Sie sind auf Seite 1von 4

Testing/Commissioning Procedure

Date: July 22, 2011

GUT/COMM/001

Rev.:

Cert no: 422970

TESTING / COMMISSIONING PROCEDURE


ELECTRICAL
GUT/COMM/001

Protective Relay Equipment

Organization Unit:
Name:
Date:

Prepared by:
PT GUT
Handriyanto / Ari Octa
July 22, 2011

Checked by:
PT IMK

Approved by:
PT IMK

July 22, 2011

July 22, 2011

Signature:

Revision
00

Date
22 July 2011

Note
First Issue

1 of 4
This document is the property of PT GUT. It must not be stored, reproduced or disclosed to others without written authorization from the PT GUT.

Testing/Commissioning Procedure
GUT/COMM/001

Date: July 22, 2011


Rev.:

Cert no: 422970

Table of Contents
1. Purpose & Safety Issues.

2. Reference Documents.

3. Test Equipments.

4. Test Records

5. Inspection and testing


5.1 Visual Check

5.2 Trip Test


6. Applicable Test Sheet.

2 of 4
This document is the property of PT GUT. It must not be stored, reproduced or disclosed to others without written authorization from the PT GUT.

Testing/Commissioning Procedure

Date: July 22, 2011

GUT/COMM/001

Rev.:

Cert no: 422970

1. Purpose.
This Procedure is used to guide anyone who want to check the Transformer Protection Equipment.
Safety Issues.
Isolate this feeder from other source (Off-line test will be more safe).
Put LOTO signs (on both sides if there is inter-trip signals) by an authorize person.
Before starting to test any relay on equipment in service, the person testing should become familiar with the relays and the
circuits involved. Where test blocks are used, the person testing must make sure that in removing or inserting plugs that a
current transformer circuit will not be opened, resulting in a voltage being built up which may be dangerous to personnel,
property, or equipment, or cause an important circuit to trip out. In old installations where test blocks are not available,
current transformer circuits must be short circuited by jumpers having reliable clamping devices which will not come loose,
before the relay current circuit is opened.
2. Reference Documents.
Title
6.6 kV Distribution Cubicle, Shandong Sida Electric Co, LTD
0.4 kV Distribution Cubicle, Shandong Sida Electric Co, LTD
Omicron 256-6 Secondary Current and Voltage Injectors

3. Test Equipments.
Type/Manufacture
Multimeter / Kyoritsu
Clamp Meter / Kyoritsu
Panel Operation Accessories
Omicron CMC 256-6

Description
AVO Meter
AC/DC Digital Current and Voltage Clamp Meter
Accessories
Secondary Current and Voltage Injectors

4. Test Records
A complete record should be kept of all test data and observations made during tests and inspections, including identifying
numbers of test equipment used.

5. Inspection and Testing


5.1 Visual Inspection
This document is the property of PT GUT. It must not be stored, reproduced or disclosed to others without written authorization from the PT GUT.

3 of 4

Testing/Commissioning Procedure

Date: July 22, 2011

GUT/COMM/001

Rev.:

Cert no: 422970

A visual inspection should be made of all relays on a terminal including the tripping auxiliaries and accessories. Any
drawout type relay should be withdrawn from its case for a close-up examination. All other, including auxiliaries, should at
least have covers removed. Included in this visual inspection should be a check for loose connections, broken studs,
burned insulation, and dirty contacts. Each relay should be checked to be in agreement with its setting sheet. On some
distance relays it may have been necessary to set the taps on something other than specified values in order to get proper
calibration. Because of this, it may also be necessary to check the taps against the last calibration test report.
5.2 Trip Test
A test trip should be made of all relay systems. All relay elements which initiate some protective function should be
checked. After proving that tripping relays will successfully trip the circuit breaker and that all reclosing schemes work,
continuity checks should be used, where applicable, to complete the checkout of the circuit breaker trip circuits.

Protection Test Connection


6. Applicable Test Sheet.
Item No.
1

Doc. No.
GUT/COMM/001

Title
Protective Relay Test Form

4 of 4
This document is the property of PT GUT. It must not be stored, reproduced or disclosed to others without written authorization from the PT GUT.