110220kV Oil-Immersed Hair-pin Type

Current Transformer

Product Installation and Operation


Instruction

z Please read the instruction carefully before operation


z Please keep the instruction complete and safe

CHINT ELECTRIC CO.LTD

User Instructions
1 Put this manual in a safe and convenient place, in order to facilitate operation and
maintenance personnel when needed for reference. For the other details, please refer
to the information except this manual or contact our company.
2 Operator requirements: Familiar with oil-immersed hair-pin type current transformer
and can operate skillfully.
3 Read this manual on the product's installation, operation and maintenance of the
equipment carefully, understand all instructions and safety precautions on the product
before using, and then operate the products according to the relevant requirements
properly.
4 During operation, forbid the followings occurring:
Beyond the requirements in this manual
Ground terminal is not earthed
Secondary winding is open-circuit
Play open oil drain valve without checking the location of bellow oil indicator, result in
the oil indicator of bellow does not match the ambient temperature.
All above could lead to product damage, we wont be responsible for the consequences
due to the above behaviors.
5 If any questions about this manual, please contact us.
6 If some failures come up, please contact us in time, and also describe the followings:
a) Nameplate (Type, Sr.No., Manufacture Date)
b) Describe the different phenomenon before and after failure(as detailed as possible)

Notices for Safety


1 In order of the operator safety, he/she must has the below abilities, and also familiar
with the product and operate skillfully.
2 Read this manual carefully, understand all instructions and safety precautions on the
product before using.
3 Record the data about installation, testing and maintenance.
4 During operation, forbid the followings occurring:
Beyond the requirements in this manual
Ground terminal is not earthed
Secondary winding is open-circuit
Play open oil drain valve without checking the location of bellow oil indicator, result in
the oil indicator of bellow does not match the ambient temperature.

Content
1

Scope and Purpose...........................................................................................................................1


1.1
Type Signification ...................................................................................................................1
1.2
Purpose ..................................................................................................................................1
1.3
Environment Conditions .........................................................................................................1
2 Structure Characteristics ...................................................................................................................1
2.1
Profile .....................................................................................................................................1
2.2
External Insulation ..................................................................................................................2
2.3
Primary Connection Terminal..................................................................................................2
2.4
Secondary Connection Terminal.............................................................................................3
2.5
Earth Terminal ........................................................................................................................3
3 Technical Parameters........................................................................................................................3
4 Transportation and Storage ...............................................................................................................4
4.1
Transportation.........................................................................................................................4
4.2
Storage ...................................................................................................................................4
5 Installation .........................................................................................................................................4
5.1
Dismantlement........................................................................................................................4
5.2
Lift, Suspend and Installation for Horizontal Packing..............................................................5
5.3
Lift, Suspend and Installation for Vertical Packing ..................................................................7
5.4
Earthing ..................................................................................................................................7
5.5
Connection on Primary Terminal.............................................................................................7
5.6
Secondary Connection Terminal.............................................................................................8
5.7
Shipping Protection for Metal Bellow(used for 220kV Current Transformers).........................8
6 Acceptance Test ................................................................................................................................8
6.1
Appearance Inspection...........................................................................................................8
6.2
Acceptance Test .....................................................................................................................8
7 Inspection and Maintenance ......................................................................................................................... 9
7.1 Installation Inspection..................................................................................................................................... 9
7.2
Inspection after Commissioning............................................................................................10
7.3
Daily Inspection ....................................................................................................................10
7.4
Period Inspection..................................................................................................................11
8 Failure and Eliminating....................................................................................................................12
9 Order Notice....................................................................................................................................13
10 Ex-work Documents ........................................................................................................................13

Scope and Purpose


1.1 Type Signification
L B
G

GY(W1,W2,W3)
Pollution Level
Altiplano Type
kV Rated Voltage
Sr. No.
With Protection Class
Current Transformer

1.2 Purpose
It is current transformer used for current, energy measurement and relay protection of
110~220kV, 50Hz Electric Power System.
1.3 Environment Conditions
1Equipment Classification

Outdoor

2Ambient Temperature
Max.
Min.

40
-40

3Altitude

1000m

4Air Conditions
The corrosive and explosive medium impacting to the insulation pollution level
doesnt exist in the air.
5Relative Humidity

95%

6Max. Wind Speed 35m/s


7Earth Method

Earthed Directly

8Seismic Performance
Seism Intensity:
8 Degree (Horizontal Acceleration:0.3g,Vertical Acceleration:0.15g)
Safety Factor

1.67

Note: if beyond the scope, please negotiate with manufacture. As per requirement
by customers, design a new one.
2

Structure Characteristics
2.1 Description

This transformer is an oil-immersed product consisting of oil tank, transformer body,


porcelain bushing and bellow. The transformer body is composed of U type primary
windings and secondary windings; the main insulation is capacitor oil-paper insulation,
wrapped on the primary winding by high-voltage cable paper, it divided by many capacitor
shields, and the inner shield connects high potential and the external shield(or called earth
1

shield or end shield) connects ground. The primary winding is divided by four outline
terminals in two sections. every outlet terminals of primary winding are brought out the
porcelain bushing, for the structure with four outline terminals, the current ratio can be
adjusted by changing the connection method of the external connection parts on the
porcelain bushing (refer to Fig.1).the secondary winding is fixed on the bracket of oil tank
after combination. The transformer oil should be dewatered and degassed.
The tank is made of aluminium sheet jointed with four lift lugs for product lifting and
suspending.
This transformer is of a fully enclosed structure, with the stainless steel laminated bellows
on the top, which is to separate the transformer interior from air, prevent the transformer oil
from moisture and prolong the service life of the transformer oil and the transformer. The
oil level indicator is provided on the bellow to monitor whether filling the oil in the product
or not. This product shall be sealed in a sound way. Never sample the oil randomly; could
use oil drain valve on the bottom of the product to sampling, remember to refill the oil in
time after oil sampling, as specified in the operational instructions of bellow.
2.2

External Insulation

The external insulation is porcelain materials, for the surface maintenance ways please
refer to Inspection and Maintenance.
2.3

Primary Connection Terminal

The primary connection terminal of which size and shape are designed as per contract and
specified requirements is on the top of current transformer. The following drawings show
you the ratio changed by adjusting the primary terminals.

Parallel Connection

Series Connection
2

Figure 1: Connection Method for external connection sheet of Tank


2.4 Secondary Connection and End Shield

Outlet Terminals

The secondary connection terminals are located in the moisture proof secondary terminal
box.
The secondary connection pad is casted by epoxy resin with a high sealed performance,
the secondary connection terminal is M8 copper bolts connected with leads conveniently.
Primary winding end shield outlet: brought out from the terminal box which on the oil tank.
Safety Caution: The secondary winding of current transformer must be
short-circuited and end shield terminal must be earthed when unused.
2.5 Earth Terminal
There is not less than one earth terminal on the oil tank of current transformer.
3

Technical Parameters

1Equipment Rated Insulation Level


Type

LB7-110

LB9-132

LB9-220

Rated System VoltagekV

110

132

220

Equipment Highest VoltagekV

126

145

252

Power Frequency Withstand Voltage on Primary

230

275

460

550

650

1050

WindingkV
Lightning Impulse Withstand Voltage on Primary
WindingkV
Full Wave Withstand VoltagekV
2Rated Frequency and Nos. of Phase
3Rated Primary Current

250~21250 A

4Rated Secondary Current


5Rated Output

1A or 5A

5~50VA

6Accuracy Class
7Dielectric Loss

50Hz Single Phase

any combination of 0.20.2S0.50.5S5P10P


0.005 (Test Methods as per 6.2 of Clause 5)

8Partial Discharge

5pC

(Test Methods as per 6.2 of Clause 5)

9 External Insulation Creepage Distancemm/kV

W1

not less than

20

W2

not less than

25

W3

not less than

31

Note: The detailed parameters as per nameplate and order technical agreement. If
necessary, the external insulation level can be adjusted according to the higher
altitude.
3

Transportation and Storage


4.1 Transportation

1Transportation Method
The 110kV current transformer should be transported on the vertical after fixed packaged,
and the 132kV 220kV current transformer should be transported on the horizontal after
fixed packaged. The transportation method (such as: railway, sea/river transportation, road,
air transportation and so on) depends on the distance and area. Use supporting structure
and gasket during transportation to protect from damage.
2Load and Unload
Put lifting ropes on the lifting lugs marks on the package before lifting the packages.
During unloading, keep smooth and slow to avoid collisions between packages, at the
same time. Put the package on a flat ground.
3Inspection for Transportation State
Please inspect the packages and contents in the package after arriving at the destination.
Possible damages as follows:
Damages due to shaking(such as porcelain, glass break-up)
Oil leakage(due to porcelain damage)
Distortion of metal parts (such as connection terminals, connection poles)
Shock indicator indicates a red color
4.2 Storage
Inspect the appearance as per packing list after receiving the packages, if necessary to
open the package to check inside, after inspection, please keep the package same as
original in order to store safely and completely.
1Storage Locations
Ground must be strong enough to withstand the weight of the packages without seeper.
The packages are suitable for stored outdoor, for the wooden cases, it should avoid
prolonged sun and rain.
2Storage Methods
During storage, keep the product from the ground at least 30cm for ventilation, and also
keep the entire packages from rainwater soaking.
5

Installation
5.1 Dismantlement

Remove off the Tic-Tac-frame from the top of the package, it must pay more attention to
the porcelain and other components not to damage each other .
4

5.2 Lift, Suspend and Installation for Horizontal Packing


Details as follows:
Fix the lifting rope to the right position as below, and then suspend the product package,
put the product on a flat ground to dismantle the cover plate and wood. See the below
Figure 1

Figure 1

The second step: dismantle the installation support side plate, installation bolt and cut the
steel strip. See the below Figure 2
The third step: start lifting the product as below Figure 3.

Figure 2

Figure 3

The four step: lifting the product to right position. See below Figure 4.
The Five step: dismantle the lifting equipment. See below Figure 5.

Figure 4

Figure 5

Notice
1The place of upper part lifting equipping as below Figure 6.
2The place of lower part lifting equipping as below Figure 7.

Figure 6

Figure 7

5.3 Lift, Suspend and Installation for Vertical Packing


When lifting the instrument transformer with the 4-hole on the base, and assure that during
lifting the metal parts dont touch the porcelain, in any conditions, the top of products cant
stand any pressure, and after that suspend the product from the supporting structure to put
it on the ground.(see the below Figure)

5.4 Earthed
Transformer ground terminals and system low potential must connect with each other
reliably. The mechanical strength must be high enough to withstand the system
short-circuit current.
Caution: unsafe or improper earthed would be dangerous to personal safety.
5.5 Connection on Primary Terminal
1Before connecting with the high end, clean the entire contact surface to keep good
electrical contact performance and also coat with protective oil. In order to keep
continuous effective contact pressure, provide spring washers for all the bolt connections.
The primary terminal of current transformer cant withstand over mechanical force from
bus bar, the permissible horizontal pull force is not more than 3000N.
2Take some special protective measures to avoid aluminum and copper parts contacting
with each other directly. For such connections, separate the aluminum with copper parts
with corrosion-resistant coating or copper-aluminum composite panels at the contact point.
3Primary Exchange Connection(Optional)
Before operation, set the primary winding rating. Clean the connection terminal and coat
the protective oil. Fix the connection terminal to ensure the adequate contact pressure.
7

5.6 Secondary Connection Terminal


Before operation with secondary connection terminal, ensure the system de-energized.
Connect the secondary terminals as per terminal markings.
5.7 Shipping Protection for Metal Bellow(used for 132kV

220kV Current

Transformers)
1Dismantle the fixed bolts on the bellow, remove the cover of bellow, and take out the
foam from bellow.
2Back the cover to the top of bellow and fix with above mentioned bolts dismantled.
6

Acceptance Test
6.1 Appearance Inspection

A. Data on the nameplate doesnt match with requirements


B. Porcelain parts are damaged
C. Other defects impacted on the operation
D. Oil leakage
E. Oil level indicator is abnormal
If above problems occur, the product cant put into operation, please contact us
immediately.
6.2 Acceptance Test
1

Terminal Markings Inspection

Measure Insulation Resistance with 2500V

Meg-ohmmeter

Primary winding to secondary

Section

Between

Secondary

winding and to earth

between

windings and secondary

primary

winding to earth

End shield
to earth

windings
1000M
3

500M

Short Time Power Frequency Withstand Voltage Test

Primary winding to secondary

Section

Between

Secondary

winding and to earth

between

windings

and

primary

secondary winding to

windings

earth

As per 80% of ex-work test

End shield
to earth

As per ex-work test report data

report data
4

Partial Discharge Measurement

After power frequency withstand voltage test, reduce the voltage to 1.2Um/ 3 kV,and
duration is 30s, the partial discharge is not less than 5pC.
5

Dielectric Loss Factor and Capacitance Measurement


8

Applied to

Dielectric Loss Factor

Applied Voltage

High Voltage Terminal

10kV

to End Shield Terminal

Um/ 3 kV

End Shield Terminal to


Earth

Capacitance

tan
0.5%

3kV

Deviation 30%

2%

Volt-Ampere Characteristic Measurement

Inter-Turns Over voltage Test

The sections between secondary windings should withstand over voltage 4.5kV(peak). For
the test method, please refer to ex-work test report.
8

Error Determination

Oil Inspection and Rules for Sampling and Drain

The product is full sealed structure, so its important to keep the product sealed, if sample,
so operate as per<Oil Drain Valve Instruction>.
After oil drain, fill the equivalent volume as per <Bellow Installation and Operation
Instruction> and the following Transformer oil characters:
Electric Power System Rated

110

132

220

0.0025

0.0025

0.0015

Electric Strength, kV

55

55

60

Moisture Content

15

15

10

Air Content

1.0

1.0

1.0

Voltage, kV
tan(1kV)

Methane1ppm, The other

Others

hydrocarbon:0, H2:0

Inspection and Maintenance


7.1 Installation Inspection

Sr. No.

Test Items

Parameters on Nameplate

Connection, fixed, sealed with bolts

Requirements
Whether meeting the
operation Conditions or not

Yes

Tight Strength

Tight Enough

Tight Strength

Tight Enough

Connection on High voltage


3

Terminals and also on Earthed


Terminals

Every Connections on Sealed

Oil Leakage or not

NO

Oil Level Indication

Oil Level

Corresponding Ambient

Temperature
Crack or not on Porcelain
6

Porcelain

No

Pollution or not on

No

Porcelain

Rainwater Entry or not

No

Oil Leakage or not

No

End Shield Terminal

Reliable Earthed

Secondary Terminal Box

Secondary Winding
Terminal

None Open-circuit

7.2 Inspection after Commissioning


Sr.No.

Test Items

Requirements

Operation Performance

Meter Indication

Noise or Vibration

Smell

Without Abnormal Smell

Oil Level Indication

Oil Level

Abnormal Noise, Discharge

Noise

7.3 Daily Inspection


Daily inspection should be done at least once by every month. Of course, when the
following nature disasters has come up, it also should do the daily inspection, such as
typhoon, seism, flood and so on.
No.
1

Test Items
Operation
Performance

Noise or Vibration

Smell

Oil Level
Indication
Appearance

Requirements

Meter Indication

Without Abnormal Phenomena

Abnormal Noise,
Discharge Noise
Without Abnormal
Smell

None

None

Oil Level

Corresponding Ambient Temperature

Rust

None

Terminal Partial Over

Without color changing or over thermal

thermal

phenomena on terminal

Oil Leakage

None

Crack or not on

None

Porcelain
10

Pollution or not on

None

Porcelain

7.4 Period Inspection


The inspection items as follows (Caution: this inspection must be done when de-energized,
forbid operating on energized)
Sr.
Test Items

Requirements

No.
1

Parameters on Nameplate
Connection, fixed, sealed with
bolts

Whether meeting the operation


Conditions or not

Yes

Tight Strength

Tight Enough

Tight Strength

Tight Enough

NO

Connection on High voltage


3

Terminals and also on Earthed


Terminals

Every Connections on Sealed

Oil Leakage or not

Oil Level Indication

Oil Level

Porcelain

Corresponding Ambient
Temperature

Crack or not on Porcelain

No

Pollution or not on Porcelain

No

Rainwater Entry or not

No

Oil Leakage or not

No
Between secondary

windings and to

Secondary Terminal Box


Insulation Resistance

earth500M
End Shield Terminal to
Earth
500M

Partial Discharge

Dielectric Loss

10

Transformer Oil Assay


(Dry Condition)

High Terminal to End Shield


Terminal and to Earth
High Terminal to End Shield
Terminal
Withstand Voltage, Dielectric
Loss, Chromatogram of
Transformer Oil

11

As per Clause 4 in 6.2

As per Clause 5 in 6.2

Meet the
Nation Standard

Failure and Eliminating

If any problems occur during Inspection or operation, it should make the reasons clear and
also make some measures, the corresponding measures as follows:

(Phenomena)
Abnormal Current
Indication

Abnormal Noise,
smell or vibration

Test Items

(Reasons)

CT Ratio
Measureme
nt
Inspection
Load
Measure the
Insulation
Resistance

Relay Protection
Actions

Oil Leakage

Rust and
Corrosion
Crack on
Porcelain

Insulation
Resistance Fell
down

Configure the
Oil Leakage
Volume

Observe
Environment
Inspection

Inner Failure
Partial Discharge
or Breakdown

Contact Us

False Connection
Secondary is
open-circuit

Correct the
Connection

Line Connection
loose even break
open

Repair the
Failure Point

Over Load

Use the
Correct Load

Abnormal
Expand of
Bellow

Stop operation
and
Contact Us

aging and
corrosion on
sealed parts

Contact Us

Paint Coat
break off
corrosion gas
Due to Outside
Force(Seism, Fly Stone)

Pollution or Moisture on
Circuit

12

Resolution

Restart to paint

Contact Us
Wipe off the
pollution and Dry, if
doesnt work,
please contact us

9 Order Notice
When order, please specify the Product Type, Rated Current Ratio, Accuracy Class, Rated
Output and so on.
10 Ex-work Documents
1Packing List
2Certification of Qualification (Including Ex-work Test Report)
3Installation and Operation Instruction
4Bellow User Manual
5Oil Drain Valve User Manual