
Load current - R -4.6 A,Y- 4.5A,B -4.6 A.

Completed

Switchyard inside Grass removing


work done

Completed

ompton, HDBL 15S/MH

e MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
e in our store.

Dt:19.01.2016

MATERIAL CONSUMED LEAVE DETAILS

Murugan ,

- Req - 10 no's

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

CEP - 2

Completed

SERVICE WATER PUMP - 3 , BC4, Triper Trolley

Completed

SPARES REQUIRED:
1) plant lightning purpose - Ballest: Make crompton, HDBL 15S/MH
HID Ballest 150 W HPSV/MH - Req 10 no's

2) 70 w bulbs Make: Crompton threaded type MB1 SIE MH LAMP 220V Base E-27 Rated l
3) 150 & 70 W lighting material not available in our store.

AILY REPORT

DATE: 21.01.2016
MAINTENANCE WORK

WORK STATUS

WTP Transformer dewatering done

Completed

PA Fan Power cable supporting angle


black paint provided.

Completed

CT Fan - 3 , Gray colour pant provided


no load trail taken current

ompton, HDBL 15S/MH

e MB1 SIE MH LAMP 220V Base E-27 Rated lumens 5600 - Req - 10 no's
e in our store.

Dt:21.01.2016

MATERIAL CONSUMED LEAVE DETAILS


Murugan ,

- Req - 10 no's

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

AOP

COMPLETED

MGF-2

COMPLETED

SAC FEED PUMP-2

SPARES REQUIRED:

Y REPORT

DATE: 22.01.2016
MAINTENANCE WORK

WORK STATUS

DEWATERING WORK COMPLETED IN DG SET

COMPLETED

625 KVA DG SET SERVICED BY SERVICE


ENGGINEER

COMPLETED

BED MATERIAL HOIST MOTOR BRAKE COIL


PROBLEM SO CHECKING WORK UNDER
PROGRESS

UNDER PROGRESS

Dt:21.02.2016

MATERIAL CONSUMED

LEAVE DETAILS
Murugan ,

ELECTRICAL DAILY REPORT


SL.NO

PM

SPARES REQUIRED:

WORK STATUS

Y REPORT

DATE: 23.01.2016
MAINTENANCE WORK

WORK STATUS

BED MATERIAL HOIST MOTOR BRAKE COIL


PROBLEM COIL NO 1-14.8 , COIL NO 1-14.8 ,
COIL NO 1-1 M , SO IT WAS REMOVED

U/P

ACC FAN UNIT-2 FOR CHECKING WORK , AGAIN


ACC FAN-8 MOTOR TERMINATION
DISCONNECTED , CABLE LAYED FROM UNIT-1
SIDE TO UNIT-2 SIDE
BOREWELL SUMP-1 POWER CABLE
DISCONNECTED DUE TO MEGGER VALUE LESS
THAN 1 M

U/P

COMPLETED

Dt:23.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

SPARES REQUIRED:

WORK STATUS

Y REPORT

DATE: 24.01.2016
MAINTENANCE WORK

WORK STATUS

ID FAN-1 MOTOR NDE SIDE ABNORMAL SOUND


CAME , SO CHECKED & N3 GREASE APPLIED , SO
MOTOR FAN COVER BOLT NOT PROPERLY NOT
GONE , SO IT WAS ARRESTED WITH CLOTH

COMPLETED

LAVT PANEL CLEANED WITH BLOWER

COMPLETED

COMPLETED
0 METER CLEANING WORK COMPLETED

Dt:24.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

PA FAN-1,2

COMPLETED

ID FAN-1

COMPLETED

MAIN GATE MOTORS

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 25.01.2016
MAINTENANCE WORK

WORK STATUS

CONSTRUCTION POWER CABLE REMOVED FROM


CABLE TRAY

COMPLETED

Dt:25.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

ACC FAN-(1-8)

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 26.01.2016
MAINTENANCE WORK

ACC FAN UNIT-2 CHECKING WORK ,ACC FAN-8


MOTOR TERMINATION REMOVED

OLD DG ROOM PANEL SHIFTING WORK UNDER


PROGRESS

WORK STATUS

U/P

U/P

Dt:26.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

1
2

SPARES REQUIRED:
230v bulb

WORK STATUS

Y REPORT

DATE: 27.01.2016
MAINTENANCE WORK

WORK STATUS

GT-1 CT B PHASE TRANSFORMER OIL 2 LITRE


TOPUP COMPELETED

COMPLETED

GT , UAT , DT-1,2,3 , WTP ALL TRANSFORMER


CLEANING AND COPPER EARTHING PROVIDING
WORK COMPELTED

COMPLETED

WTP INCOMER-2 FEEDER ACB BREAKER 3WT8 ID


NO 6640320204020 INTERCHANGE 3.5 METER
PMCC BUSCOUPLER-2 OLD BREAKER KEPT IN 3.5
METER

COMPLETED

3.5 METER PMCC PANEL HYLAM SHEET


PROVIDING WORK UNDER PROGRESS

UNDER PROGRESS

Dt:27.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

UF FAST FLUSHING PUMP-2

COMPLETED

HRSCC FEED PUMP-2

COMPLETED

NPIT PUMP-2

COMPLETED

CT FAN-3

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 28.01.2016
MAINTENANCE WORK

WORK STATUS

DT TRANSFORMER SIDE DEWATERING WORK


COMPLETED

COMPLETED

ACC FAN UNIT-2 CHECKING WORK COMPLETED ,


AGAIN ACC FAN-8 MOTOR TERMINATION WORK
COMPLETED , CURRENT-99A

COMPLETED

AC SERVICING DONE IN WTP , CHP ,TULSYAN


CONTAINER

COMPLETED

IN AC PACKAGE AC NO-3 FAN BLADE FIXED AND


TRAIL RUN TAKEN

COMPLETED

Dt:28.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

N PIT PUMP-2

COMPLETED

MGF FEED PUMP-3

COMPLETED

UF BACK WASH PUMP-2

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 29.01.2016
MAINTENANCE WORK

WORK STATUS

UNIT-2 PMCC PANEL CLEANED WITH AIR


BLOWER

COMPLETED

PMCC PANEL HYLAM SHEET PROVIDED

COMPLETED

Dt:29.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

ACW-3

COMPLETED

RO HIGH PRESSURE PUMP -3

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 30.01.2016
MAINTENANCE WORK

WORK STATUS

OLD DG ROOM PANEL SHIFITING WORK


COMPLETED

COMPLETED

Dt:30.01.2016

MATERIAL CONSUMED

LEAVE DETAILS

ELECTRICAL DAILY REPORT


SL.NO

PM

WORK STATUS

DE FAN-1

COMPLETED

SPARES REQUIRED:

Y REPORT

DATE: 31.01.2016
MAINTENANCE WORK

WORK STATUS

DG SET , HOTWELL TANK UNIT-02 DEWATERING


WORK COMPLETED

COMPLETED

ACC FAN SIDE LIGHTING WORK COMPLETED

COMPLETED

DE FAN-1 NEUTRAL TO EARTH -46V COMING , SO


IT WAS CHECKED & RECTIFIED
ACW-3 TERMINATED AND TRAIL RUN TAKEN R129 , Y-128 A ,B-129 A

COMPLETED

COMPLETED

Dt:31.01.2016