Beruflich Dokumente
Kultur Dokumente
Current Transformer
User Instructions
1 Put this manual in a safe and convenient place, in order to facilitate operation and
maintenance personnel when needed for reference. For the other details, please refer
to the information except this manual or contact our company.
2 Operator requirements: Familiar with oil-immersed hair-pin type current transformer
and can operate skillfully.
3 Read this manual on the product's installation, operation and maintenance of the
equipment carefully, understand all instructions and safety precautions on the product
before using, and then operate the products according to the relevant requirements
properly.
4 During operation, forbid the followings occurring:
Beyond the requirements in this manual
Ground terminal is not earthed
Secondary winding is open-circuit
Play open oil drain valve without checking the location of bellow oil indicator, result in
the oil indicator of bellow does not match the ambient temperature.
All above could lead to product damage, we wont be responsible for the consequences
due to the above behaviors.
5 If any questions about this manual, please contact us.
6 If some failures come up, please contact us in time, and also describe the followings:
a) Nameplate (Type, Sr.No., Manufacture Date)
b) Describe the different phenomenon before and after failure(as detailed as possible)
Content
1
GY(W1,W2,W3)
Pollution Level
Altiplano Type
kV Rated Voltage
Sr. No.
With Protection Class
Current Transformer
1.2 Purpose
It is current transformer used for current, energy measurement and relay protection of
110~220kV, 50Hz Electric Power System.
1.3 Environment Conditions
1Equipment Classification
Outdoor
2Ambient Temperature
Max.
Min.
40
-40
3Altitude
1000m
4Air Conditions
The corrosive and explosive medium impacting to the insulation pollution level
doesnt exist in the air.
5Relative Humidity
95%
Earthed Directly
8Seismic Performance
Seism Intensity:
8 Degree (Horizontal Acceleration:0.3g,Vertical Acceleration:0.15g)
Safety Factor
1.67
Note: if beyond the scope, please negotiate with manufacture. As per requirement
by customers, design a new one.
2
Structure Characteristics
2.1 Description
shield or end shield) connects ground. The primary winding is divided by four outline
terminals in two sections. every outlet terminals of primary winding are brought out the
porcelain bushing, for the structure with four outline terminals, the current ratio can be
adjusted by changing the connection method of the external connection parts on the
porcelain bushing (refer to Fig.1).the secondary winding is fixed on the bracket of oil tank
after combination. The transformer oil should be dewatered and degassed.
The tank is made of aluminium sheet jointed with four lift lugs for product lifting and
suspending.
This transformer is of a fully enclosed structure, with the stainless steel laminated bellows
on the top, which is to separate the transformer interior from air, prevent the transformer oil
from moisture and prolong the service life of the transformer oil and the transformer. The
oil level indicator is provided on the bellow to monitor whether filling the oil in the product
or not. This product shall be sealed in a sound way. Never sample the oil randomly; could
use oil drain valve on the bottom of the product to sampling, remember to refill the oil in
time after oil sampling, as specified in the operational instructions of bellow.
2.2
External Insulation
The external insulation is porcelain materials, for the surface maintenance ways please
refer to Inspection and Maintenance.
2.3
The primary connection terminal of which size and shape are designed as per contract and
specified requirements is on the top of current transformer. The following drawings show
you the ratio changed by adjusting the primary terminals.
Parallel Connection
Series Connection
2
Outlet Terminals
The secondary connection terminals are located in the moisture proof secondary terminal
box.
The secondary connection pad is casted by epoxy resin with a high sealed performance,
the secondary connection terminal is M8 copper bolts connected with leads conveniently.
Primary winding end shield outlet: brought out from the terminal box which on the oil tank.
Safety Caution: The secondary winding of current transformer must be
short-circuited and end shield terminal must be earthed when unused.
2.5 Earth Terminal
There is not less than one earth terminal on the oil tank of current transformer.
3
Technical Parameters
LB7-110
LB9-132
LB9-220
110
132
220
126
145
252
230
275
460
550
650
1050
WindingkV
Lightning Impulse Withstand Voltage on Primary
WindingkV
Full Wave Withstand VoltagekV
2Rated Frequency and Nos. of Phase
3Rated Primary Current
250~21250 A
1A or 5A
5~50VA
6Accuracy Class
7Dielectric Loss
8Partial Discharge
5pC
W1
20
W2
25
W3
31
Note: The detailed parameters as per nameplate and order technical agreement. If
necessary, the external insulation level can be adjusted according to the higher
altitude.
3
1Transportation Method
The 110kV current transformer should be transported on the vertical after fixed packaged,
and the 132kV 220kV current transformer should be transported on the horizontal after
fixed packaged. The transportation method (such as: railway, sea/river transportation, road,
air transportation and so on) depends on the distance and area. Use supporting structure
and gasket during transportation to protect from damage.
2Load and Unload
Put lifting ropes on the lifting lugs marks on the package before lifting the packages.
During unloading, keep smooth and slow to avoid collisions between packages, at the
same time. Put the package on a flat ground.
3Inspection for Transportation State
Please inspect the packages and contents in the package after arriving at the destination.
Possible damages as follows:
Damages due to shaking(such as porcelain, glass break-up)
Oil leakage(due to porcelain damage)
Distortion of metal parts (such as connection terminals, connection poles)
Shock indicator indicates a red color
4.2 Storage
Inspect the appearance as per packing list after receiving the packages, if necessary to
open the package to check inside, after inspection, please keep the package same as
original in order to store safely and completely.
1Storage Locations
Ground must be strong enough to withstand the weight of the packages without seeper.
The packages are suitable for stored outdoor, for the wooden cases, it should avoid
prolonged sun and rain.
2Storage Methods
During storage, keep the product from the ground at least 30cm for ventilation, and also
keep the entire packages from rainwater soaking.
5
Installation
5.1 Dismantlement
Remove off the Tic-Tac-frame from the top of the package, it must pay more attention to
the porcelain and other components not to damage each other .
4
Figure 1
The second step: dismantle the installation support side plate, installation bolt and cut the
steel strip. See the below Figure 2
The third step: start lifting the product as below Figure 3.
Figure 2
Figure 3
The four step: lifting the product to right position. See below Figure 4.
The Five step: dismantle the lifting equipment. See below Figure 5.
Figure 4
Figure 5
Notice
1The place of upper part lifting equipping as below Figure 6.
2The place of lower part lifting equipping as below Figure 7.
Figure 6
Figure 7
5.4 Earthed
Transformer ground terminals and system low potential must connect with each other
reliably. The mechanical strength must be high enough to withstand the system
short-circuit current.
Caution: unsafe or improper earthed would be dangerous to personal safety.
5.5 Connection on Primary Terminal
1Before connecting with the high end, clean the entire contact surface to keep good
electrical contact performance and also coat with protective oil. In order to keep
continuous effective contact pressure, provide spring washers for all the bolt connections.
The primary terminal of current transformer cant withstand over mechanical force from
bus bar, the permissible horizontal pull force is not more than 3000N.
2Take some special protective measures to avoid aluminum and copper parts contacting
with each other directly. For such connections, separate the aluminum with copper parts
with corrosion-resistant coating or copper-aluminum composite panels at the contact point.
3Primary Exchange Connection(Optional)
Before operation, set the primary winding rating. Clean the connection terminal and coat
the protective oil. Fix the connection terminal to ensure the adequate contact pressure.
7
220kV Current
Transformers)
1Dismantle the fixed bolts on the bellow, remove the cover of bellow, and take out the
foam from bellow.
2Back the cover to the top of bellow and fix with above mentioned bolts dismantled.
6
Acceptance Test
6.1 Appearance Inspection
Meg-ohmmeter
Section
Between
Secondary
between
primary
winding to earth
End shield
to earth
windings
1000M
3
500M
Section
Between
Secondary
between
windings
and
primary
secondary winding to
windings
earth
End shield
to earth
report data
4
After power frequency withstand voltage test, reduce the voltage to 1.2Um/ 3 kV,and
duration is 30s, the partial discharge is not less than 5pC.
5
Applied to
Applied Voltage
10kV
Um/ 3 kV
Capacitance
tan
0.5%
3kV
Deviation 30%
2%
The sections between secondary windings should withstand over voltage 4.5kV(peak). For
the test method, please refer to ex-work test report.
8
Error Determination
The product is full sealed structure, so its important to keep the product sealed, if sample,
so operate as per<Oil Drain Valve Instruction>.
After oil drain, fill the equivalent volume as per <Bellow Installation and Operation
Instruction> and the following Transformer oil characters:
Electric Power System Rated
110
132
220
0.0025
0.0025
0.0015
Electric Strength, kV
55
55
60
Moisture Content
15
15
10
Air Content
1.0
1.0
1.0
Voltage, kV
tan(1kV)
Others
hydrocarbon:0, H2:0
Sr. No.
Test Items
Parameters on Nameplate
Requirements
Whether meeting the
operation Conditions or not
Yes
Tight Strength
Tight Enough
Tight Strength
Tight Enough
NO
Oil Level
Corresponding Ambient
Temperature
Crack or not on Porcelain
6
Porcelain
No
Pollution or not on
No
Porcelain
No
No
Reliable Earthed
Secondary Winding
Terminal
None Open-circuit
Test Items
Requirements
Operation Performance
Meter Indication
Noise or Vibration
Smell
Oil Level
Noise
Test Items
Operation
Performance
Noise or Vibration
Smell
Oil Level
Indication
Appearance
Requirements
Meter Indication
Abnormal Noise,
Discharge Noise
Without Abnormal
Smell
None
None
Oil Level
Rust
None
thermal
phenomena on terminal
Oil Leakage
None
Crack or not on
None
Porcelain
10
Pollution or not on
None
Porcelain
Requirements
No.
1
Parameters on Nameplate
Connection, fixed, sealed with
bolts
Yes
Tight Strength
Tight Enough
Tight Strength
Tight Enough
NO
Oil Level
Porcelain
Corresponding Ambient
Temperature
No
No
No
No
Between secondary
windings and to
earth500M
End Shield Terminal to
Earth
500M
Partial Discharge
Dielectric Loss
10
11
Meet the
Nation Standard
If any problems occur during Inspection or operation, it should make the reasons clear and
also make some measures, the corresponding measures as follows:
(Phenomena)
Abnormal Current
Indication
Abnormal Noise,
smell or vibration
Test Items
(Reasons)
CT Ratio
Measureme
nt
Inspection
Load
Measure the
Insulation
Resistance
Relay Protection
Actions
Oil Leakage
Rust and
Corrosion
Crack on
Porcelain
Insulation
Resistance Fell
down
Configure the
Oil Leakage
Volume
Observe
Environment
Inspection
Inner Failure
Partial Discharge
or Breakdown
Contact Us
False Connection
Secondary is
open-circuit
Correct the
Connection
Line Connection
loose even break
open
Repair the
Failure Point
Over Load
Use the
Correct Load
Abnormal
Expand of
Bellow
Stop operation
and
Contact Us
aging and
corrosion on
sealed parts
Contact Us
Paint Coat
break off
corrosion gas
Due to Outside
Force(Seism, Fly Stone)
Pollution or Moisture on
Circuit
12
Resolution
Restart to paint
Contact Us
Wipe off the
pollution and Dry, if
doesnt work,
please contact us
9 Order Notice
When order, please specify the Product Type, Rated Current Ratio, Accuracy Class, Rated
Output and so on.
10 Ex-work Documents
1Packing List
2Certification of Qualification (Including Ex-work Test Report)
3Installation and Operation Instruction
4Bellow User Manual
5Oil Drain Valve User Manual