Beruflich Dokumente
Kultur Dokumente
Total
Say
Total
Say
Providing
&
laying
rubble
filling
of
trap/granite/quartzitegneiss stone of approved
quality in foundation including hand packing filling
joints as directed by the engineer.
Spec. No. CD -3 P-163
Rate as per Raigad DSR 2009-010
DSR items No 1 Spec. No. CD -3 P-163
Total
Say
Sr No
Ref. to
MoRTH
Spec.
Description
12.8
12.8 F
Case II
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit
Quantity
Cement
tonne
48.60
5300.00
257580.00
Coarse sand
cum
54.00
500.00
27000.00
40 mm Aggregate
cum
43.20
487.00
21038.40
20 mm Aggregate
cum
43.20
500.00
21600.00
10 mm Aggregate
cum
21.60
499.00
10778.40
Mate
day
0.84
232.00
194.88
Mason
day
3.00
232.00
696.00
Mazdoor
day
18.00
217.00
3906.00
hour
6.00
2000.00
12000.00
P&M-002
hour
6.00
550.00
3300.00
P&M-080
hour
6.00
700.00
4200.00
P&M-017
hour
15.00
433.00
6495.00
P&M-049
tonne.km
300L
36.00
216000.00
P&M-050
Lead= km
6.00
200.00
1200.00
P&M-007
b)
c)
Material
Labour
Concrete Pump
hour
4884.00
20509.60
30324.91
63682.32
700505.52
12.8
12.8 F
Case II
Rate As Per
DSR 09-10
Machinery
f)
Rate As Per
DSR 09-10.
5837.55
say
5838.00
b)
c)
Material
Cement
tonne
41.28
5300.00
218784.00
Coarse sand
cum
54.00
500.00
27000.00
40 mm Aggregate
cum
43.20
487.00
21038.40
20 mm Aggregate
cum
43.20
500.00
21600.00
10 mm Aggregate
cum
21.60
499.00
10778.40
Mate
day
0.84
232.00
194.88
Mason
day
3.00
232.00
696.00
Mazdoor
day
18.00
217.00
3906.00
hour
6.00
2000.00
12000.00
P&M-002
hour
6.00
550.00
3300.00
P&M-080
hour
6.00
700.00
4200.00
P&M-017
hour
15.00
433.00
6495.00
P&M-049
tonne.km
300L
36.00
216000.00
P&M-050
Lead= km
6.00
200.00
1200.00
P&M-007
Labour
Rate As Per
DSR 09-10
Machinery
Rate As Per
DSR 09-10.
hour
4560.00
54719.27
30095.60
63200.75
695208.30
5793.40
say
5793.00