Beruflich Dokumente
Kultur Dokumente
JOB NO.
DOC. NO.
REV.
2632
2632-PL-DS-001
PREPD BY
CHKD BY
APPD BY
SHEET: 1
Sukma M. Aji
I Wayan Eka Putra
Adi Setjadibrata
OF 3
SUK
WYN
ADS
PIPELINE ENGINEERING
REV
DATE
PAGES
20/10/05
ALL
DESCRIPTION
PREPD
CHKD
APPD
SUK
WYN
ADS
SUK
WYN
ADS
29/11/05
ALL
09/12/05
ALL
COMPANY
Table of Content
Cover ................................................................................................................................................. 1
Table of Content ............................................................................................................................... 2
Technical Data Sheet ....................................................................................................................... 3
PT TRIPATRA Engineering
Page 2 of 3
TRIPATRA ENGINEERING
Line Pipe
Facility Name:
Prepared by :
Sukma M. Aji
SUK
Location:
Checked by :
WYN
ADS
Item Name:
Line Pipe
Approved by :
Adi Setjadibrata
Doc. No.:
2632-PL-DS-001
Project No.:
2632
Line PIpe
1
0.562
0.500
0.500
9528
4008
52788
1.00
2.00
1.00
General Design:
a. Thickness (in):
0.157
200
79.9
b. Application Methode
c. Coal Tar Enamel
Spray
(Note 2)
d. Inner Wrap
Inner Wrap Quantity
(Note 3)
1 layer
(Note 4)
e. Outerwrap
Outerwrap Quantity
1 layer
Outerwrap Material
11
12
13
Cutbacks
a. Cutbacks (in):
DNV RP-E305
High Density Concrete (Note 5)
190
(Note 6)
Notes: 1. Line pipe material shall comply to COMPANY specification GS-251 General Specification Submarine Pipeline Material
2. Coal tar enamel coating system shall be in accordance with COMPANY specification GS-902 General Specification Protective Coatings - Subsea Pipelines
3. The innerwrap shall be in accordance with COMPANY specification GS-902 General Specification Protective Coatings - Subsea Pipelines
4. For coating thickness < 0.157" (4 mm) one innerwrap is suffcient, and for coating thickness 0.157 in, two innerwraps are advisable
5. Concrete weight coating shall comply to COMPANY specification GS-252 General Specification Insulation and Weight Coating
6. The cutbacks shall be in accordance with COMPANY specification GS-250 General Specification Subsea Pipeline Design Practices
Rev
Date
20/10/2005
B
0
PT TRIPATRA Engineering
Prep.
Check.
Appd.
Description
SUK
WYN
ADS
29/11/2005
SUK
WYN
ADS
9/12/2005
Client