Location
Employer
Engineer
Contractor
Contract amount
:- Rs. 2,531,280,984.15
Gross Area
:- 40,300 m2
Type of contract
:- ICTAD
Date of commencement
Contract period
10
The Proposed Custom Head Quarters Building project is a large project and it will be one of a
supper luxury building in Sri Lanka. Total length of the building is 197m and width of the
building is 29m. The building has been divided in to three construction zones as zone-A, zoneB and zone-C. The zone-A and zone-C have 5 stories and zone-B has 12 stories. As well as
there are 1-26 grid lines in longitudinal direction and A-H grid lines in cross wise. Each zone
is controlling by a construction manager. The project was performed under three construction
managers under the instructions of project manager . In addition to that the project were
supervised by a project director.
11
12
13
14
2.2.7 Storekeeper
His main duty is to keep records of stores for maintain the material of the site. If the material
quantity is less he should inform to the site administration for recover the material quantity. In
addition to that he is doing another job like handling the petty cash book, stock book etc.
15
practiced in this period. Here I learned so many things from construction manager, site
engineer, site foreman and also from labors. Their knowledge & experience were useful for me
to learn those things. I had been working at zone A for 14 weeks.
Within the last ten weeks I was appointed to work as the Site Assistant Survey Engineer. I was
supervised by Mr. Thennakon, Project Survey Engineer & instructed by Mr. Aruna, Site
Survey Engineer. In this period I could be able to learn construction survey methods and also
about many other site practices.