Sie sind auf Seite 1von 178

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: BFP - 02 VHSC

EQUIPMENT CODE

: TNL/CPP/TGH/VHSC /002

EQUIPMENT DETAILS

DATE

keltron

DESCRIPTION OF THE WORK DONE

15.09.2013

Pressure Gauge air vent was released and found normal.

11.11.2013

Scoop Controller Pilot Valve was replaced from BFP-3.Now scoop


function was found normal.

20.12.2013

Air line tubings were modified and it is under observation.

16.02.2015

BFP-2 impules lines and pressure,temp gauges are checked and


cleaned

31.08.2015

BFP - 2 Scoop actuator Position transmitter was checked

15.12.2015

BFP - 2 all instrument was cleaned and inspection work done

16.01.2016

BFP - 2 all instrument was cleaned and inspection work done

16.02.2016

BFP - 2 all instrument was cleaned and inspection work done

16.03.2016

BFP - 2 all instrument was cleaned and inspection work done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

CBM

CBM

PM

CBM

PM

Nil

PM

Nil

PM

Nil

Nil
Pilot valve - 01 NO

Nil
Nil

Nil

INCHARGE SIGNATURE

PM

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: BFP - 01 VHSC

EQUIPMENT CODE

: TNL/CPP/TGH/VHSC/001

EQUIPMENT DETAILS

: Keltron

DATE
15.9.2013

DESCRIPTION OF THE WORK DONE


Output air line leakage was arrested and feedback found normal

11.11.2013

valve open limitor was not in the operating Limit.It has been extended

20.12.2013

according to Switch operating position. Now found normal in DCS.

16.02.2015

BFP -1 discharge pressure Gauge impulse line leakage was arrested

16.02.2015

BFP 1 RPM sensor was cleaned and tightness work done

04.03.2015

Boiler feed pump 1 suction pressure gauges was calibirated

02.08.2015

BFP impulse lines and pressure,temp gauges are checked and cleaned

18.09.2015

BFP - 1 Scoop position transmitter was checked and taken on line

26.09.2015

Scoop oil tank level switch was checked

09.10.2015

BFP - 1 Scoop position transmitter was checked and taken on line

02.11.2015

BFP - 1 impulse lines and pressure,temp gauges, Hydro coupler


actuator was checked and cleaned

05.11.2015

BFP - 1 oil skid low level switch was checked and now normal

02.01.2016

BFP - 1 oil skid low level switch was checked and now normal

28.02.2016

Oil skid level switch was checked

02.03.2016

BFP - 1 oil skid low level switch was checked and now normal

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

PM

Nil

PM

Nil

CBM

Nil

SD

Nil

PM

Nil

INCHARGE SIGNATURE

PM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Deaerator pressure control

EQUIPMENT CODE

: TNL/CPP/TGH/DPV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: CST level control valve

EQUIPMENT CODE

: TNL/CPP/TGH/CST/002

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: CST reciculation control

EQUIPMENT CODE

: TNL/CPP/TGH/CRV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Gland steam temp control valve

EQUIPMENT CODE

: TNL/CPP/TGH/GST/001

EQUIPMENT DETAILS

: mazda

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Dumping steam prds pressure

EQUIPMENT CODE

: TNL/CPP/TGH/DPSP/002

EQUIPMENT DETAILS

: forbe marshal

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Gland steam temp control valve

EQUIPMENT CODE

: TNL/CPP/TGH/GST/001

EQUIPMENT DETAILS

: mazda

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Gland steam temp control valve

EQUIPMENT CODE

:TNL/CPP/TGH/DPST/002

EQUIPMENT DETAILS

: mazda

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Deaerator level control valve

EQUIPMENT CODE

: TNL/CPP/TGH/DCV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Peging steam PRDS TEMPcontrol valve

EQUIPMENT CODE

: TNL/CPP/TGH/PRT/001

EQUIPMENT DETAILS

: Forbe marshall

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Peging steam PRDS PR control valve

EQUIPMENT CODE

: TNL/CPP/TGH/PRR/002

EQUIPMENT DETAILS

: Forbemarshall

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Ejector steam PRDS PR control valve

EQUIPMENT CODE

: TNL/CPP/TGH/EPRT/001

EQUIPMENT DETAILS

: Forbemarshall

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

16.07.2015

Ejector PRDS control valve graphite gland packing was replaced

31.08.2015

Control valve gland leakage was checked

07.08.2015

Ejector PRDS control valve gland leakages was checked

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

08.12.2015

Ejector PRDS control valve was checked

10.01.2016

Ejector PRDS control valve was checked LOCAL and DCS mode

11.01.2016

Ejector PRDS control valve gland packing - 02 NOS was replaced

14.01.2016

Ejector PRDS control valve Positioner was inter changed


PRDS temperature control valve and now working normal

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

CBM

Gland packing - 03 NOS

CBM

Nil

CBM

Nil

SD

Nil

SD

Nil

CBM

Nil

INCHARGE SIGNATURE

CBM

Nil

CBM

Nil

CBM

Nil

SD

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Ejector steam PRDS Temp control valve

EQUIPMENT CODE

: TNL/CPP/TGH/EPRT/001

EQUIPMENT DETAILS

: Forbemarshall

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

16.01.2016

Ejector PRDS temp control valve Positioner was checked manual


mode working normal

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

CBM

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Deaerator Bleed control valve

EQUIPMENT CODE

: TNL/CPP/TGH/DEPS/002

EQUIPMENT DETAILS

: Mazda

DATE

DESCRIPTION OF THE WORK DONE

21.9.2014

Control valve cleaned and feedback cross checked with DCS

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

17.08.2015

Bleed - 2 steam pressure cut-off value was changed from 8.8 to 9.0

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

11.12.2015

Deaerator bleed steam Pressure control valve was checked

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

CBM

Nil

SD

Nil

SD

Nil

CBM

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: HP heater normal control valve

EQUIPMENT CODE

: TNL/CPP/TGH/HPD/001

EQUIPMENT DETAILS

: Mazda

DATE
21.9.2014

DESCRIPTION OF THE WORK DONE


valve positioner was checked and calibration work done

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: HP heater Emergency drain control valve

EQUIPMENT CODE

: TNL/CPP/TGH/HPED/001

EQUIPMENT DETAILS

: Mazda

DATE
21.9.2014

DESCRIPTION OF THE WORK DONE


valve positioner was checked and calibration work done

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

30.05.2015
27.09.2015

control valve plug and valve seat was cleaned


Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: HP heater normal control valve

EQUIPMENT CODE

: TNL/CPP/TGH/LPD/001

EQUIPMENT DETAILS

: Mazda

DATE
21.9.2014

DESCRIPTION OF THE WORK DONE


valve positioner was checked and calibration work done

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: HP heater normal control valve

EQUIPMENT CODE

: TNL/CPP/TGH/LPED/001

EQUIPMENT DETAILS

: Mazda

DATE
21.9.2014

DESCRIPTION OF THE WORK DONE


valve positioner was checked and calibration work done

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Level switch

EQUIPMENT CODE

: TNL/CPP/TGH/HPLS/001

EQUIPMENT DETAILS

: Automate

DATE
13.05.2015

DESCRIPTION OF THE WORK DONE


HP heater High level switch mechanism was replaced by new

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SD

SPARES CONSUMED
Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air receiver control valve

EQUIPMENT CODE

: TNL/CPP/TGH/SRA/001

EQUIPMENT DETAILS

: Mazda

DATE
21.9.2014

DESCRIPTION OF THE WORK DONE


valve positioner was checked and calibration work done

29.12.2014

Control valve cleaned and feedback cross checked with DCS

28.03.2015

Control valve cleaned and feedback cross checked with DCS

14.05.2015

Control valve cleaned and feedback cross checked with DCS

27.09.2015

Control valve cleaned and feedback cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Transmitters

EQUIPMENT CODE

: TNL/CPP/TGH/TR/001

EQUIPMENT DETAILS

: Automate

DATE

DESCRIPTION OF THE WORK DONE

26.07.2014

Gland steam pressure transmitter calibration work done

03.09.2014

HP heater Pressure Gauge impulse line leakage arresting work done

03.01.2015

HP heater Level transmitter impulse line was modified

01.01.2015

All transmitter impulse line tightness work was done

04.01.2015

Critical instrument transmitters and switches was Calibrated

08.01.2015

Cep recirculation Flow transmitter impulse line was modified

03.06.2015

Cooling tower Level transmitter impulse line was flushed

04.06.2015

Cooling tower Level transmitter impulse line was flushed

09.06.2015

Main steam Inlet Pressure transmitter Gland leakage was arrested

10.06.2015

Cooling tower level transmitter URV checked (2100mmwc)

11.06.2015

HP heater

level transmitter URV was checked .(-3300 to 0)

25.06.2015

CT make up - 1 & 2 pressure gauge was calibrated

19.07.2015

LP heater discharge pressure gauge was checked

12.09.2015

HP heater level transmitter flange gasket was replaced .

12.09.2015

LP heater level transmitter signal fuse was replaced after taken on line

05.10.2015

CEP recirculation flow transmitter impulse line leakages was arrested


and taken in line

06.12.2015

Turbine inlet Pr transmitter condensate pot leakage was arrested

06.02.2016

LP heater level transmitter zero trimming was done

12.02.2016

Turbine front sealing pressure transmitter was checked and taken on line

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
21.03.2016

DESCRIPTION OF THE WORK DONE


Atomospher temp transsmitter was mounted

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

INCHARGE SIGNATURE

CBM

NIL

CBM

NIL

CBM

Metallic gasket - 02 NOS

CBM

Fuse - 01 NO

CBM

NIL

CBM

NIL

CBM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

CBM

SPARES CONSUMED
NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Transmitters

EQUIPMENT CODE

: TNL/CPP/TGH/PG/001

EQUIPMENT DETAILS

: General

DATE

DESCRIPTION OF THE WORK DONE

03.04.2014

JOP discharge new pressure gauge was installed .

10.07.2014

CEP line of Ejector I/P &O/P Pressure gauge calibration work done.

18.08.2014

discharge pressure gauge calibration work done

27.08.2014

CE P-1 Suction pressure gauge was replaced by -1 to 3 kg / cm2.

07.03.2015

ACWP - 1 discharge pressure gauge was calibrated

12.03.2015

Deaerator tank pressure gauge to was calibrated

23.03.2015

ACWP - 2 discharge pressure gauge was calibrated

27.03.2015

CST level transmitter was checked

07.03.2015

ACWP - 1 discharge pressure gauge was calibrated

12.04.2015

Deaerator tank pressure gauge to was calibrated

19.04.2015

ACWP -2 discharge pressure gauge was calibrated

24.05.2015

Cooling tower level transmitter was flushed and taken on line

16.09.2015

Hot well pump pressure gauge was calibrated

21.09.2015

CEP - 2 pressure gauge was calibrated

01.10.2015

Hot well pump pressure gauge was calibrated

19.10.2015

Cooling tower return line temperature gauge was calibrated

30.10.2015

ACW- 3 discharge pressure gauge was calibrated

01.11.2015

Hot well pump pressure gauge was calibrated

25.11.2015

CT makeup pump -2 pressure gauge was calibrated

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
16.01.2016
17.01.2016
21.01.2016

DESCRIPTION OF THE WORK DONE


Hotwell pump - 2 pressure gauge was calibrated
ACW- 2 discharge pressure gauge was calibrated
CEP - 2 pressure gauge was calibrated

30.01.2016

ACW pressure gauge - 03 was calibrated

01.02.2016

Hot well pump - 1 pressure gauge was calibrated

07.02.2016
08.02.2016
16.02.2016
17.02.2016

ACW pressure gauge -01 was calibrated


CEP - 2 pressure gauge was calibrated
Hotwell pump - 2 pressure gauge was calibrated
ACW- 2 discharge pressure gauge was calibrated

21.02.2016

CEP pressure gauge - 2 was calibrated

01.03.2016

Hot well pump - 1 pressure gauge was calibrated

07.03.2016
08.03.2016
16.03.2016
17.03.2016
21.03.2016

ACW pressure gauge -01 was calibrated


CEP - 2 pressure gauge was calibrated
Hotwell pump - 2 pressure gauge was calibrated
ACW- 2 discharge pressure gauge was calibrated
CEP pressure gauge - 2 was calibrated

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

PM

NIL

PM

NIL

PM

NIL

PM

prseeure gauge -01 No

PM

NIL

PM

NIL

PM

NIL

PM

NIL

SD

NIL

PM

NIL

PM

NIL

INCHARGE SIGNATURE

PM

NIL

PM

NIL

PM

NIL

PM

NIL

CBM

NIL

PM

NIL

PM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

PM

PM

PM

PM

PM

PM

PM

PM

PM

NIL

PM

NIL

PM

PM

PM

PM

PM

NIL

PM

NIL

NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL

NIL
NIL
NIL
NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Governer control panel

EQUIPMENT CODE

: TNL/CPP/TGH/GCP/001

EQUIPMENT DETAILS

: General

DATE

DESCRIPTION OF THE WORK DONE

30.08.2015

Digitel isolation card was replaced

02.12.2015

Generator front vibration sensor- X side analog signal NEW MA


isolator was s installed due to milli Amps variation in DCS side

17.12.2015

Turbine NDE gear box vibration sensor termination tightness was


checked

27.01.2016

Governor control panel over speed protection system was checked.


AC power card failure. Now working DC power card

16.02.2016

Operating system - 3 & 5 mouse was replaced

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMUDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Digital card - 01 NO

CBM

ISOLATOR - 01 NO

CBM

NIL

SD

NIL

CBM

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

Das könnte Ihnen auch gefallen